<?xml version='1.0' encoding='utf-8'?>
<baltimore-city-law heading="Subtitle 02 – Property Tax Credit Regulations">
  <container prefix="Chapter" num="07" heading="High-Performance Newly Constructed Dwellings">
    <section prefix="Regulation" num=".01" heading="Scope.">
      <para num="A.">These regulations address the High-Performance Newly Constructed Dwellings Tax Credit.</para>
      <para num="B.">These regulations describe:<para num="(1)">The application process for obtaining the tax credit,</para>
        <para num="(2)">The criteria for qualifying for the tax credit,</para>
        <para num="(3)">The application process for obtaining a certification of the dwelling as a highperformance newly constructed dwelling,</para>
        <para num="(4)">The criteria for maintaining eligibility for the tax credit,</para>
        <para num="(5)">How the tax credit is applied, whether it is transferable and when the tax credit program will terminate, and</para>
        <para num="(6)">The effect of other tax credits on how the High-Performance Newly Constructed Dwelling Tax Credit is applied to a dwelling.</para>
      </para>
    </section>
    <section prefix="Regulation" num=".02" heading="Definitions.">
      <para num="A.">In &lt;cite data-path="05.01.07"&gt;this chapter&lt;/cite&gt;, the following terms have the meanings indicated.</para>
      <para num="B.">Terms Defined.<para num="(1)">“Closing Documentation” means any form from the settlement of the sale of real estate that contains the address of the property transferred, the parties to the transfer, and the date of the transfer.</para>
        <para num="(2)">“Credit” means the tax credit described in these regulations for highperformance newly constructed dwellings.</para>
        <para num="(3)">“DHCD” means the Baltimore City Department of Housing and Community Development.</para>
        <para num="(4)">“Finance” means the Baltimore City Department of Finance.</para>
        <para num="(5)">“HERS” means the Home Energy Rating System.</para>
        <para num="(6)">“High performance” has the meaning stated in MD &lt;cite data-doc="Md. Code" data-path="gtp|9242"&gt;Tax-Property Article, §9242(a)&lt;/cite&gt;.</para>
        <para num="(7)">“LEED” means the U.S. Green Building Council’s Leadership in Energy and Environmental Design.</para>
        <para num="(8)">“Newly constructed dwelling” has the meaning stated in &lt;cite data-doc="City of Baltimore, Md., Code" data-path="|28"&gt;City Code Article 28&lt;/cite&gt;, §10-18.1(a)(3).</para>
        <para num="(9)">“NGBS” means the National Green Building Standard.</para>
        <para num="(10)">“Owner” has the meaning stated in MD &lt;cite data-doc="Md. Code" data-path="gtp|9-304"&gt;Tax-Property Article, §9-304(d)&lt;/cite&gt;.</para>
        <para num="(11)">“System” means the Department of Finance’s Online Tax Credit Application System.</para>
        <para num="(12)">“Vacant dwelling” has the meaning stated in &lt;cite data-doc="City of Baltimore, Md., Code" data-path="|28"&gt;City Code Article 28&lt;/cite&gt;, §10-18.1(a)(5).</para>
      </para>
    </section>
    <section prefix="Regulation" num=".03" heading="Description of the Credit.">
      <para num="A.">The credit is against the property tax imposed on a high-performance newly constructed dwelling that is owned by a qualifying owner.</para>
      <para num="B.">The credit<para num="(1)">Begins at 50 percent of the tax imposed on the qualifying property in the first full tax year in which the property qualifies and</para>
        <para num="(2)">Decreases by 10 percent in each of the four following years.</para>
      </para>
      <para num="C.">The property no longer qualifies for the credit<para num="(1)">Beginning in the sixth full tax year after the property initially qualifies; or</para>
        <para num="(2)">If continuing eligibility requirements are not met.</para>
      </para>
    </section>
    <section prefix="Regulation" num=".04" heading="Eligibility Criteria.">
      <para num="A.">To be eligible for the credit a property owner shall meet the following criteria:<para num="(1)">Purchase and occupy as the property owner’s principal residence a highperformance newly constructed dwelling;</para>
        <para num="(2)">Receive a high-performance certification from DHCD;</para>
        <para num="(3)">File a state income tax return as a resident of Baltimore City for each taxable year for which the credit is sought;</para>
        <para num="(4)">The property owner may not be receiving the credit previously authorized under &lt;cite data-doc="City of Baltimore, Md., Code" data-path="|28|§10-5"&gt;City Code Article 28, § 10-5&lt;/cite&gt;; and</para>
        <para num="(5)">The property owner shall timely submit a completed application in accordance with the specifications in § .05.</para>
      </para>
      <para num="B.">To be eligible for the credit a property shall:<para num="(1)">Be one of the following:<para num="(a)">A newly constructed dwelling, or</para>
          <para num="(b)">A vacant dwelling;</para>
        </para>
        <para num="(2)">Be located within the City of Baltimore;</para>
        <para num="(3)">Be purchased by the owner-occupant following completion of the dwelling, or be constructed on land that was purchased by the owner-occupant prior to construction of the dwelling;</para>
        <para num="(4)">Receive an occupancy permit following the construction or conversion; and</para>
        <para num="(5)">Meet the standards set forth in the Maryland &lt;cite data-doc="Md. Code" data-path="gtp|9-242"&gt;Tax-Property Article, § 9-242(a)&lt;/cite&gt;.</para>
      </para>
      <para num="C.">A property that meets the eligibility criteria and has an approved application becomes eligible for the credit with the first full-year tax bill issued after the latest of<para num="(1)">The high-performance certification date,</para>
        <para num="(2)">The date on which the use and occupancy permit was issued,</para>
        <para num="(3)">The first assessment notice of the newly constructed dwelling, or</para>
        <para num="(4)">The date of settlement.</para>
      </para>
      <para num="D.">The following items must be received by Finance prior to the approval of the property’s application:<para num="(1)">An application for the tax credit that is both:<para num="(a)">Complete, and</para>
          <para num="(b)">Submitted in a timely manner;</para>
        </para>
        <para num="(2)">A final occupancy permit for the completed dwelling; and</para>
        <para num="(3)">A certification of the property as a high-performance newly constructed dwelling by the DHCD.</para>
      </para>
      <para num="E.">A credit may not be issued until the property is certified by DHCD as a highperformance newly constructed dwelling.</para>
      <para num="F.">DHCD shall issue a certification that, to the extent possible, provides a certification date that reflects the date on which the property became a HighPerformance building.</para>
      <para num="G.">In the event DHCD denies certification, DHCD will provide a letter identifying the reason for the denial.</para>
      <para num="H.">Prior to the issuance of a credit, the property owner is liable for all taxes due.</para>
      <para num="I.">Properties remain eligible for the credit for a period of five consecutive tax years.</para>
    </section>
    <section prefix="Regulation" num=".05" heading="Applications.">
      <para num="A.">An applicant who has purchased a newly constructed dwelling shall submit a completed application within 90 days after settlement.</para>
      <para num="B.">An applicant who has constructed a dwelling on land purchased prior to the construction of the dwelling, shall<para num="(1)">Submit a completed application within 90 days of the issuance of a final occupancy permit for the dwelling, and</para>
        <para num="(2)">Include complete documentation of the construction cost of the new dwelling.</para>
      </para>
      <para num="C.">An application shall be submitted electronically via the system.<para num="(1)">This system can be accessed via the internet at the following url:

          &lt;u&gt;https://propertytaxcredits.baltimorecity.gov&lt;/u&gt;
        </para>
        <para num="(2)">An applicant shall create a user account to gain access to the application system.</para>
        <para num="(3)">The user account may be used to apply for this and other tax credits for the property.</para>
      </para>
      <para num="D.">An application or required documentation may not be submitted in paper form.</para>
      <para num="E.">The City of Baltimore shall not be responsible for<para num="(1)">Connectivity issues experienced by the applicant, or</para>
        <para num="(2)">Issues beyond the control of the City of Baltimore’s Department of Finance.</para>
      </para>
      <para num="F.">For tax credit applications DHCD shall certify the property as a high-performance newly constructed dwelling.<para num="(1)">For a timely submitted application, the Department of Finance shall provide the relevant details of the subject property to DHCD for certification of the property.</para>
        <para num="(2)">For a newly-constructed dwelling built on vacant land DHCD shall review the plans to determine whether the dwelling was constructed according to the high-performance elements of the Baltimore City Residential Building Code.</para>
        <para num="(3)">Dwellings constructed prior to 2015 or that were substantially renovated without obtaining a new construction plan number and plan approval from the DHCD permit center shall qualify for the credit by completing one of the following:<para num="(a)">Obtain LEED rating for the property of Silver or higher.</para>
          <para num="(b)">Obtain a certification from NGBS (ICC 700) rating the property Silver or higher.</para>
          <para num="(c)">Obtain a rating from a certified energy rater for the HERS Index of 80 or lower and must achieve an increase in energy efficiency of at least 20 percent.</para>
        </para>
        <para num="(4)">Failure to file certification documentation required under .05(F)(3) with Finance within 30 days of receipt shall result in rejection of the application and the applicant may not reapply.</para>
      </para>
      <para num="G.">All final applications for the High-Performance Newly Constructed Dwellings Tax Credit shall be accompanied by:<para num="(1)">A copy of the final occupancy permit issued for the property after construction or rehabilitation was completed,</para>
        <para num="(2)">A copy of any building permit issued during the construction or rehabilitation of the property,</para>
        <para num="(3)">A copy of the closing documentation issued to the purchaser at the time of settlement on the new dwelling or the land on which it was built, and</para>
        <para num="(4)">Other required documents available at the time of application.</para>
      </para>
      <para num="H.">If an occupancy permit is not issued to the property prior to settlement, the property owner shall<para num="(1)">Submit a letter with the application stating that no occupancy permit was issued prior to settlement, and</para>
        <para num="(2)">Email a copy of the occupancy permit to &lt;u&gt;tax.credits@baltimorecity.gov&lt;/u&gt; when it is received.</para>
      </para>
    </section>
    <section prefix="Regulation" num=".06" heading="Transferability.">
      <text>The High-Performance Newly Constructed Dwellings Tax Credit is not transferrable to subsequent owners of the property.</text>
    </section>
    <section prefix="Regulation" num=".07" heading="Continuing Eligibility.">
      <para num="A.">The property owner shall ensure that, during the credit period the property for which the credit was granted meets the following criteria:<para num="(1)">Is in full compliance with the building, fire, and related codes of Baltimore City;</para>
        <para num="(2)">Maintains its high-performance rating; and</para>
        <para num="(3)">Is the applicant’s principal residence.</para>
      </para>
      <para num="B.">For each taxable year for which the credit is sought, an applicant shall file a state income tax return as a resident of Baltimore City.</para>
      <para num="C.">If a property no longer meets the continuing eligibility requirements, the credit will be removed from the property’s account and may not be reinstated until the issue has been remedied.</para>
      <para num="D.">The eligibility term of the credit is 5 consecutive tax years, beginning with the first full tax year in which the property qualifies for the tax credit.</para>
      <para num="E.">Ineligibility for the credit during one or more of the five years in the eligibility term will not extend the five-year term of the tax credit.</para>
    </section>
    <section prefix="Regulation" num=".08" heading="Effect of Other Tax Credits.">
      <para num="A.">A property receiving a tax credit under &lt;cite data-doc="City of Baltimore, Md., Code" data-path="|28|§10-5"&gt;City Code Article 28, § 10-5&lt;/cite&gt; is not eligible for the High-Performance Newly Constructed Dwellings Tax Credit.</para>
      <para num="B.">The calculation of this credit shall be made prior to the application of any tax credit awarded under the Maryland &lt;cite data-doc="Md. Code" data-path="gtp|9-229"&gt;State Tax-Property Article, § 9-229&lt;/cite&gt;.</para>
      <para num="C.">The calculation of this credit shall be made after<para num="(1)">The application of any credit awarded to the property under Maryland Tax Property Article §§ 9-104 and 9-105; and</para>
        <para num="(2)">Any other real property tax credit other than the credit specified in .08(B).</para>
      </para>
    </section>
    <section prefix="Regulation" num=".09" heading="Termination of Program.">
      <text>An owner whose settlement on the purchase of a high-performance newly constructed dwelling occurs after June 30, 2027 may not apply for this credit.</text>
    </section>
  </container>
  <container prefix="Chapter" num="13" heading="Energy Conservation Devices">
    <section prefix="Regulation" num=".01" heading="Scope.">
      <text>&lt;cite data-doc="COBRA Register Volume 04, Issue 02" data-path="05.01.13"&gt;This chapter&lt;/cite&gt; establishes rules and regulations related to the Energy Conservation Devices Tax Credit, including:</text>
      <para num="A.">Application processes for obtaining the tax credit;</para>
      <para num="B.">Criteria for qualifying for the tax credit;</para>
      <para num="C.">How the tax credit may be applied to the City Real Property Tax on a dwelling;</para>
      <para num="D.">Transferability of the tax credit;</para>
      <para num="E.">Criteria for maintaining eligibility for the tax credit; and</para>
      <para num="F.">The effect of other tax credits on how the Energy Conservation Devices Tax Credit is applied to a dwelling.</para>
      <annotation type="History" />
    </section>
    <section prefix="Regulation" num=".02" heading="Definitions.">
      <para num="A.">In &lt;cite data-doc="COBRA Register Volume 04, Issue 02" data-path="05.01.13"&gt;this chapter&lt;/cite&gt;, the following terms have the meanings indicated.</para>
      <para num="B.">Terms Defined.<para num="(1)">“Application system” means the Department’s online tax credit application system.</para>
        <para num="(2)">“The Department” means the Baltimore City Department of Finance.</para>
        <para num="(3)">“Dwelling” has the meaning stated in &lt;cite data-doc="City of Baltimore, Md., Code" data-path="|28|§10-31|(a)|(2)"&gt;Baltimore City Code Article 28, § 10-31(a)(2)&lt;/cite&gt;.</para>
        <para num="(4)">“Eligible costs” has the meaning stated in &lt;cite data-doc="City of Baltimore, Md., Code" data-path="|28|§10-31|(a)|(3)"&gt;Baltimore City Code Article 28, § 10-31(a)(3)&lt;/cite&gt;.</para>
        <para num="(5)">“Energy conservation device” means the following, as defined in these regulations:<para num="(a)">A solar energy device; or</para>
          <para num="(b)">A geothermal energy device.</para>
        </para>
        <para num="(6)">“Geothermal energy device” has the meaning stated in &lt;cite data-doc="City of Baltimore, Md., Code" data-path="|28|§10-31|(a)|(4)"&gt;City Code Article 28, § 10-31(a)(4)&lt;/cite&gt;.</para>
        <para num="(7)">“Homeowner” has the meaning stated in Maryland &lt;cite data-doc="Md. Code" data-path="gtp|9-105"&gt;Tax-Property Article,  § 9-105 &lt;/cite&gt;(a)(7).</para>
        <para num="(8)">“Solar energy device” has the meaning stated in &lt;cite data-doc="City of Baltimore, Md., Code" data-path="|28"&gt;City Code Article 28&lt;/cite&gt;,  § 10-31(a)(7).</para>
        <para num="(9)">“Tax credit” means the Energy Conservation Devices tax credit described in &lt;cite data-doc="City of Baltimore, Md., Code" data-path="|28|§10-31"&gt;City Code Article 28, § 10-31&lt;/cite&gt;.</para>
      </para>
      <annotation type="History" />
    </section>
    <section prefix="Regulation" num=".03" heading="Description of the Tax Credit.">
      <para num="A.">In General.
In accordance with &lt;cite data-doc="City of Baltimore, Md., Code" data-path="|28|§10-31"&gt;City Code Article 28, § 10-31&lt;/cite&gt;, the Department shall grant the tax credit against the City property tax imposed on a dwelling to which a solar energy device or geothermal energy device is:<para num="(1)">Installed; and</para>
        <para num="(2)">In use.</para>
      </para>
      <para num="B.">Amount.<para num="(1)">The Department shall ensure the amount of the tax credit is the lesser of:<para num="(a)">Fifty percent of an eligible cost up to a maximum of $5,000; or</para>
          <para num="(b)">Fifty percent of an eligible cost up to a maximum of $1,500, if the energy conservation device is installed exclusively to provide hot water for use in the dwelling.</para>
        </para>
        <para num="(2)">The Department shall ensure the amount of the tax credit applied in a tax year does not exceed the property tax imposed on the dwelling in that tax year.</para>
      </para>
      <annotation type="History" />
    </section>
    <section prefix="Regulation" num=".04" heading="Application of the Tax Credit.">
      <para num="A.">The Department shall ensure the eligibility term of the tax credit is one tax year.</para>
      <para num="B.">The Department may not issue the tax credit until the tax credit application is approved.</para>
      <para num="C.">A homeowner shall be liable for applicable taxes due prior to receiving the tax credit.</para>
      <annotation type="History" />
    </section>
    <section prefix="Regulation" num=".05" heading="Eligibility Criteria.">
      <para num="A.">Homeowner Eligibility.
A homeowner shall be eligible for the tax credit if the homeowner:<para num="(1)">Obtains an energy conservation device through:<para num="(a)">Purchase; or</para>
          <para num="(b)">Lease.</para>
        </para>
        <para num="(2)">Files a Maryland state income tax return as a resident of Baltimore City for the taxable year for which the tax credit is sought; and</para>
        <para num="(3)">Submits a timely and complete application in accordance with &lt;cite data-doc="COBRA Register Volume 04, Issue 02" data-path="05.01.13.07"&gt;Regulation .07 of this chapter&lt;/cite&gt;.</para>
      </para>
      <para num="B.">Dwelling Eligibility.<para num="(1)">To be eligible for the tax credit, a homeowner shall ensure a dwelling is:<para num="(a)">Located within the City of Baltimore; and</para>
          <para num="(b)">The homeowner’s principal residence.</para>
        </para>
        <para num="(2)">The Department may deem a dwelling for which an application has been approved eligible for the tax credit starting with the first full-year tax bill issued after the date of the submission of a complete application.</para>
      </para>
      <annotation type="History" />
    </section>
    <section prefix="Regulation" num=".06" heading="Qualification of Incurred Cost.">
      <para num="A.">A cost associated with installing an energy conservation device is incurred on the date that the cost became due.</para>
      <para num="B.">An applicant shall present documents showing that the cost was associated with installation of the energy conservation device and the date of installation.</para>
      <annotation type="History" />
    </section>
    <section prefix="Regulation" num=".07" heading="Application.">
      <para num="A.">To apply for the tax credit, a homeowner shall:<para num="(1)">Submit a complete application electronically via the application system located on the Department’s website within 12 months of incurring the eligible cost; and</para>
        <para num="(2)">Include copies of the following with their application:<para num="(a)">Documentation showing the date of the acquisition and the date of the installation of the energy conservation device including a:<para num="(i)">Receipt;</para>
            <para num="(ii)">Paid invoice;</para>
            <para num="(iii)">Canceled check; or</para>
            <para num="(iv)">Lease agreement;</para>
          </para>
          <para num="(b)">A notarized affidavit stating that:<para num="(i)">The property is the homeowner’s principal residence;</para>
            <para num="(ii)">The property is expected to be occupied by the homeowner for more than six months of a 12-month period beginning with the date of finality for the tax year for which the credit is sought; and</para>
            <para num="(iii)">The costs submitted by the homeowner are related to the installation of the energy conservation device;</para>
          </para>
          <para num="(c)">A picture of the installed energy conservation device, including device labels.</para>
        </para>
      </para>
      <para num="B.">The homeowner shall be responsible for ensuring a working internet connection for the duration of application submission.</para>
      <annotation type="History" />
    </section>
    <section prefix="Regulation" num=".08" heading="Transferability.">
      <para num="A.">If a property is sold, the Department shall automatically transfer the credit to a subsequent homeowner, if the transfer occurs within the one-year credit eligibility period.</para>
      <para num="B.">The subsequent homeowner shall ensure that the requirements of &lt;cite data-doc="COBRA Register Volume 04, Issue 02" data-path="05.01.13.09"&gt;Regulation .09&lt;/cite&gt; are met for a transferred credit.</para>
      <annotation type="History" />
    </section>
    <section prefix="Regulation" num=".09" heading="Continuing Eligibility.">
      <para num="A.">To remain eligible for the tax credit throughout the one-year period for which the credit is granted, the homeowner shall ensure:<para num="(1)">The property continues to be the homeowner’s principal residence; and</para>
        <para num="(2)">The energy conservation device remains in use.</para>
      </para>
      <para num="B.">If a property does not meet the continuing eligibility requirements, the Department shall remove the tax credit from the property’s account.</para>
      <annotation type="History" />
    </section>
    <section prefix="Regulation" num=".10" heading="Effect of Other Tax Credits.">
      <para num="A.">The Department shall make the calculation of the tax credit prior to the application of another tax credit awarded to the property under the Maryland State Tax-Property Article, §§ &lt;cite data-doc="Md. Code" data-path="gtp|9-221"&gt;9-221&lt;/cite&gt; and &lt;cite data-doc="Md. Code" data-path="gtp|9-229"&gt;9-229&lt;/cite&gt;.</para>
      <para num="B.">The Department shall calculate this tax credit after:<para num="(1)">The application of a tax credit awarded to the property under Maryland Tax-Property Article §§ &lt;cite data-doc="Md. Code" data-path="gtp|9-104"&gt;9-104&lt;/cite&gt; and &lt;cite data-doc="Md. Code" data-path="gtp|9-105"&gt;9-105&lt;/cite&gt;; and</para>
        <para num="(2)">A real property tax credit other than the tax credits specified in &lt;cite data-doc="COBRA Register Volume 04, Issue 02" data-path="05.01.13.10|A."&gt;Regulation .10(A)&lt;/cite&gt;.</para>
      </para>
      <annotation type="History" />
    </section>
    <section prefix="Regulation" num=".11" heading="Limitations.">
      <para num="A.">When combined with other tax credits, the Department shall ensure the tax credit does not exceed the amount of City real property tax liability on the dwelling in that tax year.</para>
      <para num="B.">The Department may not award more than one tax credit authorized under Art. 28, §10-31 to a single dwelling.</para>
      <annotation type="History" />
    </section>
  </container>
</baltimore-city-law>
