  <section prefix="Regulation" num=".09" heading="Violations and Fines.">
    <para num="A.">The following fineable offenses are for work being performed in a Public Way:

        &lt;table&gt;
          &lt;thead&gt;
            &lt;tr&gt;
              &lt;th&gt;Violation&lt;/th&gt;
              &lt;th&gt;Occurrence&lt;/th&gt;
            &lt;/tr&gt;
          &lt;/thead&gt;
          &lt;tbody&gt;
            &lt;tr&gt;
              &lt;td&gt;Failure to obtain a Street Cuts permit prior to beginning work or, in an emergency where permit cannot be obtained ahead of work, within 18 hours of an emergency street-cut (Absence of a permit at jobsite)&lt;/td&gt;
              &lt;td&gt;Daily&lt;/td&gt;
            &lt;/tr&gt;
            &lt;tr&gt;
              &lt;td&gt;Unsafe job site, TCP setup, or other unsafe condition&lt;/td&gt;
              &lt;td&gt;Daily&lt;/td&gt;
            &lt;/tr&gt;
            &lt;tr&gt;
              &lt;td&gt;Not reporting intended work forty-eight (48) hours prior and/or steel plate placement as required on permit&lt;/td&gt;
              &lt;td&gt;Daily&lt;/td&gt;
            &lt;/tr&gt;
            &lt;tr&gt;
              &lt;td&gt;Compaction testing not performed&lt;/td&gt;
              &lt;td&gt;Daily&lt;/td&gt;
            &lt;/tr&gt;
            &lt;tr&gt;
              &lt;td&gt;Non-compliant installation of steel plates&lt;/td&gt;
              &lt;td&gt;Daily&lt;/td&gt;
            &lt;/tr&gt;
            &lt;tr&gt;
              &lt;td&gt;Not clearing away construction debris&lt;/td&gt;
              &lt;td&gt;Daily&lt;/td&gt;
            &lt;/tr&gt;
            &lt;tr&gt;
              &lt;td&gt;Not providing for temporary patching or plating until full restoration is completed&lt;/td&gt;
              &lt;td&gt;Daily&lt;/td&gt;
            &lt;/tr&gt;
            &lt;tr&gt;
              &lt;td&gt;Patch not flush with the surrounding pavement&lt;/td&gt;
              &lt;td&gt;Daily&lt;/td&gt;
            &lt;/tr&gt;
            &lt;tr&gt;
              &lt;td&gt;Absence of identification markings (if faded, they must be refreshed daily)&lt;/td&gt;
              &lt;td&gt;Daily&lt;/td&gt;
            &lt;/tr&gt;
            &lt;tr&gt;
              &lt;td&gt;Blocked travel lanes before 9:00 AM or after 3:00 PM on weekdays without prior written DOT authorization&lt;/td&gt;
              &lt;td&gt;Daily&lt;/td&gt;
            &lt;/tr&gt;
            &lt;tr&gt;
              &lt;td&gt;Incorrect traffic control (TCP) setup and/or absence of the approved TCP in site&lt;/td&gt;
              &lt;td&gt;Daily&lt;/td&gt;
            &lt;/tr&gt;
            &lt;tr&gt;
              &lt;td&gt;Use of unapproved materials&lt;/td&gt;
              &lt;td&gt;Daily&lt;/td&gt;
            &lt;/tr&gt;
            &lt;tr&gt;
              &lt;td&gt;Failure to construct to Baltimore City standards&lt;/td&gt;
              &lt;td&gt;Daily&lt;/td&gt;
            &lt;/tr&gt;
            &lt;tr&gt;
              &lt;td&gt;Final striping not completed within 15 calendar days of permanent restoration&lt;/td&gt;
              &lt;td&gt;Daily&lt;/td&gt;
            &lt;/tr&gt;
            &lt;tr&gt;
              &lt;td&gt;Street Cuts not fully restored to be permanent within one hundred twenty (120) days from start of work in the public way&lt;/td&gt;
              &lt;td&gt;
                &lt;p&gt;Daily (beginning day 121 and each  day until permanent restoration is&lt;/p&gt;
                &lt;p&gt;complete)&lt;/p&gt;
              &lt;/td&gt;
            &lt;/tr&gt;
            &lt;tr&gt;
              &lt;td&gt;Steel plates extending beyond thirty (30) days in the public right-of-way without an approved extension&lt;/td&gt;
              &lt;td&gt;Daily (beginning day 31 and each day until steel plating is removed and replaced with temporary patching or until full and permanent restoration is complete)&lt;/td&gt;
            &lt;/tr&gt;
            &lt;tr&gt;
              &lt;td&gt;Permanent patch failure within the one-year warranty period if not corrected with thirty (30) days of notice&lt;/td&gt;
              &lt;td&gt;
                &lt;p&gt;Daily (beginning day 31 and each day&lt;/p&gt;
                &lt;p&gt;until permanent restoration is&lt;/p&gt;
                &lt;p&gt;complete)&lt;/p&gt;
              &lt;/td&gt;
            &lt;/tr&gt;
          &lt;/tbody&gt;
        &lt;/table&gt;
      </para>
    <para num="B.">A schedule of fines as previously approved by the BOE for the violations set forth in &lt;cite data-path="14.03.01.09|A."&gt;Regulation .09.A&lt;/cite&gt; are<para num="(1)">posted on the DOT website at transportation.baltimorecity.gov; and</para>
      <para num="(2)">subject to amendment by the Director with the approval of the Board of Estimates.</para>
    </para>
    <para num="C.">Unless specifically provided, fines may be imposed by DOT without provision of a Pre-Fine Notice.<para num="(1)">The Street-cuts Section is not required to issue a Pre-Fine Notice for any violation observed during inspection operations; and</para>
      <para num="(2)">DOT will not issue a Pre-Fine Notice for failure to complete permanent restoration within 120 days.</para>
    </para>
    <para num="D.">In the case of failure to complete full restoration of the Public Way within 120 days of the start of work;<para num="(1)">the total fine amount imposed will be equal to:<para num="(a)">the number of days past 120 days until the restoration is completed (b) times the daily fine amount per violation.</para>
      </para>
      <para num="(2)">The following time periods are not included in the calculation of the 120-day period within which full restoration must be completed:<para num="(a)">the winter season, which is defined generally as the period from November 15 to March 15, or</para>
        <para num="(b)">when paving plants are closed as determined by the Department.</para>
      </para>
      <para num="(3)">Any permit holder that is not able to complete full restoration within the 120-day period must<para num="(a)">make a written request for an extension to the Street-cuts Section prior to the expiration of the 120-day period, and</para>
        <para num="(b)">demonstrate good cause for the extension.</para>
      </para>
      <para num="(4)">The Street-cuts Section may then grant written extension for a reasonable time to the permit holder.</para>
      <para num="(5)">When no request for an extension of the 120-day period has been granted:<para num="(a)">Street-cuts not completed within the 120-day restoration period are required to apply for a new permit;</para>
        <para num="(b)">the new permit start date is the expiration date of the previous permit;</para>
        <para num="(c)">the new permit expiration date is the expected date that permanent restoration will be complete for the street cut; and</para>
        <para num="(d)">the permit fee owed to the City is for the entire timeframe.</para>
        <para num="(e)">these requirements are in addition to any fines imposed.</para>
      </para>
    </para>
    <para num="E.">Steel plates may not extend beyond 30 days in the public way unless<para num="(1)">an extension has been granted by the Department; and</para>
      <para num="(2)">the extension notification can be found at &lt;u&gt;https://transportation.baltimorecity.gov/quick-forms.&lt;/u&gt;</para>
    </para>
    <para num="F.">Permanent patch failure within the 1-year warranty period will be given a 30-day notice for repairs:<para num="(1)">a new permit is required for the repair;</para>
      <para num="(2)">beyond the 30-day notice period, a fine will be imposed until such time as the patch is repaired and approved; and</para>
      <para num="(3)">an additional 1-year warranty will take effect starting from the day of final approval of the repair.</para>
    </para>
    <para num="G.">The following unsafe conditions existing at a Street-cut may result in a fine:<para num="(1)">utility trench, permanent patch within the warranty phase, or utility cut where paving restoration is left:<para num="(a)">1 inch or more below existing grade, or</para>
        <para num="(b)">2 inches or more above existing grade;</para>
      </para>
      <para num="(2)">Utility trench, permanent patch within the warranty phase, or utility cut on roadways with bicycle facilities where paving restoration is left:<para num="(a)">¼ inch or more below existing grade, or</para>
        <para num="(b)">½ inch or more above existing grade;</para>
      </para>
      <para num="(3)">debris left onsite by a contractor for 24 hours or more;</para>
      <para num="(4)">wooden boards placed over utility cut;</para>
      <para num="(5)">fenced site where the fence has collapsed;</para>
      <para num="(6)">an exposed excavation left unattended;</para>
      <para num="(7)">blocking of a bicycle facility by equipment, debris, vehicles, signs or other obstruction;</para>
      <para num="(8)">blocking a pedestrian walkway, crosswalk, curb ramp or other facility by equipment, debris, vehicles, signs or other obstruction; and</para>
      <para num="(9)">any circumstance where the contractor has left work in a state considered to be a substantial threat to public safety.</para>