<?xml version='1.0' encoding='utf-8'?>
<baltimore-city-law heading="§ 18-9 Qualifications for license.">
  <section prefix="§" num="18-9" heading="Qualifications for license.">
    <para num="(a)" heading="Board to set.">An applicant for a license must furnish evidence satisfactory to the Board that the applicant meets the qualifications set by the Board.</para>
    <para num="(b)" heading="Minimum standards.">These qualifications must:<para num="(1)">be comparable to the prequalification criteria set for contractors in Baltimore City and neighboring jurisdictions; and</para>
      <para num="(2)">include, but not be limited to, at least 2 years’ experience in the installation of building sanitary sewer, building storm water sewer, and water service pipe utilities.</para>
    </para>
    <para num="(c)" heading="Additional considerations.">The Board may consider, but not give conclusive weight to, the fact that an applicant:<para num="(1)">possesses a current on-site utility contractor’s license, or its equivalent, issued by another political subdivision of this State; or</para>
      <para num="(2)">is an officer or employee of a firm or corporation currently prequalified with the City to perform Category B utilities construction work.</para>
    </para>
    <annotation type="History">Ord. 02-475</annotation>
  </section>
</baltimore-city-law>
