# § 11-2 Waste hauler permit required.

Current through 2026-07-17. Source: City of Balt., Md., Ord. 26-129. Published by the Baltimore City Department of Legislative Reference.

## § 11-2 Waste hauler permit required.

Balt., Md., Code art. 25, § 11-2 (2026)

(a) All waste haulers proposing to discharge wastewater into the sewer system must obtain a waste hauler permit before discharging wastewater to the sewer system.

(b) No waste hauler shall discharge wastewater into the sewer system except pursuant to and in accordance with a waste hauler permit.

(c) The discharge of trucked or hauled pollutants is prohibited except at discharge points designated by the POTW.

*History: Ord. 84-129*

*History: Ord. 91-775*
