# § 18-1 Director may require walling.

Current through 2026-07-17. Source: City of Balt., Md., Ord. 26-129. Published by the Baltimore City Department of Legislative Reference.

## § 18-1 Director may require walling.

Balt., Md., Code art. 25, § 18-1 (2026)

The Director of Public Works is hereby authorized, whenever he shall deem it necessary, to notify the owner or owners of property binding upon Jones’ Falls, or any part thereof, to have the same walled up on the line of said Jones’ Falls, with a good and sufficient stone, brick, masonry, or concrete wall, to such height as said Director may direct, and to have the same backed up or filled with earth, so as to secure such property or other property in the vicinity from inundation or damage by water, and when the same shall have been walled up wholly or in part, to rebuild or repair in a good and sufficient manner any such wall; all such work to be done at the entire expense of such owner or owners.

*History: Ord. 1864-070*

*History: Ord. 46-677*

*History: Ord. 76-146*

*History: Ord. 84-129*

*History: Ord. 91-775*
