§ 3-1 Permit required.
Current through 2026-07-17. Source: City of Balt., Md., Ord. 26-129. Published by the Baltimore City Department of Legislative Reference.
Balt., Md., Code art. 25, § 3-1 (2026)
§ 3-1 Permit required.LinkCopy Citation
(a)In general.
(1)
All industrial/commercial users proposing to connect or to discharge, directly or indirectly, into a public sanitary or combined sewer must apply for a wastewater discharge permit before connecting to or discharging into a public sanitary or combined sewer.
(2)
All industrial or commercial users connected to or discharging into a public sewer after June 28, 1984, must apply for a permit.
(3)
The discharge of industrial or commercial wastewater to the public sewer without having applied for a permit shall result in the assessment of penalties as provided by §§ 3-2 and 23-4.
(b)Users included.
These users include:
(1)
any user who is subject to national categorical pretreatment standards;
(2)
any significant industrial user;
(3)
any user whose discharge would be in violation of Subtitle 2 {“Control of Sanitary and Storm Sewers”} of <cite data-path="|25">this article</cite>;
(4)
any user regulated by state pretreatment requirements;
(5)
any user using, storing, or generating prohibited, toxic, or priority pollutants; and
(6)
any other user as required by the Director.
(c)Compliance with permit required.
No industrial/commercial user shall discharge wastewater directly or indirectly into a public sewer except pursuant to and in accordance with a wastewater discharge permit, when determined by the Director that a permit is required.
History: Ord. 84-129
History: Ord. 91-775