<baltimore-city-law heading="§ 15-26 Locating or relocating poles.">
  <section prefix="§" num="15-26" heading="Locating or relocating poles.">
    <para num="(a)" heading="In general.">Before erecting or relocating any pole, the applicant for a street-cut permit must agree, for itself and its successors in interest, to the conditions specified in this section.</para>
    <para num="(b)" heading="Locating pole.">The pole may be placed only in the position that the Director specifies.</para>
    <para num="(c)" heading="Required removal or relation.">
      <para num="(1)">If, at any time, the Director orders the pole to be removed or relocated, the pole will be removed or relocated within 3 days of the order or, if longer, within the time specified in the order.</para>
      <para num="(2)">All costs of removing or relocating the pole, including the cost of all needed repairs to the public way, will be borne by the applicant or its successors in interest.</para>
    </para>
    <annotation type="History">Ord. 06-245</annotation>
  </section>