<baltimore-city-law heading="Part 3 – Use of Conduit System">
  <section prefix="§" num="23-16" heading="Required permit and authorizations.">
    <para num="(a)" heading="Permit required.">Use of the conduit system for facility installations  is available only to persons to whom the Department has issued one or more permits that expressly authorize those facility installations.</para>
    <para num="(b)" heading="Additional authorizations.">In addition to permits, the Department may require the person responsible for the installation to obtain other authorizations, including lease agreements, prior to any installation.</para>
    <para num="(c)" heading="Unlawful to install without authorizations.">No person may install facilities in the conduit system without the permit and other authorizations required under this section.</para>
    <para num="(d)" heading="Removal of unauthorized installations.">
      <para num="(1)">The procedures in paragraph (2) of this subsection for the removal of an unauthorized installation are in addition to any other civil or criminal enforcement action or penalty authorized by Part 4 {“Civil and Criminal Penalties”} of this subtitle or otherwise authorized by law.</para>
      <para num="(2)">If an installation is determined to have been installed without the required permit or other authorizations:<para num="(i)">the Department shall notify the person responsible for the installation and order its removal;</para>
        <para num="(ii)">the person responsible for the installation shall remove the installation within 30 days of the notice; and</para>
        <para num="(iii)">if the installation is not removed within the required period:<para num="(i)">the Department may remove the installation; and</para>
          <para num="(ii)">the person responsible for the installation is liable to the Department for all expenses of the removal and of any consequent repairs needed to be made to the conduit.</para>
        </para>
      </para>
    </para>
    <annotation type="History">Ord. 19-263</annotation>
  </section>
  <section prefix="§" num="23-17" heading="Voluntary relocation of facilities.">
    <para num="(a)" heading="In general.">When the conduit system or any of its parts have been completed and made ready for occupancy and the rates of rental have been set pursuant to this subtitle, the Director shall lease space in the conduit system to any person that complies with the conditions prescribed by this subtitle and with any further conditions that the Director specifies.</para>
    <para num="(b)" heading="Work to be performed within 6 months.">A person authorized to install facilities under this subtitle must install the facilities within 6 months from the date the installation is authorized.</para>
    <annotation type="History">Ord. 19-263</annotation>
  </section>
  <section prefix="§" num="23-18" heading="Mandatory relocation of facilities.">
    <para num="(a)" heading="Director may order relocation.">The Director may:<para num="(1)">order facilities to be removed from above the streets and placed underground in the conduit system in accordance with Chapter 200, Laws of Maryland 1892;</para>
      <para num="(2)">order facilities to be moved from one underground conduit location to another; and</para>
      <para num="(3)">use methods that, in the judgment of the Director, are necessary to protect and promote the health, safety, and general welfare of the City.</para>
    </para>
    <para num="(b)" heading="Compliance required.">The person responsible for the facilities shall comply with a relocation order issued under this section within 150 days of the order.</para>
    <para num="(c)" heading="Relocation  by Department.">If the facilities are not relocated within 6 months of the order:<para num="(1)">the Department may relocate the facilities and remove any poles remaining above the streets; and</para>
      <para num="(2)">the person responsible for the facilities is liable to the Department for all expenses of the relocation and of the removal of poles remaining above the streets.</para>
    </para>
    <annotation type="History">Ord. 19-263</annotation>
  </section>
  <section prefix="§" num="23-19" heading="Tampering with conduit.">
    <text>No person may tamper with, open, or in any way interfere with any of the manholes or facilities in the conduit system without first having obtained:</text>
    <para num="(1)">a permit from the Department; and</para>
    <para num="(2)">all other authorizations required by the Department.</para>
    <annotation type="History">Ord. 19-263</annotation>
  </section>
  <section prefix="§" num="23-20" reserved="true" />
  <section prefix="§" num="23-21" heading="Survey of and reports by conduit users.">
    <para num="(a)" heading="Department to survey users.">The Department shall survey or otherwise identify and retain records of:<para num="(1)">each person whose facilities have been installed in the conduit system;</para>
      <para num="(2)">the nature of the facilities  installed by that person; and</para>
      <para num="(3)">the total linear footage of conduit occupied by those facilities.</para>
    </para>
    <para num="(b)" heading="Users to report annually.">
      <para num="(1)">No later than June 30 of each year, each person whose facilities have been installed in the conduit system shall report annually to the Department,  in the format that the Department requires.</para>
      <para num="(2)">The report required by this subsection shall consist of:<para num="(i)">one or more maps showing the location of all facilities installed in the conduit system by or on behalf of the person;</para>
        <para num="(ii)">the total linear footage of conduit occupied by those facilities; and</para>
        <para num="(iii)">any other information that the Department deems necessary to include in the report.</para>
      </para>
    </para>
    <para num="(c)" heading="Under- or mis-reporting.">No person that files a report under this section may intentionally misrepresent:<para num="(1)">the nature or location of the person’s facilities that have been installed in the conduit system;</para>
      <para num="(2)">the total linear feet of conduit occupied by those facilities; or</para>
      <para num="(3)">any other information provided in the report.</para>
    </para>
    <annotation type="History">Ord. 19-263</annotation>
  </section>
  <section prefix="§§" num="23-22 to 23-25" reserved="true" />
</baltimore-city-law>