<?xml version='1.0' encoding='utf-8'?>
<baltimore-city-law heading="Subtitle 30 – Property Assessed Clean Energy (PACE) Loan Program">
  <section prefix="§" num="30-1" heading="Definitions.">
    <para num="(a)" heading="In general.">In this subtitle, the following terms have the meanings indicated.</para>
    <para num="(b)" heading="Administrator.">“Administrator” means the contractor selected under &lt;cite data-path="|28|§30-3"&gt;§ 30-3 {“Program administration”} of this subtitle&lt;/cite&gt; to administer the PACE Loan Program for the City.</para>
    <para num="(c)" heading="Clean energy lender.">“Clean energy lender” means a private lender who provides a clean energy loan to a commercial property owner under this subtitle.</para>
    <para num="(d)" heading="Clean energy loan.">“Clean energy loan” means a non-accelerating loan made under this subtitle by a clean energy lender to the owner of a commercial property.</para>
    <para num="(e)" heading="Commercial property.">
      <para num="(1)" heading="In general.">“Commercial property” has the meaning stated in the Enabling Law.</para>
      <para num="(2)" heading="Illustrations.">“Commercial property” includes any industrial, multi-family residential (more than 4 dwelling units), non-profit, institutional, or agricultural property that meets the eligibility requirements of this subtitle.</para>
    </para>
    <para num="(f)" heading="Enabling Law.">“Enabling Law” means the State’s Local Government Article, Title 1, Subtitle 11 {“Clean Energy Loan Programs”}.</para>
    <para num="(g)" heading="Energy efficiency project.">“Energy efficient project” means the installation of new or replacement fixtures, products, devices, equipment, systems, materials, or measures that:<para num="(1)">increase a commercial property’s energy or water efficiency;</para>
      <para num="(2)">decrease a commercial property’s energy or water consumption; or</para>
      <para num="(3)">reduce a commercial property’s utility costs.</para>
    </para>
    <para num="(h)" heading="Energy improvement.">“Energy improvement” means an energy efficiency project or renewable energy project that qualifies under this subtitle.</para>
    <para num="(i)" heading="Finance Director.">“Finance Director” means the Director of the City Department of Finance or that Director’s designee.</para>
    <para num="(j)" heading="Financing agreement.">“Financing agreement” means an agreement between a property owner and a clean energy lender that provides for the terms and conditions of a clean energy loan.</para>
    <para num="(k)" heading="PACE Loan Program; Program.">“PACE Loan Program” or “Program” means the Property Assessed Clean Energy Loan Program established under this subtitle.</para>
    <para num="(l)" heading="Property owner.">“Property owner” means the owner of a new or existing commercial property located in the City.</para>
    <para num="(m)" heading="Renewable energy project.">
      <para num="(1)" heading="In general.">“Renewable energy project” means the installation of new or replacement  renewable energy technologies, devices, or systems that generate electric or thermal energy with a nameplate capacity authorized by the Enabling Law.</para>
      <para num="(2)" heading="Illustrations.">“Renewable energy projects” includes projects that generate thermal or electrical energy by using natural resources such as solar, wind, biomass, landfill gas, municipal solid waste, marine or hydrokinetic, or geothermal resources.</para>
    </para>
    <para num="(n)" heading="Surcharge.">“Surcharge” means the repayment obligation of a clean energy loan, including principal, interest, and administrative costs, collected from a property owner through the City’s property tax billing system.</para>
    <annotation type="History">Ord. 16-533</annotation>
    <annotation type="History">Ord. 22-125</annotation>
  </section>
  <section prefix="§" num="30-2" heading="PACE Program established.">
    <text>As authorized by the Enabling Law, there is a Property Assessed Clean Energy Loan Program for Baltimore City.</text>
    <annotation type="History">Ord. 16-533</annotation>
  </section>
  <section prefix="§" num="30-3" heading="Program administration – In general.">
    <para num="(a)" heading="Nature of City’s role.">The Mayor and City Council of Baltimore:<para num="(1)">serves only as a PACE Loan Program sponsor, facilitating the repayment of clean energy loan obligations through the City’s property tax billing system; and</para>
      <para num="(2)">is not at any time liable for any clean energy loan obligation authorized by this subtitle.</para>
    </para>
    <para num="(b)" heading="Selection of Administrator.">Subject to the approval of the Board of Estimates and to any applicable requirements imposed by or adopted under &lt;cite data-doc="City of Baltimore, Md., Charter" data-path="VI|§11"&gt;City Charter Article VI, § 11&lt;/cite&gt; {“Procurement”}, the Finance Director, in consultation with the Baltimore City Office of Sustainability, shall contract for a Program Administrator, either:<para num="(1)">by expanding the scope of an existing municipal contract vehicle;</para>
      <para num="(2)">through a competitive procurement process;</para>
      <para num="(3)">by using an existing Administrator contracted through a cooperative purchasing agreement of the Washington Metropolitan Council of Governments; or</para>
      <para num="(4)">by entering into an agreement with a private entity to administer the PACE Loan Program.</para>
    </para>
    <para num="(c)" heading="Program expenses.">
      <para num="(1)" heading="Costs.">
        <para num="(i)">The administrative costs of the PACE Loan Program shall be borne by the property owners participating in the program, and the share of administrative costs applicable to an individual clean energy loan shall be included in the loan’s financing agreement.</para>
        <para num="(ii)">These administrative costs may not exceed the actual expenses incurred by the City to administer the program.</para>
      </para>
      <para num="(2)" heading="Fees.">The City may charge property owners who participate in the PACE Loan Program the following, non-financeable fees:<para num="(i)">a reasonable application fee; and</para>
        <para num="(ii)">recording fees associated with participation in the Program.</para>
      </para>
    </para>
    <annotation type="History">Ord. 16-533</annotation>
  </section>
  <section prefix="§" num="30-4" heading="Program administration – Rules and regulations.">
    <para num="(a)" heading="Adoption.">Subject to Title 4 {“Administrative Procedure Act – Regulations”} of the &lt;cite data-path="|general"&gt;City General Provisions Article&lt;/cite&gt;, the Finance Director, in consultation with the Program Administrator and the Baltimore City Office of Sustainability, shall adopt rules and regulations to carry out this subtitle.</para>
    <para num="(b)" heading="Contents.">These rules and regulations shall:<para num="(1)">clearly delineate the respective roles and responsibilities of property owners, clean energy lenders, the Program Administrator, and the Finance Director; and</para>
      <para num="(2)">include:<para num="(i)">methodologies for determining the eligibility of commercial properties, property owners, and energy improvements;</para>
        <para num="(ii)">minimum underwriting standards for clean energy lenders;</para>
        <para num="(iii)">the documentation required on the Administrator’s request to demonstrate that the energy savings generated by an energy efficiency project exceed a property owner’s obligations under a clean energy loan financing agreement;</para>
        <para num="(iv)">efficient application intake, processing, and transaction closing procedures;</para>
        <para num="(v)">terms and provisions to be included in a Notice of Surcharge Levy to be recorded by the clean energy lender or the Program Administrator in the Land Records of Baltimore City;</para>
        <para num="(vi)">required data management services that conform to City practices;</para>
        <para num="(vii)">Program outreach strategies; and</para>
        <para num="(viii)">annual program participation and performance reporting requirements.</para>
      </para>
    </para>
    <annotation type="History">Ord. 16-533</annotation>
    <annotation type="History">Text Conformed 02/25/21</annotation>
    <annotation type="Editor's Notes">By authority of Ordinance 20-431, Section 5, the Director of Legislative Reference, in consultation with the Law Department, has conformed this section to refer expressly to and reflect the requirements of the recently-enacted Administrative Procedure Act that, effective January 15, 2021, governs the proposal, adoption, and publication of administrative rules and regulations.</annotation>
  </section>
  <section prefix="§" num="30-5" heading="Eligibility of property and property owner.">
    <para num="(a)" heading="In general.">To be eligible for a clean energy loan:<para num="(1)">the commercial property for which the energy improvements are proposed must be located in the City; and</para>
      <para num="(2)">the property owner must:<para num="(i)">have a 100% ownership interest in the commercial property;</para>
        <para num="(ii)">demonstrate that no taxes, assessments, fees, or other charges encumbering the commercial property are delinquent; and</para>
        <para num="(iii)">provide written proof that all current holders of a mortgage or deed of trust on the commercial property have expressly consented to the clean energy loan and its status as a priority lien on the property.</para>
      </para>
    </para>
    <para num="(b)" heading="Ability to repay.">Before any clean energy loan is approved under the PACE Loan Program, the Administrator must give due regard to the property owner’s ability to repay the loan, in a manner substantially similar to that required for a mortgage loan under State Commercial Law Article §§ &lt;cite data-doc="Md. Code" data-path="gcl|12-127"&gt;12-127&lt;/cite&gt;, &lt;cite data-doc="Md. Code" data-path="gcl|12-311"&gt;12-311&lt;/cite&gt;, &lt;cite data-doc="Md. Code" data-path="gcl|12-409"&gt;12-409&lt;/cite&gt;.1, 12-925, and 12-1029.</para>
    <annotation type="History">Ord. 16-533</annotation>
  </section>
  <section prefix="§" num="30-6" heading="Qualifying Energy Improvements.">
    <para num="(a)" heading="In general.">A property owner may use the PACE Loan Program to finance all costs incurred to purchase, upgrade, modify, or construct qualifying energy improvements to a new or existing commercial property, including all property improvements necessary to install a qualified energy improvement.</para>
    <para num="(b)" heading="Qualifying costs.">Qualifying energy improvement costs include:<para num="(1)">energy audits;</para>
      <para num="(2)">pre-construction and post-installation evaluation, measurement, and verification services;</para>
      <para num="(3)">engineering, design, and feasibility studies;</para>
      <para num="(4)">materials and labor necessary for installation;</para>
      <para num="(5)">commissioning or retro-commissioning;</para>
      <para num="(6)">performance guarantees;</para>
      <para num="(7)">operations and maintenance service contracts, warranties, or insurance;</para>
      <para num="(8)">accreditation or certification of building energy performance with standard-setting organizations approved by the Administrator; and</para>
      <para num="(9)">federal, state, or local regulatory compliance costs required to complete an energy improvement.</para>
    </para>
    <para num="(c)" heading="Renewable energy projects.">
      <para num="(1)" heading="Qualifications.">A renewable energy project qualifies as an energy improvement under this subtitle only if the commercial property consumes all or a portion of the output from the renewable energy project.</para>
      <para num="(2)" heading="Resiliency benefits.">Renewable energy projects may include technologies that provide resiliency benefits to the commercial property or the electrical grid.  These benefits include demand management, ancillary services, power quality, capacity firming, or other benefits determined by the Administrator to be consistent with the purpose of this program.</para>
    </para>
    <annotation type="History">Ord. 16-533</annotation>
  </section>
  <section prefix="§" num="30-7" heading="Financing.">
    <para num="(a)" heading="Underwriting standards.">
      <para num="(1)" heading="Maximum loan term.">A clean energy loan may be for a term not exceeding 25 years.</para>
      <para num="(2)" heading="Financing agreement.">The financing agreement may contain any terms agreed to by the clean energy lender and the property owner, as permitted by law.</para>
      <para num="(3)" heading="Costs included.">A clean energy loan may include costs associated with executing the financing agreement, including origination, legal, and closing costs, but excluding the non-financeable fees provided for in &lt;cite data-path="|28|§30-3|(c)|(2)"&gt;§ 30-3(c)(2) {“Program expenses”} of this subtitle&lt;/cite&gt;.</para>
    </para>
    <para num="(b)" heading="Timing.">
      <para num="(1)">For projects initiated on or after July 1, 2016, through December 31, 2019, the  Administrator may approve a clean energy loan up 30 months after the property owner places qualifying energy improvements in service, as long as the property owner has filed an initial PACE loan application on or before December 31, 2019.</para>
      <para num="(2)">For projects initiated on or after January 1, 2020, the  Administrator may approve a clean energy loan up to 30 months after the property owner places qualifying energy improvements in service, as long as the property owner has filed an initial PACE loan application prior to:<para num="(i)">commencing construction of an energy-improvement project; or</para>
        <para num="(ii)">altering a previously proposed project to include qualifying energy improvements.</para>
      </para>
    </para>
    <para num="(c)" heading="Public financing precluded.">The City may not directly finance or fund any clean energy loans under the PACE Loan Program.</para>
    <annotation type="History">Ord. 16-533</annotation>
    <annotation type="History">Ord. 18-128</annotation>
  </section>
  <section prefix="§" num="30-8" heading="Surcharge.">
    <para num="(a)" heading="In general.">
      <para num="(1)">A property owner participating in the PACE Loan Program shall repay the clean energy loan through an annual surcharge on the property owner’s real property or stand-alone tax bill.</para>
      <para num="(2)">This surcharge constitutes a first lien on the property, with priority over all prior or subsequent liens in favor of private parties, from the date it is billed on the property owner’s real property or stand-alone tax bill until the unpaid surcharge, interest, and any associated penalties are paid in full.</para>
    </para>
    <para num="(b)" heading="Calculation.">The amount of the surcharge shall be the sum of:<para num="(1)">the amount due under the terms of indebtedness and obligations agreed to in the loan’s financing agreement; and</para>
      <para num="(2)">any administrative costs owed to the City under this subtitle.</para>
    </para>
    <para num="(c)" heading="Transferability.">Except as provided in &lt;cite data-path="|28|§30-3|(a)|(2)"&gt;§ 30-3(a)(2) of this subtitle&lt;/cite&gt;, if a person acquires a commercial property that is subject to a surcharge incurred under this subtitle, that person assumes the obligation to pay the surcharge, whether the acquisition was voluntary or involuntary.</para>
    <para num="(d)" heading="Recordation.">
      <para num="(1)">Within 30 days of receiving written notice from the Administrator that a financing agreement for a clean energy loan has been executed, the clean energy lender or the Administrator shall cause a Notice of Surcharge Levy to be recorded in the Land Records of Baltimore City.</para>
      <para num="(2)">The Notice of Surcharge Levy shall include:<para num="(i)">the clean energy loan financing agreement; and</para>
        <para num="(ii)">any other information required by the rules and regulations adopted under this subtitle.</para>
      </para>
    </para>
    <para num="(e)" heading="Billing.">
      <para num="(1)" heading="In general.">The annual surcharge shall be:<para num="(i)">billed:<para num="(A)">as a separate, clearly defined line item on the real property tax bill; or</para>
          <para num="(B)">on a separate, stand-alone tax bill; and</para>
        </para>
        <para num="(ii)">due on the same dates as City real property taxes.</para>
      </para>
      <para num="(2)" heading="Initial surcharge.">
        <para num="(i)">The City shall bill the first surcharge due by a property owner on the first tax bill after the Administrator provides written notice to the Finance Director of the financing agreement’s repayment schedule.</para>
        <para num="(ii)">This billing practice does not impact the legal rights afforded a clean energy lender under:<para num="(A)">a valid, executed finance agreement; and</para>
          <para num="(B)">a properly recorded Notice of Surcharge Levy.</para>
        </para>
      </para>
    </para>
    <para num="(f)" heading="Disbursement.">
      <para num="(1)">Surcharges collected by the City under this subtitle shall be disbursed to the Administrator within 45 days after the last day of the month in which the amounts are collected.</para>
      <para num="(2)">Neither the City nor the Administrator shall at any time possess any ownership of a surcharge collected, except for the administrative costs included in the surcharge under this subtitle.</para>
      <para num="(3)">The City is obligated to pay a clean energy lender only the portion of the surcharge actually collected to repay the clean energy loan.</para>
    </para>
    <para num="(g)" heading="Repayment priority.">Surcharge payments collected through a property owner’s real property or stand-alone tax bill shall be credited:<para num="(1)">first, to any non-Program taxes, as defined by § 14-801(d) of the State Tax-Property Article, that are delinquent as of the date the surcharge payments are received; and</para>
      <para num="(2)">then, to Program surcharges.</para>
    </para>
    <para num="(h)" heading="Delinquency.">
      <para num="(1)">If a property owner fails to pay a surcharge installment in accordance with the terms of the loan financing agreement, the Finance Director shall provide written notice of the delinquency to the Administrator in a timely manner.</para>
      <para num="(2)">After providing this notice to the Administrator, the City has no obligation to collect unpaid surcharge payments until a tax lien attaches to the property.</para>
    </para>
    <para num="(i)" heading="Default.">
      <para num="(1)">If a property owner defaults on a surcharge, the Finance Director shall collect the surcharge as a tax lien, through the tax sale process, in a manner similar to other property tax assessments with respect to any penalties, fees, remedies, and lien priorities authorized under the &lt;cite data-doc="Md. Code" data-path="gtp"&gt;State Tax-Property Article, Title 14, Subtitle 8&lt;/cite&gt;.</para>
      <para num="(2)">A surcharge levied under this subtitle may be foreclosed only to the extent of any unpaid installment and any related penalties, interest, and fees.</para>
      <para num="(3)">This collection process applies to an overdue surcharge, regardless of whether real property taxes (or any other taxes, charges, or assessments) are due and owing.</para>
    </para>
    <para num="(j)" heading="Assignability.">The City may assign a PACE tax lien to the Administrator.</para>
    <para num="(k)" heading="Survivability.">If a PACE tax lien is foreclosed, the PACE tax lien shall survive the judgment of foreclosure to the extent that any unpaid surcharge installments secured by the lien were not the subject of that judgment.</para>
    <annotation type="History">Ord. 16-533</annotation>
    <annotation type="History">Ord. 18-128</annotation>
  </section>
</baltimore-city-law>
