  <container prefix="Subtitle" num="1" heading="Purpose; Transition Rules">
    <section prefix="§" num="13-101" heading="Purpose.">
      <text>The purpose of a planned unit development is to:</text>
      <para num="(1)">encourage flexibility in the development of land and in the design of structures;</para>
      <para num="(2)">encourage a creative approach to the use of land that results in better development and design than might otherwise be accomplished under the strict application of this Code on a lot-by-lot basis;</para>
      <para num="(3)">provide for the efficient use of land to facilitate a more effective arrangement of land uses, buildings, circulation systems, and utilities;</para>
      <para num="(4)">encourage the construction of appropriate aesthetic amenities that will enhance the character of the site;</para>
      <para num="(5)">promote quality development that is commensurate with other development within the community and compatible with the character of the surrounding area and adjacent properties; and</para>
      <para num="(6)">facilitate the implementation of the Comprehensive Master Plan.</para>
      <annotation type="History">Ord. 16-581</annotation>
    </section>
    <section prefix="§" num="13-102" heading="Transition rules.">
      <para num="(a)" heading="In general.">Residential, office-residential, business, and industrial planned unit developments approved before the effective date of this Code (June 5, 2017) remain valid as long as they continue to comply with all requirements and conditions of their approvals and with the Zoning Code regulations in effect immediately preceding the date of those approvals.</para>
      <para num="(b)" heading="Amendments.">Any amendments to these previously approved planned unit developments will be categorized as either engineering corrections, minor changes, or major changes in accordance with Subtitle 4 {“Modifications to approved final development plans”} of this title and must follow the corresponding approval procedure.</para>
      <para num="(c)" heading="Allowed uses.">All permitted and conditional uses of the underlying zoning district of a previously approved planned unit development are allowed unless specifically prohibited by the planned unit development.</para>
      <annotation type="History">Ord. 16-581</annotation>
      <annotation type="History">Ord. 17-015</annotation>
      <annotation type="History">Ord. 18-171</annotation>
    </section>
  </container>
  <container prefix="Subtitle" num="2" heading="Requirements; Approval Standards; Exceptions">
    <section prefix="§" num="13-201" heading="Authorization.">
      <para num="(a)" heading="In general.">Planned unit developments may only be established by ordinance of the Mayor and City Council enacted in accordance with the provisions of this title.</para>
      <para num="(b)" heading="Requirements of underlying district.">Unless otherwise specifically provided by the ordinance establishing or amending the planned unit development, all requirements of the underlying zoning district apply.</para>
      <para num="(c)" heading="PUDs precluded from certain districts.">Planned unit developments are prohibited in the I-1, I-2, and MI Districts.</para>
      <para num="(d)" heading="Repeal of PUDs.">Planned unit developments may only be repealed by ordinance of the Mayor and City Council enacted in accordance with the provisions of this title.</para>
      <annotation type="History">Ord. 16-581</annotation>
      <annotation type="History">Ord. 17-015</annotation>
      <annotation type="History">Ord. 18-171</annotation>
      <annotation type="History">Ord. 19-251</annotation>
    </section>
    <section prefix="§" num="13-202" heading="General requirements.">
      <para num="(a)" heading="Common ownership or unified control.">
        <para num="(1)">The site of the planned unit development must be under common ownership or unified control.</para>
        <para num="(2)">If there are 2 or more owners, the application for approval of a new planned unit development must be jointly filed by all owners, or their respective contract purchaser or authorized agents.</para>
        <para num="(3)">When applying for a major change or repeal of an existing planned unit development, one owner or contract purchaser, or the authorized agent of either, may make the application for approval, as  long as all other property owners, or their authorized agents, are notified in accordance with Title 5, Subtitle 6 {“Notices”} of this Code.</para>
      </para>
      <para num="(b)" heading="Minimum areas.">Planned unit developments must meet the following minimum areas:<para num="(1)">at least 5 acres in the R-1A, R-1B, R-1C, R-1D, R-1E, R-1, R-2, R-3, R-4, R-5, OIC, and BSC Districts;</para>
        <para num="(2)">at least 2 acres in the R-6, R-7, R-8, R-9, R-10, C-1, C-2, C-3, C-4, IMU-1 and -2, TOD, OR, and PC Districts; and</para>
        <para num="(3)">at least 1½ acres in the C-5 District.</para>
      </para>
      <para num="(c)" heading="Exceptions.">Exceptions to the regulations contained in this Code, including use, bulk, yard, parking, and sign regulations, may be granted through the planned unit development process, as may be desirable to achieve the objectives of the proposed planned unit development, as long as the exceptions are fully consistent with and authorized by this title.</para>
      <annotation type="History">Ord. 16-581</annotation>
      <annotation type="History">Ord. 17-015</annotation>
      <annotation type="History">Ord. 19-244</annotation>
      <annotation type="History">Ord. 19-252</annotation>
    </section>
    <section prefix="§" num="13-203" heading="Approval standards.">
      <para num="(a)" heading="In general.">In reviewing a planned unit development:<para num="(1)">the conditional use standards of § 5-405(a) {“Conditions: In general”} and § 5-406 {“Approval standards”}of this Code apply; and</para>
        <para num="(2)">the following additional factors must be considered:<para num="(i)">whether the planned unit development is in general conformance with all elements of the Comprehensive Master Plan, and the character and nature of existing and contemplated development in the vicinity of the proposed planned unit development;</para>
          <para num="(ii)">whether the planned unit development will preserve unusual topographic or natural features of the land, and the design of the planned unit development will best utilize and be compatible with the topography of the land;</para>
          <para num="(iii)">whether the physical characteristics of the planned unit development will not adversely affect future development or the value of undeveloped neighboring areas, or the use, maintenance, or value of neighboring areas already developed;</para>
          <para num="(iv)">whether the planned unit development will provide the same protection as the basic district regulations in regard to fire, health hazards, and other dangers;</para>
          <para num="(v)">whether the planned unit development will encourage innovative design features or adaptive reuse of structures that would not be possible by application of the basic district regulations; and</para>
          <para num="(vi)">whether the planned unit development is compatible with any nearby industrial district.</para>
        </para>
      </para>
      <para num="(b)" heading="Required findings.">The planned unit development may be approved only if there are findings that:<para num="(1)">the use is compatible with the surrounding neighborhood;</para>
        <para num="(2)">the use furthers the purpose of the proposed classification; and</para>
        <para num="(3)">the PUD master plan developed under &lt;cite data-path="|32|§13-304"&gt;§ 13-304 {“PUD master plan”} of this title&lt;/cite&gt; ensures that there will be no discordance with existing uses.</para>
      </para>
      <annotation type="History">Ord. 16-581</annotation>
    </section>
    <section prefix="§" num="13-204" heading="Exceptions from district regulations.">
      <para num="(a)" heading="Considerations.">In determining whether to grant an exception from district regulations, the Planning Commission and City Council must consider whether the exception will:<para num="(1)">enhance the overall merit of the planned unit development;</para>
        <para num="(2)">promote the objectives of both the City and the development;</para>
        <para num="(3)">enhance the quality of the design of the structures and the site plan;</para>
        <para num="(4)">enable the development to offer environmental and pedestrian amenities;</para>
        <para num="(5)">not cause such an adverse impact on neighboring properties so as to outweigh the benefits of the development;</para>
        <para num="(6)">not negatively affect the value and enjoyment of surrounding property, the provision of municipal services, or the flow of traffic;</para>
        <para num="(7)">be compatible with the land use policies of the Comprehensive Master Plan;</para>
        <para num="(8)">provide a substantial public benefit to the City, as illustrated in subsection (d) of this section; and</para>
        <para num="(9)">allow uses that predominantly match or are compatible with uses allowed in the underlying zoning district and the zoning districts of adjacent properties.</para>
      </para>
      <para num="(b)" heading="Required Superior design and amenities.">To be granted an exception, the applicant must demonstrate superior design and enhanced amenities.</para>
      <para num="(c)" heading="Required benefit to City.">In no case may any exception be granted unless the applicant demonstrates a substantial benefit to the City.</para>
      <para num="(d)" heading="Examples of substantial benefit to City.">Examples of substantial benefits to the City are as follows:<para num="(1)">use of sustainable design and architecture, such as green roofs, white roofs, and other energy efficient design concepts, new building technologies, and qualifying as a Leadership in Energy and Environmental Design (“LEED”) or LEED-equivalent structure;</para>
        <para num="(2)">enhanced design characteristics, including mixed-use development, circulation systems that utilize alleys or traffic-calming techniques, and a pedestrian-oriented environment;</para>
        <para num="(3)">community amenities, including plazas, malls, formal gardens, places to congregate, outdoor seating, public art, and pedestrian and transit facilities;</para>
        <para num="(4)">preservation of natural areas and site design that is sensitive to environmental features;</para>
        <para num="(5)">historic preservation and adaptive reuse of historic structures;</para>
        <para num="(6)">additional open-space and recreational amenities, such as recreational open space and playgrounds, including athletic fields, dog parks, natural water features, and conservation areas;</para>
        <para num="(7)">additional public infrastructure improvements, in addition to the minimum needed by the planned unit development, such as new or repaved streets, bicycle paths, gutters and sewers, and traffic control devices to improve traffic flow;</para>
        <para num="(8)">senior housing set-aside;</para>
        <para num="(9)">affordable housing set-aside;</para>
        <para num="(10)">provision of accessible dwelling units with accessible features beyond those required by the Americans with Disabilities Act or any other applicable codes; and</para>
        <para num="(11)">provision of public car or bike share facilities.</para>
      </para>
      <annotation type="History">Ord. 16-581</annotation>
    </section>
    <section prefix="§" num="13-205" heading="Repeal of PUDs.">
      <text>In determining whether to approve the repeal of a planned unit development, the Planning Commission and the City Council must find that:</text>
      <para num="(1)">the repeal of the planned unit development is in the public interest; and</para>
      <para num="(2)">the approved final development plan of the planned unit development:<para num="(i)">has been substantially completed;</para>
        <para num="(ii)">is no longer necessary in light of the property’s underlying zoning;</para>
        <para num="(iii)">is no longer consistent with the City’s Master Plan; or</para>
        <para num="(iv)">has been abandoned by the property owner.</para>
      </para>
      <annotation type="History">Ord. 19-252</annotation>
    </section>
  </container>
  <container prefix="Subtitle" num="3" heading="Procedures for Plan Approval">
    <section prefix="§" num="13-301" heading="In general.">
      <para num="(a)" heading="4-step process.">Approval of a planned unit development is a 4-step process comprising:<para num="(1)">preliminary consultation;</para>
        <para num="(2)">concept plan;</para>
        <para num="(3)">PUD master plan; and</para>
        <para num="(4)">final development plan.</para>
      </para>
      <para num="(b)" heading="Compliance required.">The procedures, requirements, restrictions, and conditions of this title must be observed in the authorization of a planned unit development.</para>
      <para num="(c)" heading="Introduction of legislation.">
        <para num="(1)">In accordance with Title 5, Subtitle 5 {“Legislative Authorizations”}, of this Code, at the request of a property’s owner or developer, 1 or more members of the City Council may introduce a legislative authorization to approve, amend, or repeal a planned unit development and PUD master plan.</para>
        <para num="(2)">On referral of the bill for the legislative authorization to the Planning Commission, as required by Title 5, Subtitle 5:<para num="(i)">the property owner or developer seeking the legislative authorization is considered the applicant for purposes of this title; and</para>
          <para num="(ii)">the procedures of this subtitle apply.</para>
        </para>
      </para>
      <annotation type="History">Ord. 16-581</annotation>
    </section>
    <section prefix="§" num="13-302" heading="Preliminary consultation.">
      <para num="(a)" heading="Consultation required.">Before filing any plans for a planned unit development, the applicant must attend a preliminary consultation with the Director of Planning.  This consultation must take place before or as soon as possible after introduction of the bill seeking the legislative authorization for the planned unit development.</para>
      <para num="(b)" heading="Information to be submitted.">For the preliminary consultation, the applicant must provide the following information:<para num="(1)">location of the proposed development;</para>
        <para num="(2)">proposed uses;</para>
        <para num="(3)">proposed public and private improvements;</para>
        <para num="(4)">a list of any exceptions to district requirements that the applicant anticipates will be requested; and</para>
        <para num="(5)">any other information necessary to clearly explain the planned unit development.</para>
      </para>
      <para num="(c)" heading="Purpose of consultation.">The purpose of the preliminary consultation is to make advice and assistance available to the applicant before preparation of the concept plan, so that the applicant may determine:<para num="(1)">whether the proposed planned unit development appears in general to be in compliance with the provisions of this Code and other applicable regulations;</para>
        <para num="(2)">whether any zoning exceptions are required in connection with the proposed planned unit development; and</para>
        <para num="(3)">whether the proposed planned unit development will be in conformity with the Comprehensive Master Plan and the goals and policies of the City for development.</para>
      </para>
      <para num="(d)" heading="Application and fee.">The preliminary consultation does not require the filing of an application or payment of a fee.</para>
      <para num="(e)" heading="Opinions given not binding.">Opinions or advice provided at the consultation are in no way binding on the Planning Commission or the City Council when later taking formal action on the planned unit development.</para>
      <annotation type="History">Ord. 16-581</annotation>
    </section>
    <section prefix="§" num="13-303" heading="Concept plan.">
      <para num="(a)" heading="Submission to Commission.">After the preliminary consultation, the applicant must file a concept plan with the Planning Director for the purpose of obtaining information and guidance from the Planning Commission before the applicant enters into binding commitments or incurs substantial expense.</para>
      <para num="(b)" heading="Plan components.">At minimum, the concept plan must consist of the following:<para num="(1)">a site plan that is drawn to an appropriate scale and, in general form, shows:<para num="(i)">proposed land uses and structures;</para>
          <para num="(ii)">natural features of the development site;</para>
          <para num="(iii)">approximate location of all roadways and access drives proposed within the planned unit development; and</para>
          <para num="(iv)">location of all adjacent public streets, thoroughfares, and public utilities;</para>
        </para>
        <para num="(2)">a site location map that is drawn to an appropriate scale and shows:<para num="(i)">the proposed planned unit development in relation to surrounding streets and property within 600 feet in all directions of the development site; and</para>
          <para num="(ii)">the location, height, and land use of all existing buildings and structures adjoining the development site;</para>
        </para>
        <para num="(3)">schematic drawings that show the size, gross square footage, character, and disposition of buildings currently existing on the site and buildings proposed for the site; and</para>
        <para num="(4)">a written statement that contains:<para num="(i)">a general explanation of the planned unit development;</para>
          <para num="(ii)">a statement of the present ownership of all the land within the development;</para>
          <para num="(iii)">a schedule setting forth any proposed exceptions to district requirements, including exceptions to the regulations governing use, bulk, yard, off-street parking, and signs, as they apply to the zoning district or districts in which the planned unit development is to be located; and</para>
          <para num="(iv)">proposed public benefits and amenities.</para>
        </para>
      </para>
      <para num="(c)" heading="Commission to provide guidance.">The Planning Commission must review the concept plan and provide the information and guidance that it considers appropriate.</para>
      <para num="(d)" heading="Opinions given not binding.">Opinions or advice provided by the Planning Commission are in no way binding on the Planning Commission or the City Council when later taking formal action on the planned unit development.</para>
      <para num="(e)" heading="Review to be at public meeting.">
        <para num="(1)">The review of the concept plan is a public meeting.  Public comment on the concept plan will be accepted at that meeting.</para>
        <para num="(2)">Notice of the meeting must be given as specified by the Director of Planning in accordance with:<para num="(i)">the rules and regulations that, subject to Title 4 {“Administrative Procedure Act – Regulations”} of the &lt;cite data-path="|general"&gt;City General Provisions Article&lt;/cite&gt;, the Planning Commission adopts; and</para>
          <para num="(ii)">the State Open Meetings Act (Title 3 of the State &lt;cite data-path="|general"&gt;General Provisions Article&lt;/cite&gt;).</para>
        </para>
      </para>
      <annotation type="History">Ord. 16-581</annotation>
      <annotation type="History">Text Conformed 02/28/21</annotation>
      <annotation type="Editor's Notes">By authority of Ordinance 20-431, Section 5, the Director of Legislative Reference, in consultation with the Law Department, has conformed paragraph (2)(i) of subsection (e) to refer expressly to and reflect the requirements of the recently-enacted Administrative Procedure Act that, effective January 15, 2021, governs the proposal, adoption, and publication of administrative rules and regulations.</annotation>
    </section>
    <section prefix="§" num="13-304" heading="PUD master plan.">
      <para num="(a)" heading="Purpose of plan.">The purpose of the PUD master plan is to serve as the legislatively approved plan encompassing all major aspects of site development and public benefits.  Where certain elements of site design are unknown, it is sufficient to reflect intent as provided in this section.</para>
      <para num="(b)" heading="Plan components.">The PUD master plan must include the following:<para num="(1)">an accurate topographic and boundary line map of the project area;</para>
        <para num="(2)">a location map that shows the relationship of the project area to surrounding properties;</para>
        <para num="(3)">the pattern and intended design standards of existing and proposed roads, driveways, parking facilities, and bicycle and pedestrian paths, whether public or private;</para>
        <para num="(4)">the use, type, size, arrangement, and location of existing and proposed lots, structures, and building groups;</para>
        <para num="(5)">a general plan for landscaping that demonstrates design intent and how environmental requirements will be met;</para>
        <para num="(6)">architectural drawings and sketches that illustrate the design and character of proposed structures;</para>
        <para num="(7)">the general location of existing and proposed sewer and water facilities;</para>
        <para num="(8)">the existing topography and storm drainage pattern;</para>
        <para num="(9)">the proposed storm drainage system, showing basic topographic changes;</para>
        <para num="(10)">the location of recreational and open-space areas and areas reserved or dedicated for public uses, such as school and park sites, and any open space to be owned and maintained by a property owners’ association;</para>
        <para num="(11)">statistical data on:<para num="(i)">the total size of the project area;</para>
          <para num="(ii)">density computations;</para>
          <para num="(iii)">the proposed number of residential units, by type; and</para>
          <para num="(iv)">any other similar factors pertinent to a comprehensive evaluation of the proposed planned unit development;</para>
        </para>
        <para num="(12)">a detailed time schedule for the start and completion of the planned unit development, including a proposed phasing schedule, which must indicate when the public benefits and amenities will be constructed; and</para>
        <para num="(13)">a schedule setting forth any proposed exceptions to district regulations, citing by section number each regulation from which an exception is sought.</para>
      </para>
      <para num="(c)" heading="Planning Commission review.">
        <para num="(1)">Before a public hearing is scheduled, the proposed PUD master plan must be forwarded to the appropriate City agencies, as determined by the Director of Planning, for review.  These agencies must review the proposed PUD master plan and forward their reports to the Planning Commission within 30 days of receipt of the plan.  The Planning Commission must schedule a public hearing on the proposed PUD master plan within 60 days of receipt of a complete application.</para>
        <para num="(2)">If, in the Planning Commission’s judgment, the application does not contain sufficient information to enable it to properly discharge its responsibilities, the Planning Commission may request additional information from the applicant and the 60 day period is suspended or the hearing continued.</para>
        <para num="(3)">The Planning Commission may recommend approval, recommend approval with conditions, or advise the applicant in writing of any recommended changes, additions, or corrections to the proposed PUD master plan.  If the Planning Commission recommends changes, additions, or corrections, the applicant may, within 30 days of the recommendation, submit a revised proposed PUD master plan for Planning Commission consideration, without paying an additional filing fee.  The Planning Commission may grant the applicant additional time to prepare the revised plan.  Once resubmitted, the Planning Commission may then recommend approval, approval with conditions, or denial of the proposed PUD master plan.</para>
      </para>
      <para num="(d)" heading="Recommendations to City Council.">The Planning Commission’s final determination regarding a proposed PUD master plan must be:<para num="(1)">included in the Planning Commission’s report to the Mayor and City Council under § 5-506 of this Code if the planned unit development is the subject of a proposed legislative authorization that has already been introduced under &lt;cite data-path="|32|§13-301|(c)"&gt;§ 13-301(c) of this title&lt;/cite&gt;; or</para>
        <para num="(2)">retained by the Planning Commission for at least 12 months from the date the Planning Commission makes a final determination and included in the Planning Commission’s report under § 5-506 of this Code if, within that 12-month period, the planned unit development becomes the subject of a legislative authorization.</para>
      </para>
      <annotation type="History">Ord. 16-581</annotation>
    </section>
    <section prefix="§" num="13-305" heading="Final development plan.">
      <para num="(a)" heading="Purpose of plan.">The purpose of the final development plan is to provide, after enactment of the ordinance approving the planned unit development and its PUD master plan, additional detailed information on all aspects of site development and public benefits once construction is imminent.  Whereas the PUD master plan may reflect design intent, the final development plan must reflect actual and final proposed conditions.  The Planning Commission may not approve the final development plan, as provided in this section, unless the final development plan substantially complies with the PUD master plan.</para>
      <para num="(b)" heading="When required.">
        <para num="(1)">Within 2 years after enactment of the ordinance approving or amending the planned unit development and its PUD master plan, the applicant must file a final development plan with the Director of Planning, together with the applicable filing fee.</para>
        <para num="(2)">If the PUD master plan was approved to be constructed in phases, the applicant must submit the final development plan for the first phase within 2 years of the approval of the PUD master plan.  Final development plans for subsequent phases may be submitted according to the phasing schedule approved as part of the PUD master plan.</para>
      </para>
      <para num="(c)" heading="Plan components.">The final development plan must include the following, in final form:<para num="(1)">the plan components required by &lt;cite data-path="|32|§13-304|(b)"&gt;§ 13-304(b) {“PUD master plan: Plan components”} of this subtitle&lt;/cite&gt;, updated as required to reflect actual and final proposed conditions;</para>
        <para num="(2)">the final location, type, and size of proposed landscaping features; and</para>
        <para num="(3)">final architectural drawings and sketches that illustrate the design and character of proposed structures.</para>
      </para>
      <para num="(d)" heading="Conformance review.">
        <para num="(1)">The Director of Planning must review the final development plan within 60 days of its receipt and take actions described in this subsection.</para>
        <para num="(2)">The Director of Planning may recommend approval of the final development plan to the Planning Commission if it is in substantial compliance with the PUD master plan and all City regulations.  The Director of Planning will certify to the Planning Commission that the final plan is in substantial conformance with the PUD master plan and City regulations.  Within 60 days of receipt of the Director of Planning’s recommendation, the Planning Commission must review the final development plan and approve or deny it at a public meeting.</para>
        <para num="(3)">If the Director of Planning finds that the final development plan is substantially changed from the PUD master plan, or is otherwise not in accordance with City regulations, then the Director of Planning may recommend to the Planning Commission that the final development plan be denied.  If the Planning Commission finds that the final development plan is not in conformity with the PUD master plan or City regulations, the Director of Planning must inform the applicant of the specific areas found not to be in compliance, and the applicant may resubmit the final development plan to the Director of Planning with changes to those areas found not to be in compliance.</para>
        <para num="(4)">Once resubmitted and the Director of Planning has determined the final development plan to be in substantial compliance with the PUD master plan and City regulations, the Director of Planning must certify to the Planning Commission that the final development plan is in substantial conformance with the PUD master plan and City regulations.  Within 60 days of receipt of the Director of Planning’s recommendation, the Planning Commission must review the final development plan and approve or deny it at a public meeting.</para>
        <para num="(5)">Before final approval of the final development plan, the Planning Commission may approve minor changes to the final development plan that do not conflict with the PUD master plan and City regulations.  The minor changes that may be approved by the Planning Commission are limited to those that qualify as minor variances under § 5-302(b) {“Minor and major Variances: Minor variances”} of this Code.</para>
      </para>
      <para num="(e)" heading="Approved final development plan.">After the approval of a final development plan by the Planning Commission, the use of the land and the construction, modification, or alteration of any structures within the planned unit development are governed by the approved final development plan rather than by the provisions of this Code.</para>
      <annotation type="History">Ord. 16-581</annotation>
    </section>
  </container>
  <container prefix="Subtitle" num="4" heading="Modifications to Approved Final Development Plans">
    <section prefix="§" num="13-401" heading="Engineering corrections.">
      <para num="(a)" heading="Director may approve.">
        <para num="(1)">During construction only, minor changes required by engineering or other physical site circumstances not foreseen at the time that the final development plan was approved, but encountered during construction on site, may be authorized by the Director of Planning.</para>
        <para num="(2)">However, the Director of Planning may not approve any change:<para num="(i)">that fails to substantially comply with the PUD master plan or City regulations; or</para>
          <para num="(ii)">that violates:<para num="(A)">the underlying zoning;</para>
            <para num="(B)">an approved exception;</para>
            <para num="(C)">a condition of approval attached to the planned unit development; or</para>
            <para num="(D)">a provision of the ordinance that approved or amended the planned unit development.</para>
          </para>
        </para>
        <para num="(3)">The Director of Planning may not approve any engineering correction for a site that has not had building permits issued.</para>
      </para>
      <para num="(b)" heading="Revised development plan.">
        <para num="(1)">A revised final development plan showing all changes proposed under this section must be submitted to the Director of Planning, with these changes indicated by marked-up or red-lined exhibit of plans.</para>
        <para num="(2)">The revised final development plan proposed under this section must be reviewed and approved or denied by the Director of Planning within 15 days.</para>
        <para num="(3)">A new final development plan, reflecting the changes approved under this section, must be filed with the Department of Planning, noting the date of the changes.</para>
      </para>
      <annotation type="History">Ord. 16-581</annotation>
    </section>
    <section prefix="§" num="13-402" heading="Minor changes.">
      <para num="(a)" heading="Commission may approve.">
        <para num="(1)">The Planning Commission may approve a change to the approved final development plan that is not a major change governed by &lt;cite data-path="|32|§13-403"&gt;§ 13-403 {“Major changes”} of this subtitle&lt;/cite&gt;.</para>
        <para num="(2)">However, the Planning Commission may not approve any change:<para num="(i)">that fails to substantially comply with the PUD master plan or City regulations; or</para>
          <para num="(ii)">that violates:<para num="(A)">the underlying zoning;</para>
            <para num="(B)">an approved exception;</para>
            <para num="(C)">a condition of approval attached to the planned unit development, with the exception of modifications to the planned unit development’s phasing schedule; or</para>
            <para num="(D)">a provision of the ordinance that approved or amended the planned unit development.</para>
          </para>
        </para>
      </para>
      <para num="(b)" heading="Revised development plan.">
        <para num="(1)">A revised final development plan showing all changes proposed under this section must be submitted to the Director of Planning, with these changes indicated by marked-up or red-lined exhibit of the plans.  The Director of Planning must forward the revisions to the Planning Commission.</para>
        <para num="(2)">The Planning Commission must review the revised final development plan and approve, approve with conditions, or deny it within 30 days of its submittal.</para>
        <para num="(3)">A new final development plan, reflecting the changes approved under this section, must be filed with the Department of Planning, noting the date of the changes.</para>
      </para>
      <annotation type="History">Ord. 16-581</annotation>
    </section>
    <section prefix="§" num="13-403" heading="Major changes.">
      <para num="(a)" heading="Scope of section.">This section applies to the following major changes:<para num="(1)">a 10% increase or 25% decrease in the approved number of dwelling units;</para>
        <para num="(2)">a 10% increase or a 25% decrease in the maximum building heights in the approved planned unit development;</para>
        <para num="(3)">a change in the type, location, or arrangement of land use within the development, as shown on the previously approved final development plan;</para>
        <para num="(4)">a change in the boundaries of the planned unit development;</para>
        <para num="(5)">a decrease in open space that had been included as a public benefit or amenity under &lt;cite data-path="|32|§13-204"&gt;§ 13-204 {“Exceptions from district regulations”} of this title&lt;/cite&gt;; and</para>
        <para num="(6)">any change:<para num="(i)">that fails to substantially comply with the PUD master plan or City regulations; or</para>
          <para num="(ii)">that violates:<para num="(A)">the underlying zoning;</para>
            <para num="(B)">an approved exception;</para>
            <para num="(C)">a condition of approval attached to the planned unit development, with the exception of modifications to the planned unit development’s phasing schedule; or</para>
            <para num="(D)">a provision of the ordinance that approved or amended the planned unit development.</para>
          </para>
        </para>
      </para>
      <para num="(b)" heading="Major change requires ordinance.">A major change requires introduction and enactment of an ordinance to approve an amendment to the planned unit development and PUD master plan.</para>
      <annotation type="History">Ord. 16-581</annotation>
      <annotation type="History">Ord. 19-252</annotation>
    </section>
  </container>
  <container prefix="Subtitle" num="5" heading="Enforcement">
    <section prefix="§" num="13-501" heading="Ordinance and development plan as binding agreement.">
      <text>The ordinance and approved final development plan constitute a binding agreement by the property owner and the developer to proceed with the development in strict accordance with the approved final development plan, including the detailed time schedule.</text>
      <annotation type="History">Ord. 16-581</annotation>
      <annotation type="History">Ord. 17-015</annotation>
    </section>
    <section prefix="§" num="13-502" heading="Expiration on failure to proceed timely.">
      <para num="(a)" heading="In general.">An approved planned unit development and final development plan automatically expire 2 years after the date of approval if:<para num="(1)">a building permit has not been issued; or</para>
        <para num="(2)">the installation of required infrastructure has not begun.</para>
      </para>
      <para num="(b)" heading="Extension of time.">
        <para num="(1)">The Planning Commission may extend the time for expiration of an approved planned unit development and final development plan on:<para num="(i)">a written request for extension that is submitted before the expiration; and</para>
          <para num="(ii)">for good cause shown.</para>
        </para>
        <para num="(2)">The Planning Commission must conduct a public hearing to determine whether to terminate or extend the approval.</para>
        <para num="(3)">In making its determination, the Planning Commission must take into account:<para num="(i)">hardship to the applicant;</para>
          <para num="(ii)">changes in surrounding circumstances that have occurred since the original approval;</para>
          <para num="(iii)">the schedule for providing required public benefits and amenities; and</para>
          <para num="(iv)">the likelihood that substantial construction will occur during any period of extension.</para>
        </para>
      </para>
      <annotation type="History">Ord. 16-581</annotation>
    </section>
    <section prefix="§" num="13-503" heading="Noncompliance.">
      <para num="(a)" heading="Cause for cancelling development plan.">Failure to comply with the requirements set by or under authority of this title is cause for canceling the planned unit development and final development plan.</para>
      <para num="(b)" heading="Notice.">The Zoning Administrator must provide the property owner and the developer at least 15 days notice to appear before the Zoning Administrator and answer to any charge of noncompliance.</para>
      <para num="(c)" heading="Action by Administrator.">If the Zoning Administrator finds the charges to be substantiated and if the situation is not satisfactorily adjusted within a specified period set by the Zoning Administrator, the Zoning Administrator may:<para num="(1)">order cancellation of the planned unit development and final development plan; and</para>
        <para num="(2)">take any other action that is appropriate.</para>
      </para>
      <annotation type="History">Ord. 16-581</annotation>
      <annotation type="History">Ord. 17-015</annotation>
    </section>
  </container>