<?xml version='1.0' encoding='utf-8'?>
<baltimore-city-law heading="§ 14-413 Permitted temporary uses – Batching plants.">
  <section prefix="§" num="14-413" heading="Permitted temporary uses – Batching plants.">
    <para num="(a)" heading="Where allowed.">Temporary batching plants (asphalt or concrete) are allowed in any district in connection with construction activities.</para>
    <para num="(b)" heading="Setback.">Temporary batching plants must be set back at least 50 feet from any property developed for other than industrial uses.</para>
    <para num="(c)" heading="Durational limits.">Temporary batching plants are limited the duration of construction or 1 year, whichever is sooner.</para>
    <annotation type="History">Ord. 16-581</annotation>
  </section>
</baltimore-city-law>
