<?xml version='1.0' encoding='utf-8'?>
<baltimore-city-law heading="Part III – Artwork Allocation">
  <section prefix="§" num="21-16" heading="Amount required.">
    <para num="(a)" heading="Minimum allocation – General.">Except as provided in subsection (b) of this section, at least 1% of all eligible funds for a construction project shall be allocated for:<para num="(1)">artwork for that project; or</para>
      <para num="(2)">other public art uses as authorized by this subtitle.</para>
    </para>
    <para num="(b)" heading="Minimum allocation – Water and wastewater utility work.">For water or wastewater utility projects, the Commission shall determine, on a case-by-case basis after consultation with the Department of Public works, whether and to what extent eligible funds for that project may be allocated for artwork or other public art uses.  If the Commission and the Department of Public Works disagree as to whether or to what extent eligible funds may be allocated, the Director of Public Works makes the final decision.</para>
    <annotation type="History">Ord. 07-489</annotation>
  </section>
  <section prefix="§" num="21-17" heading="Grant and other funding requests.">
    <text>In applying for grants or other funding for a construction project, a City agency shall request that:</text>
    <para num="(1)">to the fullest extent practicable, the grant or other funding be in the form of “eligible funds; and</para>
    <para num="(2)">the grant or other funding include an additional 1% of those eligible funds for artwork.</para>
    <annotation type="History">Ord. 07-489</annotation>
  </section>
  <section prefix="§" num="21-18" heading="Preliminary determinations.">
    <para num="(a)" heading="Consultation with agency.">
      <para num="(1)">Each City agency shall consult with the Commission on the application of this subtitle to any construction project being proposed by that agency.</para>
      <para num="(2)">This consultation shall occur:<para num="(i)">as early as possible in the design stage; and</para>
        <para num="(ii)">in any event, before the project is advertised for bid.</para>
      </para>
    </para>
    <para num="(b)" heading="Determination.">Based on the consultation, the Commission shall determine within 90 days:<para num="(1)">the aggregate amount of the artwork allocation required by &lt;cite data-path="|5|§21-16"&gt;§ 21-16 of this subtitle&lt;/cite&gt;; and</para>
      <para num="(2)">at least preliminarily, the extent to which all or part of that aggregate amount can and should be used for:<para num="(i)">artwork for that project; or</para>
        <para num="(ii)">other public art uses as authorized by this subtitle.</para>
      </para>
    </para>
    <annotation type="History">Ord. 07-489</annotation>
  </section>
  <section prefix="§" num="21-19" heading="Incorporation into contract specifications.">
    <text>The contract specifications in the invitation to bid or request for proposals shall incorporate:</text>
    <para num="(1)">the requirements of this subtitle; and</para>
    <para num="(2)">the Commission’s determinations under § 21-18(b)(1) and (2) of this subtitle.</para>
    <annotation type="History">Ord. 07-489</annotation>
  </section>
  <section prefix="§" num="21-20" heading="Allocation of funds.">
    <text>On the award of a contract for the project, the contracting agency shall notify the Department of Finance that the aggregate amount of the artwork allocation, as determined under &lt;cite data-path="|5|§21-18|(b)"&gt;§ 21-18(b) of this subtitle&lt;/cite&gt;, shall be transferred as it become available to a capital account to be used for purposes of this subtitle.</text>
    <annotation type="History">Ord. 07-489</annotation>
  </section>
  <section prefix="§§" num="21-21 to 21-25" reserved="true" />
</baltimore-city-law>
