§ 3-26 Engineering report.
Current through 2026-07-17. Source: City of Balt., Md., Ord. 26-129. Published by the Baltimore City Department of Legislative Reference.
Balt., Md., Code art. 7, § 3-26 (2026)
§ 3-26 Engineering report.LinkCopy Citation
(a)Report required.
Any proposal to offset the effect of development in the Floodway by construction of stream modifications must be documented by an engineering report, prepared by a licensed professional engineer, that fully evaluates the effects of the construction and is submitted with the application for a building permit.
(b)Basis.
As the basis of analysis, the report must use the base flood and floodway data prepared by the Federal Emergency Management Agency.
History: Ord. 88-188
History: Ord. 11-516
History: Ord. 14-208