<?xml version='1.0' encoding='utf-8'?>
<baltimore-city-law heading="§ 3-26 Engineering report.">
  <section prefix="§" num="3-26" heading="Engineering report.">
    <para num="(a)" heading="Report required.">Any proposal to offset the effect of development in the Floodway by construction of stream modifications must be documented by an engineering report, prepared by a licensed professional engineer, that fully evaluates the effects of the construction and is submitted with the application for a building permit.</para>
    <para num="(b)" heading="Basis.">As the basis of analysis, the report must use the base flood and floodway data prepared by the Federal Emergency Management Agency.</para>
    <annotation type="Prior Codifications">City Code, 1976/83, art. 7, §5(b)(3)(1st and 2nd sens.)</annotation>
    <annotation type="Prior Codifications">2000, art. 7, §3-24</annotation>
    <annotation type="History">Ord. 88-188</annotation>
    <annotation type="History">Ord. 11-516</annotation>
    <annotation type="History">Ord. 14-208</annotation>
  </section>
</baltimore-city-law>
