<?xml version='1.0' encoding='utf-8'?>
<baltimore-city-law heading="Division II – Stormwater Management">
  <container prefix="Subtitle" num="21" heading="Definitions; General Provisions">
    <section prefix="§" num="21-1" heading="Definitions.">
      <para num="(a)" heading="In general.">In this Division II, the following terms have the meaning indicated.</para>
      <para num="(b)" heading="Adverse impact.">“Adverse impact” means any effect on waters or wetlands, including their quality, quantity, surface area, species composition, aesthetics, or usefulness for human or natural uses, that:<para num="(1)">is deleterious; and</para>
        <para num="(2)">either:<para num="(i)">is or potentially can be harmful or injurious to human health, welfare, or safety, to property, or to biological productivity, diversity, or stability; or</para>
          <para num="(ii)">unreasonably interferes with the enjoyment of life or property, including outdoor recreation.</para>
        </para>
      </para>
      <para num="(b-1)" heading="Approval.">
        <para num="(1)" heading="In general.">“Approval” means a documented action by the Department following a comprehensive review to determine and acknowledge that submitted materials demonstrate compliance with the requirements of a specified stage in a project’s process.</para>
        <para num="(2)" heading="Exclusions.">“Approval” does not include an acknowledgment by the Department that material has been received for review.</para>
      </para>
      <para num="(c)" heading="Best management practice .">“Best management practice” means a structural or nonstructural practice designed to store temporarily or treat stormwater runoff in order to mitigate flooding, reduce pollution, and provide other amenities.</para>
      <para num="(d)" heading="Channel protection storage volume.">“Channel protection storage volume” means the volume, calculated in accordance with the State’s Design Manual, used to design structural management practices to control stream channel erosion.</para>
      <para num="(e)" heading="Department.">“Department” means the Baltimore City Department of Public Works.</para>
      <para num="(e-1)" heading="Design Guidelines, City.">“Design Guidelines, City” means the 2010 Baltimore City Stormwater Design Guidelines, and all subsequent additions, revisions, and amendments to it, as adopted by the Department and approved by the State Water Management Administration.</para>
      <para num="(f)" heading="Design Manual.">“Design Manual, State” means the 2000 Maryland Stormwater Design Manual and all subsequent additions, revisions, and amendments to it.</para>
      <para num="(g)" heading="Develop.">“Develop” means to change the runoff characteristics of a parcel of land in conjunction with residential, commercial, industrial, or institutional construction or alteration.</para>
      <para num="(h)" heading="Disturb.">
        <para num="(1)">“Disturb” means to:<para num="(i)">clear or remove trees and brush from land;</para>
          <para num="(ii)">grade, stockpile, remove, excavate, scarify, or fill soil;</para>
          <para num="(iii)">grub or remove stumps; or</para>
          <para num="(iv)">strip or remove vegetative surface cover.</para>
        </para>
        <para num="(2)">“Disturb” does not include:<para num="(i)">mowing of grass;</para>
          <para num="(ii)">trimming of trees; or</para>
          <para num="(iii)">other maintenance activities that do not create unvegetated ground.</para>
        </para>
      </para>
      <para num="(i)" heading="Drainage area.">“Drainage area” means an area, measured in a horizontal plane, that:<para num="(1)">contributes runoff to a single point; and</para>
        <para num="(2)">is enclosed by a ridge line.</para>
      </para>
      <para num="(i-1)" heading="Environmental site design.">“Environmental site design” means using small-scale stormwater management practices, nonstructural techniques, and better site planning that, in accordance with methods specified in the State’s Design Manual, are used to mimic natural hydrologic runoff characteristics and minimize the impact of land development on water resources.</para>
      <para num="(j)" heading="Extreme flood volume.">“Extreme flood volume” means the storage volume required to control infrequent, large storm events in which overbank flows reach or exceed the boundaries of the 100- year floodplain.</para>
      <para num="(j-1)" heading="Impervious area.">“Impervious area” means any surface that does not allow stormwater to infiltrate into the soil surface.</para>
      <para num="(k)" />
      <para num="(l)" heading="Infiltration.">“Infiltration” means the passage or movement of water into the soil surface.</para>
      <para num="(l-1)" heading="Maximum extent practicable.">“Maximum extent practicable” means stormwater management systems designed so that:<para num="(1)">all reasonable opportunities for using environmental site design planning techniques and treatment practices are exhausted; and</para>
        <para num="(2)">a structural best management practice is implemented only where absolutely necessary.</para>
      </para>
      <para num="(m)" heading="Off-site ... management.">“Off-site ... management” means the design and construction of a facility necessary to control stormwater from more than one development.</para>
      <para num="(n)" heading="On-site ... management.">“On-site ... management” means the design and construction of systems necessary to control stormwater within one development.</para>
      <para num="(o)" heading="Overbank flood protection volume.">“Overbank flood protection volume” means the volume, calculated in accordance with the State’s Design Manual, controlled by structural practices to prevent an increase in the frequency of out of bank flooding generated by development.</para>
      <para num="(p)" heading="Person.">
        <para num="(1)" heading="In general.">“Person” has the meaning stated in &lt;cite data-path="|general|1|1|1-107|(a)"&gt;§ 1-107(a) {“Person: In general”}&lt;/cite&gt; of the City Code’s &lt;cite data-path="|general"&gt;General Provisions Article&lt;/cite&gt;.</para>
        <para num="(2)" heading="Qualified inclusion of governmental entities.">Notwithstanding &lt;cite data-path="|general|1|1|1-107|(b)"&gt;§ 1-107(b) {“Person: Exclusion”}&lt;/cite&gt; of the &lt;cite data-path="|general"&gt;General Provisions Article&lt;/cite&gt;, in this Division II “person” also includes, except as used in &lt;cite data-path="|general|28|1|28-13"&gt;§ 28-13{“Criminal penalties”}&lt;/cite&gt;, a governmental entity or an instrumentality or unit of a governmental entity.</para>
      </para>
      <para num="(p-1)" heading="Planning techniques.">“Planning techniques” means a combination of strategies employed early in project design to reduce the impact from development and to incorporate natural features into a stormwater management plan.</para>
      <para num="(q)" heading="Qualitative Control.">&lt;em&gt;See &lt;/em&gt;“Stormwater management – Qualitative control”.</para>
      <para num="(r)" heading="Quantitative Control.">&lt;em&gt;See &lt;/em&gt;“Stormwater management – Quantitative control”.</para>
      <para num="(s)" heading="Recharge volume.">“Recharge volume” means that portion of the water quality volume, calculated in accordance with the State’s Design Manual, used to maintain groundwater recharge rates at development sites.</para>
      <para num="(t)" heading="Redevelopment.">“Redevelopment” means any construction, alteration, or improvement that:<para num="(1)">disturbs more than 5,000 square feet of land;</para>
        <para num="(2)">is performed on a site where:<para num="(i)">the existing land use is commercial, industrial, institutional, or multi-family residential; and</para>
          <para num="(ii)">the existing impervious area of the site is more than 40% of the total area of the site.</para>
        </para>
      </para>
      <para num="(t-1)" heading="Retrofitting.">“Retrofitting” means the implementation of environmental site design practices, the construction of a structural best management practice, or the modification of an existing structural best management practice in a previously developed area to improve water quality over current conditions.</para>
      <para num="(u)" heading="Sediment.">“Sediment” means soils or other surficial materials that are the product of erosion and are transported or deposited by the action of wind, water, ice, gravity, or artificial means.</para>
      <para num="(v)" heading="Site.">“Site” means any tract, lot, parcel of land, or area of construction, or combination of tracts, lots, parcels of land, or areas of construction that are:<para num="(1)">in one ownership; or</para>
        <para num="(2)">in diverse ownership, but where:<para num="(i)">development is to be performed as part of a unit, subdivision, or project; and</para>
          <para num="(ii)">either:<para num="A.">the tracts, lots, or parcels of land are contiguous; or</para>
            <para num="B.">the development is a cooperative public-private undertaking.</para>
          </para>
        </para>
      </para>
      <para num="(w)" heading="Stabilization.">“Stabilization” means the prevention of soil movement by any of various vegetative or structural means.</para>
      <para num="(w-1)" heading="Stormwater.">“Stormwater” means water that originates from a precipitation event.</para>
      <para num="(w-2)" heading="Stormwater management system.">“Stormwater management system” means a system of natural areas, environmental site design practices, stormwater management practices, and any structure through which stormwater flows, infiltrates, or discharges from a site.</para>
      <para num="(x)" heading="Stormwater management – Qualitative control.">
        <para num="(1)" heading="In general.">“Stormwater management” means, for qualitative control, a system of vegetative, structural, and nonstructural practices, natural areas, environmental site design practices, stormwater management measures, and any other structure that reduces or eliminates pollutants that might otherwise be carried by surface runoff.</para>
        <para num="(2)" heading="Inclusions.">“Stormwater management” includes, for qualitative control, design parameters for:<para num="(i)">water quality volume; and</para>
          <para num="(ii)">recharge volume.</para>
        </para>
      </para>
      <para num="(y)" heading="Stormwater management – Quantitative control.">
        <para num="(1)" heading="In general.">“Stormwater management” means, for quantitative control, a system of vegetative, structural, and nonstructural practices, natural areas, environmental site design practices, stormwater management measures, and any other structure that controls the increased volume and rate of surface runoff caused by man-made changes to the land.</para>
        <para num="(2)" heading="Inclusions.">“Stormwater management” includes, for quantitative controls, design parameters for:<para num="(i)">channel protection storage volume;</para>
          <para num="(ii)">overbank flood protection volume; and</para>
          <para num="(iii)">extreme flood volume.</para>
        </para>
      </para>
      <para num="(z)" />
      <para num="(aa)" heading="Watershed.">“Watershed” means the total drainage area contributing runoff to a single point.</para>
      <para num="(bb)" heading="Water quality volume.">“Water quality volume” means the volume needed, calculated in accordance with the State’s Design Manual, to capture and treat the runoff from 90% of the average annual rainfall at a development site.</para>
      <para num="(cc)" heading="Wetlands.">“Wetlands” means an area that has saturated soils or periodic high groundwater levels and vegetation adapted to wet conditions and periodic flooding.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 04-672</annotation>
      <annotation type="History">Ord. 10-277</annotation>
      <annotation type="History">Ord. 13- 095</annotation>
      <annotation type="History">Ord. 22-125</annotation>
    </section>
    <section prefix="§" num="21-2" heading="Rules of interpretation.">
      <para num="(a)" heading="In general.">In interpreting and applying this Division II, the following rules of interpretation apply:<para num="(i)">those contained in Subtitles 2 and 3 of the City Code’s &lt;cite data-path="|general"&gt;General Provisions Article&lt;/cite&gt;; and</para>
        <para num="(ii)">any additional rules contained in this section.</para>
      </para>
      <para num="(b)" heading="Conflicting provisions.">
        <para num="(1)" heading="Division sets minimum requirements.">In their interpretation and application, the provisions of this Division II must be taken to be the minimum requirements for the promotion of the public health, safety, and general welfare.</para>
        <para num="(2)" heading="Most restrictive provision governs.">If any condition imposed by a provision of this Division II is either more or less restrictive than a comparable condition imposed by any other provision of this Division or by any other law, rule, or regulation of any kind, the condition that is the more restrictive governs.</para>
      </para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 22-125</annotation>
    </section>
    <section prefix="§" num="21-3" heading="Incorporation by reference.">
      <para num="(a)" heading="In general.">For purposes of this Division II, the following documents are incorporated by reference:<para num="(1)">the State’s Design Manual, which serves as the official City guide for stormwater management principles, methods, and practices;</para>
        <para num="(2)">the USDA Natural Resources Conservation Service Maryland Conservation Practice Standard Pond Code 378 (January 2000); and</para>
        <para num="(3)">the City’s Design Guidelines, which serve to supplement the State’s Design Manual as it relates to stormwater management principles, methods, and practices in the City.</para>
      </para>
      <para num="(b)" heading="Defined terms.">
        <para num="(1)">Terms used in the State’s Design Manual have the meanings ascribed to them in the Design Manual or otherwise by the State Water Management Administration.</para>
        <para num="(2)">These terms include, among others:<para num="(i)">“Agricultural land management practices”.</para>
          <para num="(ii)">“Aquifer”.</para>
          <para num="(iii)">“Detention structure”.</para>
          <para num="(iv)">“Direct discharge”.</para>
          <para num="(v)">“Extended detention”.</para>
          <para num="(vi)">“Grade”.</para>
        </para>
      </para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="21-4" heading="Purpose, goal, etc.">
      <para num="(a)" heading="Purpose.">The purpose of this Division II is to:<para num="(1)">protect, maintain, and enhance the public health, safety, and general welfare through the management of stormwater;</para>
        <para num="(2)">protect public and private property from damage;</para>
        <para num="(3)">reduce the adverse effects of development;</para>
        <para num="(4)">reduce stream channel erosion, pollution, siltation, and sedimentation;</para>
        <para num="(5)">reduce local flooding;</para>
        <para num="(6)">restore, enhance, and maintain the chemical, physical, and biological integrity
of streams; and</para>
        <para num="(7)">maintain after development, as nearly as possible, pre-development runoff characteristics.</para>
      </para>
      <para num="(b)" heading="Goal.">The goal of this Division II is to manage stormwater by:<para num="(1)">using environmental site design to the maximum extent practicable; and</para>
        <para num="(2)">using structural best management practices and alternative practices only when necessary.</para>
      </para>
      <para num="(c)" heading="Authority.">This Division II is adopted under the authority of State Environment Article, Title 4, Subtitle 2.</para>
      <para num="(d)" heading="Application.">This Division II applies to all new and redevelopment projects that have not received final approval for erosion and sediment control and stormwater management plans by May 4, 2010.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="21-5" heading="Administration.">
      <para num="(a)" heading="In general.">The Baltimore City Department of Public Works is responsible for administering and enforcing this Division II.</para>
      <para num="(b)" heading="Rules and regulations.">Subject to Title 4 {“Administrative Procedure Act – Regulations”} of the &lt;cite data-path="|general"&gt;City General Provisions Article&lt;/cite&gt;, the Department may adopt rules and regulations to carry out this Division II.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Text Conformed 02/16/21</annotation>
      <annotation type="Editor's Notes">By authority of Ordinance 20-431, Section 5, the Director of Legislative Reference, in consultation with the Law Department, has conformed the text of this subsection to refer to and reflect the requirements of the recently-enacted Administrative Procedure Act that, effective January 15, 2021, governs the proposal, adoption, and publication of administrative rules and regulations.</annotation>
    </section>
    <section prefix="§" num="21-6" heading="Scope.">
      <para num="(a)" heading="In general.">Except as specified in subsection (b) of this section, this Division II applies to all development within the corporate limits of Baltimore City.</para>
      <para num="(b)" heading="Exemptions.">The following activities are exempt from this Division II:<para num="(1)">agricultural land management practices that employ methods and procedures to further crop and livestock production and conservation to conserve related soil and water resources;</para>
        <para num="(2)">a single-family detached dwelling if:<para num="(i)">the activity does not disturb more than 2,500 square feet of land area; and</para>
          <para num="(ii)">the tract, lot, or parcel has not previously been the subject of an exemption under this item (2);</para>
        </para>
        <para num="(3)">construction, grading, or development (other than for single-family dwellings) if:<para num="(i)">the activity does not disturb more than 5,000 square feet of land; and</para>
          <para num="(ii)">the tract, lot, or parcel has not previously been the subject of an exemption under this item (3);</para>
        </para>
        <para num="(4)">a single-family dwelling that disturbs more than 2,500 square feet of land area but less than 5,000 square feet of land area, subject to the payment of a “small-project” fee established under &lt;cite data-path="|7|§25-2"&gt;§ 25-2 {“Fees”} of this Division II&lt;/cite&gt;; and</para>
        <para num="(5)">development that the State Water Management Administration determines will be regulated under specific state laws that provide for managing stormwater runoff.</para>
      </para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
  </container>
  <container prefix="Subtitle" num="22" heading="Stormwater Management Plans">
    <section prefix="§" num="22-1" heading="Phased plans required.">
      <text>Except as otherwise expressly provided in this Division II, no person may develop any land unless:</text>
      <para num="(1)">the project is a single-lot residential construction that establishes stormwater management measures in accordance with a standard stormwater management plan prepared in accordance with the City’s Design Guidelines and approved by the Department; or</para>
      <para num="(2)">the person:<para num="(i)">establishes stormwater management measures that control or manage runoff
from the development; and</para>
        <para num="(ii)">incorporates those measures into phased stormwater management plans approved by the Department.</para>
      </para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="22-2" heading="Design and construction.">
      <text>These stormwater management measures must:</text>
      <para num="(1)">meet the requirements of the State’s Design Manual, this Division II, and the City’s Design Guidelines; and</para>
      <para num="(2)">be constructed according to:<para num="(i)">an approved plan for new development; or</para>
        <para num="(ii)">the policies stated in &lt;cite data-path="|7|§23-7"&gt;§ 23-7 of this Division II&lt;/cite&gt; for redevelopment.</para>
      </para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="22-3" heading="Minimum control requirements.">
      <para num="(a)" heading="In general.">The minimum control requirements for these management measures are as provided in this section and the State’s Design Manual.</para>
      <para num="(b)" heading="Volume sizing criteria.">
        <para num="(1)">The criteria in the State’s Design Manual for environmental site design to the maximum extent practicable and the use of environmental site design planning techniques and treatment practices must be exhausted before any structural best management practice or alternative practice is implemented.</para>
        <para num="(2)">Stormwater management plans for development projects subject to this Division II must be designed using environmental site design sizing criteria, recharge volume, water quality volume, and channel protection storage volume criteria according to the State’s Design Manual. The maximum-extent-practicable standard is met when channel stability is maintained, predevelopment groundwater recharge is replicated, nonpoint source pollution is minimized, and structural stormwater management practices or alternative practices are used only if determined to be absolutely necessary.</para>
      </para>
      <para num="(c)" heading="10-year frequency storm event.">Runoff from the 10-year frequency storm event must be controlled in accordance with the State’s Design Manual if the Department determines that additional stormwater management is necessary because historical flooding problems exist and downstream floodplain development and conveyance system design cannot be controlled.</para>
      <para num="(d)" heading="Additional control requirements.">The Department may require more than the minimum control requirements of the State’s Design Manual if:<para num="(1)">hydrologic or topographic conditions warrant; or</para>
        <para num="(2)">flooding, stream channel erosion, or water quality problems exist downstream from a proposed project.</para>
      </para>
      <para num="(e)" heading="Alternative minimum controls.">With the approval of the State Water Management Administration, the Department may adopt alternative minimum control requirements that will:<para num="(1)">implement environmental site design to the maximum extent practicable; and</para>
        <para num="(2)">control flood damages, accelerated stream erosion, water quality, and sedimentation.</para>
      </para>
      <para num="(f)" heading="Consistency with FHMA plans.">Where applicable, stormwater management and development plans must be consistent with watershed management plans and flood management plans approved by the State Water Management Administration under the Flood Hazard Management Act of 1976.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="22-4" heading="Environmental site design; Structural practices.">
      <para num="(a)" heading="In general.">
        <para num="(1)">In designing stormwater management measures, the following must be used, either alone or in combination:<para num="(i)">environmental site design techniques and practices; and</para>
          <para num="(ii)">structural practices.</para>
        </para>
        <para num="(2)">The applicant must demonstrate that environmental site design has been implemented to the maximum extent practicable before the use of a structural best management practice or alternative practice may be considered in developing the stormwater management plan.</para>
        <para num="(3)">Stormwater management measures, their selection, basic design criteria, methodologies, and construction specifications:<para num="(i)">must comply with the State’s Design Manual and the City’s Design Guidelines; and</para>
          <para num="(ii)">are subject to approval of the Department and the State Water Management Administration.</para>
        </para>
        <para num="(4)">Environmental site design techniques and practices and structural stormwater management measures used to satisfy the minimum control requirements of &lt;cite data-path="|7|§22-3"&gt;§ 22-3 of this subtitle&lt;/cite&gt;:<para num="(i)">must have easements, as described in &lt;cite data-path="|7|§25-1|(b)|(1)"&gt;§ 25-1(b)(1) of this Division II&lt;/cite&gt;, recorded in the land records of Baltimore City;</para>
          <para num="(ii)">must have a recorded inspection and maintenance agreement, as described in &lt;cite data-path="|7|§27-3"&gt;§ 27-3 of this Division II&lt;/cite&gt;; and</para>
          <para num="(iii)">may not be altered without the Department’s prior approval.</para>
        </para>
      </para>
      <para num="(b)" heading="Environmental site design planning techniques and practices.">
        <para num="(1)">The following planning techniques must be applied according to the State’s Design Manual to satisfy the applicable minimum control requirements of &lt;cite data-path="|7|§22-3"&gt;§ 22-3 of this subtitle&lt;/cite&gt;:<para num="(i)">preserving and protecting natural resources;</para>
          <para num="(ii)">conserving natural drainage patterns;</para>
          <para num="(iii)">minimizing impervious area;</para>
          <para num="(iv)">reducing runoff volume;</para>
          <para num="(v)">using environmental site design practices to maintain 100% of the annual predevelopment groundwater recharge volume;</para>
          <para num="(vi)">using green roofs, permeable pavement, reinforced turf, and other alternative surfaces;</para>
          <para num="(vii)">limiting soil disturbance, mass grading, and compaction;</para>
          <para num="(viii)">clustering development; and</para>
          <para num="(ix)">other practices approved by the Department.</para>
        </para>
        <para num="(2)">The following environmental site design treatment practices must be designed according to the State’s Design Manual and the City’s Design Guidelines to satisfy the applicable minimum control requirements established in &lt;cite data-path="|7|§22-3"&gt;§ 22-3 of this subtitle&lt;/cite&gt;:<para num="(i)">disconnection of rooftop runoff;</para>
          <para num="(ii)">disconnection of non-rooftop runoff;</para>
          <para num="(iii)">sheetflow to conservation areas;</para>
          <para num="(iv)">rainwater harvesting;</para>
          <para num="(v)">submerged gravel wetlands;</para>
          <para num="(vi)">landscape infiltration;</para>
          <para num="(vii)">infiltration berms;</para>
          <para num="(viii)">dry wells;</para>
          <para num="(ix)">micro-bioretention;</para>
          <para num="(x)">rain gardens;</para>
          <para num="(xi)">swales;</para>
          <para num="(xii)">enhanced filters; and</para>
          <para num="(xiii)">other practices approved by the Department.</para>
        </para>
        <para num="(3)">The use of environmental site design planning techniques and treatment practices may not conflict with existing State or local laws, ordinances, regulations, or policies.</para>
      </para>
      <para num="(c)" heading="Structural stormwater management measures.">
        <para num="(1)">The following structural stormwater management practices must be designed to satisfy the applicable minimum control requirements of &lt;cite data-path="|7|§22-3"&gt;§ 22-3 of this subtitle&lt;/cite&gt;.<para num="(i)">stormwater management ponds;</para>
          <para num="(ii)">stormwater management wetlands;</para>
          <para num="(iii)">stormwater management infiltration;</para>
          <para num="(iv)">stormwater management filtering systems;</para>
          <para num="(v)">stormwater management open channel systems; and</para>
          <para num="(vi)">other practices provided in the State’s Design Manual.</para>
        </para>
        <para num="(2)">In selecting structural practices, consideration must be given to the performance criteria specified in the State’s Design Manual for:<para num="(i)">general feasibility;</para>
          <para num="(ii)">conveyance;</para>
          <para num="(iii)">pretreatment;</para>
          <para num="(iv)">treatment and geometry;</para>
          <para num="(v)">environment and landscaping; and</para>
          <para num="(vi)">maintenance.</para>
        </para>
        <para num="(3)">Structural practices must accommodate the unique hydrologic or geologic regions of the site.</para>
      </para>
      <para num="(d)" heading="Alternative practices.">
        <para num="(1)">Alternative structural and nonstructural stormwater management practices may be used for new development water quality control if they:<para num="(i)">meet the performance criteria established in the State’s Design Manual; and</para>
          <para num="(ii)">are approved by the State Water Management Administration.</para>
        </para>
        <para num="(2)">Practices used for redevelopment projects must be approved by the Department.</para>
      </para>
      <para num="(e)" heading="Impact analysis.">
        <para num="(1)">For the purposes of modifying the minimum control requirements or design criteria, the applicant must submit to the Department an analysis of the impacts of stormwater flows downstream in the watershed.</para>
        <para num="(2)">The analysis must include the hydrologic and hydraulic calculations necessary to determine the impact of hydrograph timing modifications of the proposed development upon a dam, highway, structure, or natural point of restricted streamflow.</para>
        <para num="(3)">The point of investigation is to be established, with the Department’s concurrence, downstream of the first downstream tributary whose drainage area equals or exceeds the contributing area to the project or stormwater management facility.</para>
      </para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="22-5" heading="Contents of plan.">
      <para num="(a)" heading="In general.">
        <para num="(1)">For any proposed development, the applicant must submit phased stormwater management plans to the Department for review and approval.</para>
        <para num="(2)">At a minimum, plans must be submitted for the concept, site development, and final stormwater management construction phases of project design.</para>
        <para num="(3)">Each plan must:<para num="(i)">include the minimum content specified in &lt;cite data-path="|7|§22-3"&gt;§ 22-3 {“Minimum control requirements”} of this subtitle&lt;/cite&gt;; and</para>
          <para num="(ii)">meet the requirements of the State’s Design Manual, the City’s Design Guidelines, and &lt;cite data-path="|7|§22-4"&gt;§ 22-4 {“Environmental site design; Structural practices”} of this subtitle&lt;/cite&gt;.</para>
        </para>
      </para>
      <para num="(b)" heading="Concept plan.">
        <para num="(1)">The applicant must submit a concept plan that provides sufficient information for an initial assessment of the proposed project and whether stormwater management can be provided according to &lt;cite data-path="|7|§22-4"&gt;§ 22-4 {“Environmental site design; Structural practices”} of this subtitle&lt;/cite&gt; and the State’s Design Manual.</para>
        <para num="(2)">Plans submitted for concept approval must include the following, minimum information:<para num="(i)">a map that shows, at a scale specified by the Department:<para num="A.">site location;</para>
            <para num="B.">existing natural features;</para>
            <para num="C.">water and other sensitive resources;</para>
            <para num="D.">topography; and</para>
            <para num="E.">natural drainage patterns;</para>
          </para>
          <para num="(ii)">the anticipated location of all:<para num="A.">impervious areas;</para>
            <para num="B.">buildings;</para>
            <para num="C.">roadways;</para>
            <para num="D.">parking;</para>
            <para num="E.">sidewalks;</para>
            <para num="F.">utilities; and</para>
            <para num="G.">other site improvements;</para>
          </para>
          <para num="(iii)">the location of:<para num="A.">the proposed limit of disturbance;</para>
            <para num="B.">erodible soils;</para>
            <para num="C.">steep slopes; and</para>
            <para num="D.">areas to be protected during construction;</para>
          </para>
          <para num="(iv)">preliminary estimates of:<para num="A.">stormwater management requirements;</para>
            <para num="B.">the selection and location of environmental site design practices to be used; and</para>
            <para num="C.">the location of all points of discharge from the site;</para>
          </para>
          <para num="(v)">a narrative that supports the concept design and describes how environmental site design will be implemented to the maximum extent practicable; and</para>
          <para num="(vi)">any other information the Department requires.</para>
        </para>
      </para>
      <para num="(c)" heading="Site development plan.">
        <para num="(1)">After approval of the concept plan, the applicant must submit, unless exempted by the Department, at the Department’s discretion, site development plans that reflect comments received during the previous review phase.</para>
        <para num="(2)">Plans submitted for site development approval must be of sufficient detail to allow site development to be reviewed.</para>
        <para num="(3)">These plans must include the following, minimum information:<para num="(i)">all information provided during the concept plan review phase;</para>
          <para num="(ii)">final site layout, including:<para num="A.">exact impervious area locations and acreages;</para>
            <para num="B.">proposed topography;</para>
            <para num="C.">delineated drainage areas at all points of discharge from the site; and</para>
            <para num="D.">stormwater volume computations for environmental site design practices and quantity control structures;</para>
          </para>
          <para num="(iii)">a narrative that:<para num="A.">supports the site development design;</para>
            <para num="B.">describes how environmental site design will be used to meet the minimum control requirements; and</para>
            <para num="C.">justifies any proposed structural stormwater management or alternative practice measure; and</para>
          </para>
          <para num="(iv)">any other information the Department requires.</para>
        </para>
      </para>
      <para num="(d)" heading="Final stormwater management plans.">
        <para num="(1)">After site development approval, the applicant must submit final stormwater management plans that reflect the comments received during the previous review phase.</para>
        <para num="(2)">Stormwater management plans submitted for final approval must be in the form of construction drawings, in sufficient detail to allow all approvals and permits to be issued, and accompanied by a report that includes sufficient information to evaluate the effectiveness of the proposed runoff control design.</para>
      </para>
      <para num="(e)" heading="Waivers and variances.">The plan must be accompanied by an application for any waiver or variance sought under Subtitle 23 or Subtitle 24.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
      <annotation type="History">Ord. 13- 095</annotation>
    </section>
    <section prefix="§" num="22-6" heading="Report for final plan.">
      <text>The report submitted for final stormwater management plan approval must contain the following, minimum information:</text>
      <para num="(1)">a brief narrative description of the project;</para>
      <para num="(2)">geotechnical investigations, including soil maps, borings, site specific recommendations, and any additional information necessary to evaluate the final stormwater management design;</para>
      <para num="(3)">descriptions of all water courses, impoundments, and wetlands on or adjacent to the site or into which stormwater directly flows;</para>
      <para num="(4)">drainage area maps that show pre- development and post-development runoff flow path segmentation and land use;</para>
      <para num="(5)">hydrologic computations of the applicable environmental site design and unified sizing criteria, according to the State’s Design Manual, for all points of discharge from the site;</para>
      <para num="(6)">hydraulic computations for all environmental site design practices and structural stormwater management measures to be used;</para>
      <para num="(7)">structural computations;</para>
      <para num="(8)">volume sizing computations, according to the State’s Design Manual, that support the final stormwater management design; and</para>
      <para num="(9)">any other information that the Department requires.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="22-7" heading="Construction drawings for final plan.">
      <para num="(a)" heading="In general.">The construction drawings submitted for final stormwater management plan approval must include the following:<para num="(1)">a vicinity map;</para>
        <para num="(2)">a topography survey that shows existing and proposed contours, including the area necessary to determine downstream analysis for proposed stormwater management facilities;</para>
        <para num="(3)">any proposed improvements, including the location of buildings or other structures, impervious surfaces, storm drainage facilities, and all grading;</para>
        <para num="(4)">the location of existing and proposed structures and utilities;</para>
        <para num="(5)">any easements and rights-of-way;</para>
        <para num="(6)">the delineation, if applicable, of:<para num="(i)">the 100-year floodplain; and</para>
          <para num="(ii)">any on-site wetlands;</para>
        </para>
        <para num="(7)">structural and construction details, including representative cross sections, for all components of:<para num="(i)">the proposed drainage system or systems; and</para>
          <para num="(ii)">stormwater management facilities;</para>
        </para>
        <para num="(8)">all necessary construction specifications;</para>
        <para num="(9)">a sequence of construction;</para>
        <para num="(10)">data for:<para num="(i)">total site area;</para>
          <para num="(ii)">disturbed area;</para>
          <para num="(iii)">new impervious area; and</para>
          <para num="(iv)">total impervious area;</para>
        </para>
        <para num="(11)">a table that shows the environmental site design and unified sizing criteria volumes required by the State’s Design Manual;</para>
        <para num="(12)">a table of materials to be used for stormwater management facility planting;</para>
        <para num="(13)">all soil boring logs and locations;</para>
        <para num="(14)">a maintenance inspection and maintenance activity schedule;</para>
        <para num="(15)">a proposed construction and inspection schedule;</para>
        <para num="(16)">an as-built certification signature block, to be executed after the project is completed; and</para>
        <para num="(17)">any other information that the Department requires.</para>
      </para>
      <para num="(b)" heading="Certification of compliance.">The applicant must certify on the drawings that all grading, drainage, construction, and development will be done in strict accordance with the approved plan.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="22-8" heading="Preparation of plan.">
      <para num="(a)" heading="In general.">The design of all stormwater management plans must be prepared by a professional engineer, professional land surveyor, or landscape architect licensed in the State.</para>
      <para num="(b)" heading="Professional engineer only.">If stormwater best management practices require a dam safety permit from the Maryland Department of the Environment or small pond approval from the City, the plan must be prepared by a professional engineer licensed in the State.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="22-9" heading="Easements for runoff.">
      <para num="(a)" heading="Easement.">If a stormwater management plan involves directing some or all runoff from the site, the applicant is responsible for obtaining from adjacent property owners any needed easements or property interests for water flow.</para>
      <para num="(b)" heading="Plan creates no right.">Approval of a stormwater management plan does not create or affect any right to direct runoff onto adjacent property without that property owner’s permission.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="22-10" heading="Review and approval of plan.">
      <para num="(a)" heading="Review and comment.">
        <para num="(1)">The Department must perform a comprehensive review of the plans for each phase of site design to determine compliance with this Division II.</para>
        <para num="(2)">For each plan phase, coordinated comments will be provided that reflect input from all appropriate agencies, including Planning, Zoning, and Public Works.</para>
        <para num="(3)">At each phase of project design, comments from the Department and other appropriate agencies must be addressed by the applicant and approval received before subsequent submissions.</para>
      </para>
      <para num="(b)" heading="Conditions.">In approving a plan, the Department may impose any conditions that it considers necessary or appropriate to:<para num="(1)">ensure compliance with this Division II; and</para>
        <para num="(2)">preserve the public health and safety.</para>
      </para>
      <para num="(c)" heading="Notification.">After the Department has completed its comprehensive review for each phase of site design, the Department must notify the applicant of:<para num="(1)">the Department’s approval of the plan;</para>
        <para num="(2)">the Department’s disapproval of the plan, together with:<para num="(i)">the reasons for disapproval; and</para>
          <para num="(ii)">any modifications that the Department requires for approval; or</para>
        </para>
        <para num="(3)">if no decision has yet been made:<para num="(i)">the status of the review process; and</para>
          <para num="(ii)">the anticipated date of completion.</para>
        </para>
      </para>
      <para num="(d)" heading="Endorsement.">A stormwater management plan is not valid until the plan has been endorsed and dated by the Department.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
  </container>
  <container prefix="Subtitle" num="23" heading="Waivers">
    <section prefix="§" num="23-1" heading="Quantitative control waiver.">
      <para num="(a)" heading="In general.">Except as provided for in &lt;cite data-path="|7|§23-5"&gt;§ 23-5 {“Phased development projects”} of this subtitle&lt;/cite&gt;, the Department may grant a waiver of quantitative control requirements, applied to the existing impervious cover on the site, for a project if:<para num="(1)">environmental site design has been implemented to the maximum extent practicable; and</para>
        <para num="(2)">1 or another of the following applies:<para num="(i)">the project is within an area for which a watershed management plan has been developed consistent with &lt;cite data-path="|7|§23-6"&gt;§ 23-6 of this subtitle&lt;/cite&gt;;</para>
          <para num="(ii)">the project has a direct, concentrated discharge of stormwater:<para num="A.">to tidal waters;</para>
            <para num="B.">to tidally influenced receiving wetlands; or</para>
            <para num="C.">to connected closed storm drainage systems of adequate capacity, as provided in subsection (b) of this section;</para>
          </para>
          <para num="(iii)">the project is an in-fill development to which all of the following apply:<para num="A.">the project is located in an area designated as a priority funding area under State Finance and Procurement Article Title 5, Subtitle 7B;</para>
            <para num="B.">the economic feasability of the project is tied to the planned density allowed under the City’s Zoning Code;</para>
            <para num="C.">implementation of stormwater management regulations adopted by the State in 2009 would result in a loss of planned density allowed under the City’s Zoning Code;</para>
            <para num="D.">the area is served by existing public water, sewer, and stormwater conveyances;</para>
            <para num="E.">the quantitative waiver is applied only to the impervious cover that previously existed on the site;</para>
            <para num="F.">environmental site design to the maximum extent practicable is used to meet the full water quality treatment requirements for the entire development; and</para>
            <para num="G.">environmental site design to the maximum extent practicable is used to provide full quantity control for all new impervious surfaces;</para>
          </para>
          <para num="(iv)">the applicant demonstrates through engineering analysis that unmanaged 10-year and 100-year storm events for the proposed development will not cause erosion, flooding, or an adverse impact on the receiving waters or downstream stormwater conveyance system; or</para>
          <para num="(v)">the Department determines that circumstances exist that prevent the reasonable implementation of quantity control practices.</para>
        </para>
      </para>
      <para num="(b)" heading="Closed drainage systems.">For purposes of subsection (a)(2)(ii)C of this section, hydrologic and hydraulic investigations must show that the receiving storm drainage system can accommodate anticipated storm water flows from the project site without downstream flooding or stream-bank erosion.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="23-2" heading="Qualitative control waiver.">
      <text>Except as provided for in &lt;cite data-path="|7|§23-5"&gt;§ 23-5 {“Phased development projects”} of this subtitle&lt;/cite&gt;, the Department may grant a waiver of qualitative control requirements for a project if:</text>
      <para num="(1)">the project will return the disturbed area to a predevelopment runoff condition, such as pipeline or conduit projects, certain landscaping projects, certain maintenance projects, and certain underground projects;</para>
      <para num="(2)">the project is an in-fill development project (that is, a development on vacant, bypassed, or underutilized land within an existing developed area) for which:<para num="(i)">environmental site design has been implemented to the maximum extent practicable; and</para>
        <para num="(ii)">it has been demonstrated that other best management practices are not feasible;</para>
      </para>
      <para num="(3)">the project is a redevelopment project for which the requirements of &lt;cite data-path="|7|§23-7"&gt;§ 23-7 of this subtitle&lt;/cite&gt; are satisfied; or</para>
      <para num="(4)">the Department determines that circumstances exist that prevent the reasonable implementation of environmental site design to the maximum extent practicable.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="23-3" heading="Conditions of waiver.">
      <para num="(a)" heading="Case-by-case.">A waiver may be granted only on a case-by-case basis, after considering the cumulative effects of the Department’s waiver policy.</para>
      <para num="(b)" heading="Impact.">A waiver may be granted only if it reasonably ensures that the development will not adversely impact stream quality.</para>
      <para num="(c)" heading="Fee in-lieu.">The Department may require a person who is granted a waiver to pay a fee in-lieu-of on-site management.</para>
      <annotation type="History">Ord. 02-367</annotation>
    </section>
    <section prefix="§" num="23-4" heading="Applications.">
      <para num="(a)" heading="In general.">The application for a waiver must:<para num="(1)">be in the form that the Department requires;</para>
        <para num="(2)">contain the descriptions, drawings, and other information needed to evaluate the proposed waiver;</para>
        <para num="(3)">contain any other information that the Department requires; and</para>
        <para num="(4)">be submitted to the Department with the applicant’s proposed stormwater management plan.</para>
      </para>
      <para num="(b)" heading="Separate applications for additions, etc.">A separate application is required for subsequent additions, extensions, or modifications to a development.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="23-4.1" heading="Public notices and comment.">
      <para num="(a)" heading="Website notice.">
        <para num="(1)">When an application for a waiver is submitted, the Department shall prepare and post on its website, available for download, a public notice of the application.</para>
        <para num="(2)">The public notice shall include:<para num="(i)">the applicant’s name and address;</para>
          <para num="(ii)">a description of the location and nature of the activity for which the application is made;</para>
          <para num="(iii)">the name, address, and telephone number of the office within the Department from which persons may obtain information about the application;</para>
          <para num="(iv)">a statement that any further notices about actions on the application will be posted on the Department’s website;</para>
          <para num="(v)">a description of how persons may submit information or comments about the application; and</para>
          <para num="(vi)">the date when the public comment period closes, not to exceed 30 days, and by which information or comments must be received by the Department.</para>
        </para>
      </para>
      <para num="(b)" heading="Mail and email notices.">The Department also shall mail or email public notices to:<para num="(1)">all contiguous property owners;</para>
        <para num="(2)">the City Councilmember in whose district the property is located; and</para>
        <para num="(3)">persons who have submitted information or comments about the application.</para>
      </para>
      <para num="(c)" heading="Comments.">Comments on an application must be submitted in writing to the Department before the close of the public comment period, as specified in the public notice.</para>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="23-5" heading="Phased development projects.">
      <text>The Department may grant a quantitative and qualitative control waiver for a phased development project if:</text>
      <para num="(1)">by May 4, 2010, a stormwater system has been constructed that is designed to meet:<para num="(i)">the regulatory requirements for stormwater adopted in 2000 by the Maryland Department of the Environment; and</para>
        <para num="(ii)">the requirements of this Division II, as in effect on July 27, 2002; or</para>
      </para>
      <para num="(2)">for future phases of a phased development project that are constructed after May 4, 2010:<para num="(i)">the regulatory requirements for stormwater adopted in 2009 by the Maryland Department of the Environment cannot be met; and</para>
        <para num="(ii)">the applicant demonstrates that all reasonable efforts were made to incorporate environmental site design into these phases of the development.</para>
      </para>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="23-6" heading="Watershed management plan.">
      <para num="(a)" heading="In general.">
        <para num="(1)">The Department may develop an overall watershed management plan for the purpose of implementing different policies for waivers and redevelopment.</para>
        <para num="(2)">If the Department establishes a watershed management plan for a specific watershed, the Department may develop quantitative control waivers and redevelopment provisions that differ from § 23-1(a)(2)(ii) through (v) and § 23-7.</para>
        <para num="(3)">
          <para num="(i)">If the Department establishes a watershed management plan for a specific watershed, then the Department may develop separate policies, reviewed and approved by the State Water Management Administration, for providing water quality control.</para>
          <para num="(ii)">These separate policies may include:<para num="A.">retrofitting;</para>
            <para num="B.">stream restoration;</para>
            <para num="C.">pollution trading;</para>
            <para num="D.">design criteria based on watershed management plans developed under &lt;cite data-path="|7|§23-6|(b)"&gt;§ 23-6(b) of this Division II&lt;/cite&gt;;</para>
            <para num="E.">payment of offset fees that are dedicated exclusively to provide for stormwater management within the same watershed as the proposed development; or</para>
            <para num="F.">other policies developed by the Department.</para>
          </para>
        </para>
      </para>
      <para num="(b)" heading="Requisites.">For this purpose, the watershed management plan must:<para num="(1)">include detailed hydrologic and hydraulic analyses to determine hydrograph timing;</para>
        <para num="(2)">include an evaluation of both quantity and quality management and of opportunities for environmental site design implementation;</para>
        <para num="(3)">include a cumulative impact assessment of current and proposed watershed development;</para>
        <para num="(4)">identify existing flooding conditions and receiving stream channel conditions;</para>
        <para num="(5)">be prepared at a reasonable scale;</para>
        <para num="(6)">specify where on-site or off-site quantitative and qualitative controls are to be implemented;</para>
        <para num="(7)">be consistent with the General Performance Standards for Stormwater Management in Maryland, found in Section 1.2 of the State’s Design Manual; and</para>
        <para num="(8)">be approved by the State Water Management Administration.</para>
      </para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="23-7" heading="Redevelopment.">
      <para num="(a)" heading="In general.">
        <para num="(1)">Stormwater management plans are required for all redevelopment, unless otherwise specified by watershed management plans developed under &lt;cite data-path="|7|§23-6|(b)"&gt;§ 23-6(b) of this subtitle&lt;/cite&gt;.</para>
        <para num="(2)">Stormwater management measures must be consistent with the State’s Design Manual.</para>
      </para>
      <para num="(b)" heading="Waived requirements.">Unless otherwise specified by the Department, a redevelopment project need not comply with requirements of the State’s Design Manual for:<para num="(1)">recharge volume;</para>
        <para num="(2)">channel protection storage volume;</para>
        <para num="(3)">overbank flood protection volume; and</para>
        <para num="(4)">extreme flood protection volume.</para>
      </para>
      <para num="(c)" heading="Applicable requirements – In general.">
        <para num="(1)">All redevelopment projects must, in accordance with the State’s Design Manual, reduce existing site impervious areas within the limits of disturbance by at least 50%.</para>
        <para num="(2)">If site conditions prevent the reduction of impervious area, then environmental site design practices must be implemented to the maximum extent practicable for at least 50% of the site’s existing impervious area within the limits of disturbance.</para>
        <para num="(3)">If a combination of impervious area reduction and stormwater practice implementation is used, the combined area must equal or exceed 50% of the site’s existing impervious area within the limits of disturbance.</para>
      </para>
      <para num="(d)" heading="Applicable requirements – Alternatives.">
        <para num="(1)">Alternative stormwater management measures may be used to meet the requirements of subsection (c) of this section if the applicant satisfactorily demonstrates to the Department that:<para num="(i)">impervious area reduction has been maximized; and</para>
          <para num="(ii)">environmental site design has been implemented to the maximum extent practicable.</para>
        </para>
        <para num="(2)">Alternative stormwater management measures include:<para num="(i)">an on-site structural best management practice;</para>
          <para num="(ii)">off-site implementation of structural best management practices to provide water quality treatment for an area equal to at least 50% of the existing impervious area within the limits of disturbance; and</para>
          <para num="(iii)">a combination of impervious area reduction, environmental site design implementation, and an on-site or off-site structural best management practice for an area equal to at least 50% of the existing site impervious area within the limits of disturbance.</para>
        </para>
      </para>
      <para num="(e)" heading="Separate policies.">
        <para num="(1)">The Department may develop separate policies for providing water quality treatment for redevelopment projects if the Department determines that the provisions of subsections (c) and (d) of this section have been implemented to the maximum extent practicable.</para>
        <para num="(2)">The Department’s criteria for separate policies are outlined in the City’s Design Guidelines.</para>
        <para num="(3)">Any separate redevelopment policy must be reviewed and approved by the State Water Management Administration.</para>
        <para num="(4)">These separate policies may include:<para num="(i)">a combination of impervious area reduction, environmental site design, and on-site and off-site structural best management practices;</para>
          <para num="(ii)">retrofitting to improve water quality over current conditions by:<para num="A.">construction of structural best management practices in a previously developed area; or</para>
            <para num="B.">modification of existing structural best management practices;</para>
          </para>
          <para num="(iii)">watershed or stream restoration;</para>
          <para num="(iv)">pollution trading;</para>
          <para num="(v)">design criteria based on watershed management plans developed under &lt;cite data-path="|7|§23-6|(b)"&gt;§ 23-6(b) of this subtitle&lt;/cite&gt;;</para>
          <para num="(vi)">payment of offset fees that are dedicated exclusively for stormwater management within the same watershed as the proposed development;</para>
          <para num="(vii)">a partial waiver of the treatment requirements if environmental site design is not practicable; or</para>
          <para num="(viii)">other practices approved by the Department.</para>
        </para>
        <para num="(5)">The Department will determine during the concept design phase which alternative measures may be made available. Prioritization of the alternative measures listed in paragraph (4) of this subsection must be considered after a determination by the Department that it is not practical to meet the 2009 regulatory requirements using environmental site design.</para>
        <para num="(6)">When determining which alternative measures may be authorized under paragraph (4) of this subsection for a project, the Department may consider whether:<para num="(i)">the redevelopment project is located in an area designated as:<para num="A.">a priority funding area under State Finance and Procurement Article Title 5, Subtitle 7B;</para>
            <para num="B.">a transit oriented development area under State Transportation Article Title 7, Subtitle 1; or</para>
            <para num="C.">a base realignment and closure revitalization and incentive zone under State Economic Development Article Title 5, Subtitle 13;</para>
          </para>
          <para num="(ii)">the redevelopment project is necessary to accommodate growth consistent with the City’s comprehensive plan for the area in which the project will be located; or</para>
          <para num="(iii)">bonding and financing have been secured based on an approval of a redevelopment plan approved by the Department.</para>
        </para>
      </para>
      <para num="(f)" heading="Applicable requirements – Increased impervious area.">For any net increase in impervious area resulting from the project, stormwater management must be addressed according to the new development requirements of the State’s Design Manual.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="23-8" heading="Administrative waiver.">
      <para num="(a)" heading="In general.">
        <para num="(1)">An administrative waiver is a decision by the Department to allow construction of a development project to be governed by the provisions of this Division II, as in effect on May 4, 2009.</para>
        <para num="(2)">An administrative waiver does not include quantitative or qualitative control waivers issued under § 23-1, § 23-2, or &lt;cite data-path="|7|§23-5"&gt;§ 23-5 of this Division II&lt;/cite&gt;.</para>
      </para>
      <para num="(b)" heading="Preliminary project approval.">
        <para num="(1)">An administrative waiver may be granted by the Department to a development project that, on or before May 4, 2010, has received preliminary project approval as part of a preliminary or planning review process.</para>
        <para num="(2)">At a minimum, a preliminary project approval includes:<para num="(i)">the number of planned dwelling units or lots;</para>
          <para num="(ii)">the proposed project density;</para>
          <para num="(iii)">the proposed size and location of all land uses for the project;</para>
          <para num="(iv)">a plan that identifies:<para num="A.">the proposed drainage patterns;</para>
            <para num="B.">the location of all points of discharge from the site; and</para>
            <para num="C.">the type, location, and size of all stormwater management measures based on site-specific stormwater management requirement computations; and</para>
          </para>
          <para num="(v)">any other information that the Department requires.</para>
        </para>
        <para num="(3)">An approval granted under this subsection does not require approval of an erosion and sediment control plan as a condition for the approval.</para>
      </para>
      <para num="(c)" heading="Expiration.">Except as provided by subsection (d) of this section, an administrative waiver granted under subsection (b) of this section expires on:<para num="(1)">May 4, 2013, if the development project does not have final erosion and sediment control and final stormwater management approval on or before that date; or</para>
        <para num="(2)">May 4, 2017, if the development project receives final erosion and sediment control and final stormwater management approval on or before May 4, 2013.</para>
      </para>
      <para num="(d)" heading="Extension.">
        <para num="(1)">Except as provided in paragraph (2) of this subsection, an administrative waiver may not be extended.</para>
        <para num="(2)">The Department may grant an extension for an administrative waiver only if, by May 4, 2010, a development project:<para num="(i)">has received a preliminary project approval as provided for in subsection (b) of this section; and</para>
          <para num="(ii)">was subject to:<para num="A.">a development rights and responsibilities agreement;</para>
            <para num="B.">a tax increment financing approval; or</para>
            <para num="C.">an annexation agreement.</para>
          </para>
        </para>
        <para num="(3)">When an agreement or approval identified in paragraph (2)(ii) of this subsection expires, any administrative waiver that was extended will expire.</para>
      </para>
      <para num="(e)" heading="Completion of construction.">Construction authorized by an administrative waiver granted under this section must be completed, with an occupancy permit issued under the &lt;cite data-path="|building-codes|II"&gt;Building Code&lt;/cite&gt; and a use permit issued under the Zoning Code, on or before either:<para num="(1)">May 4, 2017; or</para>
        <para num="(2)">the expiration date specified for any extension granted under subsection (d) of this section.</para>
      </para>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
  </container>
  <container prefix="Subtitle" num="24" heading="Variances">
    <section prefix="§" num="24-1" heading="When authorized.">
      <text>The Department may grant a variance from any requirement of this Division II if, because of exceptional circumstances applicable to the site, strict adherence to that requirement will result in unnecessary hardship and not fulfill the intent of this Division II.</text>
      <annotation type="History">Ord. 02-367</annotation>
    </section>
    <section prefix="§" num="24-2" heading="Application for variance.">
      <text>The application for a variance must:</text>
      <para num="(1)">be in the form that the Department requires;</para>
      <para num="(2)">state the specific variance sought;</para>
      <para num="(3)">explain why the variance is needed;</para>
      <para num="(4)">contain any other information that the Department requires; and</para>
      <para num="(5)">be submitted to the Department with the applicant’s proposed stormwater management plan.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="24-2.1" heading="Public notices and comment.">
      <para num="(a)" heading="Website notice.">
        <para num="(1)">When an application for a variance is submitted, the Department shall prepare and post on its website, available for download, a public notice of the application.</para>
        <para num="(2)">The public notice shall include:<para num="(i)">the applicant’s name and address;</para>
          <para num="(ii)">a description of the location and nature of the activity for which the application is made;</para>
          <para num="(iii)">the name, address, and telephone number of the office within the Department from which persons may obtain information about the application;</para>
          <para num="(iv)">a statement that any further notices about actions on the application will be posted on the Department’s website;</para>
          <para num="(v)">a description of how persons may submit information or comments about the application; and</para>
          <para num="(vi)">the date when the public comment period closes, not to exceed 30 days, and by which information or comments must be received by the Department.</para>
        </para>
      </para>
      <para num="(b)" heading="Mail and email notices.">The Department also shall mail or email public notices to:<para num="(1)">all contiguous property owners;</para>
        <para num="(2)">the City Councilmember in whose district the property is located; and</para>
        <para num="(3)">persons who have submitted information or comments about the application.</para>
      </para>
      <para num="(c)" heading="Comments.">Comments on an application must be submitted in writing to the Department before the close of the public comment period, as specified in the public notice.</para>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="24-3" heading="Justification required.">
      <text>The Department may not grant a variance unless the applicant provides sufficient satisfactorily demonstrates that the implementation of environmental site design to the maximum extent practicable has been thoroughly investigated.</text>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="24-4" heading="Offset fee.">
      <text>The Department may require a person who is granted a variance to pay an offset fee to the City.</text>
      <annotation type="History">Ord. 02-367</annotation>
    </section>
  </container>
  <container prefix="Subtitle" num="25" heading="Permits; Fees; Security">
    <section prefix="§" num="25-1" heading="Approved plan prerequisite to permits.">
      <para num="(a)" heading="Grading and building permits.">For any development that requires a stormwater management plan under this Division II, a grading or building permit may not be issued unless a final erosion and sediment control plan and a stormwater management plan has been approved by the Department.</para>
      <para num="(b)" heading="Building permits.">A building permit may not be issued without:<para num="(1)">recorded easements, as needed:<para num="(i)">for the environmental site design techniques and practices and structural stormwater management measures, as provided for in the approved stormwater management plan; and</para>
          <para num="(ii)">to provide adequate access for inspection and maintenance from a public right-of-way;</para>
        </para>
        <para num="(2)">a recorded stormwater management maintenance agreement, as described in &lt;cite data-path="|7|§27-3"&gt;§ 27-3 of this Division II&lt;/cite&gt;;</para>
        <para num="(3)">a performance bond; and</para>
        <para num="(4)">all necessary permissions from adjacent property owners.</para>
      </para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="25-2" heading="Fees.">
      <para num="(a)" heading="In general.">Non-refundable fees will be assessed and collected in advance by the Department for each phase of a development.</para>
      <para num="(b)" heading="Fee schedule.">
        <para num="(1)">The fees assessed under this Division II are in addition to the usual fees charged for grading or building permits.</para>
        <para num="(2)">Fees shall be assessed for plan reviews, waivers, offsets, stormwater approvals, administration and management of the approval process, inspections, “small-project” exemptions under &lt;cite data-path="|7|§21-6|(b)|(4)"&gt;§ 21-6(b)(4) of this Division II&lt;/cite&gt;, fees in lieu, and the like.</para>
        <para num="(3)">The amount of these fees shall be based on the relative complexity of a project, in accordance with a fee schedule established from time to time by the Board of Estimates.</para>
      </para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="25-3" heading="Performance security.">
      <para num="(a)" heading="Required.">For any development that requires a stormwater management plan under this Division II, a grading or building permit may not be issued until the applicant posts a surety or cash bond, or other means of security acceptable to the Department.</para>
      <para num="(b)" heading="Amount.">The amount of the security may not be less than the total estimated construction cost of the stormwater management facility.  This estimate must be prepared by the applicant and submitted with the plan.</para>
      <para num="(c)" heading="Tenor.">The security required by this section must provide for forfeiture on failure to:<para num="(1)">complete all work specified in the approved stormwater management plan;</para>
        <para num="(2)">comply with any provision of this Division II or of any other applicable law or regulation; or</para>
        <para num="(3)">comply with any applicable time limitations.</para>
      </para>
      <para num="(d)" heading="Release.">The security may not be released until:<para num="(1)">the Department conducts a final inspection of the completed work;</para>
        <para num="(2)">the applicant submits “as-built” plans to the Department, containing an executed as-built certification block; and</para>
        <para num="(3)">the Department verifies that the stormwater management facilities:<para num="(i)">have been completed; and</para>
          <para num="(ii)">comply with the approved plan and this Division II.</para>
        </para>
      </para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="25-4" heading="Permit suspension or revocation.">
      <text>After written notice to the permit holder, the Department may suspend or revoke any grading or building permit for any of the following reasons:</text>
      <para num="(1)">any violation of the conditions of the stormwater management plan approval;</para>
      <para num="(2)">any change in the site runoff characteristics on which a plan approval or waiver was granted;</para>
      <para num="(3)">construction not in accordance with the approved plan;</para>
      <para num="(4)">failure to comply with a correction notice or stop work order issued for the facility; or</para>
      <para num="(5)">a finding by the Department that an immediate danger exists in a downstream area.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
  </container>
  <container prefix="Subtitle" num="26" heading="Inspections">
    <section prefix="§" num="26-1" heading="By whom conducted.">
      <text>All inspections under this Division II must be:</text>
      <para num="(1)">conducted by an authorized representative of the Department; or</para>
      <para num="(2)">certified by a professional engineer licensed in this State.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="26-2" heading="Notices by applicant.">
      <text>The applicant must notify the Department:</text>
      <para num="(1)">at least 48 hours before starting any work in conjunction with site development;</para>
      <para num="(2)">at least 48 hours before starting any work in conjunction with the stormwater management plan; and</para>
      <para num="(3)">on completion of the project.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="26-3" heading="Inspections during construction.">
      <para num="(a)" heading="In general.">At a minimum, regular inspections must be made and documented, at the stages of construction specified in this section, for each environmental site design planning technique and practice and each structural and nonstructural stormwater management practice.</para>
      <para num="(b)" heading="Ponds.">For ponds:<para num="(1)">On completion of excavation to sub-foundation and, when required, installation of structural supports or reinforcement for structures, including:<para num="(i)">core trenches for structural embankments;</para>
          <para num="(ii)">inlet and outlet structures, anti-seep collars or diaphragms, and watertight connectors on pipes; and</para>
          <para num="(iii)">trenches for enclosed storm drainage facilities;</para>
        </para>
        <para num="(2)">during placement of structural fill or concrete and installation of piping and catch basins;</para>
        <para num="(3)">during backfill of foundations and trenches;</para>
        <para num="(4)">during embankment construction; and</para>
        <para num="(5)">on completion of final grading and establishment of permanent stabilization.</para>
      </para>
      <para num="(c)" heading="Wetlands.">For wetlands:<para num="(1)">at the stages specified in subsection (b) of this section for pond construction;</para>
        <para num="(2)">during and after wetland reservoir area planting; and</para>
        <para num="(3)">during the second growing season to verify a vegetation survival rate of at least 50%.</para>
      </para>
      <para num="(d)" heading="Infiltration trenches.">For infiltration trenches:<para num="(1)">during excavation to subgrade;</para>
        <para num="(2)">during placement and backfill of underdrain systems and observation wells;</para>
        <para num="(3)">during placement of geotextiles and all filter media;</para>
        <para num="(4)">during construction of appurtenant conveyance systems, such as diversion structures, pre-filters and filters, inlets, outlets, and flow distribution structures; and</para>
        <para num="(5)">on completion of final grading and establishment of permanent stabilization.</para>
      </para>
      <para num="(e)" heading="Infiltration basins.">For infiltration basins:<para num="(1)">at the stages specified in subsection (b) of this section for pond construction; and</para>
        <para num="(2)">during placement and backfill of underdrain systems.</para>
      </para>
      <para num="(f)" heading="Filtering systems.">For filtering systems:<para num="(1)">during excavation to subgrade;</para>
        <para num="(2)">during placement and backfill of underdrain systems;</para>
        <para num="(3)">during placement of geotextiles and all filter media;</para>
        <para num="(4)">during construction of appurtenant conveyance systems, such as flow diversion structures, pre-filters and filters, inlets, outlets, orifices, and flow distribution structures; and</para>
        <para num="(5)">on completion of final grading and establishment of permanent stabilization.</para>
      </para>
      <para num="(g)" heading="Open channel systems.">For open channel systems:<para num="(1)">during excavation to subgrade;</para>
        <para num="(2)">during placement and backfill of underdrain systems for dry swales;</para>
        <para num="(3)">during installation of diaphragms, check dams, or weirs; and</para>
        <para num="(4)">on completion of final grading and establishment of permanent stabilization.</para>
      </para>
      <para num="(h)" heading="Environmental site design and nonstructural practices.">For environmental site design and nonstructural practices:<para num="(1)">on completion of final grading;</para>
        <para num="(2)">on establishment of permanent stabilization; and</para>
        <para num="(3)">before issuance of an occupancy permit under the &lt;cite data-path="|building-codes|II"&gt;Building Code&lt;/cite&gt; and a use permit under the Zoning Code.</para>
      </para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="26-4" heading="Inspection reports.">
      <para num="(a)" heading="Reports required.">Written reports must be made of all inspections conducted during construction.</para>
      <para num="(b)" heading="Scope.">Each inspection report must specify:<para num="(1)">the date and location of the inspection;</para>
        <para num="(2)">whether the construction complies with the approved stormwater management plan;</para>
        <para num="(3)">any variations from the approved construction specifications;</para>
        <para num="(4)">any violations found; and</para>
        <para num="(5)">any other information that the Department requires.</para>
      </para>
      <para num="(c)" heading="Notice to applicant.">The Department must provide the applicant with the results of each inspection report as soon as possible after the inspection.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="26-5" heading="Work stoppage pending inspection.">
      <text>At the completion of each construction stage for which an inspection is required, no further work may be done until the Department inspects and approves the work completed to date.</text>
      <annotation type="History">Ord. 02-367</annotation>
    </section>
    <section prefix="§" num="26-6" heading="Final inspection.">
      <text>A final inspection must be conducted after construction is completed.</text>
      <annotation type="History">Ord. 02-367</annotation>
    </section>
    <section prefix="§" num="26-7" heading="As-built certification.">
      <para num="(a)" heading="Required.">Once construction is complete, the applicant must submit to the Department an as-built plan certification by a professional engineer or professional land surveyor licensed in the State.</para>
      <para num="(b)" heading="Tenor.">The certification must certify that the completed stormwater management practices and conveyance systems comply with the specifications contained in the approved plan.</para>
      <para num="(c)" heading="Contents.">The certification must include:<para num="(1)">a set of drawings that compare the approved stormwater management plan with what has been constructed; and</para>
        <para num="(2)">any other information that the Department requires.</para>
      </para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="26-8" heading="Notice to State Administration.">
      <para num="(a)" heading="In general.">For each stormwater management practice completed, the Department must submit a notice of construction to the State Water Management Administration.</para>
      <para num="(b)" heading="When and how.">The notice must be submitted:<para num="(1)">within 45 days of construction completion; and</para>
        <para num="(2)">on the form that the Administration supplies.</para>
      </para>
      <para num="(c)" heading="Contents.">The notice must report, on a site-by-site basis, the type, number, total drainage area, and total impervious area treated by all environmental site design techniques and practices and structural stormwater management practices.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
  </container>
  <container prefix="Subtitle" num="27" heading="Maintenance">
    <section prefix="§" num="27-1" heading="Maintenance responsibility.">
      <para num="(a)" heading="In general.">The maintenance of private stormwater management facilities is the responsibility of:<para num="(1)">the owner of the property; and</para>
        <para num="(2)">any other person in control of the property.</para>
      </para>
      <para num="(b)" heading="Scope of responsibility.">The owner of a property that contains private stormwater management facilities installed under this Division II or any other person in control of that property must, in perpetuity, maintain in good condition and promptly repair and restore all:<para num="(1)">environmental site design practices;</para>
        <para num="(2)">stormwater management facilities;</para>
        <para num="(3)">grade surfaces, walls, drains, dams, and structures;</para>
        <para num="(4)">vegetation;</para>
        <para num="(5)">erosion and sediment control measures; and</para>
        <para num="(6)">other protective devices.</para>
      </para>
      <para num="(c)" heading="Compliance with plan.">All maintenance, repairs, and restoration must be in accordance with the approved stormwater management plan.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="27-2" heading="Maintenance schedule.">
      <para num="(a)" heading="Required.">A maintenance schedule must be developed for the life of every stormwater management facility or system of environmental site design practices.</para>
      <para num="(b)" heading="Contents.">The schedule must specify:<para num="(1)">the maintenance to be completed;</para>
        <para num="(2)">the time for completing that maintenance; and</para>
        <para num="(3)">the person responsible for performing that maintenance.</para>
      </para>
      <para num="(c)" heading="Schedule to be part of approved plan.">The maintenance schedule must be printed on the approved stormwater management plan.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="27-3" heading="Maintenance agreement.">
      <para num="(a)" heading="Prerequisite for permit.">Before any grading or building permit may be issued for a project for which a private stormwater management facility is required, the owner must execute an inspection and maintenance agreement binding on all current and subsequent owners of land served by the facility.</para>
      <para num="(b)" heading="Coverage.">The agreement must provide for access to the facility, at all reasonable times, for regular inspections by the Department or its authorized representative to ensure that the facility is maintained in proper working condition to meet design standards.</para>
      <para num="(c)" heading="Performance bond.">
        <para num="(1)">A performance bond, with amount, terms, and provisions acceptable to the Department, must be provided.</para>
        <para num="(2)">The agreement must provide for forfeiture of the performance bond if, after written notice by the Department to correct any nonconformance with an approved plan&lt;strong&gt;&lt;em&gt;,&lt;/em&gt;&lt;/strong&gt; the owner fails to make satisfactory corrections within a reasonable time, not to exceed 30 days, unless extended for good cause shown.</para>
      </para>
      <para num="(d)" heading="Recordation.">The owner must record the agreement in the land records of Baltimore City.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="27-4" heading="Maintenance inspections.">
      <para num="(a)" heading="Periodic inspections required.">
        <para num="(1)">The Department must periodically inspect all environmental site design practices and structural stormwater management measures to ensure that preventative maintenance is being performed.</para>
        <para num="(2)">These inspections must be made:<para num="(i)">at least once during the 1&lt;sup&gt;st&lt;/sup&gt; year of operation; and</para>
          <para num="(ii)">at least once every 3 years following.</para>
        </para>
      </para>
      <para num="(b)" heading="Inspection reports.">
        <para num="(1)">The Department must maintain inspection reports for all stormwater management systems.</para>
        <para num="(2)">These inspection reports must include the following:<para num="(i)">the date of inspection;</para>
          <para num="(ii)">the name of the inspector;</para>
          <para num="(iii)">an assessment of the quality of the stormwater management system related to environmental site design treatment practice efficiency and the control of runoff to the maximum extent practicable;</para>
          <para num="(iv)">the condition of:<para num="A.">vegetation and filter media;</para>
            <para num="B.">fences and other safety devices;</para>
            <para num="C.">spillways, valves, and other control structures;</para>
            <para num="D.">embankments, slopes, and safety benches;</para>
            <para num="E.">reservoir and treatment areas;</para>
            <para num="F.">inlet and outlet channels and structures;</para>
            <para num="G.">underground drainage;</para>
            <para num="H.">sediment and debris accumulation in storage and forebay areas;</para>
            <para num="I.">any nonstructural practices to the extent practicable; and</para>
            <para num="J.">any other item that could affect the proper function of the stormwater management system; and</para>
          </para>
          <para num="(v)">a description of needed maintenance.</para>
        </para>
      </para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
    <section prefix="§" num="27-5" heading="Deficiencies.">
      <para num="(a)" heading="Notice of deficiency.">The department must promptly notify the owner of any deficiencies discovered from a maintenance inspection.</para>
      <para num="(b)" heading="Owner to correct.">The owner must correct the deficiencies:<para num="(1)">within 30 days of the notice; or</para>
        <para num="(2)">by any other time to which the Department and the owner agree.</para>
      </para>
      <para num="(c)" heading="Reinspection.">The Department must conduct a subsequent inspection to ensure completion of all required repairs.</para>
      <para num="(d)" heading="Enforcement action.">If repairs are not made or are not done properly, the Department may take any enforcement action authorized by Subtitle 28 of &lt;cite data-path="|7"&gt;this article&lt;/cite&gt; or otherwise by law.</para>
      <para num="(e)" heading="Immediate danger to health or safety.">
        <para num="(1)">If, after an inspection by the Department, the condition of a stormwater management facility is determined to present an immediate danger to the public health or safety, the Department may take whatever action is necessary to protect the public and make the facility safe.</para>
        <para num="(2)">The Department may assess against the owner the costs incurred under this subsection.</para>
      </para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 10-277</annotation>
    </section>
  </container>
  <container prefix="Subtitle" num="28" heading="Enforcement; Reviews; Penalties">
    <section prefix="§" num="28-1" heading="Violation notices.">
      <para num="(a)" heading="Notice required.">If a violation is found, the Department must provide written notice of the violation to:<para num="(1)">the developer or owner; and</para>
        <para num="(2)">the on-site personnel.</para>
      </para>
      <para num="(b)" heading="Contents.">A violation notice must describe:<para num="(1)">the nature of the violation; and</para>
        <para num="(2)">the required corrective action.</para>
      </para>
      <annotation type="History">Ord. 02-367</annotation>
    </section>
    <section prefix="§" num="28-2" heading="Enforcement of notice.">
      <para num="(a)" heading="In general.">The Department may take any one or a combination of the following actions to enforce a violation notice.</para>
      <para num="(b)" heading="Stop work order.">If a violation persists after issuance of a violation notice, the Department may issue a stop work order for the site.</para>
      <para num="(c)" heading="Bond forfeiture; other action.">If reasonable efforts to correct the violation have not been undertaken, the Department may:<para num="(1)">cause the performance bond or other securities to be forfeited; and</para>
        <para num="(2)">refer the matter for legal action.</para>
      </para>
      <para num="(d)" heading="Civil fines.">
        <para num="(1)">The Department may impose civil fines for minor infractions of this Division II.</para>
        <para num="(2)">A schedule of fines, not to exceed $500 for any one offense, shall be established and may be amended from time to time by the Department with the approval of the Baltimore City Board of Estimates.</para>
      </para>
      <annotation type="History">Ord. 02-367</annotation>
    </section>
    <section prefix="§§" num="28-3 to 28-4" reserved="true" />
    <section prefix="§" num="28-5" heading="Administrative review – In general.">
      <para num="(a)" heading="Right of appeal.">Any person aggrieved by the action of any official charged with the enforcement of this Division II, whether as the result of the disapproval of an application, the issuance of a violation notice, an alleged failure to properly enforce this Division II, or otherwise:<para num="(1)">may appeal the action to the Director of Public Works; and</para>
        <para num="(2)">on timely request, is entitled to a hearing on that appeal.</para>
      </para>
      <para num="(b)" heading="When and how taken.">The appeal must:<para num="(1)">be in writing;</para>
        <para num="(2)">state clearly the grounds on which the appeal is based;</para>
        <para num="(3)">if the person aggrieved desires a hearing on the appeal, contain an express statement to that effect; and</para>
        <para num="(4)">be filed with the Director within 10 days of the action in dispute.</para>
      </para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 14-307</annotation>
      <annotation type="History">Ord. 19-332</annotation>
    </section>
    <section prefix="§" num="28-6" heading="Administrative review – Delegation of hearing authority.">
      <para num="(a)" heading="In general.">Hearings may be conducted by:<para num="(1)">the Director of Public Works; or</para>
        <para num="(2)">a hearing officer designated by the Director.</para>
      </para>
      <para num="(b)" heading="Scope of delegation.">The Director may delegate to a hearing officer the authority to issue:<para num="(1)">proposed or final findings of fact;</para>
        <para num="(2)">proposed or final conclusions of law;</para>
        <para num="(3)">proposed or final findings of fact and conclusions of law;</para>
        <para num="(4)">proposed or final orders; or</para>
        <para num="(5)">the final administrative decision of the Department.</para>
      </para>
      <annotation type="History">Ord. 02-367</annotation>
    </section>
    <section prefix="§" num="28-7" heading="Administrative review – Conduct of hearing.">
      <para num="(a)" heading="Notice.">
        <para num="(1)">The Director of Public Works must provide all parties reasonable written notice of the hearing.</para>
        <para num="(2)">The notice must state:<para num="(i)">the date, time, place, and nature of the hearing;</para>
          <para num="(ii)">the right of a party to be represented, at the party’s own expense, by an attorney or, if permitted by law, other representative;</para>
          <para num="(iii)">the right of a party to call witnesses and submit documents or other evidence under &lt;cite data-path="|7|§28-8"&gt;§ 28-8 of this subtitle&lt;/cite&gt;; and</para>
          <para num="(iv)">that failure to appear for the scheduled hearing may result in an adverse action against the party.</para>
        </para>
      </para>
      <para num="(b)" heading="Hearings to be open and informal.">Except as otherwise provided by law or by rule or regulation of the Department, all hearings must be:<para num="(1)">open to the public; and</para>
        <para num="(2)">conducted in an orderly but informal manner.</para>
      </para>
      <annotation type="History">Ord. 02-367</annotation>
    </section>
    <section prefix="§" num="28-8" heading="Administrative review – Evidence.">
      <para num="(a)" heading="In general.">Except as otherwise provided by this section or by rule or regulation of the Department, formal rules of evidence and trial procedures do not apply.</para>
      <para num="(b)" heading="Right to submit.">On a genuine issue of fact, a party is entitled to:<para num="(1)">call witnesses;</para>
        <para num="(2)">offer evidence, including rebuttal evidence;</para>
        <para num="(3)">cross-examine any witness that another party or the Department calls; and</para>
        <para num="(4)">present summation and argument.</para>
      </para>
      <para num="(c)" heading="Scope.">The Director or hearing officer:<para num="(1)">may admit probative evidence that reasonable and prudent individuals commonly accept in the conduct of their affairs and give probative effect to that evidence;</para>
        <para num="(2)">may not exclude evidence solely on the basis that it is hearsay;</para>
        <para num="(3)">must give effect to a privilege recognized by law;</para>
        <para num="(4)">may receive documentary evidence in the form of copies or excerpts or through incorporation by reference;</para>
        <para num="(5)">may take official notice of a fact that is judicially noticeable or that is general, technical, or scientific and within the specialized knowledge of the Department; and</para>
        <para num="(6)">may exclude evidence that is:<para num="(i)">incompetent;</para>
          <para num="(ii)">irrelevant;</para>
          <para num="(iii)">immaterial; or</para>
          <para num="(iv)">unduly repetitious.</para>
        </para>
      </para>
      <annotation type="History">Ord. 02-367</annotation>
    </section>
    <section prefix="§" num="28-9" heading="Administrative review – Final decisions.">
      <para num="(a)" heading="Form and contents.">A final decision must:<para num="(1)">be in writing; and</para>
        <para num="(2)">contain separate statements of:<para num="(i)">the findings of fact;</para>
          <para num="(ii)">the conclusions of law; and</para>
          <para num="(iii)">the decision or order.</para>
        </para>
      </para>
      <para num="(b)" heading="Distribution.">A copy of the final decision must be mailed or delivered to each party or that party’s attorney of record.</para>
      <annotation type="History">Ord. 02-367</annotation>
    </section>
    <section prefix="§" num="28-10" reserved="true" />
    <section prefix="§" num="28-11" heading="Judicial and appellate review.">
      <para num="(a)" heading="Judicial review.">A party aggrieved by a final decision of the Department under this Division II may seek judicial review of that decision by petition to the Circuit Court for Baltimore City in accordance with the Maryland Rules of Procedure.</para>
      <para num="(b)" heading="Appellate review.">A party to the judicial review may appeal the court’s final judgment to the Court of Special Appeals in accordance with the Maryland Rules of Procedure.</para>
      <annotation type="History">Ord. 02-367</annotation>
      <annotation type="History">Ord. 04-672</annotation>
      <annotation type="History">Ord. 19-332</annotation>
    </section>
    <section prefix="§" num="28-12" reserved="true" />
    <section prefix="§" num="28-13" heading="Criminal penalties.">
      <para num="(a)" heading="In general.">Any person who violates any provision of this Division II or of any rule or regulation adopted under or incorporated into this Division II is guilty of a misdemeanor and, on conviction, is subject to a fine of not more than $1,000 or imprisonment for not more than 1 year or both fine and imprisonment for each violation.</para>
      <para num="(b)" heading="Each day a separate offense.">Each day that a violation continues is a separate offense.</para>
      <annotation type="History">Ord. 02-367</annotation>
    </section>
  </container>
  <container prefix="Subtitles" num="29 to 30" />
</baltimore-city-law>
