Plain Text Law

§ 22-1 Phased plans required.

Current through 2026-07-17. Source: City of Balt., Md., Ord. 26-129. Published by the Baltimore City Department of Legislative Reference.

Balt., Md., Code art. 7, § 22-1 (2026)

§ 22-1 Phased plans required.Copy Citation

Except as otherwise expressly provided in this Division II, no person may develop any land unless:
(1)
the project is a single-lot residential construction that establishes stormwater management measures in accordance with a standard stormwater management plan prepared in accordance with the City’s Design Guidelines and approved by the Department; or
(2)
the person:
(i)
establishes stormwater management measures that control or manage runoff from the development; and
(ii)
incorporates those measures into phased stormwater management plans approved by the Department.
History: Ord. 02-367
History: Ord. 10-277