<?xml version='1.0' encoding='utf-8'?>
<baltimore-city-law heading="§ 22-1 Phased plans required.">
  <section prefix="§" num="22-1" heading="Phased plans required.">
    <text>Except as otherwise expressly provided in this Division II, no person may develop any land unless:</text>
    <para num="(1)">the project is a single-lot residential construction that establishes stormwater management measures in accordance with a standard stormwater management plan prepared in accordance with the City’s Design Guidelines and approved by the Department; or</para>
    <para num="(2)">the person:<para num="(i)">establishes stormwater management measures that control or manage runoff
from the development; and</para>
      <para num="(ii)">incorporates those measures into phased stormwater management plans approved by the Department.</para>
    </para>
    <annotation type="History">Ord. 02-367</annotation>
    <annotation type="History">Ord. 10-277</annotation>
  </section>
</baltimore-city-law>
