<?xml version='1.0' encoding='utf-8'?>
<baltimore-city-law heading="§ 22-6 Report for final plan.">
  <section prefix="§" num="22-6" heading="Report for final plan.">
    <text>The report submitted for final stormwater management plan approval must contain the following, minimum information:</text>
    <para num="(1)">a brief narrative description of the project;</para>
    <para num="(2)">geotechnical investigations, including soil maps, borings, site specific recommendations, and any additional information necessary to evaluate the final stormwater management design;</para>
    <para num="(3)">descriptions of all water courses, impoundments, and wetlands on or adjacent to the site or into which stormwater directly flows;</para>
    <para num="(4)">drainage area maps that show pre- development and post-development runoff flow path segmentation and land use;</para>
    <para num="(5)">hydrologic computations of the applicable environmental site design and unified sizing criteria, according to the State’s Design Manual, for all points of discharge from the site;</para>
    <para num="(6)">hydraulic computations for all environmental site design practices and structural stormwater management measures to be used;</para>
    <para num="(7)">structural computations;</para>
    <para num="(8)">volume sizing computations, according to the State’s Design Manual, that support the final stormwater management design; and</para>
    <para num="(9)">any other information that the Department requires.</para>
    <annotation type="History">Ord. 02-367</annotation>
    <annotation type="History">Ord. 10-277</annotation>
  </section>
</baltimore-city-law>
