<baltimore-city-law heading="§ 22-7 Construction drawings for final plan.">
  <section prefix="§" num="22-7" heading="Construction drawings for final plan.">
    <para num="(a)" heading="In general.">The construction drawings submitted for final stormwater management plan approval must include the following:<para num="(1)">a vicinity map;</para>
      <para num="(2)">a topography survey that shows existing and proposed contours, including the area necessary to determine downstream analysis for proposed stormwater management facilities;</para>
      <para num="(3)">any proposed improvements, including the location of buildings or other structures, impervious surfaces, storm drainage facilities, and all grading;</para>
      <para num="(4)">the location of existing and proposed structures and utilities;</para>
      <para num="(5)">any easements and rights-of-way;</para>
      <para num="(6)">the delineation, if applicable, of:<para num="(i)">the 100-year floodplain; and</para>
        <para num="(ii)">any on-site wetlands;</para>
      </para>
      <para num="(7)">structural and construction details, including representative cross sections, for all components of:<para num="(i)">the proposed drainage system or systems; and</para>
        <para num="(ii)">stormwater management facilities;</para>
      </para>
      <para num="(8)">all necessary construction specifications;</para>
      <para num="(9)">a sequence of construction;</para>
      <para num="(10)">data for:<para num="(i)">total site area;</para>
        <para num="(ii)">disturbed area;</para>
        <para num="(iii)">new impervious area; and</para>
        <para num="(iv)">total impervious area;</para>
      </para>
      <para num="(11)">a table that shows the environmental site design and unified sizing criteria volumes required by the State’s Design Manual;</para>
      <para num="(12)">a table of materials to be used for stormwater management facility planting;</para>
      <para num="(13)">all soil boring logs and locations;</para>
      <para num="(14)">a maintenance inspection and maintenance activity schedule;</para>
      <para num="(15)">a proposed construction and inspection schedule;</para>
      <para num="(16)">an as-built certification signature block, to be executed after the project is completed; and</para>
      <para num="(17)">any other information that the Department requires.</para>
    </para>
    <para num="(b)" heading="Certification of compliance.">The applicant must certify on the drawings that all grading, drainage, construction, and development will be done in strict accordance with the approved plan.</para>
    <annotation type="History">Ord. 02-367</annotation>
    <annotation type="History">Ord. 10-277</annotation>
  </section>