§ 22-8 Preparation of plan.
Current through 2026-07-17. Source: City of Balt., Md., Ord. 26-129. Published by the Baltimore City Department of Legislative Reference.
Balt., Md., Code art. 7, § 22-8 (2026)
§ 22-8 Preparation of plan.LinkCopy Citation
(a)In general.
The design of all stormwater management plans must be prepared by a professional engineer, professional land surveyor, or landscape architect licensed in the State.
(b)Professional engineer only.
If stormwater best management practices require a dam safety permit from the Maryland Department of the Environment or small pond approval from the City, the plan must be prepared by a professional engineer licensed in the State.
History: Ord. 02-367
History: Ord. 10-277