<?xml version='1.0' encoding='utf-8'?>
<baltimore-city-law heading="§ 22-8 Preparation of plan.">
  <section prefix="§" num="22-8" heading="Preparation of plan.">
    <para num="(a)" heading="In general.">The design of all stormwater management plans must be prepared by a professional engineer, professional land surveyor, or landscape architect licensed in the State.</para>
    <para num="(b)" heading="Professional engineer only.">If stormwater best management practices require a dam safety permit from the Maryland Department of the Environment or small pond approval from the City, the plan must be prepared by a professional engineer licensed in the State.</para>
    <annotation type="History">Ord. 02-367</annotation>
    <annotation type="History">Ord. 10-277</annotation>
  </section>
</baltimore-city-law>
