  <section prefix="§" num="25-1" heading="Approved plan prerequisite to permits.">
    <para num="(a)" heading="Grading and building permits.">For any development that requires a stormwater management plan under this Division II, a grading or building permit may not be issued unless a final erosion and sediment control plan and a stormwater management plan has been approved by the Department.</para>
    <para num="(b)" heading="Building permits.">A building permit may not be issued without:<para num="(1)">recorded easements, as needed:<para num="(i)">for the environmental site design techniques and practices and structural stormwater management measures, as provided for in the approved stormwater management plan; and</para>
        <para num="(ii)">to provide adequate access for inspection and maintenance from a public right-of-way;</para>
      </para>
      <para num="(2)">a recorded stormwater management maintenance agreement, as described in &lt;cite data-path="|7|§27-3"&gt;§ 27-3 of this Division II&lt;/cite&gt;;</para>
      <para num="(3)">a performance bond; and</para>
      <para num="(4)">all necessary permissions from adjacent property owners.</para>
    </para>
    <annotation type="History">Ord. 02-367</annotation>
    <annotation type="History">Ord. 10-277</annotation>
  </section>
  <section prefix="§" num="25-2" heading="Fees.">
    <para num="(a)" heading="In general.">Non-refundable fees will be assessed and collected in advance by the Department for each phase of a development.</para>
    <para num="(b)" heading="Fee schedule.">
      <para num="(1)">The fees assessed under this Division II are in addition to the usual fees charged for grading or building permits.</para>
      <para num="(2)">Fees shall be assessed for plan reviews, waivers, offsets, stormwater approvals, administration and management of the approval process, inspections, “small-project” exemptions under &lt;cite data-path="|7|§21-6|(b)|(4)"&gt;§ 21-6(b)(4) of this Division II&lt;/cite&gt;, fees in lieu, and the like.</para>
      <para num="(3)">The amount of these fees shall be based on the relative complexity of a project, in accordance with a fee schedule established from time to time by the Board of Estimates.</para>
    </para>
    <annotation type="History">Ord. 02-367</annotation>
    <annotation type="History">Ord. 10-277</annotation>
  </section>
  <section prefix="§" num="25-3" heading="Performance security.">
    <para num="(a)" heading="Required.">For any development that requires a stormwater management plan under this Division II, a grading or building permit may not be issued until the applicant posts a surety or cash bond, or other means of security acceptable to the Department.</para>
    <para num="(b)" heading="Amount.">The amount of the security may not be less than the total estimated construction cost of the stormwater management facility.  This estimate must be prepared by the applicant and submitted with the plan.</para>
    <para num="(c)" heading="Tenor.">The security required by this section must provide for forfeiture on failure to:<para num="(1)">complete all work specified in the approved stormwater management plan;</para>
      <para num="(2)">comply with any provision of this Division II or of any other applicable law or regulation; or</para>
      <para num="(3)">comply with any applicable time limitations.</para>
    </para>
    <para num="(d)" heading="Release.">The security may not be released until:<para num="(1)">the Department conducts a final inspection of the completed work;</para>
      <para num="(2)">the applicant submits “as-built” plans to the Department, containing an executed as-built certification block; and</para>
      <para num="(3)">the Department verifies that the stormwater management facilities:<para num="(i)">have been completed; and</para>
        <para num="(ii)">comply with the approved plan and this Division II.</para>
      </para>
    </para>
    <annotation type="History">Ord. 02-367</annotation>
    <annotation type="History">Ord. 10-277</annotation>
  </section>
  <section prefix="§" num="25-4" heading="Permit suspension or revocation.">
    <text>After written notice to the permit holder, the Department may suspend or revoke any grading or building permit for any of the following reasons:</text>
    <para num="(1)">any violation of the conditions of the stormwater management plan approval;</para>
    <para num="(2)">any change in the site runoff characteristics on which a plan approval or waiver was granted;</para>
    <para num="(3)">construction not in accordance with the approved plan;</para>
    <para num="(4)">failure to comply with a correction notice or stop work order issued for the facility; or</para>
    <para num="(5)">a finding by the Department that an immediate danger exists in a downstream area.</para>
    <annotation type="History">Ord. 02-367</annotation>
    <annotation type="History">Ord. 10-277</annotation>
  </section>