<?xml version='1.0' encoding='utf-8'?>
<baltimore-city-law heading="Division III – Soil Erosion and Sediment Control">
  <container prefix="Subtitle" num="31" heading="Definitions; General Provisions">
    <section prefix="§" num="31-1" heading="Definitions.">
      <para num="(a)" heading="In general.">In this Division III, the following terms shall have the meanings indicated.</para>
      <para num="(b)" heading="Applicant.">“Applicant” means the person that executes the necessary forms to apply for a permit or approval to carry out construction of a project.</para>
      <para num="(c)" heading="Clear.">“Clear” means to remove the vegetative ground cover while leaving the root mat intact.</para>
      <para num="(d)" heading="Department.">“Department” means the Baltimore City Department of Public Works.</para>
      <para num="(e)" heading="Developer.">&lt;em&gt;See &lt;/em&gt;“Owner; developer”.</para>
      <para num="(f)" heading="Environmental site design.">“Environmental site design” means using small-scale stormwater management practices, nonstructural techniques, and better site planning to mimic natural hydrologic runoff characteristics and to minimize the impact of land development on water resources.</para>
      <para num="(g)" heading="Erosion.">“Erosion” means the process by which land surface is worn away by the action of wind, water, ice, or gravity.</para>
      <para num="(h)" heading="Erosion and sediment control.">“Erosion and sediment control” means a system of structural and vegetative measures that minimizes soil erosion and off-site sedimentation.</para>
      <para num="(i)" heading="Grade.">“Grade” means to disturb earth by any one or combination of methods, including excavating, filling, stockpiling, grubbing, or removing root mat or topsoil.</para>
      <para num="(j)" />
      <para num="(k)" heading="Interested person.">“Interested person” means a person who has a legal right that could be directly and adversely affected by a specific erosion or sediment control issue.</para>
      <para num="(l)" heading="Owner; developer.">
        <para num="(1)" heading="General.">“Owner” or “developer” means a person:<para num="(i)">undertaking activities covered by this Division III; or</para>
          <para num="(ii)">for whose benefit activities covered by this Division III are undertaken.</para>
        </para>
        <para num="(2)" heading="Exclusions.">“Owner” or “developer” does not include a general contractor or subcontractor that does not have a proprietary interest in the project.</para>
      </para>
      <para num="(m)" heading="Person.">
        <para num="(1)" heading="In general.">“Person” has the meaning stated in &lt;cite data-path="|general|1|1|1-107|(a)"&gt;§ 1-107(a) {“Person: In general”}&lt;/cite&gt; of the City Code’s &lt;cite data-path="|general"&gt;General Provisions Article&lt;/cite&gt;.</para>
        <para num="(2)" heading="Qualified inclusion of governmental entities.">Notwithstanding &lt;cite data-path="|general|1|1|1-107|(b)"&gt;§ 1-107(b) {“Person: Exclusion”}&lt;/cite&gt; of the &lt;cite data-path="|general"&gt;General Provisions Article&lt;/cite&gt;, in this Division III “person” also includes, except as used in &lt;cite data-path="|general|35|1|35-13|(b)"&gt;§ 35-13(b){“Criminal penalties”}&lt;/cite&gt;, a governmental entity or an instrumentality or unit of a governmental entity.</para>
      </para>
      <para num="(n)" heading="Responsible personnel.">“Responsible personnel” means any foreperson, superintendent, project engineer, or other individual who is in charge of:<para num="(1)">on-site clearing and grading operations; or</para>
        <para num="(2)">the implementation and maintenance of an erosion and sediment control plan.</para>
      </para>
      <para num="(o)" heading="Sediment.">“Sediment” means soils or other surficial materials that are the product of erosion and are transported or deposited by the action of wind, water, ice, gravity, or artificial means.</para>
      <para num="(p)" heading="Site.">“Site” means any tract, lot, parcel of land, or area of construction, or any combination of tracts, lots, parcels of land, or areas of construction that are:<para num="(1)">in one ownership; or</para>
        <para num="(2)">in diverse ownership, but where:<para num="(i)">development is to be performed as part of a unit, subdivision or project; and</para>
          <para num="(ii)">either:<para num="A.">the tracts, lots, or parcels of land are contiguous; or</para>
            <para num="B.">the developer is a cooperative public-private undertaking.</para>
          </para>
        </para>
      </para>
      <para num="(q)" heading="Standards and Specifications.">“Standards and Specifications” means the &lt;em&gt;2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control &lt;/em&gt;or any subsequent revisions.</para>
      <para num="(r)" heading="Stormwater.">“Stormwater” means water that originates from a precipitation event.</para>
      <para num="(s)" heading="Stormwater management system.">“Stormwater management system” means a system of natural areas, environmental site design practices, stormwater management practices, and any structure through which stormwater flows, infiltrates, or discharges from a site.</para>
      <annotation type="History">Ord. 13-095</annotation>
      <annotation type="History">Ord. 22-125</annotation>
    </section>
    <section prefix="§" num="31-2" heading="Rules of interpretation.">
      <para num="(a)" heading="In general.">In interpreting and applying this Division III, the following rules of interpretation apply:<para num="(i)">those contained in Subtitles 2 and 3 of the City Code’s &lt;cite data-path="|general"&gt;General Provisions Article&lt;/cite&gt;; and</para>
        <para num="(ii)">any additional rules contained in this section.</para>
      </para>
      <para num="(b)" heading="Conflicting provisions.">
        <para num="(1)" heading="Division sets minimum requirements.">In their interpretation and application the provisions of this Division III must be taken to be the minimum requirements for the promotion of the public health, safety, and general welfare.</para>
        <para num="(2)" heading="Most restrictive provision governs.">If any condition imposed by a provision of this Division III is either more or less restrictive than a comparable condition imposed by any other provision of this Division or by any other law, rule, or regulation of any kind, the condition that is the more restrictive governs.</para>
      </para>
      <annotation type="History">Ord. 13-095</annotation>
      <annotation type="History">Ord. 22-125</annotation>
    </section>
    <section prefix="§" num="31-3" heading="Incorporation by reference.">
      <para num="(a)" heading="In general.">For the purposes of this Division III, the following documents are incorporated by reference:<para num="(1)">the &lt;em&gt;2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control &lt;/em&gt;or any subsequent revisions of it, which serves as the official City guide for soil erosion and sediment control principles, methods, and practices; and</para>
        <para num="(2)">the City’s Erosion and Sediment Control Manual, which supplements the State’s Standards and Specifications as it relates to soil erosion and sediment control principals, methods, and practices in the City.</para>
      </para>
      <para num="(b)" heading="Defined terms.">
        <para num="(1)">Terms used in the Standards and Specifications have the meanings ascribed to them in that document or otherwise by the Maryland Department of the Environment.</para>
        <para num="(2)">These terms include, among others:<para num="(i)">“Adverse impact”.</para>
          <para num="(ii)">“Grading unit”.</para>
          <para num="(iii)">“Maximum extent practicable”.</para>
          <para num="(iv)">“Watershed”.</para>
        </para>
      </para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="31-4" heading="Purpose, goal, authority.">
      <para num="(a)" heading="Purpose.">The purpose of this Division III is to protect, maintain, and enhance the public health, safety, and general welfare by establishing minimum requirements and procedures to control the adverse impacts associated with land disturbances.</para>
      <para num="(b)" heading="Goal.">The goal of this Division III is to minimize soil erosion and prevent off-site sedimentation by using soil erosion and sediment control practices designed in accordance with governing law and regulations.</para>
      <para num="(c)" heading="Authority.">This Division III is adopted under the authority of State Environment Article, Title 4, Subtitle 1.</para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="31-5" heading="Administration.">
      <para num="(a)" heading="In general.">The Baltimore City Department of Public Works is responsible for administering and enforcing this Division III.</para>
      <para num="(b)" heading="Rules and regulations.">Subject to Title 4 {“Administrative Procedure Act – Regulations”} of the &lt;cite data-path="|general"&gt;City General Provisions Article&lt;/cite&gt;, the Department may adopt rules and regulations to carry out this Division III.</para>
      <annotation type="History">Ord. 13-095</annotation>
      <annotation type="History">Text Conformed 02/16/21</annotation>
      <annotation type="Editor's Notes">By authority of Ordinance 20-431, Section 5, the Director of Legislative Reference, in consultation with the Law Department, has conformed the text of this subsection to refer to and reflect the requirements of the recently-enacted Administrative Procedure Act that, effective January 15, 2021, governs the proposal, adoption, and publication of administrative rules and regulations.</annotation>
    </section>
    <section prefix="§§" num="31-6 to 31-8" reserved="true" />
    <section prefix="§" num="31-8" heading="Prohibited conduct generally.">
      <text>Except as otherwise provided in this Division III, no person may disturb land without implementing soil erosion and sediment controls in accordance with this Division III and the Standards and Specifications.</text>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="31-9" heading="Exemptions.">
      <para num="(a)" heading="Definitions.">
        <para num="(1)" heading="In general.">In this section, the following terms have the meanings indicated.</para>
        <para num="(2)" heading="Agricultural land management practices.">
          <para num="(i)" heading="In general.">“Agricultural land management practices” means those methods and procedures used in the cultivation of land to further crop and livestock production and conservation of related soil and water resources.</para>
          <para num="(ii)" heading="Exclusions.">“Agricultural land management practices” does not include logging and timber removal operations.</para>
        </para>
        <para num="(3)" heading="Best management practice.">“Best management practice” means a structural device or nonstructural practice designed to temporarily store or treat stormwater runoff in order to mitigate flooding, reduce pollution, and provide other amenities.</para>
      </para>
      <para num="(b)" heading="Exempt activities.">The following activities are exempt from this Division III:<para num="(1)">agricultural land management practices;</para>
        <para num="(2)">agricultural best management practices;</para>
        <para num="(3)">clearing or grading activities that disturb less than 5,000 square feet of land area and disturb less than 100 cubic yards of earth; and</para>
        <para num="(4)">clearing or grading activities that are subject exclusively to State approval and enforcement under State law and regulations.</para>
      </para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="31-10" heading="Variances.">
      <para num="(a)" heading="When authorized.">The Department may grant a variance from any requirement of this Division III if, because of exceptional circumstances applicable to the site, strict adherence to that requirement will result in exceptional hardship and not fulfill the intent of this Division III.</para>
      <para num="(b)" heading="Application for variance.">The application for variance must:<para num="(i)">be in the form that the Department requires;</para>
        <para num="(ii)">state the specific variance sought;</para>
        <para num="(iii)">explain why the variance is needed;</para>
        <para num="(iv)">contain any other information that the Department requires; and</para>
        <para num="(v)">be submitted to the Department with the applicant’s proposed site development plan.</para>
      </para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
  </container>
  <container prefix="Subtitle" num="32" heading="Erosion and Sediment Control Plans">
    <section prefix="§" num="32-1" heading="Definitions.">
      <para num="(a)" heading="In general.">In this subtitle, the following terms have the meanings indicated.</para>
      <para num="(b)" heading="Approval.">
        <para num="(1)" heading="In general.">“Approval” means a documented action by the Department following a comprehensive review to determine and acknowledge that submitted materials demonstrate compliance with the requirements of a specified stage in a project’s development process.</para>
        <para num="(2)" heading="Exclusions.">“Approval” does not include an acknowledgment by the Department that material has been received for review.</para>
      </para>
      <para num="(c)" heading="Drainage area.">“Drainage area” means an area, measured in a horizontal plane, that:<para num="(1)">contributes runoff to a single point; and</para>
        <para num="(2)">is enclosed by a ridge line.</para>
      </para>
      <para num="(d)" heading="Stabilization.">“Stabilization” means the protection of exposed soils from erosion by the application of seed and mulch, seed and matting, sod, other vegetative measures, or structural means.</para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="32-2" heading="Plans required.">
      <text>Except as otherwise provided in this Division III, no person may grade land without erosion and sediment control plans approved by the Department.</text>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="32-3" heading="Review and approval of plans.">
      <para num="(a)" heading="Review and comment.">
        <para num="(1)">The Department must comprehensively review erosion and sediment control plans for each phase of the site design to determine compliance with this Division III.</para>
        <para num="(2)">For each plan phase, coordinated comments will be provided that reflect input from all appropriate agencies, including Planning, Zoning, and Public Works.</para>
        <para num="(3)">At each phase of project design, comments from the Department and other appropriate agencies must be addressed by the applicant and approval received before subsequent submissions.</para>
      </para>
      <para num="(b)" heading="Conditions.">In approving a plan, the Department may impose conditions that the Department considers necessary or appropriate to ensure:<para num="(1)">compliance with this Division III; and</para>
        <para num="(2)">the preservation of public health and safety.</para>
      </para>
      <para num="(c)" heading="Notification.">After the Department has completed its comprehensive review for each phase of site design, the Department must notify the applicant of either:<para num="(1)">the Department’s approval of the plan;</para>
        <para num="(2)">the Department’s disapproval of the plan, together with:<para num="(i)">the reasons for disapproval; and</para>
          <para num="(ii)">any modifications that the Department requires for approval; or</para>
        </para>
        <para num="(3)">if no decision has been made:<para num="(i)">the status of the review process; and</para>
          <para num="(ii)">the anticipated date of completion.</para>
        </para>
      </para>
      <para num="(d)" heading="Endorsement.">
        <para num="(1)">The final erosion and sediment control plan may not be considered approved without the inclusion of the Department’s dated signature on the plan.</para>
        <para num="(2)">Approved plans remain valid for 2 years from the date of approval, unless extended or renewed by the Department.</para>
      </para>
      <para num="(e)" heading="“Grandfathering” of approved plans.">
        <para num="(1)">Any plans that receive final approval after January 9, 2013, must be in compliance with the requirements of this Division III and the Standards and Specifications.</para>
        <para num="(2)">A plan that receives final approval on or before January 9, 2013, may be reapproved under its existing conditions, except for stabilization requirements, if grading activities begin on the site on or before January 9, 2015.</para>
        <para num="(3)">Stabilization practices on all sites must be in compliance with the requirements of this Division III and the Standards and Specifications on or before January 9, 2013, regardless of when an approved erosion and sediment control plan was approved.</para>
      </para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="32-4" heading="Contents of plans.">
      <para num="(a)" heading="Submission.">An applicant is responsible for submitting erosion and sediment control plans that meet the requirements of the Department, this Division III, and all other applicable provisions of the Baltimore City Code.</para>
      <para num="(b)" heading="Tenor of plans.">The plans must include sufficient information to evaluate:<para num="(1)">the environmental characteristics of the affected areas;</para>
        <para num="(2)">the potential impacts of the proposed grading on water resources; and</para>
        <para num="(3)">the effectiveness and acceptability of measures proposed to minimize soil erosion and off-site sedimentation.</para>
      </para>
      <para num="(c)" heading="Minimum information.">At a minimum, applicants must submit the following information for the concept, site development, and final erosion and sediment control phases of project design:<para num="(1)">a letter of transmittal or application;</para>
        <para num="(2)">a vicinity map indicating north arrow, scale, site location, and other information necessary to easily locate the property;</para>
        <para num="(3)">plan submittals as specified in § 32-5 {“Concept plan”}, § 32-6 {“Site development plan”}, and § 32-7 Final ... plans”}; and</para>
        <para num="(4)">the name, address, and telephone number of:<para num="(i)">the owner of the property where the grading is proposed;</para>
          <para num="(ii)">the developer; and</para>
          <para num="(iii)">the applicant.</para>
        </para>
      </para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="32-5" heading="Concept plan.">
      <para num="(a)" heading="In general.">The applicant must submit a concept plan that provides sufficient information for an initial assessment of the proposed project and whether erosion and sediment control can be provided according to this Division III.</para>
      <para num="(b)" heading="Minimum contents.">Plans submitted for concept approval must include:<para num="(1)">a map, at a scale specified by the Department, showing:<para num="(i)">the proposed limit of disturbance;</para>
          <para num="(ii)">topography;</para>
          <para num="(iii)">existing natural resources;</para>
          <para num="(iv)">wetlands;</para>
          <para num="(v)">floodplains;</para>
          <para num="(vi)">water bodies;</para>
          <para num="(vii)">highly erodible soils;</para>
          <para num="(viii)">natural drainage patterns; and</para>
          <para num="(ix)">any other sensitive areas to be protected during construction;</para>
        </para>
        <para num="(2)">a general description of the predominant soil types on the site, as described by the appropriate soil survey information available through the local soil conservation district or the USDA Natural Resources Soil Conservation Service;</para>
        <para num="(3)">the anticipated location of all:<para num="(i)">impervious areas;</para>
          <para num="(ii)">buildings;</para>
          <para num="(iii)">roadways;</para>
          <para num="(iv)">parking;</para>
          <para num="(v)">sidewalks;</para>
          <para num="(vi)">utilities; and</para>
          <para num="(vii)">other site improvements; and</para>
        </para>
        <para num="(4)">any other information that the Department requires.</para>
      </para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="32-6" heading="Site development plan.">
      <para num="(a)" heading="In general.">Unless otherwise directed by the Department, after approval of the concept plan, the applicant must submit site development plans that reflect comments received during the previous review phase.</para>
      <para num="(b)" heading="Minimum contents.">Plans submitted for site development approval must be of sufficient detail to allow site development to be reviewed and must include:<para num="(1)">all information provided during the concept plan review phase;</para>
        <para num="(2)">drainage area maps that show, at a minimum scale of 1" = 200':<para num="(i)">existing, interim, and proposed topography;</para>
          <para num="(ii)">proposed improvements;</para>
          <para num="(iii)">standard symbols for proposed sediment control features; and</para>
          <para num="(iv)">pertinent drainage information, including provisions to protect downstream areas from erosion for a minimum of 200 feet downstream or to the next conveyance system;</para>
        </para>
        <para num="(3)">a proposed erosion and sediment control plan that contains:<para num="(i)">the existing and proposed topography and improvements, at a scale between 1" = 10' and 1" = 50' with 2 foot contours or other approved contour interval;</para>
          <para num="(ii)">interim contours for projects with more than minor grading, if required by the Department;</para>
          <para num="(iii)">scale, project, and sheet title, and north arrow on each plan sheet;</para>
          <para num="(iv)">the limit of disturbance, including:<para num="A.">limit of grading (grading units, if applicable); and</para>
            <para num="B.">initial, interim, and final phases;</para>
          </para>
          <para num="(v)">storm drainage features, including:<para num="A.">existing and proposed bridges, storm drains, culverts, outfalls, etc.;</para>
            <para num="B.">velocities and peak flow rates at outfalls for the 2-year and 10-year frequency storm events; and</para>
            <para num="C.">site conditions around points of all surface water discharge from the site;</para>
          </para>
          <para num="(vi)">any phasing necessary to limit earth disturbances and impacts to natural resources; and</para>
          <para num="(vii)">an overlay plan that shows the types and locations of stormwater practices and erosion and sediment control practices to be used;</para>
        </para>
        <para num="(4)">a narrative that indicates how proposed erosion and sediment control practices will be integrated with proposed stormwater management strategy using environmental site design in accordance with Division II of &lt;cite data-path="|7"&gt;this article&lt;/cite&gt;; and</para>
        <para num="(5)">any other information that the Department requires.</para>
      </para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="32-7" heading="Final erosion and sediment control and stormwater management plans.">
      <para num="(a)" heading="In general.">After site development plan approval, the applicant must submit final erosion and sediment control plans and stormwater management plans that reflect the comments received during the previous review phase.</para>
      <para num="(b)" heading="Minimum contents.">Plans submitted for final approval must be of sufficient detail to allow all approvals and permits to be issued and must include:<para num="(1)">all information provided during the concept and site development plan review phase;</para>
        <para num="(2)">erosion and sediment control practices to minimize on-site erosion and prevent off-site sedimentation, including:<para num="(i)">the salvage and reuse of topsoil;</para>
          <para num="(ii)">phased construction and implementation of grading unit(s) to minimize disturbances, both in extent and duration;</para>
          <para num="(iii)">location and type of all proposed sediment control practices;</para>
          <para num="(iv)">design details and data for all erosion and sediment control practices; and</para>
          <para num="(v)">specifications for temporary and permanent stabilization measures, including at a minimum:<para num="A.">the “Standard Stabilization Note” on the plan stating:
“Following initial soil disturbance or re-disturbance, permanent or temporary stabilization must be completed within:<para num="1.">3 calendar days as to the surface of all perimeter dikes, swales, ditches, perimeter slopes, and all slopes steeper than 3 horizontal to 1 vertical (3:1); and</para>
              <para num="2.">7 calendar days as to all other disturbed or graded areas on the project site not under active grading.”;</para>
            </para>
            <para num="B.">details for areas requiring accelerated stabilization; and</para>
            <para num="C.">maintenance requirements as defined in the Standards and Specifications;</para>
          </para>
        </para>
        <para num="(3)">a sequence of construction that:<para num="(i)">describes the relationship between the implementation of controls and the maintenance of controls, including permanent and temporary stabilization, and the various stages or phases of earth disturbance and construction; and</para>
          <para num="(ii)">includes the following, at a minimum:<para num="A.">request for a pre-construction meeting with the Department;</para>
            <para num="B.">clearing and grubbing as necessary for the installation of perimeter controls;</para>
            <para num="C.">construction and stabilization of perimeter controls;</para>
            <para num="D.">remaining clearing and grubbing within installed perimeter controls;</para>
            <para num="E.">road grading;</para>
            <para num="F.">grading for the remainder of the site;</para>
            <para num="F.">utility installation and connections to existing structures;</para>
            <para num="G.">construction of buildings and roads;</para>
            <para num="H.">other construction;</para>
            <para num="I.">final grading, landscaping, and stabilization;</para>
            <para num="J.">installation of stormwater management measures;</para>
            <para num="K.">obtaining approval by the Department before removal of sediment controls; and</para>
            <para num="L.">removal of sediment controls and stabilization of areas that are disturbed by the removal;</para>
          </para>
        </para>
        <para num="(4)">a statement requiring the owner, developer, or representative to contact the Department or its agent at the following stages of the project or in accordance with the approved erosion and sediment control plan, grading permit, or building permit:<para num="(i)">before the start of earth disturbance;</para>
          <para num="(ii)">after the installation of perimeter erosion and sediment controls is complete, but before proceeding with any other earth disturbance or grading;</para>
          <para num="(iii)">before the start of another phase of construction or the opening of another grading unit; and</para>
          <para num="(iv)">before the removal of sediment control practices;</para>
        </para>
        <para num="(5)">certification by the owner or developer that:<para num="(i)">any clearing, grading, construction, or development will be done pursuant to the approved erosion and sediment control plan; and</para>
          <para num="(ii)">the responsible personnel involved in the construction project will have, before the project begins, a Certificate of Training from an MDE approved training program for the control of erosion and sediment; and</para>
          <para num="(iii)">the City Department of Public Works, City Department of Housing and Community Development, and Maryland Department of the Environment will be allowed right of entry for periodic on-site evaluation; and</para>
        </para>
        <para num="(6)">if required by the Department or the Maryland Department of the Environment, certification by a professional engineer, land surveyor, landscape architect, architect, or forester (for forest harvest operations only) registered in the State that the plans have been designed in accordance with erosion and sediment control laws, regulations, and standards; and</para>
        <para num="(7)">any additional information considered appropriate by the Department.</para>
      </para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="32-8" heading="Modifications to plans.">
      <para num="(a)" heading="In general.">The Department may approve modifications to approved plans as necessary.</para>
      <para num="(b)" heading="Who may request.">Modifications may be requested by the owner or developer or by the Department.</para>
      <para num="(c)" heading="Minor modifications.">
        <para num="(1)">The Department may include in its Erosion and Sediment Control Manual a list of minor modifications that the Department may approve as field revisions.</para>
        <para num="(2)">The Maryland Department of the Environment must approve the list before its implementation.</para>
      </para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="32-9" heading="Standard erosion and sediment control plan.">
      <para num="(a)" heading="Department may adopt.">The Department may include in its Erosion and Sediment Control Manual a standard erosion and sediment control plan for activities with minor earth disturbances, such as single-family residences, small commercial and other similar building sites, minor maintenance grading, and minor utility construction.</para>
      <para num="(b)" heading="Requirements.">
        <para num="(1)">A standard erosion and sediment control plan must meet the requirements of this Division III and the Standards and Specifications.</para>
        <para num="(2)">The Maryland Department of the Environment must approve the standard plan before its adoption.</para>
      </para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
  </container>
  <container prefix="Subtitle" num="33" heading="Permits; Fees; Security">
    <section prefix="§" num="33-1" heading="Approved plan prerequisite to permits.">
      <text>For any development that requires an erosion and sediment control plan under this Division III, a grading or building permit may not be issued or extended unless a final erosion and sediment control plan has been approved by the Department.</text>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="33-2" heading="Fees.">
      <para num="(a)" heading="Payable at each phase.">Non-refundable fees will be assessed and collected in advance by the Department for each phase of a development.</para>
      <para num="(b)" heading="Fee schedule.">
        <para num="(1)">The fees assessed under this Division III are in addition to the usual fees charged for grading and building permits.</para>
        <para num="(2)">Fees are assessed for plan reviews, administration and management of the approval process, inspections, and the like.</para>
        <para num="(3)">The amount of the fees are as set forth in the fee schedule established from time to time by the Board of Estimates.  The fee schedule shall be based on the relative complexity of a project.</para>
      </para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="33-3" heading="Performance bond.">
      <para num="(a)" heading="Required.">For any development that requires an erosion and sediment control plan under this Division III, a grading or building permit may not be issued until the applicant posts a surety or cash bond or other means of security acceptable to the Department.</para>
      <para num="(b)" heading="Amount.">
        <para num="(1)">The amount of the security must be equal to at least the estimated cost of the installation, maintenance, and removal of the erosion and sediment controls shown on the approved plan.</para>
        <para num="(2)">This estimate must be prepared by the applicant and submitted with the plan.</para>
      </para>
      <para num="(c)" heading="Tenor.">The security required by this section must provide for forfeiture on failure to:<para num="(1)">complete all work specified in the approved erosion and sediment control plan;</para>
        <para num="(2)">comply with any provision of this Division III or of any other applicable law, rule, or regulation; or</para>
        <para num="(3)">comply with any applicable time limitations.</para>
      </para>
      <para num="(d)" heading="Release.">The security may not be released until the Department conducts a final inspection of the completed work.</para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
  </container>
  <container prefix="Subtitle" num="34" heading="Inspections; Investigations">
    <section prefix="§" num="34-1" heading="Inspections required.">
      <para num="(a)" heading="In general.">Every active site having an approved erosion and sediment control plan should be inspected for compliance with the plan on an average of once every 2 weeks.</para>
      <para num="(b)" heading="Plan to be maintained on site.">The owner or developer must maintain a copy of the approved erosion and sediment control plan on site.</para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="34-2" heading="By whom conducted.">
      <text>All inspections under this Division III must be conducted by:</text>
      <para num="(1)">the Department; or</para>
      <para num="(2)">the Department’s authorized representative.</para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="34-3" heading="Reports on inspections.">
      <para num="(a)" heading="Required.">The Department must prepare a written report after every inspection.</para>
      <para num="(b)" heading="Contents.">The report must describe:<para num="(1)">the date and location of the site inspection;</para>
        <para num="(2)">whether the approved plan has been properly implemented and maintained;</para>
        <para num="(3)">practice deficiencies or erosion and sediment control plan deficiencies;</para>
        <para num="(4)">if a violation exists, the type of enforcement action taken; and</para>
        <para num="(5)">if applicable, a description of any modifications to the plan.</para>
      </para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§§" num="34-4 to 34-5" reserved="true" />
    <section prefix="§" num="34-6" heading="Right of entry.">
      <text>It is a condition of every grading or building permit that the Department has the right to enter property periodically to inspect for compliance with the approved plan and this Division III.</text>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="34-7" heading="Investigations.">
      <para num="(a)" heading="On complaint.">The Department must:<para num="(1)">accept and investigate complaints from interested persons about erosion and sediment control issues;</para>
        <para num="(2)">conduct an initial investigation within 3 working days from receipt of the complaint;</para>
        <para num="(3)">notify the complainant of the initial investigation and findings within 7 days from receipt of the complaint; and</para>
        <para num="(4)">take appropriate action when violations are discovered during the course of the complaint investigation.</para>
      </para>
      <para num="(b)" heading="On own initiative.">The Department may also undertake, on its own initiative, investigations of suspected erosion and sediment control issues on all properties.</para>
      <para num="(c)" heading="Posting of findings.">The Department must post on its website the Department’s findings on all investigations, whether initiated by interested persons or on the Department’s own initiative.</para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
  </container>
  <container prefix="Subtitle" num="35" heading="Enforcement; Reviews; Penalties">
    <section prefix="§" num="35-1" heading="Violation notices.">
      <para num="(a)" heading="Notice required.">If a violation is found, the Department must provide written notice of the violation to:<para num="(1)">the owner or developer; and</para>
        <para num="(2)">the responsible personnel.</para>
      </para>
      <para num="(b)" heading="Contents.">The notice must describe:<para num="(1)">the nature of the violation;</para>
        <para num="(2)">the required corrective action; and</para>
        <para num="(3)">the time period within which the violation must be corrected.</para>
      </para>
      <para num="(c)" heading="Posting of violation notices.">The Department must post on its website a copy of all notices of violations issued under this section.</para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="35-2" heading="Enforcement of notice.">
      <para num="(a)" heading="In general.">Any one or a combination of the following actions may be taken to enforce a violation notice.</para>
      <para num="(b)" heading="Stop work order.">If a violation persists after issuance of a violation notice, the Department may issue a stop work order for the site.</para>
      <para num="(c)" heading="Bond forfeiture; other action.">If reasonable efforts to correct the violation have not been undertaken, the Department may:<para num="(1)">cause the performance bond or other security to be forfeited; and</para>
        <para num="(2)">refer the matter for legal action, including pursuit of criminal and civil penalties under &lt;cite data-path="|7|§35-9"&gt;§ 35-9 of this subtitle&lt;/cite&gt;.</para>
      </para>
      <para num="(d)" heading="Civil liability.">In addition to any other sanction under this Division III, a person who fails to install or maintain erosion and sediment controls in accordance with an approved plan is liable in a civil action to the City or the State, as the case may be, for damages in an amount equal to double the cost of installing or maintaining the controls.</para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="35-3" heading="Injunctive relief.">
      <text>Any State or City agency or any interested person may seek an injunction against any person who violates or threatens to violate any provision of this Division III.</text>
    </section>
    <section prefix="§" num="35-4" reserved="true" />
    <section prefix="§" num="35-5" heading="Administrative review – In general.">
      <para num="(a)" heading="Right of appeal.">Any person aggrieved by the action of any official charged with the enforcement of this Division III, whether as the result of the disapproval of an application, the issuance of a violation notice, an alleged failure to properly enforce this Division III, or otherwise:<para num="(1)">may appeal the action to the Director of Public Works;</para>
        <para num="(2)">on timely request, is entitled to a hearing on that appeal.</para>
      </para>
      <para num="(b)" heading="When and how taken.">The appeal must:<para num="(1)">be in writing;</para>
        <para num="(2)">clearly state the grounds on which the appeal is based;</para>
        <para num="(3)">if the person aggrieved desires a hearing on the appeal, contain an express statement to that effect; and</para>
        <para num="(4)">be filed with the Director within 10 days of the action in dispute.</para>
      </para>
      <annotation type="History">Ord. 13-095</annotation>
      <annotation type="History">Ord. 14-307</annotation>
    </section>
    <section prefix="§" num="35-6" heading="Administrative review – Delegation of hearing authority.">
      <para num="(a)" heading="In general.">Hearings may be conducted by:<para num="(1)">the Director of Public Works; or</para>
        <para num="(2)">a hearing officer designated by the Director.</para>
      </para>
      <para num="(b)" heading="Scope of delegation.">The Director may delegate to a hearing officer the authority to issue:<para num="(1)">proposed or final findings of fact;</para>
        <para num="(2)">proposed or final conclusions of law;</para>
        <para num="(3)">proposed or final findings of fact and conclusions of law;</para>
        <para num="(4)">proposed or final orders; or</para>
        <para num="(5)">the final administrative decision of the Department.</para>
      </para>
      <annotation type="History">Ord. 13-095</annotation>
      <annotation type="History">Ord. 15-331</annotation>
    </section>
    <section prefix="§" num="35-7" heading="Administrative review – Conduct of hearing.">
      <para num="(a)" heading="Notice.">
        <para num="(1)">The Director of Public Works must provide all parties reasonable written notice of the hearing.</para>
        <para num="(2)">The notice must state:<para num="(i)">the date, time, place, and nature of the hearing;</para>
          <para num="(ii)">the right of a party to be represented, at the party’s own expense, by an attorney or, if permitted by law, other representative;</para>
          <para num="(iii)">the right of a party to call witnesses and submit documents or other evidence under &lt;cite data-path="|7|§35-8"&gt;§ 35-8 of this subtitle&lt;/cite&gt;; and</para>
          <para num="(iv)">that failure of a party to appear for the scheduled hearing may result in an adverse action against the party.</para>
        </para>
      </para>
      <para num="(b)" heading="Hearings to be open and informal.">Except as otherwise provided by law or by rule or regulation of the Department, all hearings must be:<para num="(1)">open to the public; and</para>
        <para num="(2)">conducted in an orderly but informal manner.</para>
      </para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="35-8" heading="Administrative review – Evidence.">
      <para num="(a)" heading="In general.">Except as otherwise provided by this section or by rule or regulation of the Department, formal rules of evidence and trial procedures do not apply.</para>
      <para num="(b)" heading="Right to submit.">A party is entitled to:<para num="(1)">call witnesses;</para>
        <para num="(2)">offer evidence, including rebuttal evidence;</para>
        <para num="(3)">cross-examine any witness that another party or the Department calls; and</para>
        <para num="(4)">present summation and argument.</para>
      </para>
      <para num="(c)" heading="Scope.">The Director or hearing officer:<para num="(1)">may admit probative evidence that reasonable and prudent individuals commonly accept in the conduct of their affairs and give probative effect to that evidence;</para>
        <para num="(2)">may not exclude evidence solely on the basis that it is hearsay;</para>
        <para num="(3)">must give effect to a privilege recognized by law;</para>
        <para num="(4)">may receive documentary evidence in the form of copies or excerpts or through incorporation by reference;</para>
        <para num="(5)">may take official notice of a fact that is judicially noticeable or that is general, technical, or scientific and within the specialized knowledge of the Department; and</para>
        <para num="(6)">may exclude evidence that is:<para num="(i)">incompetent;</para>
          <para num="(ii)">irrelevant;</para>
          <para num="(iii)">immaterial; or</para>
          <para num="(iv)">unduly repetitious.</para>
        </para>
      </para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
    <section prefix="§" num="35-9" heading="Administrative review – Final decisions.">
      <para num="(a)" heading="Form and contents.">The final decision must:<para num="(1)">be in writing; and</para>
        <para num="(2)">contain separate statements of:<para num="(i)">the findings of fact;</para>
          <para num="(ii)">the conclusions of law; and</para>
          <para num="(iii)">the decision or order.</para>
        </para>
      </para>
      <para num="(b)" heading="Distribution.">A copy of the final decision must be mailed or delivered to each party or that party’s attorney of record.</para>
      <annotation type="History">Ord. 13-095</annotation>
      <annotation type="History">Ord. 15-331</annotation>
    </section>
    <section prefix="§" num="35-10" reserved="true" />
    <section prefix="§" num="35-11" heading="Judicial and appellate review.">
      <para num="(a)" heading="Judicial review.">A party aggrieved by a final decision of the Department under this Division III may seek judicial review of that decision by petition to the Circuit Court for Baltimore City in accordance with the Maryland Rules of Procedure.</para>
      <para num="(b)" heading="Appellate review.">A party to the judicial review may appeal the court’s final judgment to the Court of Special Appeals in accordance with the Maryland Rules of Procedure.</para>
      <annotation type="History">Ord. 13-095</annotation>
      <annotation type="History">Ord. 19-332</annotation>
    </section>
    <section prefix="§" num="35-12" reserved="true" />
    <section prefix="§" num="35-13" heading="Penalties.">
      <para num="(a)" heading="Civil fines.">
        <para num="(1)">The Department may impose civil fines for violations of this Division III.</para>
        <para num="(2)">The amount of the fines are as set forth in the fine schedule established from time to time by the Department with the approval of the Board of Estimates.</para>
        <para num="(3)">No fine may exceed $1,000 for any1 offense.</para>
      </para>
      <para num="(b)" heading="Criminal penalties.">Any person who violates any provision of this Division III or of any rule or regulation adopted under or incorporated into this Division III is guilty of a misdemeanor and, on conviction, is subject to a fine of not more than $1,000 or imprisonment for not more than 1 year or both fine and imprisonment for each offense.</para>
      <para num="(c)" heading="Each day a separate offense.">Each day that a violation continues is a separate offense.</para>
      <annotation type="History">Ord. 13-095</annotation>
    </section>
  </container>
  <container prefix="Subtitles" num="36 to 40" />
</baltimore-city-law>