    <para num="(a)" heading="In general.">Unless otherwise directed by the Department, after approval of the concept plan, the applicant must submit site development plans that reflect comments received during the previous review phase.</para>
    <para num="(b)" heading="Minimum contents.">Plans submitted for site development approval must be of sufficient detail to allow site development to be reviewed and must include:<para num="(1)">all information provided during the concept plan review phase;</para>
      <para num="(2)">drainage area maps that show, at a minimum scale of 1" = 200':<para num="(i)">existing, interim, and proposed topography;</para>
        <para num="(ii)">proposed improvements;</para>
        <para num="(iii)">standard symbols for proposed sediment control features; and</para>
        <para num="(iv)">pertinent drainage information, including provisions to protect downstream areas from erosion for a minimum of 200 feet downstream or to the next conveyance system;</para>
      </para>
      <para num="(3)">a proposed erosion and sediment control plan that contains:<para num="(i)">the existing and proposed topography and improvements, at a scale between 1" = 10' and 1" = 50' with 2 foot contours or other approved contour interval;</para>
        <para num="(ii)">interim contours for projects with more than minor grading, if required by the Department;</para>
        <para num="(iii)">scale, project, and sheet title, and north arrow on each plan sheet;</para>
        <para num="(iv)">the limit of disturbance, including:<para num="A.">limit of grading (grading units, if applicable); and</para>
          <para num="B.">initial, interim, and final phases;</para>
        </para>
        <para num="(v)">storm drainage features, including:<para num="A.">existing and proposed bridges, storm drains, culverts, outfalls, etc.;</para>
          <para num="B.">velocities and peak flow rates at outfalls for the 2-year and 10-year frequency storm events; and</para>
          <para num="C.">site conditions around points of all surface water discharge from the site;</para>
        </para>
        <para num="(vi)">any phasing necessary to limit earth disturbances and impacts to natural resources; and</para>
        <para num="(vii)">an overlay plan that shows the types and locations of stormwater practices and erosion and sediment control practices to be used;</para>
      </para>
      <para num="(4)">a narrative that indicates how proposed erosion and sediment control practices will be integrated with proposed stormwater management strategy using environmental site design in accordance with Division II of &lt;cite data-path="|7"&gt;this article&lt;/cite&gt;; and</para>
      <para num="(5)">any other information that the Department requires.</para>