  <section heading="Sec. 19-60. Findings and purpose.">
    <paragraph indent="1">(a)   The County Council finds that streams, rivers, wetlands, and other sensitive environmental features in Montgomery County constitute an important natural resource.  Protecting, maintaining, and restoring the biological, physical, and chemical integrity of the waters in the County will protect the public health and general welfare, provide for a varied aquatic life, appropriate recreational uses, and other water uses, and serve the purposes of applicable federal and state laws and regulations.  Protection of fragile watershed areas will help restore and maintain the integrity of the Anacostia River, Potomac River, and Patuxent River within Montgomery County and the Chesapeake Bay.</paragraph>
    <paragraph indent="1">(b)    The purposes of this Article are to:</paragraph>
    <paragraph indent="2">(1)   implement monitoring programs in special protection areas to help attain the goals of the County's water quality laws and regulations;</paragraph>
    <paragraph indent="2">(2)   establish coordinated procedures, performance goals, and requirements for development in special protection areas that will mitigate adverse impacts on water resource areas during and after construction or other land-disturbing activities;</paragraph>
    <paragraph indent="2">(3)   ensure no net wetland loss as a result of development;</paragraph>
    <paragraph indent="2">(4)   authorize a fee to administer and enforce this Article, including monitoring development impacts on streams in special protection areas; and</paragraph>
    <paragraph indent="2">(5)   provide a focused and coordinated approach for County water quality protection and monitoring in special protection areas.</paragraph>
  </section>
  <section heading="Sec. 19-61. Definitions.">
    <paragraph indent="1">In this Article, the following words and phrases have the following meanings:</paragraph>
    <paragraph indent="1">Best Management Practices means techniques that are most effective in eliminating or reducing the amount of pollution or other detrimental impact to a watershed or wetland.</paragraph>
    <paragraph indent="1">Best Management Practices Monitoring Plan means a written plan that documents the scientific work necessary to assess the effectiveness of best management practices in maintaining water quality.</paragraph>
    <paragraph indent="1">DEP Director means the Director of the Department of Environmental Protection or the Director’s designee.</paragraph>
    <paragraph indent="1">Department or DPS means the Department of Permitting Services.</paragraph>
    <paragraph indent="1">Director or DPS Director means the Director of the Department of Permitting Services or the Director's designee.</paragraph>
    <paragraph indent="1">Erosion and Sediment Control Concept Plan means a statement or drawing or both describing how erosion and sediment, resulting from a development, will be controlled or managed to minimize the discharge of pollutants into surface waters.</paragraph>
    <paragraph indent="1">Land Use Plan means the County's General Plan (“On Wedges and Corridors”) and all amendments or additions, including master plans, sector plans, and functional plans, adopted by the District Council.</paragraph>
    <paragraph indent="1">Planning Director means the Director of the Montgomery County Planning Department or the Director's designee.</paragraph>
    <paragraph indent="1">Special Protection Area means a geographic area where:</paragraph>
    <paragraph indent="2">(1)   existing water resources, or other environmental features directly relating to those water resources, are of high quality or unusually sensitive; and</paragraph>
    <paragraph indent="2">(2)   proposed land uses would threaten the quality or preservation of those resources or features in the absence of special water quality protection measures which are closely coordinated with appropriate land use controls.</paragraph>
    <paragraph indent="1">Stormwater Management Concept Plan means a statement or drawing or both describing how water quality impacts and stormwater, resulting from a development, will be controlled or managed to minimize the discharge of pollutants into surface waters.</paragraph>
    <paragraph indent="1">Stormwater Management Plan is defined in Section 19-21.</paragraph>
    <paragraph indent="1">Stream Monitoring Plan means a statement prepared by the Department of Environmental Protection describing the location of monitoring stations and the nature, form, and frequency of monitoring to be conducted to evaluate the impacts of development on water resources in a special protection area.  A plan must also describe what will be monitored with regard to faunal groups, streams and riparian habitat features, biological features, and physical and chemical properties.</paragraph>
    <paragraph indent="1">Stream Monitoring Program means activities conducted by the Department of Environmental Protection to carry out a stream monitoring plan for property in a special protection area, including:</paragraph>
    <paragraph indent="2">(1)   an inventory and evaluation of water resources to measure baseline conditions; and</paragraph>
    <paragraph indent="2">(2)   an assessment of any impairment of the biological, chemical, and physical integrity of the stream over time related to development impacts in any special protection area.</paragraph>
    <paragraph indent="1">Technical Manual means a detailed guidance document prepared jointly by the Departments of Environmental Protection and Permitting Services, in consultation with the Planning Board, and used to implement this Article.</paragraph>
    <paragraph indent="1">Water Quality Certification means State authorization required under Section 401 of the Clean Water Act for any federally permitted activity impacting jurisdictional waters of the United States, certifying that the activity complies with Maryland's water quality standards.</paragraph>
  </section>
  <section heading="Sec. 19-62. Applicability.">
    <paragraph indent="1">(a)   Designation. The Council may designate a geographic area as a special protection area by identifying the area in:</paragraph>
    <paragraph indent="2">(1)   a land use plan;</paragraph>
    <paragraph indent="2">(2)   the Comprehensive Water Supply and Sewer System Plan;</paragraph>
    <paragraph indent="2">(3)   a watershed plan; or</paragraph>
    <paragraph indent="2">(4)   a resolution adopted after at least 15 days notice and a public hearing.</paragraph>
    <paragraph indent="1">(b)    Privately owned property. Except as otherwise expressly provided in this Chapter, the requirements for a water quality inventory and a preliminary and final water quality plan under Section 19-64 apply in any area designated as a special protection area to a person proposing a land-disturbing activity on privately owned property:</paragraph>
    <paragraph indent="2">(1)   who is required by law to obtain approval of a development plan, diagrammatic plan, schematic development plan, project plan, special exception, sketch plan, floating zone plan, conditional use, preliminary plan of subdivision, or site plan; or</paragraph>
    <paragraph indent="2">(2)   who is seeking approval of an amendment to an approved development plan, diagrammatic plan, schematic development plan, project plan, special exception, sketch plan, floating zone plan, conditional use, preliminary plan of subdivision, or site plan.</paragraph>
    <paragraph indent="1">(c)    Publicly owned property. Before engaging in any land-disturbing on publicly owned property in an area designated as a special protection area, the applying agency or department should prepare a combined preliminary and final water quality plan.</paragraph>
    <paragraph indent="1">(d)    Recorded plats. This Article does not apply to any project on property which would otherwise be subject to the requirements of this Section that has a valid, approved record plat for the entirety of the project and for which no amendment is required to accommodate the project on or before October 31, 1994.</paragraph>
  </section>
  <section heading="Sec. 19-63. Exemptions.">
    <paragraph indent="1">(a)   Any applicant covered by Section 19-62 whose property is in a special protection area must submit a water quality inventory.</paragraph>
    <paragraph indent="1">(b)   An applicant who submits a water quality inventory under Section 19-64(a) and whose development does not exceed the following limits need not submit a water quality plan, unless the applicant is specifically required to submit a water quality plan in a land use plan, watershed plan, Comprehensive Water Supply and Sewer System Plan, or Council resolution designating a special protection area, if:</paragraph>
    <paragraph indent="2">(1)   a project on property zoned for agricultural, residential, or mixed use contains:</paragraph>
    <paragraph indent="3">(A)   a proposed impervious area of less than 8% of the total land area covered by the development approval application; or</paragraph>
    <paragraph indent="3">(B)   a cumulative land area of 10 acres or less, and a proposed impervious area of less than 15% of the total land area covered by the development approval application;</paragraph>
    <paragraph indent="2">(2)   a project on property zoned for industrial or commercial use consists of a cumulative land area of 2 acres or less covered by the development approval application.</paragraph>
    <paragraph indent="1">(c)   An applicant must not avoid the application of this Article by submitting piecemeal applications for property under common or related ownership.</paragraph>
    <paragraph indent="1">(d)   If an application for new or additional development approval is submitted for property that was either:</paragraph>
    <paragraph indent="2">(1)   previously approved for development, and exempt under subsection (b); or</paragraph>
    <paragraph indent="2">(2)   part of a larger tract of land located in a special protection area that was:</paragraph>
    <paragraph indent="3">(A)   approved for development under this Article; and</paragraph>
    <paragraph indent="3">(B)   under common or related ownership when it was approved for development; the Department or Planning Board, as applicable, in reviewing an application under this Article must assess the cumulative impact of all previously approved development.</paragraph>
  </section>
  <section heading="Sec. 19-64. Water Quality Inventory Submittal; Water Quality Plans.">
    <paragraph indent="1">(a)    Water quality inventory submittal. A person who is required under Section 19-62 to comply with this Article must submit the following documents as part of a proposed development plan, diagrammatic plan, schematic development plan, project plan, preliminary plan of subdivision, site plan, special exception, sketch plan, floating zone plan, or conditional use, whichever is first required.  Each submission must be reviewed by the receiving agency as part of the plan or permit application, as provided by law.</paragraph>
    <paragraph indent="2">(1)   Stormwater management concept plan;</paragraph>
    <paragraph indent="2">(2)   Erosion and sediment control concept plan;</paragraph>
    <paragraph indent="2">(3)   Documentation showing avoidance or minimization of impacts on environmentally sensitive areas and priority forest conservation areas as specified in the Planning Board's Environmental Guidelines, and an analysis of available alternatives;</paragraph>
    <paragraph indent="2">(4)   Preliminary plan describing the proposed development which minimizes impervious area and, if applicable, meets imperviousness limits for the project as are required in a land use plan, watershed plan, or Comprehensive Water Supply and Sewer System Plan; and</paragraph>
    <paragraph indent="2">(5)   Any other information required in the technical manual.</paragraph>
    <paragraph indent="1">(b)    Preliminary water quality plan submission. Except where exempt under this Article, a person must submit the following, in addition to any information required for a water quality inventory, as part of a complete application for development approval as provided in Section 19-65:</paragraph>
    <paragraph indent="2">(1)   Description of the development proposal and all submissions normally required by law or regulation;</paragraph>
    <paragraph indent="2">(2)   Documentation of application for state or federal wetland permit;</paragraph>
    <paragraph indent="2">(3)   Description of any other mitigation techniques proposed by the applicant or required by applicable guidelines, law, or regulations; and</paragraph>
    <paragraph indent="2">(4)   Documentation of anticipated performance on water quality of each proposed measure, individually and together.</paragraph>
    <paragraph indent="1">(c)    Final water quality plan submission. A final water quality plan must be submitted as provided in Section 19-65 and must include the following:</paragraph>
    <paragraph indent="2">(1)   Stormwater management concept plan, revised as required by the Director, that identifies all proposed mitigation techniques and an analysis of how these measures will meet applicable performance criteria;</paragraph>
    <paragraph indent="2">(2)   Erosion and sediment control concept plan, revised as required by the Director;</paragraph>
    <paragraph indent="2">(3)   Proposed compliance program, revised as required by the Director, that describes the installation and inspection of all stormwater management facilities;</paragraph>
    <paragraph indent="2">(4)   Draft maintenance agreements and easements covering routine maintenance, long-term repair or replacement of any stormwater management facility or other facilities required by the water quality plan, and an assurance of access to the facilities for inspection and monitoring;</paragraph>
    <paragraph indent="2">(5)   Copy of valid water quality certification approved by state and federal agencies or, if not available, a report on the status of the certification review and a copy of any revision made to the certification application;</paragraph>
    <paragraph indent="1">(6)   Terms, conditions, and requirements as established in the approved preliminary water quality plan, or in the case of a preliminary water quality plan in conjunction with a development approval before the District Council, the terms, conditions, and requirements as required to be revised by the Planning Board or DPS Director to conform to the District Council action on the development plan, schematic plan, floating zone plan, or diagrammatic plan;</paragraph>
    <paragraph indent="2">(7)   Any other information required in the technical manual.</paragraph>
  </section>
  <section heading="Sec. 19-65. Application, review, and approval procedures.">
    <paragraph indent="1">(a)    General.</paragraph>
    <paragraph indent="2">(1)   Coordinated with project review.  Water quality review, including submittal and review of the preliminary and final water quality plans, where required, must be done in conjunction with the review process for a development plan, diagrammatic plan, schematic development plan, project plan, preliminary plan of subdivision, site plan, sketch plan, floating zone plan, conditional use, or special exception in accordance with this Section.  The Planning Director must coordinate review of the water quality plan with the DPS Director.</paragraph>
    <paragraph indent="2">(2)   Division of approval responsibilities. To avoid duplication of effort, responsibilities for review and approval of water quality plans are divided as follows:</paragraph>
    <paragraph indent="3">(A)   In acting on a preliminary or final water quality plan, the Planning Board has lead agency responsibility for:</paragraph>
    <paragraph indent="4">(i)   Conformity with all policies in the Planning Board's Environmental Guidelines which apply to special protection areas;</paragraph>
    <paragraph indent="4">(ii)   Conformity with any policy or requirement for special protection areas, including limits on impervious area, in a land use plan, watershed plan, or the Comprehensive Water Supply and Sewer System Plan; and</paragraph>
    <paragraph indent="4">(iii)   Any other element of the plan in which the Planning Board has primary lead agency design, review, and approval responsibility.</paragraph>
    <paragraph indent="3">(B)   In acting on a preliminary or final water quality plan, the Planning Board's approval must conform to the approval of the DPS Director on any element for which the DPS Director has lead agency responsibility.  Those elements include:</paragraph>
    <paragraph indent="4">(i)   Performance goals for the approved best management practices;</paragraph>
    <paragraph indent="4">(ii)   Stormwater management concept plan;</paragraph>
    <paragraph indent="4">(iii)   Erosion and sediment control concept plan; and</paragraph>
    <paragraph indent="4">(iv)   Any other element of the plan for which the Department has primary lead agency design, review, and approval responsibility.</paragraph>
    <paragraph indent="3">(C)   The Department of Environmental Protection has the lead agency responsibility for the monitoring program, including the monitoring of streams and best management practices.</paragraph>
    <paragraph indent="2">(3)   Amendments and minor modifications to an approved plan.</paragraph>
    <paragraph indent="3">(A)   Significant amendment. Any written request to amend a development approval which involves any significant alteration to a water quality plan must undergo review as described in subsection (b), except as otherwise modified by regulation.</paragraph>
    <paragraph indent="3">(B)   Minor modification. The Planning Director or the DPS Director may approve a modification to an approved water quality plan, for any element in their respective jurisdictions, which is consistent with this Chapter if:</paragraph>
    <paragraph indent="4">(i)   inspections or design evaluations reveal minor inadequacies in the plan; or</paragraph>
    <paragraph indent="4">(ii)   the modification is required by permit conditions and does not significantly affect site layout.</paragraph>
    <paragraph indent="3">(C)   Emergency situation. The Planning Director or the DPS Director may approve a modification or exception to an approved water quality plan for any element in their respective jurisdictions where necessary in an emergency situation.</paragraph>
    <paragraph indent="1">(b)    Application.</paragraph>
    <paragraph indent="2">(1)   The applicant must submit to the Planning Director a preliminary water quality plan as part of a complete application for a development plan, diagrammatic plan, schematic plan, project plan, sketch plan, floating zone plan, preliminary plan of subdivision, or site plan, whichever is first required.  For a special exception or conditional use that is subject to this Chapter, the applicant must submit a preliminary water quality plan as part of the special exception or conditional use application to the Board of Appeals. For a project on publicly owned property, the agency or department should submit the water quality plan in conjunction with the mandatory referral process.</paragraph>
    <paragraph indent="2">(2)   If the development proposal requires more than one of the approvals listed in paragraph (1), the applicant must submit a preliminary water quality plan to the Planning Director in conjunction with the first approval and a final water quality plan in conjunction with the last approval.</paragraph>
    <paragraph indent="2">(3)   If only one approval listed in paragraph (1) is required, an applicant, with the approval of the Planning Board, must submit a combined preliminary and final water quality plan.</paragraph>
    <paragraph indent="1">(c)    Review. After receiving a preliminary or final water quality plan, the Planning Director must refer the plan to the DPS Director and other reviewing agencies.  The DPS Director must transmit to the Planning Director within the time limits for acting on a plan established by law:</paragraph>
    <paragraph indent="2">(1)   Findings on compliance with this Chapter of any:</paragraph>
    <paragraph indent="3">(A)   stormwater management concept plan;</paragraph>
    <paragraph indent="3">(B)   erosion and sediment control concept plan;</paragraph>
    <paragraph indent="3">(C)   stream monitoring plan and best management practices monitoring plan as prepared and implemented by the Department of Environmental Protection;</paragraph>
    <paragraph indent="3">(D)   maintenance agreements and easements; and</paragraph>
    <paragraph indent="3">(E)   other element of a plan in which the Department has primary lead agency review and approval responsibility.</paragraph>
    <paragraph indent="2">(2)   Comments, if any, on any element of a plan in which the Planning Board has primary lead agency review and approval responsibility, including any determination of conformance with a land use plan, watershed plan, or the Planning Board's Environmental Guidelines.</paragraph>
    <paragraph indent="1">(d)    Condition of approval.</paragraph>
    <paragraph indent="2">(1)   In the case of a water quality plan in conjunction with an amendment to a development plan, schematic development plan, diagrammatic plan, sketch plan, or floating zone plan, Planning Board action on the water quality plan must conform to Section 7.2.1.E or Section 7.7.1.B of Chapter 59.</paragraph>
    <paragraph indent="2">(2)   In the case of a water quality plan in conjunction with a special exception, the Planning Board, after holding a public hearing and finding that the plan meets the standards of this Article, must approve a water quality plan and forward the approved plan to the Board of Appeals with its recommendation on the special exception in accordance with Section 59-G-1.2.</paragraph>
    <paragraph indent="2">(3)   The final water quality plan, as amended by the Planning Board, must be a condition of approval of the development application and must conform to:</paragraph>
    <paragraph indent="3">(A)   changes made by the DPS Director to elements that are in DPS's jurisdiction under subsection (a)(2);</paragraph>
    <paragraph indent="3">(B)   any requirements and limits of the state water quality certification and wetland permit, as approved or, if not yet approved, as applied for, and other regulatory approvals, not inconsistent with the certification or permit;</paragraph>
    <paragraph indent="3">(C)   any regulations and guidelines, including any policies or requirements in a land use plan, watershed plan, or Comprehensive Water Supply and Sewer System Plan concerning water quality protection in a special protection area;</paragraph>
    <paragraph indent="3">(D)   any bond provisions required under Sections 19-10 and 19-32, and any element in the water quality plan required by the Planning Board; and</paragraph>
    <paragraph indent="3">(E)   any other condition necessary to implement this Article.</paragraph>
    <paragraph indent="2">(4)   For a water quality plan for a project on public property, the Planning Board, after public hearing which may be conducted when the Board considers a mandatory referral application, must determine if the plan meets the standards of this Article.  The applying agency or department should not engage in land-disturbing activities that are inconsistent with the approved combined water quality plan unless the applying agency has found that the water quality protection measures it would otherwise use meet the purposes of this Chapter.</paragraph>
  </section>
  <section heading="Sec. 19-66. Enforcement, appeals, waiver.">
    <paragraph indent="1">(a)    Enforcement agreement. Each final water quality plan must contain an enforceable agreement, including an approved financial security instrument, with the Planning Board and the DPS Director, requiring maintenance of all facilities required by the plan.  The financial security instrument may be combined with any other financial security instrument required by this Chapter.</paragraph>
    <paragraph indent="1">(b)    Transference of responsibility. Each approved final water quality plan for a residential project must provide that neither ownership nor maintenance of any feature of the water quality plan may be transferred to the County, a homeowners association, or any resident until the DPS Director or the Planning Board, depending on which is the lead agency to review the feature, finds that:</paragraph>
    <paragraph indent="2">(1)   each feature has been installed in accordance with the specifications shown on the approved plan;</paragraph>
    <paragraph indent="2">(2)   each feature has been verified, by inspection to have been operational and functioning as designed for a reasonable period of time after construction of all units and facilities associated with the last phase of the development project; and</paragraph>
    <paragraph indent="2">(3)   homeowners association documents include detailed instructions and a schedule concerning how the facilities and features operate and should be maintained, and assure adequate funding for routine and long term inspections, repair and maintenance of all features shown on the approved plan.</paragraph>
    <paragraph indent="1">(c)    Appeals.</paragraph>
    <paragraph indent="2">(1)   An aggrieved person may appeal a final decision by the Planning Board or the DPS Director concerning a final development approval or permit in which the provisions of this Article are applied.</paragraph>
    <paragraph indent="3">(A)   A final decision by the Planning Board occurs when a written opinion concerning a development approval which requires the implementation of a final water quality plan is mailed.</paragraph>
    <paragraph indent="3">(B)   A final decision by the DPS Director occurs when the Department has approved, rejected, issued, modified, or revoked a permit which requires the implementation of a final water quality plan.</paragraph>
    <paragraph indent="2">(2)   An appeal of a final decision by the Planning Board must be filed with the Circuit Court within 30 days after the written opinion is mailed.  The DPS Director may intervene as a party in any appeal involving the implementation of a final water quality plan. The Board of Appeals does not have jurisdiction to hear any appeal arising from a final decision by the Planning Board under this Article.</paragraph>
    <paragraph indent="2">(3)   An administrative appeal of a decision by the DPS Director must be filed with the Board of Appeals within 30 days after the decision is made.  The Planning Board may present evidence to the Board of Appeals concerning any element of a final water quality plan that relates to its lead agency authority, if relevant to the appeal.</paragraph>
    <paragraph indent="1">(d)    Event of default.</paragraph>
    <paragraph indent="2">(1)   Events of default are:</paragraph>
    <paragraph indent="3">(A)   Required stormwater management facilities, erosion and sediment control facilities, or other mitigation techniques have not been installed or maintained in a correct manner.</paragraph>
    <paragraph indent="3">(B)   An applicant has not complied with any other requirement of a water quality plan or this Article.</paragraph>
    <paragraph indent="3">(C)   Required fees have not been paid to support a stream monitoring program.</paragraph>
    <paragraph indent="2">(2)   If an event of default occurs, the Planning Board or the DPS Director, as applicable, may, in addition to any other remedy already permitted under this Chapter:</paragraph>
    <paragraph indent="3">(A)   issue an order prohibiting the applicant from performing any further land-disturbing activities on any developed or undeveloped phase of the project until the applicant is in compliance, or revoking or suspending a permit under Section 19-9.</paragraph>
    <paragraph indent="3">(B)   issue a citation for a Class A violation.  Each day a violation continues is a separate offense.</paragraph>
    <paragraph indent="3">(C)   take any legal action under Section 1-20 or Chapter 50.</paragraph>
    <paragraph indent="1">(e)    Waiver.</paragraph>
    <paragraph indent="2">(1)   Written request. An applicant may apply for a waiver from this Article or any regulation adopted under it if enforcement would result in undue hardship to the applicant.  The application must be directed to either the Planning Board or the DPS Director, as applicable.</paragraph>
    <paragraph indent="2">(2)   Review and action. After consulting reviewing agencies and holding a public hearing, the Planning Board or the DPS Director, as applicable, may waive any requirement if the applicant shows by clear and convincing evidence that:</paragraph>
    <paragraph indent="3">(A)   the application of some or all requirements of this Article would result in undue hardship to the applicant because of events or circumstances not caused or facilitated by the applicant;</paragraph>
    <paragraph indent="3">(B)   the applicant would still comply with all applicable federal, state, or County water quality standards; and</paragraph>
    <paragraph indent="3">(C)   the relief sought is the minimum needed to prevent hardship.</paragraph>
  </section>
  <section heading="Sec. 19-67. Implementation.">
    <paragraph indent="1">(a)    Stream monitoring program.</paragraph>
    <paragraph indent="2">(1)   Program. The Director of Environmental Protection must design, develop, and implement a stream monitoring program as described in regulations adopted under this Chapter.</paragraph>
    <paragraph indent="2">(2)   Priorities. The Director of Environmental Protection must set priorities for monitoring subwatershed areas before development. Priorities must be based on anticipated timing of development within a 2-year period, as indicated by the Planning Director.</paragraph>
    <paragraph indent="1">(b)    Regulations; technical manual; environmental guidelines; performance goals.  The Departments of Permitting Services and Environmental Protection, after consulting the Planning Board, must jointly adopt regulations, including a technical manual and necessary procedures, under method (2) to administer this Chapter.  The Departments and the Board must carry out their functions under this Article in accordance with these regulations.  The regulations must include:</paragraph>
    <paragraph indent="2">(1)   procedures and standards for preparing a water quality inventory, preliminary or final water quality plans, and a combined preliminary/final water quality plan;</paragraph>
    <paragraph indent="2">(2)   procedures to enhance coordination between the Department and the applicant where a wetland permit or water quality certification is also required;</paragraph>
    <paragraph indent="2">(3)   supplementary requirements for stormwater management and erosion and sediment control concept plans for special protection areas;</paragraph>
    <paragraph indent="2">(4)   criteria for distinguishing minor and significant amendments or modifications;</paragraph>
    <paragraph indent="2">(5)   standards for water quality protective measures during and after construction, including special restrictions or standards required for special protection areas;</paragraph>
    <paragraph indent="2">(6)   model language for an enforcement agreement or a homeowners association maintenance agreement;</paragraph>
    <paragraph indent="2">(7)   other appropriate program requirements consistent with this Article.</paragraph>
    <paragraph indent="1">(c)    Annual Report. The Directors of Environmental Protection and Permitting Services jointly must prepare an annual report, in coordination with the Planning Board, to the County Council that describes the effectiveness of best management practices and the observed impact of development on the biological integrity of streams in special protection areas.  A copy of the report must be sent to the Planning Board and other responsible agencies.</paragraph>
    <paragraph indent="1">(d)    Fee.</paragraph>
    <paragraph indent="2">(1)   The Directors of Environmental Protection and Permitting Services may set a fee in an amount not to exceed the reasonable cost of administering, implementing, and enforcing their respective duties under this Article.  The fee, including the time when it must be paid, must be set by regulation under Method (3).  The Planning Board may set a fee under Chapter 50.  A person to whom this Article applies must pay the fees.</paragraph>
    <paragraph indent="2">(2)   The fees established under this subsection may be based on the size of a tract or other relevant factor and are intended to offset the cost of:</paragraph>
    <paragraph indent="3">(A)   permit review and enforcement of conditions; and</paragraph>
    <paragraph indent="3">(B)   monitoring of streams and best management practices to determine the impact of a particular development on stream water quality as well as the effectiveness of certain best management practices in maintaining stream water quality.</paragraph>
  </section>