Chapter 49. Streets and Roads.
Article 1. In General.
Montgomery County, Md., Code § 49-1 (2026)
Sec. 49-1. Compliance with standards; regulations; penalty for violations.LinkCopy Citation
(a)
A public road, bridge, sidewalk or bikeway must not be constructed, reconstructed, repaired, graded, improved or maintained by any person unless the construction, reconstruction, repair, improvement, grading or maintenance fully complies with this Chapter and any regulations issued under it.
(b)
The closure of any private road must meet the standards and requirements of Chapter 22, and the owner of the private road must obtain a permit from the Department of Permitting Services if required under Section 49-11A.
(c)
The County Executive may issue regulations under method (2) to implement this Chapter, except where a different method is specified.
(d)
Any violation of this Chapter or any regulation issued under it is a Class B violation, except when expressly provided otherwise.
Montgomery County, Md., Code § 49-2 (2026)
Sec. 49-2 Resolving doubt as to location of County roads.LinkCopy Citation
(a)
Whenever any doubt exists as to the proper location or width of a County road, the Director of Transportation may cause the road to be surveyed and a description and plat made of it and recorded in the County land records.
(b)
Whenever possible, this description must be made by reference to the original description of the road when it was acquired by grant or condemnation, if the original description can be found. If the original description cannot be found, then the description and plat must be made of the road as actually laid out.
(c)
The total cost of any necessary survey must be paid by the party that requested the survey. The total cost of a survey includes field preparation work, field surveys, office work, plat preparation, and recording time and fees.
Montgomery County, Md., Code § 49-3 (2026)
Sec. 49-3. Authority to classify road repairs.LinkCopy Citation
The Director of Transportation may decide whether a road repair should be classified as maintenance or construction under this Chapter.
Montgomery County, Md., Code § 49-4 (2026)
Sec. 49-4. Public-private participation.LinkCopy Citation
The County Executive may contract with any person who is developing land in the County to participate in the cost of any road, including any sidewalk, bikeway, gutter, curb or drainage construction, landscaping, traffic control device, bikeshare station, electric vehicle charging station, or placement of utilities, conduits, or other amenities in a road dedicated to public use.
Montgomery County, Md., Code § 49-5 (2026)
Sec. 49-5. Right to drain dedicated roads without liability to abutting owners.LinkCopy Citation
If any road is dedicated to the use of the public by a private grant, the grant must include the right to properly drain the road, including a grant to the County of any necessary easements, without liability of the County to any abutting owner for any resulting injury.
Montgomery County, Md., Code § 49-6 (2026)
Sec. 49-6. Roads used for 20 years may be declared public highways.LinkCopy Citation
Whenever any road has been used by the public for 20 or more years, though the road may never have been condemned or granted as a public road and regardless of whether the road termini are public, the County Executive may by Executive order published in the County Register declare the road to be public.
Montgomery County, Md., Code § 49-7 (2026)
Sec. 49-7. Authority of special taxing districts to regulate streets and roads.LinkCopy Citation
Any special taxing district which has the authority to pave and maintain streets and roads may adopt and amend reasonable regulations under method (2) governing the construction, maintenance, improvement, grading, and repairing of the roads and streets in the district, including those dedicated for public use.
Resolution 17-1162, adopted July 15, 2014, by the Montgomery County Council, adopts regulations governing streets for the Village of Drummond.
Montgomery County, Md., Code § 49-8 (2026)
Sec. 49-8. Restoration of public right-of-way.LinkCopy Citation
(a)
The Director of Permitting Services may require any applicant for a construction permit which includes a haul route to provide bonding for the restoration, after construction is finished, of any existing improvement in the public right-of-way.
(b)
The Director may require this bonding when the applicant is likely to deliver or remove construction materials to or from a proposed work site.
(c)
The applicant must identify each proposed haul route from the work site to a major highway.
Montgomery County, Md., Code § 49-9 (2026)
Sec. 49-9. Removal of items that obstruct the vision of motorists on public highways or interfere with the use of public rights-of-way.LinkCopy Citation
(a)
Notice to owner of property. If the Director of Transportation finds that any tree, bush, vine, undergrowth, or other obstruction, except a building or similar structure affixed to the ground, on private property poses a threat to public safety by obstructing the vision of operators of vehicles traveling on any public road, interfering with the public rights- of-way as a traffic hazard, limiting access by Fire and Rescue Service vehicles, or restricting the use by pedestrians or bicyclists of the public rights-of-way, the Director promptly must serve on the owner, agent, lessee or any other person supervising the property a written notice that:
(1)
describes where the obstruction exists;
(2)
describes how the obstruction impairs the vision of operators of vehicles, including bicycles, or impedes pedestrian or legal bicycle travel on the right-of- way;
(3)
describes the steps necessary to correct such conditions; and
(4)
directs the person receiving the notice to take corrective steps within a stated period of time.
(b)
Reserved.
(c)
Effect of failure to remove obstructions. When any person does not comply with any order issued under this Section within the time specified in the order, the Director of Transportation must remove all or part of the obstruction as necessary to eliminate the hazard or impediment. An agent of the Department may enter the property to take this action.
(d)
Service of orders and notices. All orders and notices issued under this Section must be served on the person to whom they are directed either by registered or certified mail or by personal delivery. If that person is not known to reside and cannot be found in the County, service may be made by publishing the order or notice once in a newspaper of general circulation in the County and by posting it on the premises in a conspicuous manner. Service by publication and posting is completed on the day of publication or posting.
(e)
Cost of removal when done by the Department. Whenever the Department eliminates an obstruction under this Section, the Director must file with the Department of Finance a certified statement of the cost to the County of eliminating the obstruction, together with proof of service of the notice required by subsection (a). The cost certified to the Department of Finance and any cost of publishing the notice under subsection (a) constitutes a charge and lien against the property that the County must collect in the same manner as the County collects real estate taxes.
Sec. 2. Transition. This Act does not apply to any appeal to the Board of Appeals that was filed before this Act took effect.
Sec. 3. Regulations. Regulations 6-06AM and 7-06AM remain in effect, notwithstanding any amendment to the County Code in Section 1 of this Act, except for any provision of the National Fire Code that authorizes or refers to an appeal to the Board of Appeals.
Montgomery County, Md., Code § 49-10 (2026)
Sec. 49-10. Obstruction of public rights-of-way.LinkCopy Citation
Except as provided in Section 49-11, in the public right-of-way, a person must not:
(a)
place, maintain, use, permit, allow, or exercise control over, any object or structure;
(b)
perform any reconstruction or maintenance work; or
(c)
allow the erection or placement of any structure, fence, post, rock, or other object, except:
(1)
mailboxes mounted on a support that will bend or break away on impact by a vehicle;
(2)
individual residential newspaper boxes mounted on a support that will bend or break away on impact by a vehicle;
(3)
street trees placed and maintained under Section 49-33(i);
(4)
ground cover placed and maintained under Section 49-33(j);
(5)
a temporary, removable obstruction or occupation of a right-of-way installed under a permit issued under Section 49-11; or
(6)
as otherwise permitted by law.
Any object placed in the public right-of-way under Section 49-10(c) must not impede use of a sidewalk or other right-of-way by pedestrians or persons in wheelchairs, or impede or endanger automobiles or other vehicles.
Montgomery County, Md., Code § 49-11 (2026)
Sec. 49-11. Permit to obstruct public rights-of-way.LinkCopy Citation
(a)
Definitions. In this Section, the following terms have the meanings indicated.
Public includes pedestrians, bicyclists, and transit users.
Safe alternative path means an alternate sidewalk or sidepath that:
(A)
is on the same side of the street as a temporary closure; and
(B)
provides safe access and passage to pedestrians.
Temporary closure means a temporary obstruction, blockage, or occupation of a right-of-way under a permit issued by the Director of Permitting Services under this Section.
(b)
Subject to subsections (c) and (d) of this Section, the Director of Permitting Services may issue a permit to:
(1)
reconstruct or repair a sidewalk, sidepath, driveway, curb, or other structure;
(2)
repair, locate, or replace underground utilities or infrastructure under a sidewalk or sidepath;
(3)
install a temporary, removable obstruction or occupation of a right-of-way;
(4)
close a curb lane, sidewalk, or sidepath in conjunction with the construction or reconstruction of an abutting structure;
(5)
install permanent, nonstandard structures in the right-of-way that were approved by the Planning Board, the City of Rockville, or the City of Gaithersburg in a site plan as a site element of streetscape. Streetscape means street furnishings and fixtures used by the public in the right-of-way but does not include structures or improvements for private use. The permit applicant must execute a declaration of covenants that runs with the land on which the streetscape will be installed to perpetually maintain the permitted streetscape in a good and safe condition; return the right-of way to its condition before the permitted streetscape was installed if the nonstandard permitted streetscape is removed; and indemnify the County from any cost or liability associated with the construction, maintenance, use or removal of the nonstandard permitted streetscape; or
(6)
install a private, non-commercial structure that is accessory to a residential use. The permittee must execute a maintenance and liability agreement that is approved by the Director of the Department of Permitting Services.
(c)
Permits for temporary obstructions. If a permit under subsection (b)(1) involves a temporary closure located in a Central Business District planning policy area, a Bicycle-Pedestrian Priority Area, an area within ½ mile of a Purple Line Station, or an area within ½ mile of a Bus Rapid Transit Station Area, the Director may issue the permit only if:
(1)
the permit has conditions necessary to:
(A)
minimize inconvenience to the public;
(B)
limit the duration of the temporary closure to the minimum time period necessary; and
(C)
assure public safety in the work area;
(2)
the Director of Transportation approves a temporary traffic control plan under subsection (g);
(3)
the area subject to the temporary closure is not used for vehicle parking;
(4)
the permittee has any franchise required under Section 49-20; and
(5)
the duration of the temporary closure complies with subsection (d).
(d)
Time limits for temporary closures without safe alternative paths. Except as provided in subsections (e) and (f):
(1)
a temporary closure to reconstruct or repair a sidewalk or sidepath must not exceed 6 months without the provision of a safe alternative path; and
(2)
any other temporary closure must not exceed 15 days without the provision of a safe alternative path.
(e)
Extensions – in general. The Director may extend a time period under subsection (d), for a time period designated by the Director, if the Director finds that:
(1)
(A)
based on a certification submitted by a professional engineer, construction of a safe alternative path is not possible; or
(B)
the street is closed; and
(2)
the extension meets minimum requirements established under Method (2) regulations, including requirements that the permit must:
(A)
limit the temporary closure to the minimum time necessary;
(B)
be subject to regular review by the Director to determine whether the temporary closure without a safe alternative path remains necessary; and
(C)
if the Director determines that the temporary closure without a safe alternative path is no longer necessary, require the permittee immediately to:
(i)
provide a safe alternative path; or
(ii)
terminate the temporary closure.
(f)
Short extensions for hardship.
(1)
The Director may grant one extension of a time period under subsection (d), for no more than 15 days, on a showing by the applicant of undue hardship involving significant difficulty or expense.
(2)
The Executive must adopt regulations under Method (3) to specify the standards a permittee must meet to demonstrate undue hardship involving significant difficulty or expense.
(g)
Temporary traffic control plan. A temporary traffic control plan under subsection (c) must meet standards established by the Executive under Method (2) regulations, including that:
(1)
a professional engineer must certify for the applicant that the plan minimizes inconvenience to the public, provides necessary warnings, and includes safe and reasonable pedestrian alternatives in accordance with accepted engineering standards; and
(2)
the permit and the traffic control plan must require signage during construction to inform pedestrians about the duration of the obstruction, the permit number, and the County contact telephone number to call.
(h)
Public access to permit information. The Director of Permitting Services must publish on the Department’s website a copy of each application received and permit granted under this section.
Montgomery County, Md., Code § 49-11A (2026)
Sec. 49-11A. Permit to temporarily obstruct private roads.LinkCopy Citation
(a)
A person must not close any portion of a private road that is an urban road as defined in Section 49-32 without a permit from the Director of Permitting Services.
(b)
The Director of Permitting Services may issue a permit for the complete or partial closure of a private road on a temporary basis if the closure does not:
(1)
violate Chapter 22;
(2)
interfere with use of the private road by persons with disabilities;
(3)
impede or endanger the users of any building or structure adjacent to or abutting the private road; or
(4)
adversely impact the use of connecting public roads.
(c)
An application to close a private road may only be made by the owner of the private road. The owner must apply for a permit on a form prescribed by the Director of Permitting Services, submit detailed information, including the locations to be closed, duration of closure, location of required temporary closure signs, purpose of closure, and use and occupancy of all buildings or structures adjacent to or abutting the private road, and any additional information as the Director may require.
(d)
The Director of Permitting Services may charge a fee, set by Method (3) regulation, for the permit application and may include conditions in each permit that provide for the safety of any user of a building or structure adjacent to or abutting the private road, including providing for safe alternate access to and egress from any building or structure.
(e)
Before the Director of Permitting Services issues a permit to close a private road in whole or in part under this Section, the Director of Transportation must review or waive review of each application to ensure that closure will not adversely impact the use of connecting public roads. The Director of Transportation may recommend permit conditions to the Director of Permitting Services. The owner of a private road must submit a temporary traffic control plan that requires signage during closure to inform pedestrians about the duration of the closure, the permit number, and the owner’s contact telephone number to call that address conditions of closure as may be required by the Director of Permitting Services.
Montgomery County, Md., Code § 49-12 (2026)
Sec. 49-12. Exemptions from Sections 49-10 and 49-11.LinkCopy Citation
(a)
Subject to paragraphs (1) and (2), Sections 49-10 and 49-11 do not apply to, and no permit under those Sections is required of, any municipality, special taxing district or government agency to construct streets, roads, sewers, or drainage facilities in the County over which the entity has jurisdiction. However:
(1)
Sections 49-10 and 49-11 apply to any road that is located in a municipality and owned or maintained by the County; and
(2)
if the County owns or maintains a right-of-way, Section 49-11 applies to any temporary closure of the right-of-way.
Montgomery County, Md., Code § 49-13 (2026)
Sec. 49-13. Penalty for violation of Sections 49-10 and 49-11.LinkCopy Citation
Any violation of Sections 49-10 and 49-11 or any permit granted under those Sections is a Class A violation.
Montgomery County, Md., Code § 49-14 (2026)
Sec. 49-14. Debris likely to injure persons, animals, or vehicles.LinkCopy Citation
A person must not place or leave in or on any public road, any debris liable to cause injury or damage to any vehicle or personal property. Any violation of this Section is a Class C violation.
Montgomery County, Md., Code § 49-15 (2026)
Sec. 49-15. Accumulations of soil or foreign material on roads.LinkCopy Citation
(a)
A person must not, personally or by an agent or employee:
(1)
cause or permit earth, soil, mud, or other foreign material to be deposited on any public right-of-way, including any public road, street, alley, sidewalk, bikeway, or parking area, or in any drain or ditch designed to carry surface water from any public right-of-way, whether the material is spilled, dropped, placed, washed, or tracked from a vehicle; and
(2)
fail to remove immediately from the right-of-way or drain or ditch the material deposited.
(b)
A person who owns or occupies land contiguous to any public right-of-way, including any public road, street, alley, sidewalk, bikeway, or parking area, or contiguous to any drain or ditch designed to carry surface water from a public right-of-way, knowing that earth, soil, mud, or any other foreign material has been spilled, dropped, washed, or tracked from that land onto a right-of-way or into a drain or ditch, must remove immediately from the right-of-way or drain or ditch the material so deposited.
(c)
Any violation of this Section is a Class C violation.
Montgomery County, Md., Code § 49-16 (2026)
Sec. 49-16. Covered loads.LinkCopy Citation
(a)
A person must not carry any loose or bulky material in a motor vehicle on any road, as defined in Section 49-26, unless that part of the motor vehicle in which the load is carried is:
(1)
Fully enclosed on the bottom and all sides; and
(2)
Covered on the top by a firmly secured cover sufficient to contain all loose or bulky material, if the vehicle does not have a roof that covers the entire area in which the load is carried.
(b)
A cover and (for bulky material) sides are not required if the material is contained or secured by other means that prevent its escape.
(c)
As used in this section:
(1)
Loose material includes dirt, ash, sand, pebbles, rocks, gravel, metal, glass, wood chips, and any other substance that can readily blow off or drop from a vehicle;
(2)
Bulk material includes bricks, cinder blocks, lumber, logs, gypsum board, barrels, pipes, furniture, and any other items that can readily drop from a vehicle.
(d)
This Section does not apply to:
(1)
A government agency, or a contractor hired by a government agency, that is using a motor vehicle to:
(A)
Drop sand, salt, or other materials to improve traction;
(B)
Spread water or another substance to clean a road; or
(C)
Collect newspapers for recycling.
(2)
A vehicle transporting agricultural products as harvested.
(3)
A construction or mining vehicle only when it is:
(A)
Crossing a highway; or
(B)
Moving between construction barricades on a public works project.
(4)
A fire and rescue vehicle.
Montgomery County, Md., Code § 49-17 (2026)
Sec. 49-17. Accumulation of snow and ice on property prohibited.LinkCopy Citation
(a)
Legislative findings.
(1)
During significant winter storm events, Montgomery County’s sidewalks often become impassable and covered in piles of snow that are pushed aside from the road as a result of County and State snowplows. The scope of the problem is prevalent on Montgomery County’s busiest roads, where sidewalks are often within an arm’s reach of traffic.
(2)
These blocked sidewalks often persist for days following the end of a snowstorm, creating a significant pedestrian safety hazard that often forces pedestrians to walk in a lane with oncoming traffic.
(3)
County law allocates the responsibility of property owners to clear snow on a public sidewalk fronting their property within 24 hours of the end of snowfall. However, such clearing rarely occurs due to a variety of reasons, including the difficulty of removing the large piles of compacted snow and ice created by plow trucks.
(4)
The County, in its current operation, clears sidewalks in urban districts and approximately sixty (60) miles of sidewalks with no adjacent residential or commercial property owner outside of such areas.
(5)
Snow-covered and icy sidewalks adversely affect essential workers and commuters, who often travel by foot or public transportation, and must walk along high-traffic roads to get to bus stops and retail stores.
(6)
It is in the best interest of the County to adopt fair, reasonable and equitable legislation to address safety hazards and increase walkability access on sidewalks for pedestrians during winter storms.
(b)
(1)
Definitions. In this Section:
(A)
Commercial property means real property that either:
(i)
is not designed for or intended for human habitation; or
(ii)
contains a multi-family dwelling of four or more units.
(B)
Residential property means real property containing either:
(i)
a single-family dwelling; or
(ii)
a multi-family dwelling of three or fewer units.
(C)
Department means the Department of Transportation.
(D)
Non-buffered Sidewalk means a sidewalk along a roadway that does not contain a grass strip or other physical separation between the sidewalk and the adjacent curb or road edge.
(E)
Orphan sidewalk means a sidewalk either abutting a State or County road and be located:
(i)
adjacent to a vacant lot;
(ii)
an overpass with no adjacent commercial or residential property adjoined; or
(iii)
behind a residential or commercial property that is not directly accessible from the owner’s property and is separated from the sidewalk by a fence, guardrail, or change in elevation grade.
(2)
A person is responsible for removing snow and ice on any sidewalk, sidepath, other areas intended for public pedestrian access, or parking area on or adjacent to property that the person owns, leases, or manages, to provide a pathway wide enough for safe pedestrian and wheelchair use. For purposes of this Section, commonly owned property between a single-family residential lot and a common sidewalk or sidepath is considered part of the lot if the intervening common property includes a sidewalk, sidepath, or driveway that serves only that lot.
(3)
Except as provided in paragraph (5), each owner, tenant, or manager is jointly and severally responsible for clearing snow and ice from the property and complying with Section 31-26A(d).
(4)
The requirements of this Section do not apply to:
(A)
an unpaved sidewalk;
(B)
a private sidewalk or parking area on the property of a single-family residence;
(C)
a public sidewalk or sidepath behind a single-family residence that is not directly accessible from the owner’s property;
(D)
a sidewalk that:
(i)
is at least 25 feet from vehicular traffic;
(ii)
serves only pedestrian destinations that are also accessible by another sidewalk that this Section requires to be cleared;
(iii)
was not routinely cleared of snow and ice after August 1999; and
(iv)
is not the primary route for pedestrian access to a winter recreational facility open to the public; or
(E)
any non-buffered sidewalk or path as specified under Section 49-17(j), regardless if the private property is fronting or abutting the sidewalk.
(5)
(A)
An individual who lives in a multi-family dwelling is not responsible for removing snow and ice from a common sidewalk, sidepath, or parking area.
(B)
A homeowners’ association, as that term is used in State law, is not responsible for removing snow and ice from a sidewalk or sidepath adjacent to a single-family residential lot, if the lot owner is responsible under paragraph (1) for removing snow and ice from that sidewalk or sidepath.
(c)
If ice or hardpacked snow is impossible or unreasonably difficult to remove, the person is responsible for applying sufficient sand, other abrasives, or salt to provide safe pedestrian use.
(d)
The person is responsible for removing snow and ice within 24 hours after the end of the precipitation that caused the condition. If a snowplow redeposits snow or ice on a sidewalk, sidepath or other area intended for pedestrian access after a person has complied with this Section, the person is not responsible for clearing the area until 24 hours after the snowplow redeposited the snow or ice.
(e)
The County Executive must designate a department to enforce this Section and may designate other County employees or contractors to enforce this Section.
(f)
The Executive may order a different deadline or conditions for removing snow and ice during or immediately after a severe or unusual storm or other public-safety condition.
(g)
In addition to any other remedy or penalty for a violation of this Section, the County may clear the snow and ice and charge the responsible property owner for the cost, which the County may collect in the same manner as property taxes.
(h)
Violations.
(1)
A violation of this Section is:
(A)
on or adjacent to residential property, a class C violation; and
(B)
on or adjacent to commercial property, a class A violation subject to a civil penalty of $250 for an initial offense, with penalties for repeat offenses according to Section 1-19.
(2)
A person authorized to enforce this Section must not issue a citation for a violation unless the violation still exists 24 hours after a notice of violation. An authorized enforcement officer may issue the notice of violation to any person responsible under subsection (a) for clearing the snow or ice, or post the notice in a conspicuous place on the property where the violation exists.
(3)
Each day a violation continues to exist is a separate violation, except for a violation on or adjacent to a single-family residential property.
(i)
Sidewalk snow removal plan. The Executive must develop, update, and publish on the County internet site a sidewalk snow removal plan allocating available resources in a fair and equitable manner throughout the County that includes a:
(1)
digital map of the County that shows who is responsible for clearing snow and ice on each sidewalk in the County;
(2)
“major storm event”' communications plan that addresses notice to County residents of a major storm event and the sidewalk snow and ice removal requirements in this Section;
(3)
targeted public education campaign about sidewalk snow and ice removal for owners of property in the County;
(4)
designation of pedestrian priority routes for targeted education and increased snow and ice removal enforcement;
(5)
public education campaign about how to request enforcement of this Section;
(6)
plan to provide extended hours for County personnel who receive snow and ice removal complaints during a major storm event;
(7)
plan for removal of snow and ice on publicly owned property:
(A)
at bus-stops and Metro stations;
(B)
near schools;
(C)
along State highways;
(D)
along the highest priority pedestrian routes;
(E)
in urban districts; and
(F)
used for hiker-biker trails; and
(8)
plan for trash removal during a major storm event.
(j)
Sidewalk snow removal - Required. The Executive must implement a plan and require the Department to remove or cause to be removed snow and ice accumulation from the last day of precipitation within the following designated areas:
(1)
orphan sidewalks; and
(2)
non-buffered sidewalks or paths within the nineteen (19) arterial roads prescribed below:
(A)
MD-187 Old Georgetown Road between Arlington Road and Democracy Boulevard;
(B)
MD-355 Wisconsin Avenue between Chestnut Street and Jones Bridge Road;
(C)
Jones Bridge Road from MD-355 to Jones Mill Road;
(D)
Middlebrook Road between Waring Station Road and MD-118;
(E)
MD-97 Georgia Avenue between Blueridge Avenue and Glenallen Avenue;
(F)
MD-97 Georgia Avenue between Hewitt Avenue and Bel Pre-Road;
(G)
MD-185 Connecticut Avenue between the Matthew Henson Trail and MD-97;
(H)
Randolph Road between Middlevale Lane and Rock Creek;
(I)
MD-586 Veirs Mill Road between Galt Avenue and the Matthew Henson Trail;
(J)
MD-320 Piney Branch Road between Sligo Creek and the Prince George’s County line;
(K)
MD-193 University Boulevard between Carroll Ave (MD-195) and the Capital Beltway (I-495);
(L)
MD-193 University Boulevard between Arcola Avenue and Amherst Avenue;
(M)
Flower Avenue between MD-320 and East Wayne Avenue;
(N)
Carroll Avenue between MD-193 and MD-320;
(O)
MD-650 New Hampshire Avenue between the Prince George’s County line and Lockwood Drive;
(P)
Lockwood Drive between MD-650 and 11431 Lockwood Drive;
(Q)
Tech Road between Old Columbia Pike and Broadbirch Drive;
(R)
Old Columbia Pike between Tech Road and Briggs Chaney Road; and
(S)
Briggs Chaney Road between Robey Road and U.S. 29.
Montgomery County, Md., Code § 49-18 (2026)
Sec. 49-18. Interfering with or damaging roads under construction.LinkCopy Citation
A person must not:
(a)
interfere with, impede, or hinder the building, repairing, improvement, or construction of any public road by traveling over the road with motor vehicles or in any other manner that would damage or destroy the road being built, repaired, improved, or constructed; or
(b)
interfere with building, repairing, or improving a public road; or
(c)
tear down or destroy a public road being built, repaired, improved, or constructed; or
(d)
tear down or destroy any barricades or lanterns which give notice to the public and all parties not to travel the portion of road being built, repaired, improved or constructed.
Any violation of this Section is a Class C violation
Montgomery County, Md., Code § 49-19 (2026)
Sec. 49-19. Conversion of overhead lines to underground locations.LinkCopy Citation
If the construction or improvement of any County road requires any person to relocate any overhead electric, telephone, or other overhead line or related facility in any County road right-of-way, the County Executive must, by regulation adopted under Method (3), require that any affected line must be installed underground if the Executive finds that underground installation is desirable after considering the following factors:
(a)
Any fire hazard or possible interference with fire fighting equipment due to the location of the line;
(b)
A close proximity of the line to any place where people may congregate;
(c)
The anticipated increase of traffic on the road to be reconstructed or improved;
(d)
The population of the area, increase in population, and future conditions reasonably anticipated in the normal course of development;
(e)
Air traffic in the general area of the road, proximity of any airport, location of the line in an approach to an existing or anticipated runway, or other future hazard to air traffic;
(f)
The comparative costs of relocating the line overhead and installing it underground;
(g)
The comparative maintenance costs for overhead and underground lines;
(h)
The comparative frequency of interruptions in service for overhead and underground lines;
(i)
The improvement in the appearance of the area which would result from installing the line underground;
(j)
Any location or relocation of an overhead line in a Metro Station Policy Area, Town Center Policy Area, or other area expressly identified for this purpose in a Council resolution; or
(k)
Any other condition that affects the public convenience, health, safety, or general welfare.
Any regulation to implement this Section must require the replacement of any street light removed during the installation of underground facilities.
Montgomery County, Md., Code § 49-19A (2026)
Sec. 49-19A. Permit exemption for the Purple Line.LinkCopy Citation
(a)
The State of Maryland, including its agencies and divisions, is exempt from any permitting requirement in Chapters 8 (“Buildings”), 17 (“Electricity”), 22 (“Fire Safety Code”), and 49 (“Streets and Roads”) for the construction of:
(1)
any portion of the Purple Line that is located within the public right-of-way under a valid franchise agreement approved by the County Council under Section 49-21; and
(2)
any structure related to the Purple Line owned by the State of Maryland or its agencies or divisions, including any hiker/biker trail that will be owned or maintained by the County.
(b)
However, the State of Maryland, and its agencies, divisions, and contractors, must obtain any permit required under Chapter 8, 17, 22, and 49 for the construction or alteration of any structure owned by the County, except the hiker/biker trail, or by a private person or entity.
Article 2. Franchises.
Montgomery County, Md., Code § 49-20 (2026)
Sec. 49-20. Franchises for use of street; procedure for granting; notice and hearing.LinkCopy Citation
The Council may approve a franchise for the occupation of any road or other right-of-way, either on, above, or below the surface if the following requirements are met:
(a)
Application to be published. The applicant must publish notice of each application for a franchise once a week for 3 successive weeks in one or more newspapers of general circulation in the County, specifying:
(1)
a summary of terms of the proposed franchise;
(2)
the compensation the County may receive, including in-kind goods and services; and
(3)
the location, character, and extent of the use of the right-of-way.
(b)
Inquiry as to value. The County Executive or a designee may investigate the value of the proposed franchise and the adequacy of the compensation proposed to be paid for it.
(c)
Hearing on objections. If any taxpayer, or any property owner whose property rights may be affected by the grant of the franchise, files an objection to the granting of the franchise in writing with the County Executive within 10 days after the last notice required by subsection (a) appears, the County Executive or a designee must hold a hearing within 15 days after the objection is filed on the proposed franchise and any objections to it.
(d)
Recommendations of County Executive. The County Executive must, after any hearings required by this Article, forward to the Council written recommendations concerning the proposed franchise, including any Executive findings as to the value of the proposed franchise, any response to objections which have been raised, and any other relevant issues.
(e)
As used in this Chapter, “franchise” includes any franchise, lease, license, contract, or other right or permission to use or occupy a County right-of-way. However, “franchise” does not include an occupation of a right-of-way for which the Department of Permitting Services has issued a permit under Section 49-11.
(f)
The Director of Permitting Services must issue a permit under this Article before a franchisee may occupy or obstruct the right-of-way.
The state public service commission may approve the transfer of assets of a public service corporation without the County's consent, Montgomery County v. Public Service Commission, 203 Md. 79, 98 A.2d 15 (1953).
Montgomery County, Md., Code § 49-21 (2026)
Sec. 49-21. Council action.LinkCopy Citation
(a)
The Council may grant a franchise for such compensation as it, after considering the recommendations of the County Executive, finds proper, for a period not longer than 25 years. If the franchise allows the location of a permanent structure with a useful life longer than 25 years in the County right-of-way, the initial term of the franchise may exceed 25 years.
(b)
The franchise may allow the franchisee to renew the franchise, after the County determines the value of the renewed franchise for one or more terms that each do not cumulatively exceed 25 years.
(c)
Every grant of any franchise must provide, by forfeiture of the grant, for compelling compliance with its terms and the maintenance of the right-of-way in good condition, throughout the grant.
(1)
the mode of determining any valuation and revaluation under this Article,
(2)
the time limit to exercise the rights given, and
(3)
the procedure for default for a lapse of the franchise.
(d)
When any construction authorized by a County franchise or permit is finished, each franchisee must submit a full set of as-built drawings to the Director of Permitting Services. The required drawings must be submitted in a hard copy format maintained by the franchisee in the ordinary course of business and in an electronic format acceptable to the Director. The required drawings must show in detail the exact as-built location of any facility installed in a County right-of-way. The Director must keep the required drawings confidential and distribute them only to another County Department which needs them to perform essential construction, maintenance, regulatory, or security functions.
Montgomery County, Md., Code § 49-22 (2026)
Sec. 49-22. County to retain control.LinkCopy Citation
When the Council grants a franchise under this Article, the County must continue to exercise full control over the franchised right-of-way.
Montgomery County, Md., Code § 49-23 (2026)
Sec. 49-23. Certain private rights not affected.LinkCopy Citation
Nothing in this Article is intended to affect any private right, except as necessary to comply with this Chapter.
Montgomery County, Md., Code § 49-24 (2026)
Sec. 49-24. Application of funds.LinkCopy Citation
All money received by the County under this Article must be applied to County transportation programs.
Article 3. Road Design and Construction Code.
Montgomery County, Md., Code § 49-25 (2026)
Sec. 49-25. Complete streets policy and standards.LinkCopy Citation
This Article is intended to guide the planning, design, and construction of transportation facilities in the public right-of-way. Each transportation facility in the County must be planned and designed to:
(a)
maximize the choice, safety, convenience, and mobility of all users, regardless of age, ability, or mode of transportation,
(b)
maintain or expand connectivity for users,
(c)
respect and maintain the master plan recommendations for the community where it is located,
(d)
ensure access, convenience, safety, and investment of resources are equitably applied,
(e)
minimize stormwater runoff and otherwise preserve the natural environment, and
(f)
facilitate, to the maximum extent possible, the future accommodation of improved transportation technology elements, such as intelligent signals, smart parking meters, electric vehicle charging, car- and bicycle-sharing, and way-finding systems.
To achieve these goals, each County road and street must be designed so that the safety and convenience of all intended users of the roadway system is accommodated. Complete streets function as a road transportation network that is safe and convenient for all intended users, regardless of mode. Stormwater management requirements, including vegetated and structural practices, may be met on-site and within the public right-of-way. Complete streets policies must be employed in all phases of publicly or privately funded facility development, including planning, design, construction, reconstruction, and streetscaping.
The County Executive must adopt under Method (2) a Complete Streets Design regulation that provides guidance on the planning, design, and operation of roadways for all intended users.
This Article may be cited as the “Montgomery County Road Design and Construction Code.”
Sections 49-25, 49-26, 49-27, 49-28, 49-29, 49-31, 49-33, 49-34, 49-35, 49-36, 49-37, 49-41, 49-39, 49-40, 49-41, and certain repealed sections [formerly §§ 93-6 through 93-19] are cited in Perlmutter v. Bacas, 219 Md. 406, 149 A.2d 23 (1959).
Montgomery County, Md., Code § 49-26 (2026)
Sec. 49-26. Definitions.LinkCopy Citation
In this Chapter, except where specified otherwise, the following words and phrases have the meanings indicated:
Bikeway means any area expressly intended for bicycle travel, including associated curbs and gutters and any:
(a)
Bike lane means a portion of a roadway designated by striping, signing, or pavement markings for the preferential or exclusive use of bicycles, and on which travel by motor vehicles is not allowed.
(b)
Off-street trail means paths located outside of the road right-of-way that provide two-way travel for people walking, bicycling and using other non-motorized modes. This facility was formerly referred to as a “shared use trail.”
(c)
Separated bike lane, also known as a protected bike lane or cycle track means an exclusive bikeway that is physically separated from motor vehicles and distinct from the sidewalk. A separated bike lane may be in a one-way or two-way configuration.
(d)
Shared use roadway means a roadway open to both bicycle and motor vehicle travel and which is designated as a preferred route for bicycle use by warning or informational signs.
(e)
Sidepath means a paved path that is located parallel to and within the road right-of-way. Sidepaths provide two-way travel routes designated for walking, bicycling, jogging and skating. Sidepaths are separated from motorized traffic by a curb, barrier, or landscape panel. This facility was formerly referred to as a “shared use path”.
Complete streets means streets that are planned, designed, and constructed to enable safe access for all intended users, including pedestrians, bicyclists, motorists, and transit riders of all ages and abilities, commercial vehicles, freight haulers, and emergency service vehicles.
Complete streets infrastructure means any design feature that contributes to a safe, convenient, and comfortable travel experience, which may include such features as sidewalks; sidepaths, bike lanes, and separated bike lanes; bike stations and bike storage facilities; narrow motor vehicle lanes and tight curb radii; street trees, planting strips, and other right-of-way landscaping; curbs and accessible curb ramps; curb extensions, crosswalks, and refuge islands; raised medians; pedestrian and traffic signals, including countdown and accessible signals; signage; streetlighting; street furniture; bicycle parking facilities; stormwater management; public transportation stops and shelters; dedicated transit lanes; and traffic calming devices.
Construction and constructed include “reconstruction” and “reconstructed” but not “maintenance,” and include grading, installation of drainage structures, paving, curbs and gutters, curb returns, sidewalks and other areas intended for pedestrian access, bikeways, driveway entrances, guardrails, retaining walls, sodding, and planting.
Curb extension means an area that extends the line of a curb into a parking lane, reducing the width of a street.
Curbside Width means the area beyond each curb necessary for sidewalks, sidepaths, street trees and other landscaping, streetlights, utilities, and other elements.
Dedication plat means any plat conforming to law, duly recorded in the County land records, which has the legal effect of dedicating one or more rights-of-way to public use. If the plat was recorded after the Maryland-National Capital Park and Planning Commission was created, and the property is located in the Commission’s jurisdiction, the Commission must have approved the plat.
Design standard means the standard adopted by regulation under this Article for each type of road, as defined in Section 49-31, except Freeways and Controlled Major Highways, which shows typical cross-sections and other dimensions to which the road must conform.
Director means the Director of Transportation or the Director of Permitting Services, as specified, and each Director’s designee.
Drainage structure means any culvert, bridge, storm drain, storm sewer, catch basin, canal, channel, inlet, ditch, or subsurface drain, and any other structure or watercourse designed to convey surface or other waters.
Dual road means any road in which the travel directions are separated by a median.
Forest conservation plan means a plan for the retention, afforestation, or reforestation of forest and trees approved under Chapter 22A.
Ground cover means low-maintenance, non-invasive, leafy, grassy, or woody vegetation that covers and holds soil.
Maximum target speed means the maximum speed at which vehicles should operate on a thoroughfare in a specific context, consistent with the level of multimodal activity generated by adjacent land uses, to provide mobility for motor vehicles and a safe environment for pedestrians and bicyclists.
Private Road means any road or any segment of a road, including any sidewalk, sidepath, or other area intended for pedestrian access adjacent to the private road that has not been deeded, dedicated or otherwise permanently appropriated to the public for public use or County maintenance.
Protected Crossing means specific traffic control devices that improve the safety and comfort of pedestrians and bicyclists crossing streets by reducing or eliminating conflicts, as well as increasing stopping and yielding for pedestrians and bicyclists, using measures such as traffic signals (full signals with pedestrian signals), pedestrian hybrid (HAWK) beacons, all-way stop control, or grade-separated crossings.
Reconstruct and reconstruction include any change in the width, alignment, or design of a road or other structural features within or along a roadway but does not include resurfacing a road, bikeway, or sidewalk without any change in its width.
Road means any road, street, highway, avenue, boulevard, lane, alley, bridge, sidepath, sidewalk, viaduct, or any segment of any of them, and any related storm drain and stormwater management facility.
Rural area means an area designated as the Rural East and Rural West policy areas in the Growth and Infrastructure Policy.
Sidewalk means any portion of the right-of-way for a County road that is expressly intended for pedestrians, including pedestrian ramps.
Specimen tree means any tree with a diameter measured at 4.5 feet above the ground of 30 inches or more, or any tree with 75% or more of the diameter of the current champion tree of that species, as designated by the County Forest Conservation District Board.
Speed hump means a parabolic or flat-top device used to create vertical deflection along a roadway for traffic calming purposes. These may include wheel gaps that allow target vehicles to pass through unaffected or flat-top devices may include crosswalks.
Street tree means a tree that is listed in the design standards as acceptable for planting in a public right-of-way. In a private road right-of-way or easement, a tree listed as acceptable for planting in the Planning Board technical manual for forest conservation.
Subdivision means the division or assemblage of a lot, tract or parcel of land into one or more lots, plots, sites, tracts, parcels, or other divisions for immediate or future rental, sale, or building development. Subdivision includes a re-subdivision, but not a division or partition of land for agricultural purposes.
Transitway means a right-of-way for use exclusively by public transit vehicles.
Urban area means areas depicted in the Master Plan of Highways and Transitways as amended, or by any replacement functional, master, or sector plan that defines urban areas or urban road code boundaries.
Montgomery County, Md., Code § 49-27 (2026)
Sec. 49-27. Applicability of Article.LinkCopy Citation
This Article applies to all roads in the County, except any:
(a)
state road;
(b)
federal road;
(c)
road located in any park under the jurisdiction of the Maryland-National Capital Park and Planning Commission;
(d)
private road; or
(e)
municipally owned and maintained road.
Nothing in this Article prevents the County from building, and assessing the cost of, any drainage structure, curb or gutter, sidewalk, sidepath, curb return, or sidewalk and driveway entrance, along a state or federal road.
Montgomery County, Md., Code § 49-28 (2026)
Sec. 49-28. Standards and specifications.LinkCopy Citation
(a)
Except as otherwise provided in this Article, the construction of all roads must conform to the standards and specifications in this Article or any regulation adopted under this Article. As used in this Article, “standards” means County design standards including the regulation adopting the complete streets design, and “specifications” means the most recent state standard specifications for road construction and materials. When no County standards or specifications are applicable, the County will apply the current guidance published by the American Association of State and Highway Transportation Officials (AASHTO) or National Association of City Transportation Officials (NACTO).
(b)
The Executive may set a fee by Method (3) regulation for the review of any plan or document submitted under Chapter 50 or this Chapter. Each fee must be based on the costs of reviewing any plan or document and any staff participation in the subdivision process. The Department must provide a copy of each fee regulation to the Planning Board.
(c)
The Department of Transportation must make available to the public, free or at a reasonable cost, an up-to-date copy of all applicable County road design standards and specifications.
Montgomery County, Md., Code § 49-29 (2026)
Sec. 49-29. Pedestrian sidewalks, bikeways, and wheelchair traffic.LinkCopy Citation
(a)
The County must construct bikeways and sidewalks when it is constructing, reconstructing, or relocating a County road, except:
(1)
any sidewalk or sidepath in front of a lot that is larger than 25,000 square feet for a single-family detached dwelling in a rural zone;
(2)
any sidewalk or sidepath on any roadway that is classified as rustic or exceptional rustic;
(3)
any sidewalk or sidepath on a neighborhood street or neighborhood yield street serving fewer than 75 dwelling units if the Planning Board and Department of Transportation find that a sidewalk is not expected to be necessary for pedestrian movement;
(4)
any sidewalk if the site is located in an environmentally sensitive area with limits on the amount of impervious surface allowed.
Each bikeway and sidewalk must conform to approved capital improvements programs and be consistent with applicable area master plans and transportation plans adopted by the Planning Board.
(b)
To promote the safety of bicycle and wheelchair travel throughout the County, the County Executive must adopt, by Method (3) regulation, standards and specifications to build and maintain ramps at curbed intersections and stormwater gratings and other openings along roads and streets, in each case of a design and type that is not a hazard to bicycle and wheelchair traffic and is consistent with Americans with Disabilities Act best practices guidelines published by the United States Department of Justice. These ramps, gratings, and openings must be built and maintained as part of each project under subsection (a).
Montgomery County, Md., Code § 49-30 (2026)
Sec. 49-30. Traffic calming.LinkCopy Citation
(a)
The Director of Transportation must consider installing traffic calming and bicycle- and pedestrian-friendly design features on any area connector, neighborhood connector, neighborhood street, or neighborhood yield street over 1,000 feet long, downtown street, town center street, and industrial street. Traffic calming features include raised crosswalks and raised intersections, traffic circles, medians, pedestrian refuge islands, curb extensions, smaller centerline radii, parking cut-outs, chicanes, other forms of horizontal or vertical deflection, and special paving and streetscaping in central business districts or other commercial areas.
(b)
Speed hump location and placement:
(1)
speed humps that are 12 feet wide may be built on any neighborhood street, neighborhood yield street, or alley, but must be spaced at least 500 feet from any other hump and 200 feet from any intersection;
(2)
speed humps that are 22 feet wide may be built on any downtown street, town center street, or shared street, but must be spaced at least 500 feet from any other hump and 200 feet from any intersection;
(3)
speed humps that are 22 feet wide may be built on a downtown boulevard, town center boulevard, area connector, neighborhood connector, rustic or exceptional rustic road, or industrial street, but must be spaced at least 750 feet from any other hump and 300 feet from any intersection; and
(4)
before speed humps are installed in any road, all other requirements specified in applicable regulations must be met.
Montgomery County, Md., Code § 49-31 (2026)
Sec. 49-31. Classification of roads.LinkCopy Citation
(a)
In this Article and the regulations adopted under it, County area types are as follows until subsequently designated by functional plans, master plans, or sector plans:
(1)
A downtown area consists of areas with the highest intensity of development. These areas are:
(A)
Bethesda CBD;
(B)
Friendship Heights CBD;
(C)
Silver Spring CBD;
(D)
Wheaton CBD;
(E)
White Flint Sector Plan area;
(F)
White Flint 2 Sector Plan area west of the CSX Metropolitan Branch;
(G)
Life Science/FDA Village area of the 2014 White Oak Science Gateway Master Plan;
(H)
Life Science Center Districts in the 2010 Great Seneca Science Corridor Master Plan: LSC Belward, LSC North, LSC Central and LSC West districts; and
(I)
Rock Spring Sector Plan.
(2)
A town center area consists of areas with moderate to high development intensity. These areas are:
(A)
Burtonsville urban area;
(B)
Cabin Branch urban area;
(C)
Chevy Chase Lake urban area;
(D)
Clarksburg Town Center urban area;
(E)
Damascus urban area;
(F)
Forest Glen/Montgomery Hills Sector Plan urban area;
(G)
Germantown Town Center urban area;
(H)
Glenmont urban area;
(I)
Grosvenor urban area;
(J)
Kensington urban area;
(K)
Langley Crossroads urban area;
(L)
Life Science Center South in Great Seneca Science Corridor urban area;
(M)
Lyttonsville Station urban area;
(N)
Olney Town Center urban area;
(O)
Piney Branch urban area;
(P)
Shady Grove urban area;
(Q)
Twinbrook urban area;
(R)
Veirs Mill-Randolph urban area in Veirs Mill Corridor Master Plan;
(S)
Washingtonian Town Center in Great Seneca Science Corridor urban area;
(T)
Westbard Sector Plan urban area;
(U)
White Flint 2 Sector Plan area east of the CSX Metropolitan Branch;
(V)
White Oak Science Gateway urban area excluding Life Sciences/FDA Village Center; and
(W)
Woodside Station urban area.
(3)
A country area is located within the designated Rural area.
(4)
An industrial area is an area with predominantly industrial zoning.
(5)
A suburban area is an area with predominantly residential zoning that is not already a downtown, town center, industrial, or country area.
(6)
These areas may be created, eliminated or modified by functional plans, master plans, or sector plans.
(7)
Roads are included in the area within which they are located. Roads bordering on two areas will be assigned to the area with the greater development intensity.
(b)
Each road must be assigned a County classification and a federal classification. Federal classifications are assigned in accordance with the most recent edition of the Federal Highway Administration Highway Functional Classification typologies.
(c)
County classifications are:
(1)
A Freeway is a road meant exclusively for through movement of vehicles at a high speed. Access must be limited to grade-separated interchanges.
(2)
A Controlled Major Highway is a road meant exclusively for through movement of vehicles at a lower speed than a Freeway. Access must be limited to grade-separated interchanges or at-grade intersections with public roads.
(3)
A Parkway is a road meant exclusively for through movement of vehicles at a moderate speed. Access must be limited to grade-separated interchanges and at-grade intersections. Any truck with more than four wheels must not use a Parkway, except in an emergency or if the truck is engaged in Parkway maintenance.
(4)
A Downtown Boulevard is a road in a downtown area that serves a high volume of vehicles, pedestrians, bicyclists, or transit users. Access to abutting properties is allowed but not preferable. These roads were previously classified as major highways and arterials.
(5)
A Downtown Street is a road in a downtown area that serves a large share of pedestrians, bicyclists, or transit users. This road type is meant for circulation in commercial and mixed-use zones. Access to abutting properties is expected. These roads were previously classified as business streets.
(6)
A Boulevard is a road that typically connects employment and entertainment centers, civic, commercial, and institutional land uses, and may also provide cross-county and regional connections. Pedestrian, bicycle, and transit users are to be accommodated. Some access to abutting properties is expected. These roads were previously classified as major highways and arterials.
(7)
A Town Center Boulevard is a road in a town center area that serves a moderate to high volume of vehicles, pedestrians, bicyclists, or transit users. Access to abutting properties is allowed but generally not preferable. These roads were previously classified as major highways and arterials.
(8)
A Town Center Street is a road in a town center area that serves a larger share of pedestrians, bicyclists, or transit users. This road type is meant for circulation in commercial and mixed-use zones. Access to abutting properties is expected. These roads were previously classified as business streets.
(9)
An Area Connector is a two-lane street in a suburban area that typically connects employment and entertainment centers, civic, commercial, and institutional land uses, and may also provide limited regional connectivity and serve primary circulation in residential zones. These roads were previously classified as minor arterials.
(10)
A Neighborhood Connector is a street in a suburban area providing primary circulation in residential zones and may also enable traffic to pass through a neighborhood. These streets were previously classified as primary residential streets.
(11)
A Neighborhood Street is a street that provides internal circulation within suburban areas. Access to abutting properties is expected. These streets were previously classified as secondary and tertiary residential streets.
(12)
A Neighborhood Yield Street is a Neighborhood Street that is designed as a bi-directional one-lane street.
(13)
An Industrial Street is a road meant for circulation in areas consisting predominantly of industrial zones.
(14)
A Country Connector is a road in a country area that was previously classified as major highways, arterials, or country arterials.
(15)
A Country Road is a low intensity road in a country area.
(16)
An Alley is a right-of-way intended to provide secondary access to the rear or side of lots or buildings and not intended for transporting through traffic. An alley may be used to provide primary vehicular access if the Planning Board and the Director of Transportation concur that the dimensions and specifications proposed in a project, preliminary subdivision, or site plan would provide adequate primary vehicular access. An Alley is a Residential Alley if serving only residential zones, or a Commercial Alley if serving any non-residential zones.
(17)
A Rustic Road or an Exceptional Rustic Road means a road classified as such under Article 8.
(18)
A Residential Shared Street or Commercial Shared Street is a street designed to create a shared traffic environment where pedestrians, bicyclists, and other non-motorized traffic may comfortably occupy the same space as motor vehicle traffic. These streets prioritize pedestrian and bicycle movement by slowing vehicular speeds and communicating clearly through design features that motorists must yield to all other users. A Shared Street is a Residential Shared Street if serving only residential zones, or a Commercial Shared Street is serving any non-residential zones.
(d)
County classifications are assigned as follows until the roads are re-designated by functional plans, master plans, or sector plans. The number of lanes is defined as the number of through lanes for motor vehicles and is tallied based on the number of planned lanes for that road, or the number of existing lanes if not specified by any functional plan, master plan, or sector plan.
(1)
Freeways retain their classifications as Freeways.
(2)
Controlled Major Highways retain their classifications as Controlled Major Highways.
(3)
Parkways retain their classifications as Parkways.
(4)
Major highways:
(A)
Major highways located in a downtown area are classified as Downtown Boulevards.
(B)
Major Highways located in a town center area are classified as Town Center Boulevards.
(C)
Two-lane Major Highways located in a country area are classified as Country Connectors.
(D)
Two-lane Major Highways located in a suburban area are classified as Area Connectors.
(E)
All Major Highways not addressed by (A) through (D) are classified as Boulevards.
(5)
Arterials:
(A)
Arterials with four or more lanes located in a downtown area are classified as Downtown Boulevards.
(B)
Arterials with fewer than four lanes located in a downtown area are classified as Downtown Streets.
(C)
Arterials with more than two lanes located in a town center area are classified as Town Center Boulevards.
(D)
Arterials with two lanes located in a town center area are classified as Town Center Streets.
(E)
Arterials located within a country area are classified as Country Connectors.
(F)
Two-lane Arterials located in a suburban area are classified as Area Connectors.
(G)
All Arterials not addressed by (A) through (F) are classified as Boulevards.
(6)
Minor Arterials:
(A)
Minor Arterials with four or more lanes located in a downtown area are classified as Downtown Boulevards.
(B)
Minor Arterials with fewer than four lanes located in a downtown area are classified as Downtown Streets.
(C)
Minor Arterials with more than two lanes located in a town center area are classified as Town Center Boulevards.
(D)
Minor Arterials with two lanes located in a town center area are classified as Town Center Streets.
(E)
Minor Arterials located within a country area are classified as Country Connectors.
(F)
All Minor Arterials not addressed by (A) through (E) are classified as Area Connectors.
(7)
Business District Streets:
(A)
Business District Streets with four or more lanes located in a downtown area are classified as Downtown Boulevards.
(B)
Business District Streets with fewer than four lanes located in a downtown area are classified as Downtown Streets.
(C)
Business District Streets with more than two lanes that are not located in a downtown area are classified as Town Center Boulevards.
(D)
Business District Streets with two lanes that are not located in a downtown area are classified as Town Center Streets.
(8)
Industrial Streets retain their classification as Industrial Streets.
(9)
Primary Residential Streets:
(A)
Primary Residential Streets located in a country area are classified as Country Roads.
(B)
Primary Residential Streets not located in a country area are classified as Neighborhood Connectors.
(10)
Secondary Residential Streets are classified as Neighborhood Streets.
(11)
Tertiary Residential Streets are classified as Neighborhood Streets.
(12)
Country Arterials are classified as Country Connectors.
(13)
Country Roads retain their classifications as Country Roads.
(14)
Shared Streets with entirely residential zoning along its frontage are classified as a Residential Shared Street.
(15)
Shared Streets with any non-residential zoning along its frontage are classified as a Commercial Shared Street.
(16)
Alleys retain their classifications as Alleys.
(17)
Rustic Roads retain their classifications as Rustic Roads.
(18)
Exceptional Rustic Roads retain their classifications as Exceptional Rustic Roads.
(19)
If, after consultation with the staff of the Planning Board, the Department of Transportation determines that the criteria under (d)(1) through (d)(18) are not suitable for a particular road, the Department may determine that a more context-sensitive classification or transition length applies in lieu of the default classifications.
Montgomery County, Md., Code § 49-32 (2026)
Sec. 49-32. Design standards for types of roads.LinkCopy Citation
(a)
The design standards adopted under this Article govern the construction or reconstruction of any County road except Rustic Roads and Exceptional Rustic Roads. If the Planning Board, in approving a subdivision or site plan, finds that a waiver from any applicable design standard is necessary to promote context-sensitive design of a specific road, the Executive or the Executive’s designee must adopt the Board’s recommendation unless the Executive or the Executive’s designee notifies the Board why approving the waiver would significantly impair public safety. The County Council may adopt alternative standards for a specific road constructed or reconstructed in a project in the approved capital improvements program.
(b)
A limited segment of a County road may be designed to vary slightly from the applicable standards, criteria, or specifications, as necessary to adjust to site-specific conditions, as long as the road’s typical cross-section and other attributes conform to the applicable standards, criteria, or specifications. The regulations adopted under this Article must include a process by which the Department that approves a limited design variance under this subsection regularly notifies other affected County departments, the Planning Board, and the public of each variance.
(c)
The minimum right-of-way for a road may be specified in the most recent applicable functional plan, master plan, or sector plan for the area where the road is located. Minimum rights-of-way generally do not include continuous features along a typical section, and account for parking, drainage and stormwater management, spot conditions such as auxiliary lanes or transit stations, or infrastructure at intersections such as signal equipment and protected intersections. If a minimum right-of-way for a particular road is not specified in a functional plan, master plan, or sector plan, the minimum right-of-way must be:
(1)
80 feet for a Downtown Street;
(2)
80 feet for a Town Center Street;
(3)
70 feet for an Area Connector;
(4)
70 feet for a Neighborhood Connector;
(5)
60 feet for a Neighborhood Street;
(6)
50 feet for a Neighborhood Yield Street;
(7)
80 feet for an Industrial Street;
(8)
74 feet for a Country Connector;
(9)
70 feet for a Country Road;
(10)
20 feet for an Alley serving any non-residential zoning;
(11)
16 feet for an Alley serving only residential zoning;
(12)
40 feet for a Commercial Shared Street;
(13)
40 feet for a Residential Shared Street.
(d)
Grass shoulders must be load bearing at any specific location designated by the Director of Permitting Services after consulting the Fire Chief and Director of Transportation.
(e)
Unless otherwise specified in this Article, each grading, drainage structure, paving, shoulder, landscaping, and traffic control must be installed as provided in the latest applicable County design standards, storm drain criteria, and specification. Unless extenuating circumstances would result in a safety hazard, when a road is resurfaced the road must also be restriped to meet any applicable lane width standard and may include bike lanes where appropriate.
(f)
The curb radius at the corner of each intersection is 15 feet. Exceptions to these requirements may be allowed as follows:
(1)
A maximum 10-foot corner radius is required at intersections where all intersecting streets are Area Connectors, Neighborhood Connectors, Neighborhood Streets, or Neighborhood Yield Streets;
(2)
A larger corner radius is acceptable where there is a curb extension;
(3)
A 25-foot radius is acceptable where at least one street is an Industrial Street;
(4)
A larger corner radius is needed to serve the design vehicle and control vehicle with consideration of the allowable encroachment defined by the Complete Streets Design regulation; or
(5)
A road improvement required by a subdivision or site plan would significantly impair public safety.
(g)
Each pedestrian refuge must be at least 6 feet wide. A pedestrian refuge must be located at each intersection approach along a divided highway with 6 or more through travel lanes.
(h)
Unless otherwise specified in a functional plan, master plan, sector plan, or the approved capital improvements program, the maximum target speed for a road must be:
(1)
25 mph for a Downtown Boulevard;
(2)
20 mph for a Downtown Street;
(3)
35 mph for a Boulevard, except 25 MPH if in an Urban Area;
(4)
30 mph for a Town Center Boulevard, except 25 MPH if in an Urban Area;
(5)
25 mph for a Town Center Street;
(6)
25 mph for an Area Connector;
(7)
20 mph for a Neighborhood Connector;
(8)
20 mph for a Neighborhood Street;
(9)
20 mph for a Neighborhood Yield Street;
(10)
25 mph for an Industrial Street;
(11)
40 mph for a Country Connector;
(12)
between 20 to 35 mph for a Country Road;
(13)
between 45 to 55 mph for a Major Highway;
(14)
case-by-case determinations for Alleys, and Shared Streets; and
(15)
30 mph for Rustic Roads, and Exceptional Rustic Roads.
Montgomery County, Md., Code § 49-33 (2026)
Sec. 49-33. Road construction and reconstruction requirements.LinkCopy Citation
(a)
If alternative standards and specifications are allowed in Section 49-32, any one alternative may be selected by the applicant for a permit, subject to the approval of the Director of Permitting Services.
(b)
The Department of Transportation must erect, or order a permittee to erect, name signs at each road intersection. If the Director of Transportation finds that traffic control or vehicular or pedestrian safety so requires, the Director may order a permittee to install traffic control signs, markings, or other devices on any right-of-way that will be publicly maintained.
(c)
If a preliminary drainage study indicates that a minimum right-of-way or storm drain easement width required in this Article is inadequate to properly drain a particular road, the Department of Permitting Services may require any additional right-of-way or storm drain easement necessary for proper drainage. The Department must notify the permittee of any added right-of-way before a dedication plat is approved by the Planning Board (or equivalent body in any municipality with land use authority) and recorded in the County land records, and must notify the permittee of any added easement when it approves a right-of-way permit.
(1)
If a lot or lots front on a public road, the permittee must provide sufficient drainage easements to allow for the safe conveyance of stormwater from the public right-of-way to either an approved outfall or an approved public structure.
(d)
(1)
If a lot or lots front on a public road, the permittee must construct sidewalks, master- planned bikeways, ramps, curbs, and gutters, except:
(A)
any sidewalk or sidepath in front of a lot that is larger than 25,000 square feet for a single-family detached dwelling in a rural area;
(B)
any sidewalk or sidepath on any roadway that is classified as rustic or exceptional rustic;
(C)
any sidewalk or sidepath on a neighborhood street or neighborhood yield street serving fewer than 75 dwelling units if the Planning Board and Department of Transportation find that a sidewalk is not expected to be necessary for pedestrian movement;
(D)
any sidewalk if the site is located in an environmentally sensitive area with limits on the amount of impervious surface allowed if the Planning Board and Department of Transportation find that a sidewalk is not expected to be necessary for pedestrian movement; or
(E)
any sidewalk or sidepath on a neighborhood street, neighborhood yield street, or service drive where the Department of Permitting Services finds that a sidewalk or sidepath is infeasible, will not connect to other sidewalk segments within the foreseeable future, or qualifies for fee payments in lieu of construction under Section 49-40; or
(F)
any sidewalk or master-planned bikeway where the Planning Board establishes criteria to accept a payment in lieu of a transportation improvement.
(2)
However, the Planning Board may require the applicant to install sidewalks, bikeways, ramps, curbs, and gutters if the Board finds, as a condition of approval of a preliminary subdivision plan or site plan, that sidewalks, bikeways, ramps, curbs, and gutters at that location are necessary to allow access:
(A)
to an existing or planned sidewalk or bikeway;
(B)
to a bus or other public transit stop;
(C)
to an amenity or public facility that will be used by occupants of the site or subdivision; or
(D)
by persons with disabilities.
Before the Planning Board approves any requirement under this paragraph, the Board must give the Departments of Permitting Services and Transportation a reasonable opportunity to comment on the proposed requirement.
(e)
The construction of half roads or any road of less than the width required by this Article is prohibited except as permitted in Section 49-40. Construction of such portions of roads is permitted if the dedicated portion of the road established by a dedication plat and recorded in the County land records before August 15, 1950 is wide enough to permit the grading and construction of paving 20 feet wide with curbs, gutters, and sidewalks required for the type of road.
(f)
A road must not be constructed unless it connects with an existing public road at one end. A road must not be constructed short of an intersection unless it connects with an existing public road or the dedication of the right-of-way ends short of an intersection. If any road construction ends at or goes through an intersection, the intersection must be completed. If a road ends at other than an intersection or a point of connection with an existing road, a turnaround such as a cul-de-sac must be provided. Each turnaround must be graded, paved, and include appropriate drainage structures and temporary curbs if required by the Department of Permitting Services.
(g)
If drainage structures are required for any particular class of road, the Planning Board must require the applicant to install or construct drainage structures that the Board finds are necessary or appropriate, after reviewing a preliminary drainage study approved by the Department of Transportation, in accordance with applicable design standards and specifications.
(h)
Driveway entrances to individual lots must be required if the Planning Board finds that off- street parking facilities are necessary and practicable.
(i)
Street trees.
(1)
On public road rights-of-way, street trees must be planted in accordance with design standards of the Department of Transportation. On private road rights-of-way and easements, street trees must be planted in accordance with the technical manual adopted by the Planning Board under Chapter 22A.
(2)
The Department of Permitting Services, the Department of Transportation, and the staff of the Planning Board should coordinate the specific location and species of street tree plantings to promote compatibility of the plantings with road function and safety, signage, maintenance, appropriate visual buffering, utilities, other public or private improvements, and aesthetic considerations related to streetscape design.
(j)
Ground cover.
(1)
A property owner may plant and maintain ground cover in a public right-of-way adjacent to the owner’s property if the owner:
(A)
complies with County regulations;
(B)
maintains the ground cover to prevent any obstruction of the public right-of- way prohibited under Section 49-10; and
(C)
holds the County harmless for any damage to the ground cover, and any damage or injury caused by the ground cover.
However, ground cover in a public right-of-way adjacent to the owner’s property must not be planted where it will reduce public safety or impede travel.
(2)
In this subsection, property owner or owner includes each person with a legal interest in the property and any successor to that person’s interest.
(3)
The County Executive must adopt Method (3) regulations that define the design and maintenance standards applicable to this Section.
(4)
Except as provided in paragraph (1), this subsection does not impair the County’s right to enter, maintain, occupy, or otherwise control any public right-of-way for any purpose.
(k)
Curbs and gutters.
(1)
A person must not install any curb or gutter in any portion of a road that is located in:
(A)
an environmentally sensitive watershed area, including a Class III, Class IV, or high-quality Class I watershed, as designated by the Maryland Department of the Environment; or
(B)
an area that the Department of Environmental Protection designates as environmentally sensitive, after giving the Department of Transportation and the Planning Board a reasonable opportunity to comment.
(2)
The Director of Permitting Services may allow a person to install curbs and gutters in a portion of a road located in an area listed in paragraph (1), after giving the Planning Board a reasonable opportunity to comment, if:
(A)
installing curbs and gutters will not significantly degrade water quality in the area;
(B)
curbs and gutters are necessary for vehicular or pedestrian safety or the proper grading or maintenance of the road, or to reduce the environmental impact of the road on any park, forest, or wetland; and
(C)
a preliminary subdivision plan or site plan approved by the Planning Board for the land abutting the portion of the road where curbs and gutters may be installed expressly permits the curbs and gutters to be installed, if either plan is required for the land in question.
Montgomery County, Md., Code § 49-34 (2026)
Sec. 49-34. Construction by County.LinkCopy Citation
(a)
The County must not construct any road unless:
(1)
the County has previously acquired the right-of-way for the road, or the right-of way has been dedicated to public use by appropriate recording in the County land records; and
(2)
the cost of the road will be charged against the benefitted property in accordance with Sections 49-51 to 49-61 and subsection (c) of this Section.
(b)
Nothing in this Article prohibits the County from constructing a road under a contract with a municipality or an agreement between the County and another government agency.
(c)
If a road is constructed as a “front foot assessment” project under Sections 49-51 to 49-61, the cost chargeable and assessed to the benefitted abutting properties must be all costs of construction, including costs of design and of acquiring land or any interest in land for right-of-way.
(d)
All costs in excess of the special benefit to the abutting property or otherwise waived in this Article must be borne by the County.
(e)
The County Executive may authorize the construction of sidepaths or sidewalks to serve general community needs. Whenever a sidewalk or sidepath is built in a right-of-way where there is no pavement or other road construction, building the sidewalk or sidepath does not mean that the County is responsible for maintaining any part of the right-of-way except the sidewalk or sidepath.
Montgomery County, Md., Code § 49-35.Right-of-way (2026)
Sec. 49-35.Right-of-way permit.LinkCopy Citation
(a)
(1)
A permit is required from the Director of Permitting Services for any work within the public right-of-way. Any permit issued for roadside tree work must comply with Section 49-36A. In this Article, “roadside tree” means any plant that has a woody stem or trunk which grows all, or in part, in the right-of-way of any County public road.
(2)
In this Section and Sections 49-36, 49-36A, and 49-37, unless otherwise specified, Director refers to the Director of Permitting Services and Department refers to the Department of Permitting Services.
(3)
Permit applicants must use forms prescribed by the Director, submit detailed plans and specifications, and include locations and record plats approved by the Department and the Planning Board.
(4)
If the proposed activity requires a sediment control permit, the Department must issue the permit before any activity occurs under a permit issued under this subsection. The State Highway Administration must approve any action under its jurisdiction before the Director may approve the permit.
(5)
As a requirement to issue a permit under this Section, the Director may require the applicant to designate and bond a haul route for construction materials, as described in Section 49-8.
(b)
The Director must collect a fee, set by Method 3 regulation, for each right-of-way permit application. However, the Director must not collect a fee for any permit to:
(1)
remove or prune a tree that endangers a person or property;
(2)
remove a stump in the right-of-way;
(3)
plant a tree; or
(4)
install a sign identifying a geographic area in the right-of-way if:
(A)
the primary applicant is an unincorporated or non-profit civic or homeowners’ organization that is either:
(i)
listed on the Planning Board’s most recent list of civic and homeowners associations; or
(ii)
exempt from federal income taxes and shows that its annual revenue during its most recent fiscal year did not exceed an amount set by a regulation;
(B)
in a homeowners’ association, maintenance responsibility of all common areas has been transferred from the developer; and
(C)
the proposed sign would be smaller than a maximum size set by regulation.
(c)
Before an applicant begins any road, sidewalk, sidepath, bikeway, curb and gutter, driveway, retaining wall, steps, or drainage project, on a road or within the boundaries of a dedication to public use, the applicant for a permit to undertake any such project must pay to the County an inspection and engineering fee set by the County Executive by Method (3) regulation.
(d)
If any such project is solely a grading project, the applicant must pay an inspection and engineering fee to the County if Department staff does the engineering work on the project and an inspection fee if the applicant submits the engineering work.
(e)
Any violation of this Section is a Class A violation.
(f)
The Director must refund half the fees required by this Section to the applicant if a permit is rejected or withdrawn before construction begins. If an applicant proposes to undertake a project using materials, standards, or specifications superior to those required under this Article, the fees charged must be computed on the estimated cost of the project as if it met those requirements.
(g)
A person, including any utility corporation, must not cut within the right-of-way to install, replace, or maintain or connect any underground gas, electric power, or telephone line, or any other underground infrastructure, without a permit from the Director. The Director must supervise all backfilling and repaving of utility trenches to assure that the permittee complies with all applicable specifications. The permittee must restore the right-of-way to its prior condition.
(h)
An aggrieved person may file an appeal with the County Board of Appeals from a denial, suspension, or revocation of a permit issued under this Section within 10 days of the denial, suspension, or revocation.
Montgomery County, Md., Code § 49-36 (2026)
Sec. 49-36. Permit conditions and procedures.LinkCopy Citation
Each permit issued under Section 49-35 must be subject to the following conditions:
(a)
Irrespective of the plans and specifications filed with the application, the actual construction must conform to law and to the requirements for a road of its class.
(b)
A permit is nontransferable. A permit becomes immediately invalid if any provision of the permit is violated.
(c)
The permit automatically expires 18 months after its issuance unless the Director specifies a shorter or longer term when issuing the permit or later approves an extension, stating the reasons for the extension. However, a permit to reconstruct, repair, or otherwise close a sidewalk is subject to the durational and other restrictions in Section 49-11. The Director must not approve an extension unless the bond filed with the permit by its term continues in full force and effect, a new bond is filed, or the applicant obtains the consent of the surety to the extension.
(d)
The permittee and the permittee's agents, employees, and subcontractors must comply with all approved plans, written requirements, and permit conditions that the Director specifies, either before or during the grading or construction, that the Director finds necessary to protect public safety or avoid unnecessary inconvenience to the public during the grading or construction.
(e)
Any authorized official or employee of the County must be able to inspect the construction work materials, plans, and specifications at all times. A permittee must notify the Department at least 48 hours before starting any construction for which the Department issued the permit.
(f)
The Director must not issue a permit for paving unless the Department has inspected and approved the grading.
(g)
For any proposed road construction the permittee must post a notice in a conspicuous place on each project site as near to a public road as practicable. The notice must take the form of a sign that the Department must furnish to the permittee when the Department issues the permit. The sign must state that the construction is authorized by the Department of Permitting Services under permit and must display the permit number. The permittee must post the sign continuously during construction of the work covered by the permit and until final inspection. A person must not remove the sign until the Department completes its final inspection. If any other person removes the sign or if the sign is damaged, lost, or destroyed, the permittee must replace the sign within 24 hours, excluding Saturdays and Sundays. The Department must issue new signs upon request to replace signs that are damaged, lost, or destroyed. A permittee who does not comply with this subsection has violated the permit.
(h)
The Director must not issue a permit for construction unless the right-of-way has been acquired by the County or dedicated to public use and the acquisition or dedication has been recorded in the County land records.
(i)
If the Director finds that a person has violated the conditions of any permit, the Director may order the permittee to stop construction and may revoke the permit. The refusal of any permittee to stop construction after receiving notice of a stop-work order is a separate violation of this Article.
(j)
An aggrieved person may file an appeal with the County Board of Appeals from the issuance of a stop-work order or the imposition of additional conditions under this Section. The appeal must be filed with the Board within 10 days after the stop-work order is issued or the additional conditions are imposed.
Montgomery County, Md., Code § 49-36A (2026)
Sec. 49-36A. Roadside tree work.LinkCopy Citation
(a)
Right-of-way permit required. The Department must not issue a building or related permit to an applicant for any demolition, clearing, pre-construction activity, construction, or development that is likely to result in the trimming, pruning, root-pruning, cutting, or removal of, or injury to, a roadside tree unless the applicant obtains a right-of-way permit from the Department under Section 49-35.
(b)
Applicability; exceptions.
(1)
A person may receive a right-of-way permit to perform tree work on a roadside tree if the person:
(A)
holds title to the land where the roadside tree is located;
(B)
owns property abutting the right-of-way at the point where the tree is located;
(C)
is a government agency that has an easement for the public right-of-way where the tree is located;
(D)
is responsible for providing tree care to the tree;
(E)
is a public utility; or
(F)
is an authorized agent of any of these.
(2)
The following activities are not subject to this Section (except subsection (f)) and do not require a right-of-way permit:
(A)
cutting or clearing a public utility right-of-way or land for an electric generating station licensed under Sections 7-204, 7-205, 7-207, or 7-208 of the Public Utilities Article of the Maryland Code, or any successor provision, if:
(i)
any required certificate of public convenience and necessity has been issued under Section 5-1603(f) of the Natural Resources Article of the Maryland Code or any successor provision; and
(ii)
the cutting or clearing is conducted in a way that minimizes the loss of forest;
(B)
routine maintenance of a public utility right-of-way, and cutting or clearing any tree by a public utility as necessary to comply with applicable vegetation management requirements or to maintain, repair, replace, or upgrade any public utility transmission or distribution line; or
(C)
cutting or clearing a public utility right-of-way or land for a new transmission or distribution line.
(3)
(A)
A licensed tree expert need not obtain a right-of-way permit for tree work performed on:
(i)
a tree that is uprooted or severely damaged because of a storm or vehicular collision;
(ii)
a tree branch that is broken and contacts a telephone, cable television, electric power, or other wire carrying electric current; or
(iii)
a tree or tree branch that a licensed tree expert finds immediately endangers a person or property.
(B)
A licensed tree expert who provides tree work under subparagraph (A) must, within one week after an action is taken, give the Department:
(i)
notice of the property address, if available, and general area where the action was taken; and
(ii)
a proposed plan to upgrade the work, if necessary, to the tree work standards in this Section and applicable regulations.
The Department must approve, modify, or reject the proposed plan, after reviewing the actions taken, within 14 days after receiving the information. If the Department does not act on the proposed plan within 14 days, the plan is approved by default. The Department may require further information, and may extend this deadline once for an additional 15 days in extenuating circumstances. The Director also may extend this deadline at the request of the applicant.
(c)
Basis of permit. The Department may issue a right-of-way permit if the applicant shows that the proposed tree work is necessary to:
(1)
protect the health of the tree;
(2)
eliminate or reduce a hazard to property, public safety, or health;
(3)
improve or prevent a deteriorated tree condition;
(4)
improve the overall appearance of the right-of-way; or
(5)
carry out a development which has received all other applicable development approvals.
(d)
Tree protection plan.
(1)
The Department must not issue a right-of-way permit for tree work under Section 49-35 until the applicant has submitted, and the Department has approved, a site-specific tree protection plan that requires the applicant to take all necessary measures to protect, and minimize damage during development to, any affected roadside tree.
(2)
If the advice or consent of any County department, in its role as owner of or otherwise responsible for the care of any tree in a County right-of-way, is needed or requested before the state Department of Natural Resources may act on a permit allowing tree work on a tree in a County right-of-way, that County department must not give its advice or consent until the Department of Permitting Services has approved a tree protection plan under this subsection, Section 8-26, or Section 19-71.
(3)
The Department must approve or reject each proposed tree protection plan within 30 days after receiving it. If the Department does not act on a proposed plan within 30 days, the plan is approved by default. The Department may require further information after a proposed plan is submitted, and may extend this deadline once for an additional 15 days to receive any needed information. The Department also may extend this deadline at the request of the applicant.
(e)
Tree replacement.
(1)
Each permittee who removes a roadside tree in a County right-of-way must:
(A)
plant a tree from the recommended County tree list in a County right-of-way, at or near the location of the original tree, which is suitable to that location, unless the Director waives this requirement because:
(i)
compliance at the particular site would not be feasible; or
(ii)
the removed tree was already dead or posed a danger to persons or property; and
(B)
pay an amount into a Street Tree Planting Fund maintained by the Department of Transportation, unless the Director waives this requirement because the removed tree was already dead or posed a danger to persons or property, at a rate set under paragraphs (C) or (D) that will allow the Department of Transportation to plant 2 more suitable replacement trees, or 3 more replacement trees if the Director has waived the on-site planting requirement because compliance at the particular site would not be feasible, at suitable locations in the right-of-way of a public road in the County.
(C)
Except as provided under subparagraph (D), the rate to calculate the amount payable under subparagraph (B) equals $450 per tree, as adjusted on July 1st of each odd numbered year by the percentage amount of the cumulative increase or decrease in the Consumer Price Index for all urban consumers in the Washington-Baltimore metropolitan area, or any successor index, for the two most recent calendar years.
(D)
By resolution after a public hearing, the Council may set the rate to calculate the amount payable per tree under subparagraph (B).
(E)
The Director must:
(i)
calculate an annual fee adjustment under subparagraph (C) to the nearest multiple of 5 cents; and
(ii)
publish an amount of a fee adjustment under subparagraphs (C) or (D) not later than May 1st of each odd numbered year.
(2)
The permittee must pay the required amount within 30 days after the Director notifies the permittee that the payment is required.
(3)
The Department of Transportation must use funds in the Street Tree Planting Fund only to plant trees in the right-of-way of a public road in the County, and must not use funds received under this subsection to hire additional County staff or to supplant funds otherwise appropriated for that purpose.
(4)
In locating, selecting, and planting trees under this subsection, the Department must:
(A)
give highest priority to those areas of the County, such as central business districts and other urban and suburban areas, that have relatively low tree canopy coverage; and
(B)
take every reasonable measure to avoid interference with utility transmission and distribution lines.
(f)
Roadside tree planting.
(1)
In this Section, recommended County tree list means a list of trees approved by the Director after consulting the Department of Transportation. The list must only include trees that are also on the State recommended tree list and must include each tree that the Director identifies as suitable for planting on specific sites and conditions in the right-of-way of a public road in the County.
(2)
Any tree that any person plants on a public right-of-way must be a species and variety listed on the recommended County tree list and must conform to the American Standard for Nursery Stock.
(g)
Enforcement. In addition to any other procedure or remedy allowed by law, the Director may issue a stop work order to prevent or correct any violation of this Section or any permit issued or plan approved under this Section. Sections 8-20 and 8-22 apply to any stop work order issued under this Section.
(h)
Regulations. The County Executive must adopt regulations under Method (2) to administer this Section that are at least as stringent as applicable state roadside tree care standards and requirements. These regulations may include:
(1)
criteria and procedures to issue, deny, modify, suspend, or revoke permits for work on roadside trees;
(2)
tree work standards and practices needed to protect and maintain roadside trees, including construction practices needed to prevent or minimize damage to roadside trees; and
(3)
supplementary roadside tree planting requirements and specifications, and criteria and procedures needed to administer the Street Tree Planting Fund.
Montgomery County, Md., Code § 49-37 (2026)
Sec. 49-37. Street and road bonds.LinkCopy Citation
(a)
(1)
Before beginning any grading or construction, a permittee under this Article must deliver to the County acceptable security in the form of an irrevocable letter of credit from a financial institution, cash bond, corporate bond, certificate of guarantee, or other instrument approved by the County Attorney. The security must guarantee an amount that the Director estimates to be the total cost to perform all work necessary to complete the subdivision's streets and roads, including any necessary repairs, in a manner suitable for acceptance by the County. As used in this Section, acceptable security includes any such letter of credit, bond, certificate, or other acceptable instrument.
(2)
As used in this Article, a certificate of guarantee is an instrument issued by an organization or entity which is approved by the Director and meets capitalization and other reasonable criteria established by regulation. Other criteria may include the demonstrated expertise of the issuing organization or its members in construction of streets and roads; the estimated cost of the work to be performed by the permittee; the estimated cost of all work guaranteed by the issuing organization or entity; and the incidence of violation of, or otherwise failing to comply with, this section by all members of the issuing organization or entity. The certificate of guarantee must only be issued by the approved organization or entity on behalf of members in good standing of that organization or entity. The member for whom the certificate is issued must qualify as a developer or subdivider as defined in Section 50-1. The Director must resolve any question about the eligibility of a permittee to post a certificate of guarantee in the Director's sole discretion.
(3)
Any acceptable security must run to the County and specify that the permittee and all agents and employees must:
(A)
comply with all applicable terms, conditions, requirements, standards, and specifications of this Article and any other applicable law;
(B)
faithfully complete the work for which the permit is issued; and
(C)
indemnify the County from any expense incurred because of the failure of the permittee or any agent or employee to complete the work as required by this Article, and from any damages growing out of the negligence of the permittee or any agent or employee.
(b)
(1)
(a)
Instead of satisfying the requirements of subsection (a), a permittee may file an acceptable security approved by the County Attorney in an amount that the Director finds would assure appropriate stabilization of the ground surface of any proposed road project if:
(A)
the permittee is a developer or subdivider as defined in Section 50-1, and the Director may resolve any question as to the permittee's status in the Director's sole discretion; and
(B)
the permittee files in the County land records, subject to the approval of the County Attorney and the Director, a master deed or covenant delineating the entire subdivision and providing that no lot or parcel has been or may be sold or otherwise alienated until the road running between that lot or parcel and an existing public road is constructed, approved, and accepted by the County for maintenance, or until the County accepts an acceptable security assuring the completion of the subdivision streets and roads. This subparagraph does not prohibit the sale of all or a substantial portion of any subdivision to one or more other developers or subdividers.
(2)
In determining the conditions and the amount of the acceptable security, the Director may set reasonable criteria based on practical, engineering, environmental or other considerations, including:
(A)
the estimated cost of the work to be performed, in order to assure sufficient protection to the property on or adjacent to the subject subdivision from harm caused by storm water, sediment, or other factors resulting from grading, constructing or otherwise disturbing the right-of- way; and
(B)
the estimated cost of removing or repairing any hazardous condition resulting from the operation of the developer's or subdivider's equipment.
(3)
If the Director finds that a road or portion of a road is necessary to protect the public safety or welfare or to connect other subdivisions to public highways, subsection (b)(1) does not apply and the Director may require an acceptable security to complete the applicable road or portion of road.
(4)
The Director may at any time, after finding a violation of an applicable law, regulation, or the terms and conditions of the permit, revoke the permit and proceed against the security posted to assure the appropriate stabilization of the ground surface of the proposed road project. The Director may post stop-work orders throughout the subject subdivision until an acceptable security is posted which assures the performance of all work necessary to complete the streets and roads, including any necessary repairs.
(c)
Before acceptance, each proposed security must be approved by the County Attorney. If a corporate bond is offered, it must be executed by a surety or guaranty company qualified to transact business in the state. If a cash bond is offered, it must be deposited with the Director of Finance, who must give an official receipt reciting that the cash bond has been deposited in compliance with, and subject to, this Section. Any accepted security may be released if the permittee and Director agree. Accepted securities may be released on a prorated basis, depending on the amount of completed and approved work. The Director must decide the amount to be retained by the County, but the amount retained must not be less than 15% of the total cost of the project until the Director finally accepts the project.
(d)
(1)
If the Director finds a violation of an applicable law or regulation, or a default in the performance of any term or condition of the permit or accepted security, the Director must give written notice of the violation or default to the principal and to the surety of the accepted security. The notice must specify the work to be done, the estimated cost of the work, and the period of time the Director finds reasonably necessary to complete the work.
(2)
If a cash bond has been posted, the Director must give notice of default to the principal; and if compliance is not achieved within the time specified, the Director may, without delay and without further notice or proceedings, use the cash deposited, or any portion of the deposit, to cause the required work to be performed by contract or otherwise in the Director’s discretion. After any default in the performance of any term or condition of the permit or accepted security, the County, the surety, and any person employed or engaged on their behalf may enter the site to complete the required work.
(3)
If the County undertakes the required work with funds from the forfeited security, the funds must be used to pay the cost of contracting, including engineering and administration, for necessary work within the requirements of the plan, permit, security, or this Chapter.
(4)
If the cost of the work exceeds the amount of the security, the permittee is liable to pay all excess costs and expenses incurred by the County. The costs and expenses must be a lien upon all property and all rights to property, real or personal, of any person liable to pay those costs after the costs become due and payable, including interest at the rate applicable for overdue County taxes. The costs must be listed on the tax bill and must be collected in the manner of ordinary taxes.
(5)
If the Director finds a violation of an applicable law or regulation by an organization or entity issuing certificates of guarantee, the Director may revoke all permits of members of that organization or entity for which a certificate of guarantee has been posted. The Director may post stop-work orders wherever applicable until an appropriate security acceptable to the County is substituted for the certificates of guarantee.
(e)
The Executive may adopt regulations under method (2) to implement this section. The Director must recommend permit fees to include amounts that are necessary to cover any increased costs of administration of any programs in this section.
Montgomery County, Md., Code § 49-38 (2026)
Sec. 49-38. Acceptance of roads.LinkCopy Citation
(a)
The County Executive may specify by Executive order, published in the County Register, the terms and conditions on which any road may be acquired by the County or dedicated to public use.
(b)
Any action by the County to accept a road must be in writing and fully identify the portion accepted. Any accepted road must conform to this Chapter and all other applicable laws in force at the time of acceptance.
(c)
When the County accepts any road, it becomes a part of the County road system and thereafter must be maintained by the County at its expense.
Montgomery County, Md., Code § 49-39 (2026)
Sec. 49-39. Pre-acceptance review by County.LinkCopy Citation
(a)
All permittees under this Article and their agents, contractors, and sub-contractors must comply with all applicable provisions of this Article. Until the County accepts a road constructed under this Article for maintenance, the permittees, their agents, contractors, and sub-contractors and the bond given under this Article remain liable for the faithful performance all requirements.
(b)
After completion and final inspection of a road, the County must either accept the road, if the Director of Permitting Services finds that its construction has met all requirements of this Article, and release the bond, or the Director must reject the road by written notice to the permittee and surety, where an acceptable security was posted, specifying the reasons for rejection by reference to the particular requirement which has been violated, and allow a specified reasonable time for the permittee or surety to comply with all applicable requirements.
(c)
If the permittee or surety does not, within the time specified, complete the construction as required, the Director must take any necessary action to cause the construction to comply with this Article. The permittee and surety are jointly liable for any expense incurred thereby.
(d)
If cash has been deposited under subsection 49-37(c) and a road is not accepted, the County may withhold any funds remaining in the cash deposit account until the permittee complies with this Article. If the permittee does not comply, the County may declare a forfeit of any amount need to bring the road into compliance.
Montgomery County, Md., Code § 49-40 (2026)
Sec. 49-40. Waivers of requirements of Article.LinkCopy Citation
(a)
The Director of Permitting Services may waive any requirement of this Article for sidewalks, bikeways, rights-of-way widths, grade percentages, full-width grading, and the construction of both roadways of a dual road, or any combination of them, as allowed in this Section, for any road constructed by the County or a permittee.
(b)
The Director must apply the following standards for granting or denying waivers:
(1)
Sidewalks and Sidepaths.
(A)
Waiver authority. The Director, after consultation with the staff of the Planning Board, may waive any requirement, subject to (B), to install sidewalks or sidepaths if:
(i)
the lots abutting the right-of-way are unimproved;
(ii)
the street was lawfully graded before August 15, 1950, and the terrain is so steep and uneven that grading for sidewalks or sidepaths cannot be done except at excessive cost, or
(iii)
houses or buildings abutting the right-of-way which were constructed before August 15, 1950, are so situated, and the property upon which those houses or buildings are located is so graded, that the construction of sidewalks or sidepaths is undesirable.
(B)
Waivers not allowed. The Director must deny a waiver if:
(i)
the street involved is an Area Connector, Neighborhood Connector, Industrial Street, Downtown Street, Town Center Street, Downtown Boulevard, Town Center Boulevard, Boulevard, or Controlled Major Highway; or
(ii)
the required sidewalks or bikeways are necessary or desirable to provide safe access for pedestrians and/or bicyclists.
(C)
Waiver and fee payment. As an alternative to building a sidewalk or bikeway on an existing or proposed street, the Director must require an applicant to pay a fee if the applicant shows that building a sidewalk or bikeway as required would cause extreme hardship or if the Director finds that it would cause significant environmental impact. The sidewalk or bikeway that would be waived must not connect to another existing or proposed sidewalk, bikeway, bus stop, school, or other public facility. The fee must equal the full cost to build the sidewalk or bikeway, including the design and supervision costs. This fee must be paid, any necessary right-of-way must be dedicated, and any necessary perpetual easement must be recorded before the Director issues any road construction permit for the proposed public street. The revenue from these fees must be assigned to a capital account for sidewalk or bikeway construction and may be spent as appropriated by the County Council.
(2)
Right-of-way widths. The Director may waive or reduce any right-of-way width if:
(A)
the proposed right-of-way connects with an existing right-of-way of substandard width which was lawful when established, but the Director must not waive or reduce any part of the proposed right-of-way which is beyond a four-way intersection or any other logical point of widening;
(B)
the proposed right-of-way is the connecting link of a street and the right- of-way at each end is a substandard width which was lawful when established.
(3)
Grade percentages. The Director may waive or reduce any required grade percentage if the road connects with another road or private driveway in such manner that the grade percentage required by this Article cannot be provided.
(4)
Full-width grading. The Director may waive or reduce any requirement for full- width grading if:
(A)
a grading permit was issued before August 15, 1950, all grading required by that permit was done, sidewalks are not required or are waived, further grading is not required to construct the pavement or curbs and gutters, and a majority of the lots abutting the proposed road have been developed;
(B)
the reduced width is needed to protect a specimen tree, significant stand of mature trees, or certain trees or other sensitive environmental features designated for preservation in an approved forest conservation plan or other regulatory approval; or
(C)
for a Neighborhood Street or Neighborhood Yield Street, the applicant proposes to extend an existing paved road which ends short of an intersection, the right-of-way containing the existing paved road is not graded to its full width and the waiver does not apply beyond the intersection.
(5)
Dual roads. The Director may allow the construction of only one roadway of a dual road if:
(A)
the applicant for a waiver does not own the property abutting the roadway for which the waiver is requested;
(B)
the abutting property is undeveloped;
(C)
the temporary use of two-way traffic on the single roadway to be constructed will not interfere with the flow of traffic so as to cause congestion;
(D)
each intersection will be constructed completely; and
(E)
the main drainage system will be constructed as a part of the roadway first constructed.
(c)
In addition to the other provisions of this section, any person may propose temporary or interim improvements to an existing public road by filing a written request for a waiver of any requirement of this Article. The County Executive may grant the request for a waiver in whole or in part when the Executive finds, by notice published in the County Register, that the application satisfies the following conditions:
(1)
The Director of Permitting Services, after reviewing detailed plans and specifications of the proposed improvements, must recommend in writing, using waiver criteria developed by the Department of Transportation, that the Executive should approve or disapprove the improvements proposed in the plans submitted by the applicant and state the reasons for the recommendation. The failure of the Director to act on the plans within 30 days after submission constitutes the Director's support of the Executive granting the waiver.
(2)
If a road is proposed to be improved by the County, the road is listed for construction or reconstruction in an approved six-year capital improvements program.
(3)
An immediate, temporary improvement is necessary to provide safe vehicular access to residents presently residing on or near the road.
(4)
The road is a County public road, and all rights-of-way required for the proposed improvements have been acquired by or dedicated to the County.
(5)
The applicant for such a waiver has agreed to make, or cause to be made, all of the proposed improvements in the road at no cost to the County. An applicant under this subsection, before beginning any grading or construction, must deliver to the County a cash or corporate bond in the amount estimated to be the total cost of the project. The cash or corporate bond must run to the County and require the applicant to:
(A)
comply with all applicable terms, conditions, requirements, standards, and specifications of this Article;
(B)
faithfully complete the work for which the permit is issued; and
(C)
indemnity the County from any expense incurred through failure of the permittee or the permittee’s agents and employees, to complete the work as required by this Article or from any damages that result from the negligence of the permittee or the permittee’s agents or employees.
(6)
The applicant for a waiver under this subsection must submit for recording in the County land records, in a form approved by the County Attorney, covenants which bind the applicant, each petitioner, and their successors in title to accept, as against each of their properties which are adjacent to the road, any future special improvement assessments levied to build the road, reserving the right to challenge any assessment which exceeds the amount by which the property is specially benefitted.
(d)
The County may make temporary or interim improvements to an existing public road without construction or reconstructing it, and thereby waive any requirements of this Article, if the County Executive finds, by notice published in the County Register, that:
(1)
the road to be improved is listed for planning and design or for construction or reconstruction in the most recently approved six-year capital improvements program;
(2)
an immediate, temporary improvement is necessary to provide safe vehicular access to nearby residents;
(3)
the road is a County public road, and no additional right-of-way is needed for the proposed improvement; and
(4)
waiving of any requirement of this Article will not impair public safety.
(e)
The County may make temporary or interim improvements to an existing County public road without constructing or reconstructing it, and thereby waive any requirements of this Article, if the County Executive finds, by notice published in the County Register, that:
(1)
the road improvements are needed to relieve hazardous or emergency conditions, or to protect the health and well-being of the community;
(2)
the road to be improved is less than 1¼ miles long, not located in a new subdivision, and no additional right-of-way is needed for the proposed improvement;
(3)
existing and projected traffic levels are appropriate to the construction standards proposed;
(4)
the road improvements are limited to surface treatments and minor drainage improvements;
(5)
the road improvements will reduce road maintenance expenses;
(6)
the County Executive has received a petition endorsing the proposed improvements signed by a substantial majority of the property owners adjacent to the road; and
(7)
the proposed improvements and their estimated costs were expressly included in the County Executive's annual budget, and the Council appropriated all necessary funds.
(f)
The County Executive may waive any provision of this Article to respond to an unforeseen emergency or disaster, such as a flood, hurricane, or public health crisis, or to comply with Federal or State rules, regulations or recommendations issued to deal with any emergency or disaster; if the Executive:
(1)
issues an Executive order which states the nature of the unforeseen emergency or disaster, the scope and duration and any other conditions of the waiver, and
(2)
promptly submits a copy of the order to the County Council.
Montgomery County, Md., Code § 49-41 (2026)
Sec. 49-41. Penalty for violations of Article.LinkCopy Citation
Any violation of this Article is a Class A violation, except as expressly provided otherwise.
Montgomery County, Md., Code § 49-42 (2026)
Sec. 49-42. Reconstruction, rehabilitation, and resurfacing schedule; coordination with other government agencies and private parties.LinkCopy Citation
(a)
The Director of Transportation must annually adopt a 3-year schedule for the reconstruction, rehabilitation, and resurfacing of sidewalks, streets, and roads that the County controls or maintains. That schedule must be based on:
(1)
expenditure schedules in the approved County Capital Improvements Program;
(2)
the evaluation of the Department of Transportation’s Pavement Management System; and
(3)
coordination and consultations with other government agencies and public utilities.
(b)
The 3-year schedule must be published in the County Register each January and shown on the County’s web site. The web site must be promptly updated to reflect changing information, and must include a street map displaying the location of street, road and sidewalk reconstruction, rehabilitation, and resurfacing work included in the adopted 3-year schedule. The Director must take all feasible steps to include on this map the location of construction work undertaken or planned by public utilities in County rights-of-way to the extent that each public utility makes this data available for County use.
(c)
The Director must send the schedule published in the County Register annually to:
(1)
the State Highway Administration;
(2)
each municipality in the County;
(3)
each public utility, and each cable communications franchisee, that operates in the County;
(4)
the Washington Suburban Sanitary Commission;
(5)
the County Planning Board;
(6)
civic, business, and community organizations active in the County; and
(7)
any other agency, organization, or person that would benefit from that information.
(d)
In adopting and implementing a 3-year schedule under subsection (a), the Director must take all feasible steps to coordinate the Department’s reconstruction, rehabilitation, and resurfacing activities with those of other government agencies, public utilities and cable communications providers, and any other entity permitted to reconstruct, rehabilitate, or resurface sidewalks, streets, or roads, to:
(1)
avoid conflicting or duplicative activities; and
(2)
minimize the time that any sidewalk, street, or road will be unavailable for unimpeded public use.
(e)
The Chief Administrative Officer, in conjunction with Washington Suburban Sanitary Commission, other public utilities, the State, and appropriate County municipalities, must develop an automated information sharing and mapping system covering planned construction projects in all public rights-of-way in the County. This system should be based on a standardized interagency geographic information data repository which enables geographic information system-based applications to access and view current information about all planned right-of-way construction and maintenance activities. The data and data applications should allow access to recently-completed, current, and planned projects, and should provide County, State, and utility staff with direct links to up-to-date information such as project location, scope, design plans, permit status, schedule, cost, moratorium status, and points of contact.
(f)
In coordinating its activities under this Section, the Department must collaborate with the applicable public utility, cable communications provider, or other entity to promote locating distribution facilities underground where feasible and prudent before resurfacing begins.
(g)
The adoption of a schedule under this Section does not limit the Department’s authority to respond to any emergency.
Montgomery County, Md., Code § 49-43 (2026)
Sec. 49-43. Reserved.LinkCopy Citation
Montgomery County, Md., Code § 49-44 (2026)
Sec. 49-44. Reserved.LinkCopy Citation
Article 4. Acquisition of Land.
Montgomery County, Md., Code § 49-45 (2026)
Sec. 49-45. Authority to acquire land for transportation purposes.LinkCopy Citation
The County may buy land which is needed in connection with:
(a)
the opening of any new road, bikeway, or sidewalk,
(b)
the construction or repair of any bridge,
(c)
the relocation, straightening or widening of any road, street, alley, bikeway, or sidewalk,
(d)
the proper drainage of any road, street, alley, bikeway or sidewalk,
(e)
the building of any public building or structure, or
(f)
any other public transportation purpose.
Montgomery County, Md., Code § 49-46 (2026)
Sec. 49-46. Condemnation.LinkCopy Citation
If the County cannot agree with the owner of any land, building, or improvement required for any public purpose listed in Section 49-45, the County may condemn the land, building, or improvement, or any interest in them, for the use of the County under any applicable State law that authorizes condemnation by local governments.
The County need not accept the award or judgment rendered in any proceeding under this Section, but instead may abandon the project after paying any costs required by law.
Montgomery County, Md., Code § 49-47 (2026)
Sec. 49-47. Reserved.LinkCopy Citation
Montgomery County, Md., Code § 49-48 (2026)
Sec. 49-48. Reserved.LinkCopy Citation
Montgomery County, Md., Code § 49-49 (2026)
Sec. 49-49. Procedure after construction work has been done.LinkCopy Citation
If the County has built any road, highway, street, bridge, bikeway, sidewalk, curb, gutter or drainage ditch on any land which the County did not own or have authority to use, the County may condemn the land and any improvements on it under any applicable State law which authorizes the condemnation of land for public purposes as though the improvement had not been built before condemnation proceedings began.
Montgomery County, Md., Code § 49-50 (2026)
Sec. 49-50. Optional method of condemnation of land for streets or roads.LinkCopy Citation
As authorized by Section 40A of Article III of the Maryland Constitution, the County may acquire any land or interest in land required for a right-of-way for a County road or street by using the following procedure:
(a)
When the County Council finds an immediate need to acquire land or an interest in land, the Council by resolution must:
(1)
describe the property,
(2)
list the owner as the owner appears on the County assessment records,
(3)
appoint a licensed real estate broker or a licensed real estate appraiser to estimate the property's fair market value,
(4)
direct the County Attorney to acquire the property or interest under this procedure, and
(5)
guarantee the payment of any amount above the estimated fair market value, later awarded by a jury.
(b)
(1)
Promptly after being appointed, the broker or appraiser must estimate the fair market value of the property or interest and submit a written report to the County.
(2)
The County then may by petition, naming the owner and all persons of record whose interest in the property would be taken, pay to the Circuit Court the amount estimated by the broker or appraiser to be the fair market value of the property, and record a copy of the resolution of taking in the County land records. A copy of the resolution must be attached to the petition and filed with the Circuit Court. A copy of the petition and resolution must be sent to each person named in the petition.
(3)
A copy of the petition and resolution must be filed with the Supervisor of Assessments, who must promptly adjust the tax assessment records.
(4)
The County may then immediately take possession of the property or interest described in the resolution without further notice to the property owner or other person of interest, and may proceed with the road or street project.
(5)
Payment into court of the amount estimated by the County's broker or appraiser to be the fair market value of the property or interest does not limit the amount that may be later awarded by a jury. The guarantee of the County to pay any further sum later awarded by a jury remains in effect until the final disposition of the proceeding.
(c)
The owner of any property or interest taken, upon written request to the Clerk of the Court, must receive the amount paid to the court if the owner agrees in writing filed with the Clerk to pay back to the County the difference between the amount received and a final award made by a jury, if the final award is less than the amount paid to the court.
(d)
Upon payment of the required money to the court under subsection (b)(2), the County must negotiate with the property owner to attempt to obtain by amicable negotiation any right, title or interest necessary for the road or street project. If the County and the owner cannot agree on a sum to be paid after payment to the court, the owner may request the County to institute condemnation proceedings. The County must, within 90 days after receiving a request, begin condemnation proceedings under Title 12 of the Real Property Article of the Maryland Code, or any successor provision. The County on its own may also begin condemnation proceedings at any time.
(e)
The jury award on any property or interest taken under this Section must be based on the value of the property or interest when the County paid to the court.
(f)
The County is not required to accept the estimate of its broker or appraiser. Before paying any funds to the court, the County may withdraw its petition by paying any costs required by law. In that case, the County is not entitled to take possession of the property or interest. In withdrawing its petition, the County does not waive its right to begin a condemnation action or a new proceeding under this Section against the same property, or to buy the same property or interest by negotiation with the owner.
(g)
The procedure in this Section does not apply if the property to be taken includes a building.
Article 5. County Roads - Authority and Funding.
Montgomery County, Md., Code § 49-51 (2026)
Sec. 49-51. Reserved.LinkCopy Citation
Montgomery County, Md., Code § 49-52 (2026)
Sec. 49-52. An assessment of costs for road construction to be authorized by County Executive; Council to assess benefits.LinkCopy Citation
(a)
The County must not assess the cost of constructing any road as a benefit to adjacent property unless the Executive has issued an order authorizing the assessment. After the Executive has authorized the assessment, the County Council may assess the cost of construction by resolution as a benefit to all property adjacent to the road’s right-of-way and specially benefited by its construction as provided in this Section.
(b)
The law in effect when construction is authorized must allow the assessment of all or part of its cost.
(c)
A property must not be assessed more than the amount by which the property is specially benefited by the construction.
(d)
Property owned by the United States, the State, or any agency of either must not be assessed.
(e)
The Council may waive any assessment in an urban renewal project, community redevelopment project, or neighborhood improvement project.
Montgomery County, Md., Code § 49-53 (2026)
Sec. 49-53. Public hearing; notice.LinkCopy Citation
(a)
Before an assessment for road construction is authorized, the County Executive or the Executive’s designee must hold a public hearing. Any person who would be subject to an assessment or otherwise affected by the location or construction of the road is entitled to be heard at the hearing. Notice of the hearing must be sent by certified or registered mail, at least 2 weeks before the scheduled date of the hearing, to the owners of each property that would be subject to an assessment, as listed in the records of the Department of Finance.
(b)
Each notice issued under subsection (a) must contain:
(1)
the time and place of the hearing;
(2)
the location of the construction which is the subject of the hearing;
(3)
the extent and kind of construction intended;
(4)
the type of materials to be used;
(5)
the estimated cost of construction; and
(6)
the location of the real property that will be benefited by the construction.
(c)
A summary of the notice provided for in subsection (a) must be published twice in a newspaper of general circulation in the County before the scheduled date of the hearing. The summary must tell where a full copy of the notice may be obtained.
(d)
Before beginning construction of any road, the Director of Transportation or the Director’s designee must hold a public hearing to receive comments on the proposed design of the road.
(e)
The Director need not hold a hearing under subsection (d) before a sidewalk or sidepath is constructed if:
(1)
the sidewalk or path can be constructed entirely in one or more existing public rights-of-way without a detailed engineering design;
(2)
(A)
a civic association, homeowner’s association, or other organization, which includes a substantial number of owners of property located on the proposed route of the sidewalk or path, has filed a notice of its support for the sidewalk or path with the Executive or a designee; or
(B)
if no such organization has filed a notice of support, a petition signed by a majority of owners of property located on the proposed route of the sidewalk or path has been filed with the Executive or a designee; and
(3)
the Executive finds, after the Executive’s designee has given notice to and met with residents of the area, that no significant controversy has arisen that would require a public hearing to be held.
Montgomery County, Md., Code § 49-54 (2026)
Sec. 49-54. Authorization of an assessment of costs for construction; recommendation of assessments to Council.LinkCopy Citation
(a)
If, after the hearing required by Section 49-53(a) is held, the County Executive finds that the public interest requires the assessment under consideration to be carried out, the Executive must authorize the assessment as required in this Chapter.
(b)
As soon as practicable after the Executive authorizes an assessment of costs for road construction under this Section, the Executive must forward to the County Council a written report recommending any proposed assessments based on the estimated cost of building the road. The report must describe the work to be done and state, with particularity, what portion of the cost of the construction, if any, should be paid by the adjacent properties and what portion, if any, of the cost should be paid by the County under this Chapter.
(c)
The recommendations must be based on the actual costs of publishing notices, conducting hearings, advertising for bids, and engineering, and the anticipated costs of financing to be incurred before the Council adopts the assessment resolution. Each cost assessment must be computed on the basis of linear frontage of adjacent properties, except as otherwise provided in this Chapter. The report must also estimate the dollar amount of the cost share to be paid by adjacent properties.
Montgomery County, Md., Code § 49-55 (2026)
Sec. 49-55. Assessment of costs by County Council; appeals.LinkCopy Citation
(a)
Within 270 days after the County accepts any road authorized and subject to assessments under Section 49-54, the County Executive must forward final recommendations for assessments to the Council. The Executive must include any adjustment to previous estimates resulting from the actual costs of the project, including financing.
(b)
Within 90 days after receiving these recommendations, the Council must approve or modify the recommended assessments and, by resolution, assess the costs of the road project against the adjacent properties, subject to the limits of Section 49-52. Each assessment must be computed on the basis of the linear frontage of each property, except as otherwise provided in Section 49-56. Each assessment becomes final when the Council adopts the resolution.
(c)
Any person aggrieved by an assessment may appeal, within 30 days after the notice is mailed, to the Circuit Court for the County. Any party may appeal a decision of the Circuit Court to the Court of Special Appeals.
Montgomery County, Md., Code § 49-56 (2026)
Sec. 49-56. Assessment of corner lots.LinkCopy Citation
If the property to be assessed is located at the intersection of 2 or more streets (hereinafter, a corner lot), the linear frontage of each corner lot assessed in connection with the construction of each adjacent street must be reduced to one-half of the total frontage of that lot on the street to be built, but any reduction must not exceed 50 feet on any one street. The portion of the cost of the construction which would otherwise have been assessed to a corner lot must be added to the overall cost assessed to the remaining assessable frontage of the whole project, unless the Executive authorizes the County to pay all or part.
Montgomery County, Md., Code § 49-57 (2026)
Sec. 49-57. Roads partly in unincorporated area and partly in city or town.LinkCopy Citation
(a)
Building roads.
(1)
If a road, bridge, storm drain, sidewalk, sidepath, transitway, or other transportation facility is located partly in the unincorporated area of the County and partly in a municipality or special taxing district that is authorized by law to build or maintain that part of the facility that is located in the municipality, either the County or the municipality or special taxing district may improve the entire facility according to applicable County laws or any law or regulation that applies in the municipality or special taxing district, respectively, as if the facility were completely located in the unincorporated area of the County or in the municipality or special taxing district.
(2)
The County Executive and the governing body of the municipality or special taxing district must mutually consent to construct or improve the facility, which consent may be granted without regard to the laws of the County or of the municipality or special taxing district regarding construction of roads and assessment for the construction.
(3)
The County may build or improve a road, bridge, storm drain, sidewalk, sidepath, bikeway, transitway, or other transportation facility which it is authorized by law to construct and maintain, including when the facility is located partly or entirely in a municipality or special taxing district. Before taking any action under this paragraph, the Executive must consult each affected municipality.
(b)
Assessing costs.
(1)
If the County or any municipality or special taxing district authorizes the construction of a road, obtains the consent of the other under subsection (a), assesses its cost against abutting property on the basis of benefit to the abutting property, and the assessment is made in accordance with the laws and regulations of the County or municipality or special taxing district levying the assessment, any property which abuts the road or public way but which is located in whole or in part in the other jurisdiction, may be assessed for its proportionate share of the cost of construction in the same manner as if the property were located only in the County or municipality or special taxing district levying the assessment, as the case may be.
(2)
Any party on whom an assessment may be levied under this subsection may appeal the assessment, in the same manner under the law of the jurisdiction levying the assessment, as any other party entitled to appeal under its law.
(3)
A municipality or special taxing district may, in its discretion, pay all or part of the costs assessed by the County against any property located in it.
(c)
State roads. Nothing in this Section affects any State road, except to the extent that the County participates in paying any construction cost under an agreement with the State Highway Administration or any successor agency.
This section is quoted and interpreted in Maryland-National Capital Park & Planning Commission v. Friendship Heights, 57 Md.App. 69, 468 A.2d 1353 (1984).
Montgomery County, Md., Code § 49-58 (2026)
Sec. 49-58. Payment of assessments; due date; interest and penalties; deferring payments.LinkCopy Citation
(a)
(1)
Any assessments under this Article is due and payable 30 days after the Council adopts the resolution levying the assessment. Until the assessment is paid, the Director of Finance may attach a lien on the property on which the assessment was levied.
(2)
The Council may provide in the resolution that assessments may be paid in full at any time or in up to 20 equal annual installments. Each assessment must bear interest on the unpaid balance from the date the Council adopts the resolution at the interest rate paid by the County on its bonds used to finance construction of the road, plus one percent.
(3)
The resolution must provide that all or any portion of the assessment may be paid without interest within 90 days after the resolution levying the assessment is adopted, or in equal annual installments starting on the July 1 at least 30 days after the levy of the assessment. Each payment must include interest on the unpaid balance. Any annual installment, together with the interest on it, not paid on or before the September 30 after its due date, is overdue and must be charged additional interest and penalty at the rate prescribed by law for overdue taxes on real property for the full taxable year.
(b)
Notwithstanding the provisions of this Section, the Council may by resolution permit a taxpayer to defer the payment of assessments for a period not to exceed 5 years, subject to the following conditions:
(1)
The payment deferral must be provided only on assessments connected with property which has been subject to an increased County property tax assessment resulting directly from a government-initiated change in the zoning classification of the property to a higher intensity use. A government-initiated change in the zoning classification of property is a change proposed by the Planning Board.
(2)
The property connected with the assessment has been and must be actually occupied by the taxpayer for residential purposes. Any change in use during the period of payment deferral automatically ends the deferral. Any deferred assessment and accumulated interest on it is then immediately due and payable.
(3)
The payment deferral ends immediately when the owner of record listed on the tax records when the property was rezoned transfers the property. Any deferred assessment and accumulated interest on it is then immediately due and payable.
(4)
The owner must execute an agreement with the County to pay the balance of unpaid deferred assessments and accumulated interest on them immediately if the owner transfers ownership or does not comply with any other condition, or when the specified deferral period expires.
(5)
Interest on the unpaid balance of any deferred assessments must accrue from the date of the deferral resolution at the rate specified in this Section.
(6)
A first lien must attach to the property for all deferred assessments and accumulated interest on them.
Montgomery County, Md., Code § 49-59 (2026)
Sec. 49-59. Collecting assessments; default in paying installments.LinkCopy Citation
(a)
Any assessment under this Article must be collected in the same way as real property taxes are collected under State and County laws. Each annual installment due may be included on the County tax bill, or billed separately, as the Director of Finance orders.
(b)
If any person does not pay any annual installment, including any interest and penalty due, the Director of Finance may sell the property against which the assessment has been made at tax sale for the unpaid balance due on the assessment, including any interest or penalty due, in the same manner as real property is sold for nonpayment of taxes, together with all other charges due, if any.
Montgomery County, Md., Code § 49-60 (2026)
Sec. 49-60. Correcting errors in assessments.LinkCopy Citation
(a)
If any property subject to assessment was not properly assessed, or the assessment erroneously describes the property or is made in a wrong name or in an erroneous amount, or if the property owner was not properly notified, the Council may, if the County Executive so recommends or on its own, correct the assessment by amending the resolution.
(b)
The Council may correct an error without further notice to the affected property owner if the owner had notice of the hearing conducted under Section 49-53 and the error did not occur before the hearing was held and was not contained in any notice of the hearing.
(c)
If the error occurred before the hearing or was contained in any notice of the hearing, the error must not be corrected until any affected property owner is given adequate notice and an opportunity to be heard.
Montgomery County, Md., Code § 49-61 (2026)
Sec. 49-61. Borrowing and certificates of indebtedness.LinkCopy Citation
The County may, by Council resolution, borrow from time to time on its faith and credit any funds needed to finance construction authorized by this Article, and may issue its negotiable certificates of indebtedness.
Article 6. Abandonment and Closing of Rights-Of-Way.
Montgomery County, Md., Code § 49-62 (2026)
Sec. 49-62. Abandonment authority; scope of Article; procedures.LinkCopy Citation
(a)
Authority. The County Council, by adopting a resolution, may close to public use or abandon the County’s right to use any right-of-way. As used in this Article, right-of-way means any road, sidewalk, bikeway, crosswalk, water main, sanitary sewer, storm sewer, or storm drainage right-of-way used at any time by the public, including use by pedestrians and bicyclists. This Article applies to all rights-of-way except as provided in subsection (j) and State road rights-of-way, and may apply to a State road right-of-way if the appropriate State agency expressly consents. Before the Council adopts a resolution under this Article, the procedures in this Article must be followed.
(b)
Application. Any person or government agency may file an application with the Department of Transportation to close or abandon any right-of-way. In this Article, unless the context clearly indicates otherwise, Department refers to the Department of Transportation.
(c)
Fee. Each applicant, except a County government agency, must pay with the application a filing fee set by regulation under method (3) to defray the cost of processing the application and holding a hearing.
(d)
Notice to property owners. After receiving an application under this Article, the Department must promptly notify by certified mail each property owner listed in the County assessment records whose property abuts the right-of-way proposed to be closed or abandoned. However, the fact that any property owner did not receive a notice under this section does not invalidate an otherwise valid closing or abandonment.
(e)
Notice to public. The Department must prominently post a notice of the application in or adjacent to the right-of-way to be closed or abandoned. The Department also must publish notice of the application once each week for 2 successive weeks in a newspaper of general circulation in the County. This notice, and those sent under subsection (d), must inform recipients of the opportunity for a hearing and the date a hearing will be held.
(f)
Hearing. The Executive or the Executive's designee must hold a hearing on the application not earlier than 30 days after notice is mailed under subsection (d).
(g)
Executive's report; comments of government agencies and utilities. After the hearing held under this section, the County Executive must forward to the County Council the application, a report based on the record of the proceedings, and the Executive’s recommendation on the proposed abandonment or closing. The report must state whether the government agencies and utilities listed in subsection (h) have endorsed the proposal and the conditions, if any, of each agency's or utility’s endorsement. The Executive must not forward the report or recommendation until the Executive receives a response from each agency or other party. If an agency or other party does not respond within 60 days after notice is first published under subsection (e), the County Executive must presume that the agency or other party does not oppose the proposal.
(h)
Agencies. The government agencies and other parties from which the Executive must solicit a response are:
(1)
the Department of Transportation;
(2)
the Department of Permitting Services;
(3)
the Maryland-National Capital Park and Planning Commission;
(4)
the Washington Suburban Sanitary Commission, if any part of the right-of-way is located in the Washington Suburban Sanitary District;
(5)
each public utility authorized by the Public Service Commission to operate in the area and which has any overhead or underground facilities in the vicinity;
(6)
the governing body of each incorporated municipality or special taxing district in which any of the right-of-way is located;
(7)
the Police Department;
(8)
the County Fire and Rescue Service; and
(9)
any grantee of a franchise under Article 2, if the franchise authorizes the grantee to install or use any facility in, over, or under the affected right-of-way.
(i)
Temporary closure. This Article does not apply to any temporary closure required by a construction traffic control plan if the closure does not last longer than 12 months. If special circumstances require that a temporary closure last longer than 12 months, the Director of Transportation must apply to the Council for approval to extend the closure. The Council, by resolution, may approve an extended temporary closure under this subsection without following the procedures in this Article.
(j)
Storm drainage rights-of-way.
(1)
In this subsection, County Executive means the County Executive or the Executive’s designee.
(2)
The procedures in this subsection are the exclusive means to abandon all or a portion of a platted or recorded public storm drainage right-of-way that is not used for any other public purpose.
(3)
The County Executive may grant a partial or total abandonment of the existing storm drainage right-of-way if the Executive:
(A)
receives a written request, accompanied with a survey delineating the area sought to be abandoned;
(B)
investigates any potential impacts that the requested abandonment may have upon the existing storm drain facility; and
(C)
finds that:
(i)
the area requested to be abandoned is no longer necessary for current or anticipated public use in the foreseeable future; and
(ii)
abandoning the portion of the right-of-way will not adversely impact the County’s ability to access and/or maintain any portion of the storm drain facility located within the right-of-way.
(4)
Before granting a partial or total abandonment of a storm drainage right-of-way under this subsection, the County Executive may require the owner of the land that is presently encumbered by the storm drainage right-of-way, or the proposed owner if the County holds fee-title to the storm drainage right-of-way, to execute a maintenance and liability agreement. If the Executive requires a maintenance and liability agreement, the agreement must:
(A)
be on a form acceptable to the Executive; and
(B)
hold the County harmless for any damages to private property located in the area proposed to be abandoned that arises out of the presence, maintenance of, or other work related to the existing storm drain facility.
Res. No. 9-1378 establishes guidelines for oral argument proceeding relative to road abandonments or closures. See appendix I, pt. I.
Montgomery County, Md., Code § 49-63 (2026)
Sec. 49-63. Decision of the Council.LinkCopy Citation
(a)
The Council must consider the record of the proceedings and the report and recommendations of the County Executive, including any recommendations of the government agencies and other parties listed in Section 49-62(h), and any other relevant and material information the Council receives from any person.
(b)
The Council may at any time remand an application to the Executive or the Executive's designee to reopen the record or consider new information.
(c)
A right-of-way may be abandoned or closed if the Council by resolution finds that:
(1)
the right-of-way is no longer necessary for present public use or anticipated public use in the foreseeable future, or
(2)
the abandonment or closing is necessary to protect the health, safety and welfare of the residents near the right-of-way to be abandoned or closed. In assessing health, safety, and welfare issues, the Council may consider:
(A)
any adopted land use plan applicable to the neighborhood;
(B)
safe and efficient pedestrian and vehicular traffic patterns and flows, together with alternatives, in the immediate neighborhood, for local and through traffic; and
(C)
changes in fact and circumstances since the original dedication of the right-of-way.
(d)
A right-of-way which is the sole means of access to any property must not be abandoned or closed.
Montgomery County, Md., Code § 49-64 (2026)
Sec. 49-64. Withdrawal of application.LinkCopy Citation
(a)
At any time before the Council takes final action on the application, the applicant may request in writing that the application be withdrawn.
(b)
The request must be made to the County Executive if the Executive has not forwarded the application to the Council. If the Executive has forwarded the application to the Council, the request must be made to the Council.
Montgomery County, Md., Code § 49-65 (2026)
Sec. 49-65. Notice to Planning Board; filing subdivision plat.LinkCopy Citation
(a)
Not less than 30 nor more than 60 days after the Council adopts the resolution to approve an abandonment or closing, the Council Clerk must notify the Planning Board, the Directors of Permitting Services and Transportation, and the County Attorney that the Council has authorized the abandonment or closing.
(b)
The Director of Permitting Services, after receiving a copy of the Council resolution, must sign, on behalf of the County, a plat of subdivision prepared by the applicant, which the Planning Board has approved for recording, approving the abandonment or closing.
(c)
The County Attorney must cause to be recorded in the County land records the Council resolution which approved the abandonment or closing.
(d)
Any abandonment or road closure approved after July 1, 2007, is automatically revoked by operation of law if each condition specified in the approval resolution, including any later amendment to that resolution, has not been completed within the time specified in the resolution or, if the resolution did not specify a completion date, within 5 years after the Council approved the resolution or amended the resolution to insert that condition.
Montgomery County, Md., Code § 49-66 (2026)
Sec. 49-66. Appeal from action of the Council.LinkCopy Citation
The action of the Council on any application for abandonment or closing is final, subject to any Council procedure for reconsideration that would otherwise apply. Any aggrieved person may appeal the action of the Council approving or denying an abandonment or closing to the Circuit Court within 30 days after the Council takes the action.
Montgomery County, Md., Code § 49-67 (2026)
Sec. 49-67. Notice of abandonment or closure.LinkCopy Citation
Before abandoning or closing any right-of-way after Council approval under this Article, the Director of Transportation must cause to be posted prominently in the area of the right-of-way, for at least 15 days after the Council action, a notice listing the date when the right-of-way will be abandoned or closed.
Montgomery County, Md., Code § 49-68 (2026)
Sec. 49-68. Abandonment of previously unused rights-of-way.LinkCopy Citation
(a)
If any right-of-way, except a right-of-way located entirely in a municipality which has independent zoning and subdivision authority, has not been in public use, one or more abutting property owners may petition the Planning Board to abandon the right-of-way. The petition must take the form of a preliminary plan for the subdivision of land, and must state the reason for the proposed abandonment and show any proposed relocation or realignment of the right-of-way, where applicable.
(b)
The petitioner must notify:
(1)
each person with a recorded financial interest in land abutting the right-of-way;
(2)
the Department of Transportation;
(3)
the County Fire and Rescue Service;
(4)
the Police Department;
(5)
the Washington Suburban Sanitary Commission, when applicable;
(6)
each public utility operating in the area;
(7)
the governing body of each incorporated municipality or special taxing district which adjoins the right-of-way sought to be abandoned; and
(8)
Any grantee of a franchise under Article 2, if the franchise authorizes the grantee to install or use any facility in, over, or under the affected right-of-way.
(c)
The Planning Board must solicit the comments of each notice recipient, and then promptly determine whether:
(1)
the right-of-way previously was improved or used for the purposes for which it was intended or dedicated; and
(2)
the right-of-way is necessary for anticipated public use.
(d)
If a recipient of notice under subsection (b) does not respond within 60 days after the notice is sent, the Planning Board must presume that the recipient does not oppose the proposal.
(e)
If the Planning Board finds that the right-of-way is not necessary for anticipated future public use or that an alternative alignment or location will not adversely affect the public interest, the Board may authorize the right-of-way to be abandoned by incorporating the abandoned land into an amended plat of subdivision. The amended subdivision plat must require the dedication of any land needed for rights-of-way, easements, and other public uses.
Article 7. Freeways and Controlled Major Highways.
Montgomery County, Md., Code § 49-69 (2026)
Sec. 49-69. ReservedLinkCopy Citation
Montgomery County, Md., Code § 49-70 (2026)
Sec. 49-70. Designating means of access to certain highways.LinkCopy Citation
(a)
A Freeway and Controlled Major Highway are defined in Section 49-31.
(b)
If any existing County road is classified as a Freeway or Controlled Major Highway:
(1)
The Director of Transportation may, by agreement or condemnation, restrict or limit the right of any owner of land abutting the Freeway or Controlled Major Highway to lay out or construct any new means of access to, from or across the abutting land to or from the Freeway or Controlled Major Highway or to enlarge or extend any existing means of access. The Director may designate points where access is permitted, or permit changes in existing means of access, consistent with any applicable master plan, on specified terms and conditions.
(2)
The Director may close any existing means of access to, from, or across abutting land to or from the Freeway or Controlled Major Highway by agreement or condemnation, consistent with any applicable master plan.
Montgomery County, Md., Code § 49-71 (2026)
Sec. 49-71. Acquiring property for Freeways or Controlled Major Highways.LinkCopy Citation
To build any Freeway or Controlled Major Highway or rebuild any portion of any existing road as a Freeway or Controlled Major Highway, or for any service or feeder road in connection with a Freeway or Controlled Major Highway, the County may acquire any real property or any interest in real property by the same procedure as property may be acquired for road purposes.
Montgomery County, Md., Code § 49-72 (2026)
Sec. 49-72. Control of use and access.LinkCopy Citation
When any road has been constructed or designated as a Freeway or Controlled Major Highway, the Director of Transportation:
(a)
may restrict or prohibit access to the Freeway or Controlled Major Highway from any existing highway, road, or street, or from any new highway, road, or street, if reasonable access to the freeway or expressway from any existing or new highway, road, or street is maintained;
(b)
may control, restrict, or prohibit the use of the Freeway or Controlled Major Highway by various classes of vehicles or traffic if an alternate route is provided for restricted or prohibited classes of vehicles or traffic; and
(c)
may maintain, discontinue, abandon, or close, and exercise all other powers with respect to Freeways or Controlled Major Highways to the same extent and in the same manner as other roads.
Montgomery County, Md., Code § 49-73 (2026)
Sec. 49-73. Access to Freeway or Controlled Major Highway where it divides property under one ownership.LinkCopy Citation
If real property held by one owner is severed by a Freeway or Controlled Major Highway, the Director of Transportation may provide for access across the Freeway or Controlled Major Highway from one such tract to the other, either at grade or below or above grade, on such conditions as the Director sets. Any connecting road or roads must not be used for or in connection with the conduct of any roadside business or enterprise. If the affected land is no longer held under one ownership, the Department may discontinue any access road.
In acquiring property for any purpose listed in the three preceding sections, the Director must fully inform the owners of the use and restrictions of the property.
Montgomery County, Md., Code § 49-74 (2026)
Sec. 49-74. Right of access.LinkCopy Citation
When a road is constructed as a Freeway or Controlled Major Highway, an owner of land abutting the road or other person must not have any right of access to, from, or across any abutting land to or from the Freeway or Controlled Major Highway. At the time of the construction of the Freeway or Controlled Major Highway or thereafter, the Director of Transportation may designate points at which access will be permitted, on conditions the Director sets.
Montgomery County, Md., Code § 49-75 (2026)
Sec. 49-75. Reserved.LinkCopy Citation
Article 8. Rustic Roads Program.
Montgomery County, Md., Code § 49-76 (2026)
Sec. 49-76. Purpose.LinkCopy Citation
This Article authorizes the identification and classification of rustic roads in that part of the County located in the Maryland-Washington Regional District. This Article establishes a program to preserve as rustic roads those historic and scenic roadways that reflect the agricultural character and rural origins of the County. Preservation of rustic roads must be achieved by retaining certain physical features of rustic roads and by certain right-of-way maintenance procedures.
Montgomery County, Md., Code § 49-77 (2026)
Sec. 49-77. Definitions.LinkCopy Citation
In this Article, the following terms have the meanings indicated:
Committee means the Rustic Roads Advisory Committee.
Commodity farmer means a person engaged in the production of at least 100 acres of field crops such as corn, soybeans, barley, and wheat, or forage crops such as hay, requiring the use of large commercial equipment for planting, nutrient application, pest management, and harvesting.
Exceptional rustic road means an existing public road or road segment which is so classified under Section 49-78.
Public utility means any private company or public agency that is regulated as a public utility under state law, or otherwise provides water, sewer, electric, gas, telephone, or cable service (as defined in Chapter 8A) in the County.
Rustic road means an existing public road or road segment which is so classified under Section 49-78.
Montgomery County, Md., Code § 49-78 (2026)
Sec. 49-78. Rustic road classification and reclassification.LinkCopy Citation
(a)
Classification. The County Council may classify, reclassify, or revoke the classification of an existing public road or road segment as a rustic road or an exceptional rustic road by approving an amendment to the functional plan and the relevant area master plan.
(b)
Criteria for rustic road. Before classifying a road as rustic, the Council must find that an existing public road or road segment:
(1)
is located in an area where natural, agricultural, or historic features are predominant, and where master planned land use goals and zoning are compatible with a rural/rustic character;
(2)
is a narrow road intended for predominantly local use;
(3)
is a low volume road with traffic volumes that do not detract significantly from the rustic character of the road;
(4)
(A)
has outstanding natural features along its borders, such as native vegetation, stands of trees, stream valleys;
(B)
provides outstanding vistas of farm fields and rural landscape or buildings; or
(C)
provides access to historic resources, follows historic alignments, or highlights historic landscapes; and
(5)
the history of vehicle and pedestrian crashes on the road in its current configuration does not suggest unsafe conditions.
The Council must not classify a road as rustic if that classification will significantly impair the function or safety of the road network.
(c)
Criteria for exceptional rustic road. The Council may classify an existing public road or road segment as an exceptional rustic road. Before classifying a road as an exceptional rustic road, the Council must find that the road or road segment:
(1)
qualifies as a rustic road under subsection (b);
(2)
contributes significantly to the natural, agricultural, or historic characteristics of the County;
(3)
has unusual features found on few other roads in the County; and
(4)
would be more negatively affected by improvements or modifications to the physical characteristics of the road than would most other roads in the rustic roads program.
(d)
Significant features. When the Council classifies a road as a rustic road or an exceptional rustic road, the Council must identify the significant features of each such road that must be preserved when the road is maintained or improved.
Montgomery County, Md., Code § 49-79 (2026)
Sec. 49-79. Maintenance and improvements.LinkCopy Citation
(a)
County roads. Each rustic road and exceptional rustic road must be maintained and improved in a manner that preserves the road's significant features which the Council identified under subsection 49-78(d), but this requirement does not preclude improvements to promote safety or movement of farm equipment. The County Executive must establish guidelines by regulation under method (2) for maintenance and improvement of rustic roads and exceptional rustic roads.
(b)
State and park roads. The Executive must encourage the State Highway Administration and the County Parks Department to maintain and improve rustic roads owned by the State or Park Commission in a manner consistent with this Article.
(c)
Public utilities. Public utility work on or near a rustic road or exceptional rustic road is limited by this Article only when the work will damage a structure identified as a significant feature of the road which the Council identified under subsection 49-78(d). Each public utility must make all reasonable efforts to limit irreparable damage to any significant feature when working on or near a rustic road or exceptional rustic road.
(d)
If this Article conflicts with Chapter 24A, Chapter 24A prevails.
Montgomery County, Md., Code § 49-80 (2026)
Sec. 49-80. Rustic Roads Advisory Committee.LinkCopy Citation
(a)
Membership. The County Executive must appoint, subject to confirmation by the County Council, a Rustic Roads Advisory Committee. In making appointments, the Executive must strive to achieve diversity on the Committee in support of racial equity and social justice. The Committee has 9 voting members. Each member must be a resident of the County. The Executive should appoint:
(1)
three members who operate commercial farmland earning 50 percent or more of their income from direct involvement in commodity farming;
(2)
one member who is a representative of the Agricultural Advisory Committee and has been recommended to the Executive by the AAC;
(3)
one member who knows rural preservation techniques through practical experience and training;
(4)
one member who knows roadway engineering through practical experience and training; and
(5)
three at-large members who do not satisfy the requirements of subsections (a)(1) through (a)(4) above, to be drawn from frequent users of rustic roads.
The Chairman of the Planning Board must designate a member of the planning staff as a non-voting Committee member.
(b)
Officers. The Committee must elect a chair annually. The Committee may select other officers annually as it finds appropriate. A member must not serve as chair for more than 2 consecutive years.
(c)
Meetings. The Committee must meet at the call of the chair as often as required to perform its duties, but at least 6 times each year. The Committee must also meet if two- thirds of the voting members request in writing that a meeting be held. The Chair must give reasonable advance notice of all meetings to members of the Committee and the public. A majority of the members are a quorum to transact business.
(d)
By-laws. The Committee may adopt by-laws to govern its activities.
(e)
Duties. The Committee must:
(1)
promote public awareness and knowledge of the County rustic roads program;
(2)
review and comment on classification of rustic roads and exceptional rustic roads;
(3)
review and provide comments on subdivision applications when the requirements of the Subdivision Regulations conflict with this Article or Executive Regulations;
(4)
other duties as required by Executive Regulations;
(5)
review and comment on Executive Regulations and other County policies and programs that may affect the rustic roads program; and
(6)
report on June 1 of each even numbered year to the Executive, the Council, and the Planning Board on the status of the rustic roads program.
(f)
Advocacy. The Committee must not engage in any advocacy activity at the State or federal levels unless that activity is approved by the Office of Intergovernmental Relations.
(g)
Staff. The Chief Administrative Officer must provide the Committee with staff, offices, and supplies as are appropriated for it.
“Notwithstanding Section 49-80(a) of the County Code, the County Executive may reappoint to the Rustic Roads Advisory Committee, subject to confirmation by the County Council, any at-large member of the Committee appointed before January 1, 1997, who otherwise may be precluded from reappointment because of the specific requirements of that subsection.”
Article 9. Pedestrian and Traffic Safety Advisory Committee.
Montgomery County, Md., Code § 49-81 (2026)
Sec. 49-81. Pedestrian, Bicycle, and Traffic Safety Advisory Committee.LinkCopy Citation
(a)
Definition. In this Section “Committee” means the Pedestrian, Bicycle, and Traffic Safety Advisory Committee.
(b)
Established. The County Executive must appoint, subject to confirmation by the County Council, a Pedestrian, Bicycle, and Traffic Safety Advisory Committee.
(c)
Composition and terms of members.
(1)
The Committee has 17 members.
(2)
The Executive must appoint a representative from each of the following departments as members:
(A)
the Police Department;
(B)
the Department of Transportation; and
(C)
one of the Regional Services Centers.
(3)
The Executive must invite a representative from each of the following agencies to serve as members:
(A)
the County Council;
(B)
the County Planning Board;
(C)
the Montgomery County Public Schools; and
(D)
the State Highway Administration.
(4)
The Executive must appoint:
(A)
one member representing a municipality from a list provided by the County chapter of the Maryland Municipal League;
(B)
one member representing advocates of bicycling; and
(C)
one member representing people with disabilities.
(5)
The Executive must appoint the remaining individuals from different geographic areas of the County.
(6)
The term of each member is 3 years. After an appointment to fill a vacancy before a term expires, the successor serves the rest of the unexpired term.
(d)
Voting, officers, meetings, and compensation.
(1)
All members of the Committee are voting members.
(2)
The Executive must designate a member of the Committee as Chair for one 2- year term.
(3)
The Committee meets at the call of the Chair. The Committee must meet as often as necessary to perform its duties, but not less than 4 times each year.
(4)
A member must serve without compensation. However, a member may request reimbursement for mileage and dependent care costs at rates established by the County.
(e)
Duties. The Committee must:
(1)
advise the Executive and Council on the status of the implementation of the recommendations in the Pedestrian Safety Final Report, issued in 2002;
(2)
advise the Executive and Council of priorities and needs for pedestrian and bicycle safety and access, and other pedestrian-related issues; and
(3)
continue to gather information on pedestrian safety and other pedestrian-related issues and identify new issues that emerge.
(f)
Annual Report. By November 1 each year, the Committee must submit to the Executive and the Council an annual report on its functions, activities, accomplishments, and plans and objectives.
(g)
Advocacy. The Committee must not engage in any advocacy activity at the State or federal levels unless that activities is approved by the Office of Intergovernmental Relations.
(h)
Staff. The Chief Administrative Officer must provide appropriate staff to the Committee.