      <paragraph indent="2">In accordance with the procedures authorized in Chapter 19, Article V, entitled "Water Quality Review - Special Protection Areas," Section 19-67, the following Executive Regulation applies to an application for approval of or significant amendment to, a development plan, diagrammatic plan schematic development plan, project plan, preliminary plan of subdivision, special exception, or site plan, in designated special protection areas.</paragraph>
    </subsection>
    <subsection heading="19.67.01.02 Definitions">
      <paragraph indent="2">Active Floodplain means the flat area adjacent to the channel constructed by the stream and overflowed by the stream at a recurrence interval of about two years or less.</paragraph>
      <paragraph indent="2">Best Management Practices (BMP) means techniques that are most effective in eliminating or reducing the amount of pollution or other detrimental impact to a watershed or wetland.</paragraph>
      <paragraph indent="2">Best Management Practices Monitoring Plan means a statement prepared by an applicant describing how the applicant will monitor and assess the effectiveness of its best management practices.</paragraph>
      <paragraph indent="2">Bank Full Discharge means the water discharged when stream water just begins to overflow into the active floodplain.</paragraph>
      <paragraph indent="2">Base Flow means that portion of the stream discharge that is derived from natural storage (i.e., groundwater outflow and the draining of large lakes and swamps or other sources outside the net rainfall that create surface runoff); discharge sustained in a stream channel, not a result of direct runoff, and without the effects of regulation diversion, or other works of man. Also called sustaining, normal, ordinary, or groundwater flow.</paragraph>
      <paragraph indent="2">Baseline Stream Monitoring means biological, habitat, and physical/chemical monitoring conducted by the Department to assess and quantify stream conditions in special protection areas prior to development of these areas.</paragraph>
      <paragraph indent="2">Cumulative Impact means the impact on water quality, stream habitat, and aquatic biological communities within a special protection area watershed which may result from the incremental impact of a development project when added to other past present and future developments within that watershed. Cumulative impacts can result from individually minor but collectively significant actions taking place over a period of time. Impacts may include beneficial and/or detrimental effects.</paragraph>
      <paragraph indent="2">Development Impact Monitoring means the monitoring conducted by the Department to measure the effects that development projects occurring within special protection areas have on in-stream water quality, stream habitat and resident aquatic life.</paragraph>
      <paragraph indent="2">Environmentally Sensitive Areas means areas having beneficial features to the natural environment, including but not limited to: steep slopes; habitat for Federal and/or State rare, threatened, and endangered species; 100-year ultimate floodplains; streams; seeps; springs; wetlands, and their buffers; priority forest stands; and other natural features in need of protection.</paragraph>
      <paragraph indent="2">Index of Biotic Integrity is a measurement of the aquatic community's structure and function within special protection areas as compared to the aquatic community inhabiting the least impaired reference streams within a specific region.</paragraph>
      <paragraph indent="2">Performance Goals mean goals that are established for development projects, located within special protection areas, to enhance protection of on-site water resources or other environmental features relating to those water resources. Performance goals for streams are expressed as narrative or numeric targets which represent biological, physical, and chemical measures of stream health to be achieved or maintained. Performance goals for best management practice effectiveness are expressed as narrative or numeric targets for achieving base flow preservation, peak storm flow reduction, and pollutant removal. Performance goals may also include measures that quantify the extent and effectiveness of public education measures to reduce the on-site generation on non-point pollution sources.</paragraph>
      <paragraph indent="2">Reference Condition means the measurement of the biological community and the physical and/or chemical parameters found in the set of reference streams for Montgomery County.</paragraph>
      <paragraph indent="2">Reference Stream means a stream, or a portion of a stream selected by the Department to define a reference condition for a water body that represents a minimally impaired stream.</paragraph>
      <paragraph indent="2">Special Protection Area (SPA) means a geographic area where: 1) existing water resources or other environmental features directly relating to those water resources are of high quality or unusually sensitive; and 2) proposed land uses would threaten the quality of preservation of those resources or features in the absence of special water quality protection measures which are closely coordinated with appropriate land use controls.</paragraph>
      <paragraph indent="2">Special Protection Area Conservation Plan means a plan developed by the Department for a special protection area, which identifies those natural resource parameters that must be protected to achieve and maintain a high level of water quality protection for SPA watersheds that, at a minimum, meet established State water quality standards as defined in COMAR 26.08.01-.04. SPA conservation plans are derived from baseline and reference stream monitoring conducted by the Department in accordance with the stream monitoring program, and, as deemed appropriate by the Department, from previously conducted water quality inventories, technical studies, and functional master plans which contain credible information on water quality, aquatic life, hydrology, and riparian conditions.</paragraph>
      <paragraph indent="2">Standard Scientific Format means the orderly presentation of results of required stream and best management practice monitoring (e.g., goals, objectives, methods, materials, results, references) using the standard format for technical publications as presented in the scientific literature. (e.g., the North American Journal of Fisheries Management, American Fisheries Society.)</paragraph>
      <paragraph indent="2">Stream Monitoring Plan means a statement prepared by the Department describing the location of monitoring stations and the nature, form, and frequency of monitoring to be conducted to evaluate the impacts of development on water resources in a special protection area. A plan must also describe what will be monitored with regard to: (a) faunal groups, (b) stream and riparian habitat features, (c) biological features, and (d) physical and chemical properties.</paragraph>
      <paragraph indent="2">Stream Monitoring Program means activities conducted by the Department to carry out a stream monitoring plan for property in a special protection area, including:</paragraph>
      <paragraph indent="4">(1)   an inventory and evaluation of water resources to measure baseline conditions; and</paragraph>
      <paragraph indent="4">(2)   an assessment of any impairment of the biological, chemical, and physical integrity of the stream over time related to development impacts in any special protection area.</paragraph>
      <paragraph indent="2">Technical Manual means the provisions found in 19.67.01.12 of this regulation.</paragraph>
      <paragraph indent="2">Water Quality means the chemical, physical, and biological factors required to maintain a designated State Use Class, and maintain conformance with the anti-degradation requirements of State Water Quality Standards as defined in COMAR 26.08.01-.04.</paragraph>
    </subsection>
    <subsection heading="19.67.01.03 Applicability">
      <paragraph indent="2">The following requirements apply to a person proposing a land disturbing activity within a special protection area:</paragraph>
      <paragraph indent="2">A.   Privately owned property.</paragraph>
      <paragraph indent="3">1.   All persons proposing to disturb land within a SPA, except as provided by law, must submit, for review and approval, a water quality inventory which covers any portion of the project located within the SPA.</paragraph>
      <paragraph indent="3">2.   Except as exempted under 19.67.01.04, all persons proposing to disturb land within a SPA must also submit a preliminary water quality plan and a final water quality plan if they are:</paragraph>
      <paragraph indent="3">(i)   required by law to obtain approval of a development plan, diagrammatic plan, schematic development plan, project plan, special exception, preliminary plan of subdivision, or site plan; or</paragraph>
      <paragraph indent="3">(ii)   seeking approval of an amendment to an approved development plan, diagrammatic plan, schematic development plan, project plan, special exception, preliminary plan of subdivision, or site plan; or</paragraph>
      <paragraph indent="3">(iii)   specifically required to submit a water quality plan in a land use plan, watershed plan, comprehensive water supply and sewer system plan amendment, or by resolution of the County Council.</paragraph>
      <paragraph indent="2">B.   Publicly owned property. Before engaging in any land disturbing activity on publicly owned property in an area designated as a SPA, the applying agency or department proposing the land disturbing activity should prepare a water quality inventory which covers that portion of the project located within the SPA and/or a combined preliminary and final water quality plan.</paragraph>
      <paragraph indent="2">C.   Exception. This regulation does not apply to projects on properties that have valid, approved record plats for the entirety of the project and for which no amendments are required an or before October 31, 1994, to accommodate development of the sites.</paragraph>
    </subsection>
    <subsection heading="19.67.01.04 Exemptions">
      <paragraph indent="2">A.   Applicability. An applicant, unless otherwise specifically required to do so, need not submit a preliminary or final water quality plan if:</paragraph>
      <paragraph indent="3">1.   a project on agricultural, residential, or mixed use zoned property contains:</paragraph>
      <paragraph indent="4">(i)   a proposed impervious area of less than 8% of the total area covered by the development approval application: or</paragraph>
      <paragraph indent="4">(ii)   a cumulative area of 10 acres or less, and 2 proposed impervious area of less than 15% of the total land area covered by the development approval application.</paragraph>
      <paragraph indent="3">2.   a project on property zoned for industrial or commercial use consists of a cumulative land area of two acres or less covered by the development approval application.</paragraph>
      <paragraph indent="2">B.   Cumulative Impacts. In reviewing an application submitted in accordance with this regulation, the Department or Planning Board, as applicable, must assess the cumulative impact of all previously approved development if an application for new or additional development approval is submitted for property that was either:</paragraph>
      <paragraph indent="3">1.   previously approved for development, and exempt under 19.67.01.04 of this Regulation; or</paragraph>
      <paragraph indent="3">2.   part of a larger tract of land located in a special protection area that was:</paragraph>
      <paragraph indent="4">(i)   approved for development under this regulation; and</paragraph>
      <paragraph indent="4">(ii)   under common or related ownership when it was approved for development.</paragraph>
      <paragraph indent="2">C.   Piecemeal applications. An applicant must not avoid the application of this regulation by submitting piecemeal applications for property under common or related ownership.</paragraph>
    </subsection>
    <subsection heading="19.67.01.05 Process to Develop an SPA Conservation Plan">
      <paragraph indent="2">A.   Applicability. A SPA conservation plan will be developed by the Department for each area designated as a SPA. The plan will be based upon the baseline and reference stream monitoring conducted by the Department in accordance with the stream monitoring program, and, as appropriate, upon the Department's review of other data derived from previously conducted water quality inventories, technical studies, and functional master plans which contain credible information on water quality, aquatic life, hydrology, and riparian habitat conditions. The SPA conservation plan will be used as guidance to develop site specific performance goals, and best management practices (BMP) performance goals.</paragraph>
      <paragraph indent="2">B.   Stream monitoring priorities. The Director, where possible, will establish priorities for monitoring subwatershed areas before development, based on the anticipated timing of development within a two year period, as indicated by the Planning Director. The Planning Director must notify the Director in writing at the time of initial designation of each SPA, and, on or around November I of each calendar year, indicate when development is anticipated, including its staging, within each SPA within the succeeding two years. Notification is intended to allow for the necessary time required to establish average baseline conditions supported by a minimum of two years of monitoring data prior to start of construction.</paragraph>
      <paragraph indent="2">C.   Stream monitoring program design.</paragraph>
      <paragraph indent="3">1.   The objective of the stream monitoring program is to determine the biological condition and stream channel characteristics of the watershed. Monitoring the development site during and after development activities enables the Department to link changes in the biological condition and stream channel characteristics to the performance of BMPs.</paragraph>
      <paragraph indent="3">2.   Stream monitoring protocols for each special protection area will be designed and developed by the Department to be as comparable as possible with other State, County, and Federal assessments of surface waters in the northern piedmont and coastal plain ecoregions in and around the County.</paragraph>
      <paragraph indent="3">3.   The stream monitoring program will include assessments of freshwater fish, benthic macroinvertebrates, aquatic habitat, stream channel characteristics, riparian habitat conditions, and other appropriate physical/chemical measurements.</paragraph>
      <paragraph indent="3">4.   Analysis of data by the Department will be based on comparisons to the set of minimally impaired streams (reference conditions) within the County or within adjacent areas of the same ecoregion.</paragraph>
      <paragraph indent="2">D.   Baseline monitoring and development Impact monitoring implementation.</paragraph>
      <paragraph indent="3">1.   Baseline monitoring data must be collected by the Department in anticipation of development within a special protection area subwatershed. Site selection for baseline information will be determined so that subwatershed water quality can be assessed.</paragraph>
      <paragraph indent="3">2.   When the precise locations of specific development projects are identified within a subwatershed, the Department will conduct development impact monitoring during and after development. Locations and number of monitoring stations will be contingent upon the size of the development, the location of the development in the subwatershed, and the anticipated location of structural and nonstructural BMPs. Development impact monitoring will commence after the final water quality plan is approved and prior to sediment control permit issuance.</paragraph>
    </subsection>
    <subsection heading="19.67.01.06 Performance goals">
      <paragraph indent="2">A.   Purpose. Performance goals will be established for each development application within a special protection area. Performance goals will be developed to implement the SPA conservation plan. Performance goals will be established to:</paragraph>
      <paragraph indent="3">1.   Protect, maintain, and restore water quality, natural stream environments, and the ecological balance of aquatic communities within the County;</paragraph>
      <paragraph indent="3">2.   Mimic natural watershed processes:</paragraph>
      <paragraph indent="3">3.   Stimulate innovative and integrated applications of site plan, sediment control, and stormwater management measures to limit changes to natural hydrology, reduce the on-site generation of pollutants that impact water quality, and mitigate impacts on adjacent and downstream conditions;</paragraph>
      <paragraph indent="3">4.   Develop better measures of assessing BMP effectiveness:</paragraph>
      <paragraph indent="3">5.   Seek improved best management practice designs with higher effectiveness to protect water quality and minimize maintenance; and</paragraph>
      <paragraph indent="3">6.   Protect downstream receiving waters.</paragraph>
      <paragraph indent="2">B.   Use of performance goals. The Department will establish performance goals for each development project. Performance goals will be based upon consideration of the development site location within the subwatershed, she topography and hydrology, presence of environmentally sensitive areas, and results of available baseline stream monitoring within the watershed. Where possible, numeric performance goals will be based on pre-development baseline monitoring results and parameters established in SPA conservation plans. BMP performance goals will be developed and evaluated using the most currently available and pertinent monitoring information and published research. Achievement of performance goals will be measured and analyzed using protocols or procedures for best management practices monitoring that the Department specifies to the applicant at the pre-application meeting and development impact monitoring conducted by the Department.</paragraph>
      <paragraph indent="2">C.   Nature of performance goals. Performance goals established for each project will vary based upon the above considerations. Following is a listing of types of performance goals that may be considered for each project, their rationale, and specific examples of how these goals may be expressed quantitatively or qualitatively depending upon the conditions that exist for a particular site.</paragraph>
      <paragraph indent="3">1.   Stream/Aquatic life habitat protection.</paragraph>
      <paragraph indent="4">Rationale:  To maintain, preserve, or improve the pre-development aquatic community.</paragraph>
      <paragraph indent="4">Examples of goals:</paragraph>
      <paragraph indent="4">(i)   Protect, and maintain habitat features identified in the water quality plan.</paragraph>
      <paragraph indent="4">(ii)   Restore or create habitat which promotes natural recovery toward stream habitat reference conditions.</paragraph>
      <paragraph indent="4">(iii)   Promote recovery of the aquatic community as measured by pre- and post-development comparisons to the reference condition.</paragraph>
      <paragraph indent="3">2.   Maintain stream base flow.</paragraph>
      <paragraph indent="4">Rationale: Maintenance of stream bass flow, particularly during low flow periods, is essential to supporting the critical habitat needs of the aquatic biological community. Base flow reductions decrease the wetted width and depth of stream riffle, run, and pool aquatic habitats. Maximum base flow preservation is important to maintain viable populations of existing or target species. Reductions in base flow may also result in increased stream temperatures, and lower dissolved oxygen levels to the detriment of aquatic life.</paragraph>
      <paragraph indent="4">Examples of goals:</paragraph>
      <paragraph indent="4">(i)   Limit the reduction of base flow in streams with:</paragraph>
      <paragraph indent="6">a.   Drainage areas of 1000 acres or less, or</paragraph>
      <paragraph indent="6">b.   In first and second order streams with minimum base flows of 2 cubic feet/second (cfs) or less, as identified through baseline stream monitoring during the low flow period of the year (July to October).</paragraph>
      <paragraph indent="4">(ii)   Maintain post-development mean daily baseflow, as measured during the critical low flow period of the year, so as not to reduce available on-site aquatic habitat below pre-development conditions.</paragraph>
      <paragraph indent="3">3.   Protect seeps, springs, and wetlands.</paragraph>
      <paragraph indent="4">Rationale: Seeps/springs and wetlands are principal outlets for groundwater flow into a stream. These are the sources of cold water recharge necessary to maintain water temperature within the tolerance limits of the biological community.</paragraph>
      <paragraph indent="4">Examples of goals:</paragraph>
      <paragraph indent="4">(i)   Protect natural recharge areas of perennial seeps and springs that provide cold water to streams. Construct recharge areas, as necessary and feasible, to mimic the function of natural recharge areas that cannot be protected.</paragraph>
      <paragraph indent="4">(ii)   Protect vernal pools that provide amphibian habitat by inclusion within stream buffer lines.</paragraph>
      <paragraph indent="3">4.   Maintain natural on-site stream channels.</paragraph>
      <paragraph indent="4">Rationale: Channels originating from perennial or intermittent springs/seeps and wetlands deliver the cold groundwater to the receiving stream. Maintaining the integrity of the channel will help maintain the quality of the flow.</paragraph>
      <paragraph indent="4">Examples of goals:</paragraph>
      <paragraph indent="4">(i)   Perennial streams:</paragraph>
      <paragraph indent="6">a.   Use bio-engineering techniques in conjunction with effective upland site planning and stormwater controls to help stabilize and protect desirable stream habitat features most vulnerable to anticipated development impacts.</paragraph>
      <paragraph indent="6">b.   As discrete project phases in sub-watersheds are completed and stabilized, implement immediate measures to restore damaged stream habitat caused by the project. Use bioengineering or other appropriate habitat restoration techniques.</paragraph>
      <paragraph indent="4">(ii)   Intermittent streams:</paragraph>
      <paragraph indent="6">a.   Protect those intermittent channels formed primarily by intermittent springs and seeps at a higher level than intermittent channels formed primarily by overland surface flow. These channels may convey cold water originating from ground water recharge.</paragraph>
      <paragraph indent="6">b.   Use intermittent channels from surface flows and associated stream buffers as part of a system for quality treatment of stormwater.</paragraph>
      <paragraph indent="6">c.   Stabilize the channel banks with bio-engineered solutions, perhaps in combination with traditional methods where appropriate.</paragraph>
      <paragraph indent="3">5.   Minimize storm flow runoff increases.</paragraph>
      <paragraph indent="4">Rationale: The frequency of runoff events that create erosion in stream channels in a given subwatershed needs to be managed. In general, bankfull discharges cause the most damage to the quality of the stream channel habitat. Cumulative increases in subwatershed runoff affect downstream channels as well as on-site channels. Therefore, analysis to determine the storm events that cause bankfull discharge will be conducted within and/or downstream of the development project site.</paragraph>
      <paragraph indent="4">Examples of goals:</paragraph>
      <paragraph indent="4">(i)   Design storm flow controls to manage on-site and downstream bankfull discharges at or below pre-construction frequencies.</paragraph>
      <paragraph indent="4">(ii)   Reduce the frequency and duration of bankfull events, and associated sediment loadings resulting from bank erosion.</paragraph>
      <paragraph indent="4">(iii)   Maintain current bankfull storm frequency and duration if bank stability and channel conditions are determined to be in an optimal to sub-optimal range.</paragraph>
      <paragraph indent="4">(iv)   Reduce bankfull frequency and duration, or stabilize banks through bio- engineered and structural best management practice solutions if habitat is determined to be in marginal to poor condition.</paragraph>
      <paragraph indent="3">6.   Identify and protect stream banks prone to erosion and slumping.</paragraph>
      <paragraph indent="4">Rationale: Even with on-site stormwater management, prolonged storm flow releases from development can cause stream bank erosion and habitat impairment, especially in the most erosion prone stream reaches.</paragraph>
      <paragraph indent="4">Examples of goals:</paragraph>
      <paragraph indent="4">(i)   Identify the most erosion prone stream bank areas, and stabilize them with a combination of structural and bio-engineered solutions to anticipate the altered flow regime resulting from development.</paragraph>
      <paragraph indent="4">(ii)   Determine the new volume, rate, and bank height of storm water runoff resulting from the site's BMPs. Stabilize the stream bank areas most prone to erosion and provide in-stream habitat features to maintain stream channel conditions required for the new flows.</paragraph>
      <paragraph indent="3">7.   Minimize increases to ambient water temperature.</paragraph>
      <paragraph indent="4">Rationale: Peak stream temperatures and their duration are additional primary determinants of the biological community structure that can be maintained in a stream. The peaks and duration of temperature extremes during low flow periods of the year should not increase beyond the limits of those documented during baseline monitoring, or the upper temperature limits specified in State Water Use Standards (COMAR 26.08.01 to 04). Base flow bypasses from stormwater controls, and preventive forest preservation, natural succession, and afforestation measures undertaken in stream buffers are methods to reduce the elevation of ambient water temperature.</paragraph>
      <paragraph indent="4">Examples of goals:</paragraph>
      <paragraph indent="4">(i)   As the stream flows through the site, maintain the existing temperature conditions at an optimal level.</paragraph>
      <paragraph indent="4">(ii)   If monitored water temperature increases as the stream flows through the site or if the project is expected to increase stream temperatures, reduce heating effects to maintain ambient water temperature to State Water Use Standards temperature criteria (COMAR 26.08.02.03-3).</paragraph>
      <paragraph indent="3">8.   Minimize sediment loading.</paragraph>
      <paragraph indent="4">Rationale: Excessive loadings of fine sediment can destroy the stream riffle habitats of benthic macroinvertebrates and fresh water fish. Maintaining the quality of the riffle habitat is critical because most members of the macroinvertebrate community reside in riffle habitat. Loss of this community also eliminates the primary food source for insectivorous fish, causing a reduction in the quality of this biological community as well. Excessive sediment loads can smother and destroy the eggs of species that use riffle habitat for spawning. Excess sedimentation fills in pools, reducing habitat for fish. Abrasive sediment loadings also contribute to stream bank instability by accelerating stream bed and bank erosion. This further compounds siltation damages downstream.</paragraph>
      <paragraph indent="4">Examples of goals:</paragraph>
      <paragraph indent="4">(i)   During construction phases, stream embeddedness levels should remain within preconstruction levels.</paragraph>
      <paragraph indent="4">(ii)   Post development embeddedness levels should return to pre-development levels within one year after completion and stabilization of each defined phase of the development project</paragraph>
      <paragraph indent="4">(iii)   The recovery of the riffle benthic community and riffle fish community should be to pre-development levels as described by measurements of community structure and function.</paragraph>
      <paragraph indent="3">9.   Minimize nutrient loadings.</paragraph>
      <paragraph indent="4">Rationale: Excessive nutrient loadings can cause algae blooms and after the community composition of the stream fish and macroinvertebrates. Excessive nutrient loadings can be especially damaging when introduced to downstream water supply reservoirs and to other slow moving impounded or tidal waters. The State has established tributary protection strategies to reduce the impact of nitrogen and phosphorus loadings on the Chesapeake Bay of upstream tributaries.</paragraph>
      <paragraph indent="4">Examples of goals:</paragraph>
      <paragraph indent="4">(i)   Measure or provide estimates, acceptable to the Department, of pollution reduction achieved through implementation of educational pollution source control programs targeted to resident citizens and the business community.</paragraph>
      <paragraph indent="4">(ii)   Design BMPs to achieve specified ranges of nutrient reduction. Implement best management practice monitoring plan to measure nutrient reductions observed from best management practices designed to provide water quality control.</paragraph>
      <paragraph indent="3">10.   Control insecticides, pesticides, and toxic substances.</paragraph>
      <paragraph indent="4">Rationale: Toxic concentrations of chemicals are extremely dangerous to all forms of life. If not controlled, acute or chronic toxic impairment can destroy or lessen the aquatic community downstream of the development.</paragraph>
      <paragraph indent="4">Examples of goals:</paragraph>
      <paragraph indent="4">(i)   Maintain levels of toxic compounds below concentration thresholds established in United States Environmental Protection Agency criteria and State water quality standards.</paragraph>
      <paragraph indent="4">(ii)   Include language in Homeowners Association documents or other appropriate educational materials to implement site specific Integrated Pest Management pollution source control programs that minimize the use of herbicides, pesticides, and insecticides.</paragraph>
      <paragraph indent="4">(iii)   Reduce the use of potentially toxic substances by the resident community, (e.g., oil and antifreeze dumping, proper use of pesticides).</paragraph>
      <paragraph indent="4">(iv)   Measure or provide estimates, acceptable to the Department, of reductions in  toxic pollution achieved through implementation of educational pollution source control programs targeted to resident citizens and the business community.</paragraph>
      <paragraph indent="4">(v)   For high density commercial, industrial, and mixed use developments with large impervious areas, special consideration must be given to the control of hydrocarbons, heavy metals, and other pollutants normally associated with intense land use.</paragraph>
      <paragraph indent="4">In addition to the performance goals set forth above, the Department may establish other performance goals based on the need to protect unique water quality features or federal/state designated rare, threatened, or endangered species.</paragraph>
      <paragraph indent="2">D.   Performance criteria. Performance goals will be applied and monitored to assess relationships between land use, the effectiveness of various BMPs, individually and in combination, and measured impacts of development on water quality, stream habitat, and aquatic life. The Director will present an annual report to the County Executive and County Council on development impacts in SPAs and on the performance of mitigation  measures provided by improved site plans and BMP designs.</paragraph>
    </subsection>
    <subsection heading="19.67.01.07 Pre-Application Meeting">
      <paragraph indent="2">A.   Purpose. Prior to submission of the water quality inventory and formal plans for review and approval, the applicant must attend a pre-application meeting with the Department and the Planning Department. The pre-application meeting is required to provide the applicant with advance guidance concerning the development of acceptable preliminary water quality inventory or preliminary water quality plan submissions. At the meeting, representatives from the Department and the Planning Department will discuss with the applicant all available information received about the site and ways to achieve the performance goals.</paragraph>
      <paragraph indent="3">The purpose of the meeting is to:</paragraph>
      <paragraph indent="3">1.   Present the applicant with the proposed performance goals that are to be used for the development of the site layout;</paragraph>
      <paragraph indent="3">2.   Discuss the conceptual approach and possible locations of preferred structural and nonstructural best management practice and their estimated suitability for achieving the performance goals;</paragraph>
      <paragraph indent="3">3.   Review monitoring protocols, and procedures to be followed by the applicant in developing a best management practice monitoring plan,</paragraph>
      <paragraph indent="3">4.   Review development impact monitoring protocols and procedures that will be used by the Department in development impact monitoring; and</paragraph>
      <paragraph indent="3">5.   Use innovative site layouts and linked best management practice options to maximize protection of water quality, stream habitat, and aquatic life.</paragraph>
      <paragraph indent="2">B.   Written request. The applicant must request the Director, in writing, to set up a pre- application meeting. The Director or designee will provide, within 10 working days of the receipt of the applicant's written request, written information regarding the time and location of the pre-application meeting, information required from the applicant for the meeting, and information to be provided by the Department and Planning Department for the meeting.</paragraph>
      <paragraph indent="2">C.   Submittals required. At a minimum, the applicant must supply three copies of these specific elements of the required water quality inventory at least 30 working days prior to the pre-application meeting:</paragraph>
      <paragraph indent="3">1.   Location and rating of infiltratable soils based on the latest edition of the soil survey for Montgomery County, Maryland. On-site soils analysis will be required with the applicant's formal submission of the water quality inventory.</paragraph>
      <paragraph indent="3">2.   Forest stand delineation and natural resources inventory to include:</paragraph>
      <paragraph indent="4">(i)   Stream buffer delineation in accordance with the Planning Board's Environmental Guidelines.</paragraph>
      <paragraph indent="4">(ii)   Erodible soils and areas of steep slopes.</paragraph>
      <paragraph indent="4">(iii)   Location of all field delineated intermittent and perennial springs, seeps, and wetlands.</paragraph>
      <paragraph indent="3">3.   A drainage area map showing the upstream drainage area, hydrologically important fractures, and the location of existing developed areas and BMPs in the subwatershed (as identified in the Department's inventory of stormwater management facilities).</paragraph>
      <paragraph indent="2">D.   Department responsibility. At a minimum, the Department will supply three copies of the following information at least six working days prior to the pre-application meeting;</paragraph>
      <paragraph indent="3">1.   Available results and analysis of baseline stream monitoring in the subwatershed.</paragraph>
      <paragraph indent="3">2.   Proposed performance goals for the site and for selected BMPs. The ranges of the numeric performance goals should be designed to protect the water quality on the site and downstream, and to encompass the variability associated with the effectiveness of the specific BMP.</paragraph>
      <paragraph indent="3">3.   Proposed monitoring protocols and procedures to be followed by the applicant in developing a BMP monitoring plan.</paragraph>
      <paragraph indent="3">4.   A summary of development impact monitoring that the Department will perform to evaluate impacts of the applicant's development project.</paragraph>
      <paragraph indent="3">5.   A map and table giving the location, and contact address of on-going monitoring programs in the SPA subwatershed. Monitoring partnerships, where possible, that allow efficient use of resources are encouraged.</paragraph>
      <paragraph indent="2">E.   Written summary by applicant. The applicant will provide a written summary of the pre- application meeting including documentation of the established performance goals, best management practice monitoring protocols and procedures to be followed, and a list of items the applicant must include as part of the water quality plan submission. The applicant's written summary must contain any corrections requested by the Department during the pre-application meeting. Upon the Director's written approval, the summary will constitute the official public record of the meeting's results.</paragraph>
    </subsection>
    <subsection heading="19.67.01.08 Water Quality Inventory">
      <paragraph indent="2">A.   Elements of Water Quality Inventory. The applicant's water quality inventory submission must include the following:</paragraph>
      <paragraph indent="3">1.   Stormwater Management Concept Plan. All stormwater management concepts must be designed in accordance with Chapter 19, Article II, Montgomery County Code, Maryland Law, and all associated regulations.</paragraph>
      <paragraph indent="3">2.   Sediment Control Concept Plans.</paragraph>
      <paragraph indent="4">(i)   All sediment control concept plans must be designed in accordance with Chapter 19, Article I, Montgomery County Code, Maryland Law, and associated regulations.</paragraph>
      <paragraph indent="4">(ii)   Sediment control plans must include phased land disturbance and provisions for prompt stabilization.</paragraph>
      <paragraph indent="4">(iii)   Land disturbing activities must be kept to a minimum through staging and phasing of all construction activities.</paragraph>
      <paragraph indent="3">3.   Documentation of Impervious areas.  A plan describing the proposed development which minimizes impervious areas and, if applicable, meets imperviousness limits for the project as are required in a land use plan, watershed plan, comprehensive water and sewerage system plan, or specified in a County Council resolution designating a SPA.</paragraph>
      <paragraph indent="3">4.   Additional documentation. Documentation showing avoidance, minimization, or proposed mitigation for impacts on environmentally sensitive areas, and on priority forest conservation areas as specified in the Planning Board's Environmental Guidelines.  Documentation must also include:</paragraph>
      <paragraph indent="4">(i)   Rationale in narrative form that any proposed encroachment is both necessary and unavoidable in that location; and</paragraph>
      <paragraph indent="4">(ii)   Description as to how flexibility in Chapter 59 of the County Code ("Zoning Ordinance") and other County regulations has been utilized (e.g. percent housing mix, minimum lot size, reduced width street right-of-way, "environmental" primary cross section) to avoid and minimize impacts.</paragraph>
      <paragraph indent="3">5.   Other. Any other information required in the Technical Manual.</paragraph>
    </subsection>
    <subsection heading="19.67.01.09 Water Quality Plan Submissions">
      <paragraph indent="2">A.   Elements of a Preliminary Water Quality Plan. Preliminary Water Quality Plans must include:</paragraph>
      <paragraph indent="3">1.   Water quality inventory.</paragraph>
      <paragraph indent="3">2.   Description of the proposed development project. This must be in tabular or note form and include:</paragraph>
      <paragraph indent="4">(i)   All information as required on the Department's current stormwater management concept plan application form:</paragraph>
      <paragraph indent="4">(ii)   Zoning, with appropriate standards;</paragraph>
      <paragraph indent="4">(iii)   Type and number of dwelling units allowed and proposed;</paragraph>
      <paragraph indent="4">(iv)   Overall impervious area and impervious area outside of sensitive areas, with density and related impervious area assumptions specified ("typical" or average lot may be used); and</paragraph>
      <paragraph indent="4">(v)   Amount (acreage) and percentage of environmental sensitive areas disturbed, preserved, and in total.</paragraph>
      <paragraph indent="3">3.   Documentation of applications to State and Federal agencies for wetlands permits. When applicable, this documentation shall be in the form of written acknowledgement by the receiving agency, that all applications have been accepted for review. Documentation of proposed wetland mitigation measures should also be submitted.</paragraph>
      <paragraph indent="3">4.   Description of other mitigation techniques. Environmental protection techniques and plans, including those not otherwise required by law, regulation, or guideline, which are included in the preliminary water quality plan must be described in writing. This description should indicate how the following sediment and erosion control, stormwater management, and other water quality protective measures, are incorporated within the water quality plan or, if not included, provide justification acceptable to the Department:</paragraph>
      <paragraph indent="4">(i)   Linked BMP systems. BMP applications will be linked in series to progressively minimize sediment and stormwater impacts wherever possible.</paragraph>
      <paragraph indent="4">(ii)   Stabilization Requirements. Vegetative stabilization of perimeter controls and areas specified must occur within three days of installation of temporary sediment and erosion control structures.</paragraph>
      <paragraph indent="4">(iii)   Phased Grading. Phased grading to minimize land disturbance during the development and construction process.</paragraph>
      <paragraph indent="4">(iv)   Roads.</paragraph>
      <paragraph indent="6">a.   The requirement for open section roads shall not be waived except as provided in Chapter 49 of the County Code.</paragraph>
      <paragraph indent="6">b.   If open section roads cannot be implemented where they would normally apply, options for reducing road width or other means to reduce impacts of impervious surfaces on the stream hydrology, water quality, and aquatic life must be considered.</paragraph>
      <paragraph indent="4">(v)   Stream Buffers. All County stream buffers will be shown on 211 water quality plan maps showing sediment and erosion control plans or stormwater management control plans. Stormwater and sediment control structures are not to be placed within the stream valley buffer except as approved by the Department and the Planning Board.</paragraph>
      <paragraph indent="4">(vi)   Ground Water Recharge. Opportunities to provide recharge of clean stormwater into the ground water supply will be maximized. Stormwater requiring treatment will be conveyed to a water quality treatment best management practice.</paragraph>
      <paragraph indent="3">5.   Documentation of anticipated performance. Each proposed BMP or group of BMPs must be documented to show how it will achieve the performance goals selected for the site.</paragraph>
      <paragraph indent="3">6.   BMP monitoring plan. Monitoring plans must meet the requirements specified in the pre- application meeting and identify:</paragraph>
      <paragraph indent="4">(i)   Performance goals established for the she and for any specific best management practices.</paragraph>
      <paragraph indent="4">(ii)   A description and characterization of the BMPs chosen for the monitoring plan. The characterization of and description of the BMP will meet the minimum required in the pre-application meeting.</paragraph>
      <paragraph indent="4">(iii)   A description and characterization of the monitoring protocol, as established by the Department, that will include:</paragraph>
      <paragraph indent="6">a.   Methods</paragraph>
      <paragraph indent="6">b.   Frequency of data recording.</paragraph>
      <paragraph indent="6">c.   Length and season of monitoring.</paragraph>
      <paragraph indent="6">d.   Data analysis (including statistical and graphical analysis).</paragraph>
      <paragraph indent="6">e.   Report milestones.</paragraph>
      <paragraph indent="4">(iv)   The protocols to use for specific BMP monitoring are those supplied during the pre-application meeting. The monitoring protocols are designed to provide biologically meaningful information about the BMP performance and changes in stream water quality.</paragraph>
      <paragraph indent="3">(v)      The final BMP's monitoring program and monitoring timeline approved by the Department will be submitted along with the applicant's final water quality plan. Upon approval, the monitoring program will be implemented according to the approved timeline.</paragraph>
      <paragraph indent="2">B.   Elements of Final Water Quality Plans. The plan must include:</paragraph>
      <paragraph indent="3">1.   Final stormwater management concept plan approved by the Department.</paragraph>
      <paragraph indent="3">2.   Final sediment control concept plan approved by the Department.</paragraph>
      <paragraph indent="3">3.   Final BMP monitoring plan approved by the Department. The final BMP monitoring plan must contain:</paragraph>
      <paragraph indent="4">(i)   Final narrative and numeric performance goals to use to monitor the effectiveness of the BMPs.</paragraph>
      <paragraph indent="4">(ii)   Documentation and basis for the numeric goals.</paragraph>
      <paragraph indent="4">(iii)   Final selection of BMPs chosen for the monitoring plan, including best management practice design characterization.</paragraph>
      <paragraph indent="4">(iv)   Final BMP monitoring protocol.</paragraph>
      <paragraph indent="4">(v)   Final methods for data collection, handling, analysis, and reports including monitoring frequencies, monitoring duration and season.</paragraph>
      <paragraph indent="4">(vi)   Schedule for implementing BMP monitoring and reporting requirements.</paragraph>
      <paragraph indent="3">4.   Water quality certifications and wetlands disturbance permits as required by state and federal agencies, or if not yet issued, progress reports acknowledged by state and federal agencies.</paragraph>
      <paragraph indent="3">5.   Other. Terms, conditions, and requirements as established in the approved preliminary water quality plan or in case of a preliminary water quality plan in conjunction with a development approval before the District Council; the terms, conditions, and requirements as required to be revised by the Planning Board or the Department to conform to the District Council action on the development plan, schematic plan, or diagrammatic plan.</paragraph>
    </subsection>
    <subsection heading="19.67.01.10 Application Requirements and Approval Procedures">
      <paragraph indent="2">A.   Application submittal. Applications for water quality inventories and plans must be submitted concurrently to the Department and the M-NCPPC for review.</paragraph>
      <paragraph indent="2">B.   Public notice and request for Informational meeting.  The Department shall give written notice of the submission of preliminary water quality plans for review and approval. The Department will conduct a public information meeting to review the submission and receive public input if requested to do so in writing within 15 days after notice is given. The applicant or designee must attend such meetings and be prepared to give information as requested.</paragraph>
      <paragraph indent="2">C.   Approval of Final Water Quality Plan. The Planning Board must not give final approval of a water quality plan until the Department gives its approval.</paragraph>
      <paragraph indent="2">D.   Instruments of security. The Department will require bonds, other financial instruments, or certificates of guarantee to be posted to insure compliance with the provisions of the regulations, including monitoring. The bonds, other financial instruments, or certificates of guarantee may be combined with sediment control and stormwater management bonds as allowed by Chapter 19, Articles I &amp; II of the County Code.</paragraph>
      <paragraph indent="2">E.   Amendments and modifications. All modifications to an approved water quality plan are considered as significant amendments pursuant to Chapter 19, Article V, Section 19-65 (a)(3)(A)* and will be resubmitted for review and approval in accordance with 19.67.01.03 of the executive regulation, except for minor modifications where:</paragraph>
      <paragraph indent="3">1.   Field inspections or design evaluation reveal minor changes are needed; or</paragraph>
      <paragraph indent="3">2.   The changes do not significantly affect site layout; or</paragraph>
      <paragraph indent="3">3.   An emergency situation exists as determined by the Director.</paragraph>
      <paragraph indent="3">All minor modifications will be handled through the Department or the Planning Department for any element within their respective jurisdiction as provided under Chapter 19, Article V, Section 19-65 (a)(3)(B) and (C).</paragraph>
      <paragraph indent="2">F.   Other elements required with stormwater management and sediment control permit applications. All development, as appropriate, must have a water quality plan with a complete water quality inventory approved by the Department at the time of detailed design plan submittal for stormwater management and sediment control permits. Any project where a wetland permit or a water quality certification is required by the State must have a valid water quality certification approved by the State prior to the issuance of the stormwater/sediment control permit.</paragraph>
      <paragraph indent="2">G.   Qualifications for persons submitting data under this Article. Preliminary and Final Water Quality Plan submissions should be submitted by a multi-disciplinary team of qualified professionals consisting of engineers, hydrologists, aquatic ecologists, and surveyors. Qualified professionals should possess the following minimum combinations of education, skills, and experience:</paragraph>
      <paragraph indent="3">1.   For submission of BMP design plans:</paragraph>
      <paragraph indent="4">BMP plans submitted to the Department must be certified as meeting the requirements of this regulation and must be sealed by a professional engineer registered in the State of Maryland, or other qualified professional.</paragraph>
      <paragraph indent="3">2.   For submission of best management practice monitoring plans:</paragraph>
      <paragraph indent="4">B.S. degree in aquatic ecology, biology, natural resources management, hydrology, engineering, or related field as determined by the Department, and five years combined experience in the following three areas:</paragraph>
      <paragraph indent="4">(i)   the design and/or monitoring of best management practices</paragraph>
      <paragraph indent="4">(ii)   stream/watershed management and restoration, and</paragraph>
      <paragraph indent="4">(iii)   hydrological studies to support land use initiatives.</paragraph>
      <paragraph indent="4">The experience requirements can be met by one person of a professional team, or met by the combined experience of the team. The educational requirements are to be met by each member.</paragraph>
      <paragraph indent="3">3.   Education can be substituted for experience. A Master's degree in a relevant field is equivalent to one year of experience, and a Ph.D. degree in a relevant field or P.E. is equivalent to two years of experience.</paragraph>
      <paragraph indent="3">4.   The composition of the design team shall be submitted for the Department's approval prior to commencement of all work.</paragraph>
    </subsection>
    <subsection heading="19.67.01.11 Enforcement Agreement">
      <paragraph indent="2">Each final water quality plan must contain an enforceable agreement, including an approved financial security instrument, with the Planning Board and the Director, as applicable, requiring maintenance of all facilities required by the plan and best management practices monitoring.</paragraph>
    </subsection>
    <subsection heading="19.67.01.12 Technical Manual - Additional Guidance for Implementing this Regulation">
      <paragraph indent="2">This Technical Manual provides general guidance for carrying out the monitoring, data analysis, reporting work, and supplemental requirements as required to implement the requirements of this regulation. At the pre-application meeting the Department will provide detailed guidance on the specific monitoring procedures and protocols for the applicant to follow in carrying out the BMP monitoring plan, and any supplemental requirements that will be applied to each development project. The Department will develop these requirements based on review of the applicant's submittal of information required in advance of the pre-application meeting as specified in Section 19.67.01.07.C.</paragraph>
      <paragraph indent="2">A.   Required Monitoring/Water Quality Data Submission/Reporting Protocols.</paragraph>
      <paragraph indent="3">1.   Stream Monitoring Program.</paragraph>
      <paragraph indent="4">(i)   A stream monitoring plan will be prepared by the Department to guide the implementation of the stream monitoring program.</paragraph>
      <paragraph indent="4">(ii)   The stream monitoring program must be included in the preliminary water quality plan.</paragraph>
      <paragraph indent="4">(iii)   The objective of the stream monitoring program is to determine the biological condition and stream channel characteristics of the subwatershed prior to development activities. Monitoring the development site, during and after development activities, will enable the Department to link changes in the biological condition and stream channel characteristics to the performance of BMPs. Development impact monitoring may require different sample location procedures.</paragraph>
      <paragraph indent="4">(iv)   Selection of stream monitoring locations will be determined by the Department when the Planning Director indicates future development is anticipated in a SPA subwatershed. Selection of sites will be determined by the size and complexity of the subwatershed, the ability to locate and prioritize anticipated development in the subwatershed, and available resources.</paragraph>
      <paragraph indent="3">2.   Baseline monitoring by the Department conducted under the stream monitoring program.</paragraph>
      <paragraph indent="4">(i)   Minimum monitoring requirements include the Department's assessment of the following:</paragraph>
      <paragraph indent="6">a.   Benthic macroinvertebrates</paragraph>
      <paragraph indent="6">b.   Freshwater fish</paragraph>
      <paragraph indent="6">c.   In-stream habitat</paragraph>
      <paragraph indent="4">(ii)   Baseline information will be collected for freshwater fish, benthic macroinvertebrates, and habitat conditions. Biological indices of community structure, function, and health will be used to determine the current biological condition as compared to reference conditions.</paragraph>
      <paragraph indent="4">(iii)   Procedures for monitoring freshwater fish, benthic macroinvertebrates, and in stream habitat will follow the Department's most current version of the Montgomery County water quality program's stream monitoring protocols.</paragraph>
      <paragraph indent="3">3.   Development impact monitoring by the Department conducted under the stream monitoring program.</paragraph>
      <paragraph indent="4">(i)   Development impact monitoring data will be used to assess the impact and recovery of biological communities as compared to baseline information and reference conditions. This will enable the Department to assess the magnitude of any changes within the watershed. Comparing baseline information to reference conditions will enable the Department to determine the magnitude of any impairment present in the watershed before, during, and after construction activities.</paragraph>
      <paragraph indent="4">(ii)   The Department will assess the need for additional monitoring stations for development impact monitoring. Additional monitoring locations will be selected to evaluate the performance of BMPs, assess the impact of the development on the stream, and to document the recovery of the biological community. The monitoring locations will be determined by the size and location of the development and the location of BMPs.</paragraph>
      <paragraph indent="4">(iii)   Normally three to nine monitoring locations will be selected for each development.  Monitoring locations will be selected upstream and downstream of the development site. Additional locations will be monitored to assess the impact of the development on the stream and the recovery of the biological community.</paragraph>
      <paragraph indent="4">(iv)   Monitoring locations will be selected based on the size of the development, location in the watershed, and drainage area. Table 1 will be used as guidance to designate the number of required monitoring stations:</paragraph>
      <paragraph indent="0">Table 1. Number of monitoring locations per different development acreages.</paragraph>
      <paragraph indent="3">4.   BMP monitoring by the applicant.</paragraph>
      <paragraph indent="4">(i)   A BMP monitoring plan will be submitted by the applicant to meet the requirements presented during the pre-application meeting and will be included in the preliminary and final water quality plans as approved by the Department.</paragraph>
      <paragraph indent="4">(ii)   The objective of the BMP monitoring program is to document the performance of selected BMPs in meeting the performance goals selected for the site, as established during the pre-application meeting.</paragraph>
      <paragraph indent="4">(iii)   For those BMPs to be monitored, the standard monitoring requirements for inflows and outflows of structural best management practices shall include, at a minimum:</paragraph>
      <paragraph indent="6">a.   Flow rate and volume</paragraph>
      <paragraph indent="6">b.   Temperature</paragraph>
      <paragraph indent="6">c.   pH</paragraph>
      <paragraph indent="6">d.   Conductivity</paragraph>
      <paragraph indent="6">e.   Turbidity</paragraph>
      <paragraph indent="6">Unusual conditions, including, but not limited to project size, layout, and on-site conditions, may require that other physical, chemical, and biological monitoring requirements be added.</paragraph>
      <paragraph indent="6">Monitoring will be required for nonstructural BMPs on a case-by-case basis, and will depend on the nature of the practice and its expected mitigation effects.</paragraph>
      <paragraph indent="4">(iv)   Detailed methods for monitoring the achievement of the performance goals for the selected BMP's will be supplied to the applicant by the Department during the pre-application meeting.</paragraph>
      <paragraph indent="4">(v)   General monitoring guidelines for BMPs that would apply to different development types and densities are shown in Tables 2 and 3. Table 4 describes the typical densities of each zoning category.</paragraph>
      <paragraph indent="4">(vi)   The final selection of the BMP monitoring sites will be done concurrently with the Department's approval of the final water quality plan.</paragraph>
      <paragraph indent="4">(vii)   The applicant will submit quarterly reports summarizing and analyzing the BMP monitoring data to the Department.</paragraph>
      <paragraph indent="4">(viii)   The applicant's raw data submissions to the Department must be on a 3.5" IBM compatible diskette in ASCII format with documentation on the structure of the database and data format as approved by the Department.</paragraph>
      <paragraph indent="4">(ix)   The report must follow standard scientific format as defined by the Department.</paragraph>
      <paragraph indent="4">(x)   Report will contain trend analysis, including graphical interpretation and descriptive statistics of the BMP parameters.</paragraph>
      <paragraph indent="3">5.   Annual report by the Department.</paragraph>
      <paragraph indent="4">(i)   An annual report summarizing and analyzing available results of stream and BMP monitoring data conducted within SPAs will be submitted to the County Executive and County Council with a copy to the Planning Board. The report will also be made available to the general public upon request. The report will be submitted to the County Council no later than February of the year following the completion of the annual field monitoring season.</paragraph>
      <paragraph indent="4">(ii)   The report will follow standard scientific format. It will contain trend analysis including descriptive statistics and graphical interpretation of biological indices and habitat assessments. The biological condition of each station will be compared to the appropriate reference condition.</paragraph>
      <paragraph indent="2">B.   Supplemental requirements for stormwater management and erosion and sediment control concept plans for SPAs.</paragraph>
      <paragraph indent="3">1.   Purpose. The purpose of these requirements is to reduce the environmental impacts which typically occur during and after site construction. These impacts include:</paragraph>
      <paragraph indent="4">(i)   The loss of sediment from the site during construction which adversely affects fish spawning areas and buried aquatic insect habitat.</paragraph>
      <paragraph indent="4">(ii)   Erosion within the stream buffers, both on and off-site.</paragraph>
      <paragraph indent="4">(iii)   Inhibition of fish passage by installing typical culvert crossings.</paragraph>
      <paragraph indent="4">(iv)   Temperature changes in the receiving streams caused by warm water runoff from impervious surfaces from site development. Increasing the stream temperature can harm cool water fish species.</paragraph>
      <paragraph indent="4">(v)   Runoff of nutrients, toxins, and/or other water pollutants caused by excessive fertilizer applications, improper use, handling, storage, or disposal of petroleum by products, pesticides, and other potential water contaminants.</paragraph>
      <paragraph indent="4">(vi)   Degradation to receiving streams from increased runoff and pollutants created by land development.</paragraph>
      <paragraph indent="3">2.   Required water resource protection measures. To mitigate these impacts, the following water quantity, quality, thermal impact reduction, and sediment control methods are required and must be incorporated into the concept package for review and approval.</paragraph>
      <paragraph indent="3">3.   Water quantity design requirements.</paragraph>
      <paragraph indent="4">(i)   Unless otherwise approved by the Department, all proposed stormwater management facilities must be located entirely out of the stream buffer and outfall locations must be combined to reduce the amount of disturbance to the stream buffer.</paragraph>
      <paragraph indent="4">(ii)   Provide measures, such as flow splitting, to increase the flow length and reduce temperature impacts to the stream during small storms. Tree plantings may be required if the existing tree stand does not provide sufficient shade.</paragraph>
      <paragraph indent="4">(iii)   All on-site areas must have stormwater management controls. Provide either a private storm drain or permanent berm along the backs of lots to convey all runoff from developed areas to proposed stormwater management facilities. If this is physically impossible due to topography, then the applicant must demonstrate to the Department's satisfaction how stormwater quantity will be compensated by other proposed facilities.</paragraph>
      <paragraph indent="4">(iv)   Stormwater management concept plans need to identify any off-site areas that are used in design computations for proposed outfall study points.</paragraph>
      <paragraph indent="3">4.   Water quality design requirements.</paragraph>
      <paragraph indent="4">(i)   Infiltration trenches should be used whenever possible for water quality control. However, within SPAs, added measures such as a surface sand filter uphill of the trench for added treatment will be required. To provide enhanced nutrient removal, the surface of the sand filter may be required to have a porous soil layer which can support wetness tolerant plantings.</paragraph>
      <paragraph indent="4">(ii)   Unless otherwise approved by the Department, water quality structures must be located outside of stream buffers.</paragraph>
      <paragraph indent="4">(iii)   For ease of maintenance and improved pretreatment of grit and trash, the infiltration trenches should be designed to be shallow and receive surface runoff only. The sand filter underdrain must outlet onto the surface of the trench. In thermally sensitive streams, a modified infiltration trench design may be required to prevent the trench from failing and staying full of water. An underdrain pipe must be added in the bottom of the trench, similar to the sand filter, but the end of the pipe must be capped. If the infiltration trench fails over time and no longer drains into the soil, then the cap can be removed and the trench will function as a sand filter.</paragraph>
      <paragraph indent="4">(iv)   Designs must provide a safe, non-erosive overflow for any proposed water quality structures. A berm with a vegetated weir lined with turf reinforcement mat is recommended.</paragraph>
      <paragraph indent="4">(v)   A geotechnical report must be provided, including in-place percolation tests for any proposed water quality structures. Fractures providing recharge to the site should be identified. Groundwater recharge structures will be designed and located so as to maintain infiltration of rainfall.</paragraph>
      <paragraph indent="3">5.   Thermal impact reduction.</paragraph>
      <paragraph indent="4">(i)   Shade all rip rap outfalls, infiltration trenches, and sand filter surfaces.</paragraph>
      <paragraph indent="4">(ii)   Provide a low flow channel in any proposed pond bottom lined with turf reinforcement mat. The bottom of the proposed pond should also be reforested with wetness tolerant tree and shrub species.</paragraph>
      <paragraph indent="4">(iii)   Unless otherwise approved by the Department and the Department of Transportation, open section roadways must be used.</paragraph>
      <paragraph indent="4">(iv)   Reforest the disturbance from any proposed pond barrel and pond outfall below the pond, if tree removal is excessive. Keep the tree and shrub plantings away from the embankment.</paragraph>
      <paragraph indent="4">(v)   Provide a mini-riser on any dry pond riser to prevent clogging of the trash rack and unwanted ponding of water.</paragraph>
      <paragraph indent="4">(vi)   Prevent warming of the groundwater by avoiding excavation into the groundwater tables for any proposed pond and water quality structures. If this cannot be avoided in dry ponds, then add drain tile to convey the groundwater seeps directly to the riser, and a drain at the end of the barrel to pass the water under the rip rap outfall to keep it cool.</paragraph>
      <paragraph indent="3">6.   Sediment control requirements.</paragraph>
      <paragraph indent="4">(i)   Use sediment traps with at least 3600 cubic feet of storage per acre of drainage area. Dewater all traps and the pond (while it functions for sediment control) to draw down the water before it warms up. Dewatering devices must be designed to remove fine particulate matter such as clay from runoff. Redundant structures can be used together to improve sediment removal efficiency.</paragraph>
      <paragraph indent="4">(ii)   If the pond is used for sediment control and its design storage is not sufficient for double the sediment storage, then a trap must be added uphill to make up the difference. The size of the pond must not be expanded.</paragraph>
      <paragraph indent="4">(iii)   Reduce the amount of disturbance by providing a phased grading and stabilization scheme. Where feasible, phased grading will be required and the entire site will not be allowed to be disturbed at the same time.</paragraph>
      <paragraph indent="4">(iv)   Unless otherwise directed by the Department, sediment controls must be located out of the stream buffers to preserve the existing trees and limit site disturbance.</paragraph>
      <paragraph indent="4">(v)   The use of "super" sift fences, will be required for all areas where sift fences are to be applied (e.g. for pond construction or culvert construction).</paragraph>
      <paragraph indent="4">(vi)   A meeting with the Department prior to detailed design plan submittal to discuss the erosion and sediment control strategy is recommended.</paragraph>
      <paragraph indent="0">Table 2 Recommended monitoring protocols for selected physical parameters. This table presents the full range of physical parameters that could be monitored.  All parameters will not be required to be monitored for most developments.</paragraph>
    </subsection>
    <subsection heading="19.67.01.13 Effective Date">
      <paragraph indent="2">This regulation takes effect immediately after adoption by the Montgomery County Council.</paragraph>
    </subsection>
  </regulation>
  <regulation heading="COMCOR 19.67.02 Schedule of Fees for Permits, Licenses and Inspections - Method 3">
    <subsection heading="19.67.02.01 Road and Right-of-Way Construction">
      <paragraph indent="0">All roadway-construction projects, or any construction activity within the boundaries of a dedicated public right-of-way; or any complete or partial private road closure in urban areas; including roads, sidewalks/bikeways, curbs, gutters, and drainage systems; require a permit and will be charged a fee by the Department of Permitting Services.</paragraph>
      <paragraph indent="2">A.   General</paragraph>
      <paragraph indent="3">1.   Applications, including applications for revisions, must be accompanied by the permit fee or the filing fee as specified.</paragraph>
      <paragraph indent="3">2.   All remaining fees must be paid before permit issuance.</paragraph>
      <paragraph indent="3">3.   The estimated project cost is determined by the Director of the Department of Permitting Services based on average costs submitted on recent County capital-improvement project bids for comparable work or a current professionally prepared cost estimate for the average costs of such work. Information regarding estimation of construction costs can be found at this link:</paragraph>
      <paragraph indent="0">http://permittingservices.montgomerycountymd.gov/DPS/bond/BondsEstimate.aspx</paragraph>
      <paragraph indent="3">4.   Where a maintenance of traffic or traffic control plan is required, a permit must be obtained for activity in the right-of-way; or for complete or partial closure of any private road in urban areas, and the permit fee must be paid before permit issuance.</paragraph>
      <paragraph indent="3">5.   The minor plat fee must be paid prior to Department approval.</paragraph>
      <paragraph indent="3">6.   The fee for a revision to an Engineered Public Right-of-Way Permit for changes of ownership is the minimum permit fee.</paragraph>
      <paragraph indent="3">7.   The fee for a change of legal description or other administrative revision to a Right of Way Permit after permit issuance is 50% of the minimum permit fee.</paragraph>
      <paragraph indent="3">8.   All fees noted in this regulation are subject to the Automation Enhancement Fee per COMCOR 08.24B.02.</paragraph>
      <paragraph indent="3">9.   A private road is considered to be completely closed if any section of the road has no lanes available for vehicular use. A private road is considered partially closed if at least one lane is available for vehicular use or when any portion of an abutting sidewalk is closed to pedestrian use. Additional standards apply to partial road closures of 15 days or more.</paragraph>
      <paragraph indent="2">B.   Work in Public Right-of-Way Permits</paragraph>
      <paragraph indent="3">•   Driveway Permits</paragraph>
      <paragraph indent="4">1.   Fee is 14.65% of the estimated project cost.</paragraph>
      <paragraph indent="4">2.   Non-refundable filing fee of $150 is required.</paragraph>
      <paragraph indent="3">•   Utility Permits</paragraph>
      <paragraph indent="4">1.   Under Roadway Work    $0.775/LF, Minimum $775</paragraph>
      <paragraph indent="4">2.   Above Roadway Work (minimal or no trenching)    $0.425/LF,  Minimum $425</paragraph>
      <paragraph indent="4">3.   Aerial Work    $0.425/LF, Minimum $425</paragraph>
      <paragraph indent="4">4.   House Connections    $425/Connection</paragraph>
      <paragraph indent="3">•   Special Use and Roadway Occupancy Permits    $215</paragraph>
      <paragraph indent="0">(Includes dumpsters, cranes, storage container, temporary pedestrian access, partial closure of a private road for 14 days or less, and tree planting)</paragraph>
      <paragraph indent="3">•   Stump and Hazardous Tree Removal    $0</paragraph>
      <paragraph indent="0">(Includes removal of a roadside tree which has been determined by a licensed tree expert and approved by the Department to immediately endanger a person or property)</paragraph>
      <paragraph indent="2">C.   Engineered Public Right-of-Way Permits</paragraph>
      <paragraph indent="3">•   Roadway Grading Permit</paragraph>
      <paragraph indent="3">•   Paving Permit</paragraph>
      <paragraph indent="3">•   Storm Drain Permit</paragraph>
      <paragraph indent="3">1.   Fee is 14.65% of the estimated project cost, or $1,910, whichever is greater.</paragraph>
      <paragraph indent="3">2.   A nonrefundable filing fee of 50% of the estimated project cost or $1,910, whichever is greater is required.</paragraph>
      <paragraph indent="3">3.   Must include best available information on project costs when the initial application is submitted.</paragraph>
      <paragraph indent="2">D.   Traffic Management Plans and Private Road Closures                  $2,600</paragraph>
      <paragraph indent="0">This fee applies to: 1. Maintenance of traffic plans in Central Business Districts; 2. Rights of way 80 feet or greater; 3. Work in any other area that is two weeks or greater in duration; 4. Any site specific non-standard workzone temporary traffic control plans. 5. A complete closure of a private road of any duration or partial closure of a private road of 15 days or more.</paragraph>
      <paragraph indent="2">E.   Minor Record Plats</paragraph>
      <paragraph indent="3">1.   For review and approval of Subdivision Record Plats created per requirements of Chapter 50 Section 35A for Minor Subdivisions.</paragraph>
      <paragraph indent="3">2.   Nonrefundable Filing Fee               $500</paragraph>
      <paragraph indent="2">F.   Permit Revisions</paragraph>
      <paragraph indent="3">1.   Engineered Right-of-Way Permits</paragraph>
      <paragraph indent="4">a.   14.65% of the estimated project revision cost, or $1,910, whichever is greater.</paragraph>
      <paragraph indent="4">b.   An engineered cost estimate, fully detailing estimated project cost, must accompany the revision application.</paragraph>
      <paragraph indent="3">2.   All Other Right of Way or Private Road Closure Permit Revisions         $150</paragraph>
      <paragraph indent="2">G.   Public Right-of-Way Permit Extensions</paragraph>
      <paragraph indent="3">1.   Road and Right of Way construction permits are valid for a period of 18 months.</paragraph>
      <paragraph indent="3">2.   The fee to extend an Engineered Right of Way Permit is 15% of the total permit fee in effect when the extension request is submitted.</paragraph>
      <paragraph indent="3">3.   The fee to extend all other Right of Way Permits       $150</paragraph>
    </subsection>
    <subsection heading="19.67.02.02 Sediment Control, Stormwater Management, Special Protection Areas, and Floodplain District">
      <paragraph indent="2">A.   General</paragraph>
      <paragraph indent="3">1.   Applications, including applications for revisions, must be accompanied by the permit fee or the minimum filing fee as specified.</paragraph>
      <paragraph indent="3">2.   All remaining fees must be paid within one year after permit issuance or before final inspection, whichever occurs first.</paragraph>
      <paragraph indent="3">3.   All Stormwater Management Concept fees, Floodplain Study fees and Floodplain-District Permit fees must be paid when the application is submitted or before the Department initiates reviews.</paragraph>
      <paragraph indent="3">4.   The fee for a revision to a Sediment Control Permit or a Floodplain District Permit for changes of ownership is the minimum permit fee.</paragraph>
      <paragraph indent="3">5.   The fee for a change-of-legal description or other administrative revision to a Sediment Control Permit or a Floodplain District Permit after permit issuance is 50% of the minimum permit fee for the permit type being revised.</paragraph>
      <paragraph indent="3">6.   All fees noted in this regulation are subject to the Automation Enhancement Fee per COMCOR 08.24B.02.</paragraph>
      <paragraph indent="2">B.   Stormwater Management Concept or SPA Water Quality Inventory</paragraph>
      <paragraph indent="3">1.   Fee at Submittal                  $2,765</paragraph>
      <paragraph indent="3">2.   Fee to Revise                     $1,385</paragraph>
      <paragraph indent="2">C.   Site Development SWM Plan Review               $1,385</paragraph>
      <paragraph indent="2">D.   Stormwater Concept/Site Development Stormwater Plan Combo   $2,765</paragraph>
      <paragraph indent="2">E.   SPA Water Quality Plan Review (Preliminary)</paragraph>
      <paragraph indent="3">1.   Fee at Submittal                   $815/Acre</paragraph>
      <paragraph indent="3">2.   Minimum Fee                     $2,765</paragraph>
      <paragraph indent="3">3.   Maximum Fee                      $16,300</paragraph>
      <paragraph indent="2">F.   SPA Water Quality Plan Review (Final)            $1,385</paragraph>
      <paragraph indent="2">G.   SPA Water Quality Plan Review (Preliminary &amp; Final)</paragraph>
      <paragraph indent="3">1.   Fee at Submittal                   $815/Acre</paragraph>
      <paragraph indent="3">2.   Minimum Fee                     $2,765</paragraph>
      <paragraph indent="3">3.   Maximum Fee                      $16,300</paragraph>
      <paragraph indent="2">H.   Other Revisions to Stormwater Concept Plans         $1,385</paragraph>
      <paragraph indent="2">I.   Other Revisions to Water Quality Plans            $1,385</paragraph>
      <paragraph indent="2">J.   Stream Monitoring                      $860/Acre</paragraph>
      <paragraph indent="3">1.   Fee must be paid before issuance of the Sediment Control Permit.</paragraph>
      <paragraph indent="3">2.   The fee will be calculated based on the total acreage of the site as shown on the approved record plat.</paragraph>
      <paragraph indent="3">3.   All fractions of acreage will be rounded to the nearest whole number.</paragraph>
      <paragraph indent="3">4.   If the acreage fraction is .5, the next higher whole number will be used.</paragraph>
      <paragraph indent="3">5.   The Department of Permitting Services collects this fee for the Department of Environmental Protection.</paragraph>
      <paragraph indent="2">K.   Sediment Control Permits</paragraph>
      <paragraph indent="3">1.      Engineered Permits</paragraph>
      <paragraph indent="4">a.   Fee is $.086 per square feet of disturbed area, or $1,910, whichever is greater.</paragraph>
      <paragraph indent="4">b.   A nonrefundable filing fee of 50% of the total permit fee, or $1,910, whichever is greater, is required when the application is submitted.</paragraph>
      <paragraph indent="4">c.   Fee to Revise is $.086 per square feet of additional disturbed area plus the Minimum fee of $1,910.</paragraph>
      <paragraph indent="3">2.   Engineered Permits for Single Family Lots</paragraph>
      <paragraph indent="4">a.   Fee at Submittal               $1,910</paragraph>
      <paragraph indent="4">b.   Applies to work on one single family lot.</paragraph>
      <paragraph indent="4">c.   Does not apply to plans that include work on multiple lots or which include road construction.</paragraph>
      <paragraph indent="4">d.   Must be for single family use.</paragraph>
      <paragraph indent="4">e.   A Stormwater Concept Submission is not required.</paragraph>
      <paragraph indent="3">3.   Small Land Disturbance Activity Permits</paragraph>
      <paragraph indent="4">a.   Fee at Submittal               $815</paragraph>
      <paragraph indent="4">b.   May be used for projects that do not require stormwater management.</paragraph>
      <paragraph indent="4">c.   May be used for single family residential lots when the disturbed area is less than 20,000 square feet or for the maintenance of existing stormwater management facilities unless otherwise approved by the Department.</paragraph>
      <paragraph indent="3">4.   Forest Harvest Activity Permits               $815</paragraph>
      <paragraph indent="3">5.   Stormwater Management As-Built Plans</paragraph>
      <paragraph indent="4">a.   Fee at Submittal               $1,910</paragraph>
      <paragraph indent="4">b.   Any extension fees will be due when the As-Built Plans are submitted.</paragraph>
      <paragraph indent="3">6.   Permit Extensions</paragraph>
      <paragraph indent="4">a.   The fee to extend an Engineered Sediment Control permit is 15% of the total permit fee in effect when the extension request is submitted. If an as-built plan has been submitted and approved, the fee is $210.</paragraph>
      <paragraph indent="4">b.   Initial Sediment Control permits are valid for 24 months.</paragraph>
      <paragraph indent="4">c.   The fee to extend all other Sediment Control permits   $150</paragraph>
      <paragraph indent="2">L.   Floodplain District Permits</paragraph>
      <paragraph indent="3">1.   Fee at Submittal                  $900</paragraph>
      <paragraph indent="3">2.   One Year Extension Fee               $135</paragraph>
      <paragraph indent="2">M.   Floodplain Studies</paragraph>
      <paragraph indent="3">1.   Fee at Submittal                  $1,140</paragraph>
      <paragraph indent="3">2.   A Floodplain Study may include a dam breach analysis.</paragraph>
    </subsection>
    <subsection heading="19.67.02.03Individual Water Supply and Sewage Disposal Systems">
      <paragraph indent="2">A.   General</paragraph>
      <paragraph indent="3">1.   Applications, including applications for revisions, must be accompanied by the permit fee or the minimum filing fee as specified.</paragraph>
      <paragraph indent="3">2.   All remaining fees must be paid before any subsequent submission for review or before permit issuance, whichever occurs first.</paragraph>
      <paragraph indent="3">3.   Permits are valid for a period of one year.</paragraph>
      <paragraph indent="3">4.   Permit fees are not transferable.</paragraph>
      <paragraph indent="3">5.   The fee for minor plan revisions is the Minor Plan Review Fee.</paragraph>
      <paragraph indent="3">6.   The fee for investigation, review and issuance of a permit to repair an existing sewage-disposal system is the Minor Plan Review Fee.</paragraph>
      <paragraph indent="3">7.   All fees noted in this regulation are subject to the Automation Enhancement Fee per COMCOR 08.24B.02, unless otherwise noted.</paragraph>
      <paragraph indent="2">B.   Conventional Percolation Tests Per Lot, Per Visit         $780</paragraph>
      <paragraph indent="2">C.   Percolation Tests Per Lot, Per Visit, for Mound Systems      $1,050</paragraph>
      <paragraph indent="2">D.   Water Table Level Checks, Per Visit               $440</paragraph>
      <paragraph indent="2">E.   Individual Sewage Disposal Permit               $1,200</paragraph>
      <paragraph indent="2">F.   Plans Review for Subdivision and Platted Lots and Revisions    $510/Lot</paragraph>
      <paragraph indent="2">G.   Minor Plan Review and Environmental Health Survey      $375</paragraph>
      <paragraph indent="2">H.   Partial Environmental Health Survey            $235</paragraph>
      <paragraph indent="2">I.   Review Repair of Existing Sewage Disposal Systems         $375</paragraph>
      <paragraph indent="2">J.   Septage Hauler Permit Inspection (Including Truck Inspection)   $375</paragraph>
      <paragraph indent="2">K.   Septage Hauler Permit Inspection (Reciprocal Truck Inspection)   $235</paragraph>
      <paragraph indent="2">L.   Permit Extensions</paragraph>
      <paragraph indent="3">1.   Fee at Submittal                  $170</paragraph>
      <paragraph indent="3">2.   Permits are valid for 12 months.</paragraph>
      <paragraph indent="3">3.   Upon written request a permit may be extended for an additional six months.</paragraph>
      <paragraph indent="2">M.   Well Permits                           $160</paragraph>
      <paragraph indent="3">1.   Not subject to Automation Enhancement Fee.</paragraph>
    </subsection>
    <subsection heading="19.67.02.04 Miscellaneous Fees">
      <paragraph indent="0">Filing fees and permit fees are based on fees in effect on the date the application was filed. All other fees are based on fees in effect when the service is requested (revision fee, extension fee, etc.).</paragraph>
      <paragraph indent="2">A.   Administrative Permit Application Revisions            $70</paragraph>
      <paragraph indent="2">B.   Refunds</paragraph>
      <paragraph indent="3">1.   Filing fees are nonrefundable except in the case of an administrative error.</paragraph>
      <paragraph indent="3">2.   In the case of an abandonment or discontinuance of a project under permit, a refund of up to 50 percent of the fee paid (excluding filing fee) may be granted provided:</paragraph>
      <paragraph indent="4">a.   No construction has occurred, and</paragraph>
      <paragraph indent="4">b.   A written request for refund is made before the expiration date of the permit.</paragraph>
      <paragraph indent="4">c.   Revoked, suspended, or invalid licenses or permits, or permits or licenses in litigation are not eligible for refunds.</paragraph>
      <paragraph indent="2">C.   Bonding Alterations</paragraph>
      <paragraph indent="0">Bonds must be posted for permitted projects under the applicable Code. Fees for alterations to a posted bond are as follows:</paragraph>
      <paragraph indent="3">1.   Fee to replace a Performance Bond, Irrevocable Letter of Credit, Cash Bond or Certificate of Guarantee             $140</paragraph>
      <paragraph indent="3">2.   If the purpose of the replacement is to reduce the amount of the instrument due to partial completion of work, the fee for the partial reduction is                   $280</paragraph>
      <paragraph indent="2">D.   Expedited Plan Reviews</paragraph>
      <paragraph indent="3">1.   Fee is 25% of total permit fee.</paragraph>
      <paragraph indent="3">2.   Per COMCOR 08.24B.01.</paragraph>
    </subsection>
    <subsection heading="19.67.02.05 Indexing of Fees to Labor and Operating Cost Changes and to Manage Reserves">
      <paragraph indent="0">The Director of Permitting Services must calculate an enterprise fund stabilization factor (EFSF) each year to be applied to each fee set in or under this regulation on July 1 of each year. The EFSF is the factor by which the fee calculation is adjusted, up or down, to cover DPS labor and operating costs and to manage the DPS reserve policy in accordance with the 2002 Principles of the Fiscal Management of the Permitting Services Fund. The Director must publish the EFSF for each upcoming fiscal year not later than March 15 of the current fiscal year. For any year in which the EFSF will be less than .80 or greater than 1.20, the Department must review its fee rates and functional analysis behind the fee rates to determine if changes need to be made to the fee rates.</paragraph>
    </subsection>
    <subsection heading="19.67.02.06Severability">
      <paragraph indent="0">If a court holds that part of this regulation is invalid, the invalidity does not affect other parts.</paragraph>
    </subsection>
  </regulation>
  <regulation heading="COMCOR 19.67.03 Best Management Practices Monitoring Fees - Method 3">
    <subsection heading="19.67.03.01 Best Management Practices Monitoring Fees">
      <paragraph indent="1">A.   Fee Calculation:  Best management practices (BMP) monitoring fees in the amount of $0.06 per square foot of disturbed area per the Sediment Control Permit application(s) must be paid by the permittee before the Department of Permitting Services (DPS) Director releases the Sediment Control Permit(s) for a permitted project in a Special Protection Area (SPA).  Each project with an approved water quality plan is subject to the fee.  The Director of the Department of Environmental Protection (DEP) must determine the frequency, quantity, and type of monitoring needed for each permitted project.  The fee to be charged for each project must be determined as follows:</paragraph>
      <paragraph indent="2">(1)   If the land area for an individual development site lies entirely within a designated SPA, the fee calculation must be based on the aggregated sum of disturbed area for that site.</paragraph>
      <paragraph indent="2">(2)   If the land area for an individual development site does not lie entirely within a designated SPA, the fee calculation must only take into account the disturbed area within the SPA and be based on the drainage area delineation to SPA tributaries, as determined by the DPS Director.</paragraph>
      <paragraph indent="1">B.   Transfer of BMP Monitoring Responsibility:  A permittee must pay a BMP monitoring fee if the permittee’s approved water quality plan is amended after the effective date of this regulation for the purpose of transferring responsibility for BMP monitoring from the permittee to DEP.  The fee charged for each transferred project must be based on the area of disturbance as described in subsection A and computed as follows:</paragraph>
      <paragraph indent="2">(1)   If the permittee transfers to DEP the responsibility for BMP monitoring before initiating any during-construction monitoring, the permittee must pay a monitoring fee in the amount of $0.06 per square foot of disturbed area per the Sediment Control Permit application(s).</paragraph>
      <paragraph indent="2">(2)   If the permittee transfers to DEP the responsibility for during or post-construction monitoring after having initiated during- construction monitoring, the monitoring fee to be paid by permittee must be the lesser of:</paragraph>
      <paragraph indent="3">(a)   $0.04 per square foot of disturbed area per the Sediment Control Permit application(s); or</paragraph>
      <paragraph indent="3">(b)   The percent of required post-construction BMP monitoring that has not yet been completed and approved by DEP, multiplied by the previously determined post-construction BMP monitoring bond estimate, and calculated according to the following formula:</paragraph>
      <paragraph indent="4">[(A - B) / A] x C = Total BMP Monitoring Fee Due</paragraph>
      <paragraph indent="4">A =   Number of months post-construction BMP monitoring required</paragraph>
      <paragraph indent="4">B =   Number of months post-construction BMP monitoring completed, as calculated and approved by DEP</paragraph>
      <paragraph indent="4">C =   Previously determined post-construction BMP monitoring bond estimate.</paragraph>
      <paragraph indent="4">Example calculation:</paragraph>
      <paragraph indent="0">A | # Months Required | 60
B | # Months Completed | 48
C | Bond Estimate | $100,00 0

 | [(A - B) / A] x C = | $20,000</paragraph>
      <paragraph indent="1">C.   Collection:  The Department of Permitting Services is responsible for collecting all BMP monitoring fees.  The DPS Director must deposit the BMP monitoring fees collected under this regulation into the stormwater management fund created under Section 19-35 of the County Code.</paragraph>
      <paragraph indent="1">D.   Indexing of Fees to Labor and Operating Cost Changes:  The DPS Director must adjust the fee set under this regulation on July 1 of each year as provided in § 19.67.02.05.</paragraph>
    </subsection>
    <subsection heading="19.67.03.02 Severability">
      <paragraph indent="0">If a court holds that part of this regulation is invalid, the invalidity does not affect other parts.</paragraph>
    </subsection>
    <subsection heading="19.67.03.03 Effective Date">
      <paragraph indent="0">This regulation takes effect when received by the County Council.</paragraph>