<section heading="Sec. 2-58E Telecommunications Facility Coordination - Regulations">
  <regulation heading="COMCOR 02.58E.01 Telecommunications Transmission Facilities Coordination Requirements">
    <subsection heading="02.58E.01.01 Authority.">
      <paragraph indent="2">This Executive Regulation is authorized by Montgomery County Code 1994, as amended, Section 2-58E, "Telecommunications facility coordination" and applies to all telecommunications transmission facilities (TTFs) as defined herein.</paragraph>
    </subsection>
    <subsection heading="02.58E.01.02 Administration.">
      <paragraph indent="2">a.   Delegation of Authority. Code Section 2-58E directs the Director of the Department of Technology Services to establish a procedure for the review of siting and modification applications.  In furtherance of that procedure, the Director must maintain a record of the location of all TTFs within the County and ensure the appropriate and efficient placement of the facilities.</paragraph>
      <paragraph indent="2">b.   Submission of Applications. All applications pertaining to the siting or modification of a telecommunications transmission facility by certain government agencies and private parties must be coordinated by this procedure.</paragraph>
      <paragraph indent="2">c.   Application Review Period. All applications must be reviewed in an efficient and timely manner, with the objective of final disposition occurring within 60 days after the date a complete application has been submitted to the Tower Coordinator. The applicant must be advised of the reason for any delay beyond this period.</paragraph>
      <paragraph indent="2">d.   Meetings. All required meetings must be scheduled so as to meet the 60-day time frame goal for completing the review of an application.</paragraph>
      <paragraph indent="2">e.   Reporting. As appropriate, the Director must report to the County Executive and the Council regarding matters pertaining to this procedure.</paragraph>
      <paragraph indent="2">f.   Database Administration. As part of the coordination process, a database must be maintained for all telecommunications transmission facilities located in the County, including any that the Director knows are proposed to be located in the County.</paragraph>
      <paragraph indent="2">g.   Fee.  Applicants must pay the following fees:</paragraph>
      <paragraph indent="3">Charge Categories</paragraph>
      <paragraph indent="4">1)   Annual fee - Fee to be paid when the annual plan is submitted.  The annual fee is charged for updating and maintaining the database, oversight, and the review of the annual plan.</paragraph>
      <paragraph indent="4">2)   Minor Modification - The application fee for any of the following minor modifications that require a building permit:</paragraph>
      <paragraph indent="5">i.   a modification of existing antennas at a single site; or</paragraph>
      <paragraph indent="5">ii.   the addition of antennas at a single existing site; or</paragraph>
      <paragraph indent="5">iii.   a change or addition of equipment at a single existing site.</paragraph>
      <paragraph indent="4">3)   Multiple Modifications - The application fee for any of the following multiple modifications that require a building permit:</paragraph>
      <paragraph indent="5">i.   a modification of antennas at two or more sites; or</paragraph>
      <paragraph indent="5">ii.   the addition of antennas at two or more existing sites; or</paragraph>
      <paragraph indent="5">iii.   a change or addition of equipment at two or more existing sites.</paragraph>
      <paragraph indent="4">4)   Co-location on existing structure - The application fee for the use of an existing structure to support new antennas permitted by right under the zoning ordinance.</paragraph>
      <paragraph indent="4">5)   New support structure, permitted use - The application fee for the construction of a new antenna support structure that is permitted by right under the zoning ordinance.</paragraph>
      <paragraph indent="4">6)   New support structure, special exception or mandatory referral - The application fee for the construction of a new antenna support structure that must be authorized as a special exception or reviewed by the Maryland-National Capital Park and Planning Commission.</paragraph>
      <paragraph indent="3">All fees must be submitted to the Office of Cable Communications, 100 Maryland Ave., Suite #250, Rockville, MD 20850, prior to submitting the application or annual plans.</paragraph>
    </subsection>
    <subsection heading="02.58E.01.03 Definitions.">
      <paragraph indent="2">The words or phrases described below have the following meanings as used in this Regulation:</paragraph>
      <paragraph indent="2">a.   Land-owning Agency. Land-owning Agency means any government agency which owns or controls any land on which a telecommunications transmission facility is located or proposed to be located.</paragraph>
      <paragraph indent="2">b.   Land Use Agency. Land Use Agency means the Planning Board, the County Board of Appeals, the Department of Permitting Services and any other public agency or body with jurisdiction over the siting of any telecommunications transmission facility, including any municipal land use agency or body.</paragraph>
      <paragraph indent="2">c.   Telecommunications Transmission Facility. Telecommunications Transmission Facility means any antenna, tower, monopole, or other structure used primarily to receive or transmit wireless voice, data, or image information (or any combination of them).</paragraph>
      <paragraph indent="2">d.   Telecommunications Transmission Facility Coordinating Group. The TTFCG is that body convened by the Director as prescribed in Section 2-58E(d) of the Montgomery County Code 1994, as amended, to review, comment and facilitate communications between member agencies on telecommunications transmission facility policy and siting issues.</paragraph>
      <paragraph indent="2">e.   Tower Coordinator. The Tower Coordinator is the Director's designee or contractor who administers Section 2-58E of the Montgomery County Code.</paragraph>
    </subsection>
    <subsection heading="02.58E.01.04 Application Submission.">
      <paragraph indent="2">a.   An application for siting of a telecommunications transmission facility must meet the following requirements:</paragraph>
      <paragraph indent="3">1.   An application must be submitted to the Tower Coordinator.</paragraph>
      <paragraph indent="3">2.   Three copies of each application must be submitted.</paragraph>
      <paragraph indent="3">3.   Each application must be complete and filed on a form in accordance with Section 9* of this regulation. Incomplete applications will not be processed.</paragraph>
      <paragraph indent="3">4.   Proprietary information submitted with an application must be clearly marked as being confidential. Applicants should minimize, to the extent possible, the use of confidential data in order to facilitate rapid governmental interagency coordination.</paragraph>
      <paragraph indent="3">5.   An application for a new tower or monopole must include the following: RF propagation maps; a photograph of a balloon test at the proposed site that shows the approximate top of the tower, if available; a Federal Aviation Administration application or certification, if available; an explanation as to why the site was selected; an identification of any sites that were rejected; and an explanation as to why any sites were rejected.</paragraph>
      <paragraph indent="2">b.   For each submitted application, the Tower Coordinator must:</paragraph>
      <paragraph indent="3">1.   Stamp the date and time of receipt on all copies of each application and register the application in the Wireless Communications Site Applications database and/or logbook.</paragraph>
      <paragraph indent="3">2.   Assign each application an application number yyyymm-nnn, herein called the Wireless Communications Site application number, where "yyyy" represents the year, "mm" represents the month, and "nnn" represents the sequence 001, 002, 003 , etc. for the first three applications submitted during the year "yyyy" and the month "mm."</paragraph>
      <paragraph indent="3">3.   Distribute copies to the appropriate agencies and return one copy to the applicant upon final disposition of the siting request.</paragraph>
    </subsection>
    <subsection heading="02.58E.01.05 Application Review.">
      <paragraph indent="2">a.   The Tower Coordinator must:</paragraph>
      <paragraph indent="3">1.   Coordinate and schedule the Telecommunications Transmission Facility Coordinating Group (TTFCG - the "Group"), as required, to facilitate the review and recommendation for each application.</paragraph>
      <paragraph indent="3">2.   Develop a siting recommendation to the Group based on:</paragraph>
      <paragraph indent="3">(a)   zoning standards for siting a telecommunications transmission facility;</paragraph>
      <paragraph indent="3">(b)   effect of the telecommunications transmission facility on the land owning agency;</paragraph>
      <paragraph indent="3">(c)   existing and future public safety telecommunications transmission facilities and plans;</paragraph>
      <paragraph indent="3">(d)   co-location options; and</paragraph>
      <paragraph indent="3">(e)   potential impacts on the surrounding area.</paragraph>
      <paragraph indent="3">3.   Review the recommendation with the applicant:</paragraph>
      <paragraph indent="3">(a)   for site suitability and co-location options; and</paragraph>
      <paragraph indent="3">(b)   for coordination with other County agencies.</paragraph>
      <paragraph indent="2">b.   The land-owning agency must:</paragraph>
      <paragraph indent="3">1.   Review the site application in accordance with the agency's siting standards and policy.</paragraph>
      <paragraph indent="3">2.   Receive and evaluate public input as part of the agency's decision process.</paragraph>
      <paragraph indent="3">3.   Submit input concerning the application at the scheduled Group meeting via, its Group designee.</paragraph>
      <paragraph indent="3">4.   Maintain a record of all telecommunications transmission facility siting leases that affect the agency.</paragraph>
      <paragraph indent="2">c.   The land use agency must:</paragraph>
      <paragraph indent="3">1.   Submit the Telecommunications Transmission Facility Coordinating Group recommendation for inclusion in the record of proceedings of any telecommunications transmission facility special exception.</paragraph>
      <paragraph indent="3">2.   Refer to the Tower Coordinator any building permit or special exception application submitted directly to the agency.</paragraph>
      <paragraph indent="2">d.   The Telecommunications Transmission Facility applicant must:</paragraph>
      <paragraph indent="3">1.   Submit a telecommunications transmission facility location plan in accordance with Section 2-58E of the Montgomery County Code and Attachment 2 of this regulation.</paragraph>
      <paragraph indent="3">2.   Update the plan each year.</paragraph>
    </subsection>
    <subsection heading="02.58E.01.06 Telecommunications Transmission Facility Coordinating Group Review.">
      <paragraph indent="2">a.   The Tower Coordinator must coordinate and assist the Group Chair in scheduling the meetings of the Telecommunications Transmission Facility Coordinating Group. The applicant must be notified of any meeting at which its application is considered, and be allowed to attend the meeting.</paragraph>
      <paragraph indent="2">b.   The Chair or the Chair's designee must conduct the meeting. A written record of actions and recommendations must be maintained by the Tower Coordinator.</paragraph>
      <paragraph indent="2">c.   Group review of an application may include:</paragraph>
      <paragraph indent="3">1.   The written recommendation of the Tower Coordinator with database details where appropriate;</paragraph>
      <paragraph indent="3">2.   Any comments of the land-owning agency and land-use agency;</paragraph>
      <paragraph indent="3">3.   Any other relevant information concerning the proposed siting of the telecommunications transmission facility.</paragraph>
      <paragraph indent="2">d.   A written review and recommendation must be prepared:</paragraph>
      <paragraph indent="3">1.   One copy must be maintained by the Tower Coordinator in the application file.</paragraph>
      <paragraph indent="3">2.   One copy must be provided to the applicant.</paragraph>
      <paragraph indent="3">3.   One copy must be sent to the County Board of Appeals if a special exception is required.</paragraph>
      <paragraph indent="3">4.   One copy must be sent to the Department of Permitting Services and/or any municipal agency that would issue permits for such use.</paragraph>
      <paragraph indent="3">5.   One copy must be sent to the land owning agency, if appropriate.</paragraph>
      <paragraph indent="2">e.   The Group may delegate to the Tower Coordinator any functions necessary to promote the efficiency of the process in accordance with the provisions of the County Code.</paragraph>
    </subsection>
    <subsection heading="02.58E.01.07 Leases.">
      <paragraph indent="2">a.   The recommendations and comments of the Telecommunications Transmission Facility Group must be provided to the relevant land owning agency for use during the negotiation of any lease for placement of a telecommunications transmission facility on land within the control of a land owning agency.</paragraph>
      <paragraph indent="2">b.   A form lease must be developed by the Tower Coordinator and be made available for the use of the land owning agencies.</paragraph>
      <paragraph indent="2">c.   Any lease must include a provision requiring the removal of the facility by the lessee after the useful life of the facility concludes or upon expiration or termination of the lease, and may include the posting of a bond to guarantee removal.</paragraph>
    </subsection>
    <subsection heading="02.58E.01.08 Building Permit.">
      <paragraph indent="2">a.   A building permit is required for the construction of a telecommunications transmission facility in the County.</paragraph>
      <paragraph indent="2">b.   All permit applications must reference the Wireless Communications Site application number, and must include the recommendation of the Telecommunications Transmission Facility Coordinating Group and the approval of the land owning agency, if applicable.</paragraph>
      <paragraph indent="2">c.   Building permit approvals may be expedited if copies of standard construction drawings are on file with the permitting agency.</paragraph>
      <paragraph indent="2">d.   Upon issuance and release of the building permit, a copy of the permit will be sent to the Tower Coordinator for filing with the application and supporting documentation. A copy of the site plan and construction drawings will be furnished to the Tower Coordinator upon request for use in updating the database.</paragraph>
    </subsection>
    <subsection heading="02.58E.01.09 Wireless Siting Application.">
      <paragraph indent="2">The Wireless Communications Site Coordination application form is included as Attachment 1 of this regulation.</paragraph>
    </subsection>
    <subsection heading="02.58E.01.10 Siting Plan.">
      <paragraph indent="2">Attachment 2 of this regulation sets forth the requirements for initial submission and annual update of the applicant's siting plan.</paragraph>
    </subsection>
    <subsection heading="02.58E.01.11. Effective Date.">
      <paragraph indent="2">This regulation takes effect on March 25, 2003.</paragraph>
      <paragraph indent="0">(ATTACHMENTS FOLLOW)</paragraph>
      <paragraph indent="0">Attachment 1</paragraph>
      <paragraph indent="0">MONTGOMERY COUNTY, MARYLAND</paragraph>
      <paragraph indent="0">APPLICATION FOR WIRELESS COMMUNICATIONS</paragraph>
      <paragraph indent="0">SITE COORDINATION</paragraph>
      <paragraph indent="0">DATE:___________________   NUMBER: ______________________</paragraph>
      <paragraph indent="10">(To be filled in by County)</paragraph>
      <paragraph indent="0">Applicant Name: __________________________________________________________________</paragraph>
      <paragraph indent="0">Address: _________________________________________________________________________</paragraph>
      <paragraph indent="0">Contact Person and Phone No.: _______________________________________________________</paragraph>
      <paragraph indent="0">Provide a description of the proposed installation, including the type and height of the structure (i.e. monopole, rooftop, water tank, guyed tower, self-support tower, etc.) and whether it is existing, modified, or new.  Describe any modifications that will be made to existing structure.</paragraph>
      <paragraph indent="0">________________________________________________________________________________</paragraph>
      <paragraph indent="0">________________________________________________________________________________</paragraph>
      <paragraph indent="0">Address/City: ____________________________________________________________________</paragraph>
      <paragraph indent="0">Site Name: _____________________________________________________Zoning: ________</paragraph>
      <paragraph indent="0">Site Owner/Landlord: ______________________________________________________________</paragraph>
      <paragraph indent="0">Structure Owner: __________________________________________________________________</paragraph>
      <paragraph indent="0">Latitude/Longitude (NAD27 Degrees/Minutes/Seconds) ___________________________________</paragraph>
      <paragraph indent="0">Ground Elevation AMSL in feet:  _____________________________________________________</paragraph>
      <paragraph indent="0">Antenna Height AGL in feet: _________________________________________________________</paragraph>
      <paragraph indent="0">Frequency bands to be used:  _________________________________________________________</paragraph>
      <paragraph indent="0">Maximum Effective Radiation Power (EFP):  ____________________________________________</paragraph>
      <paragraph indent="0">Federal Communications Commission (FCC) Emission Designator:  __________________________</paragraph>
      <paragraph indent="0">FCC Antenna Structure Registration Number: ____________________________________________</paragraph>
      <paragraph indent="0">Description of antenna(s), including physical size, patterns, gain and orientation (include copy of spec sheet or drawings):</paragraph>
      <paragraph indent="0">_________________________________________________________________________________</paragraph>
      <paragraph indent="0">_________________________________________________________________________________</paragraph>
      <paragraph indent="0">Describe area to be served by the proposed installation. Attach a map of the general area showing the location of the site.  Attach propagation studies showing service area coverage surrounding the proposed site with and without the proposed site.</paragraph>
      <paragraph indent="0">_________________________________________________________________________________</paragraph>
      <paragraph indent="0">_________________________________________________________________________________</paragraph>
      <paragraph indent="0">Will antennas be installed on an existing structure? _______________________________________</paragraph>
      <paragraph indent="0">If not, describe results of investigation about possible co-location.  Include a listing of alternative sites considered and an explanation as to why each possible alternative was not selected.  If a site was ruled out because of radio frequency (RF) issues, provide RF propagation maps documenting inadequate coverage:  ________________________________________________________________</paragraph>
      <paragraph indent="0">_________________________________________________________________________________</paragraph>
      <paragraph indent="0">_________________________________________________________________________________</paragraph>
      <paragraph indent="0">_________________________________________________________________________________</paragraph>
      <paragraph indent="0">Justification of why this site was selected: _______________________________________________</paragraph>
      <paragraph indent="0">_________________________________________________________________________________</paragraph>
      <paragraph indent="0">Will site be used to support government telecommunications facilities or other equipment for government use? _____________________________________________________________________________</paragraph>
      <paragraph indent="0">If yes, describe: ____________________________________________________________________</paragraph>
      <paragraph indent="0">_________________________________________________________________________________</paragraph>
      <paragraph indent="0">Attach a site plan of the proposed facility showing location of monopole, tower, or structure on the property, location of existing and proposed equipment buildings or cabinets, and distance of any new structures or buildings from property lines and other buildings or residences within 300 feet.  Clearly identify existing versus proposed facilities.  Also provide an elevation sketch of the structure showing major dimensions, existing attachments, and mounting height of proposed antennas.  If a balloon test has been performed, please provide copies of the photographs.</paragraph>
      <paragraph indent="0">Will the antenna installation be in compliance with the maximum permissible RF exposure limits set forth in § 1.1310 of the FCC Rules and Regulations?  Yes_______ No _______</paragraph>
      <paragraph indent="0">If the answer is no, please attach an explanation.</paragraph>
      <paragraph indent="0">Type of compliance study required under § 1.1307 of the FCC Rules and Regulations:</paragraph>
      <paragraph indent="1">Categorically Excluded         _______</paragraph>
      <paragraph indent="1">Routine Environmental Evaluation      _______</paragraph>
      <paragraph indent="1">Environmental Assessment         _______</paragraph>
      <paragraph indent="0">If antennas will be located on a rooftop, please attach a description of any steps that have been or will be taken to prevent the aggregate RF from exceeding exposure limits.</paragraph>
      <paragraph indent="0">Montgomery County Code, Chapter 2-58E requires applicants to submit a facility location plan indicating the location of every existing telecommunications transmission facility and the general location of facilities that are anticipated to be built in the near future.  Has a new or updated plan been filed with the County within the last year?   Yes _______ No _______.  If the answer is no, please submit a plan with this application.</paragraph>
      <paragraph indent="0">If an application for an FAA review has been submitted or an FAA determination has been issued, please attach a copy.</paragraph>
      <paragraph indent="0">Application fees have been paid to Montgomery County Government on _______________________.</paragraph>
      <paragraph indent="0">Submit this application to:</paragraph>
      <paragraph indent="0">Columbia Telecommunications Corporation</paragraph>
      <paragraph indent="0">c/o Montgomery County Tower Coordinator</paragraph>
      <paragraph indent="0">5550 Sterrett Place, Suite 200</paragraph>
      <paragraph indent="0">Columbia, MD 21044</paragraph>
      <paragraph indent="0">Phone: (410) 964-5700</paragraph>
      <paragraph indent="0">Attachment 2</paragraph>
      <paragraph indent="0">GUIDE FOR WIRELESS SERVICE PROVIDER FACILITY LOCATION PLANS</paragraph>
      <paragraph indent="1">Montgomery County Code Section 2-58E requires sponsors of wireless communications facilities to submit annually revised antenna site planning information for proposed system construction or enhancement within Montgomery County.</paragraph>
      <paragraph indent="1">The following information is required by the County to assist in planning activities and analysis of co-location opportunities. Applicants must submit a projected growth plan for antenna sites, and must update that plan at least annually. More frequent updates are recommended if information submitted in the previous plan changes significantly. We recognize that site specific information may not be available until late in the implementation process. However, the County desires that information submitted in the plan be as detailed and complete as possible.</paragraph>
      <paragraph indent="0">1.   In what geographical areas of Montgomery County will new service be provided or existing service (requiring additional site facilities) be upgraded? (Be specific, such as “Rte. 270 corridor from Shady Grove to the Comus exit,” or “Along Rte. 29 from the D.C. line to the Beltway,” or “at the bottom of the Piney Branch stream valley in Takoma Park,” etc.)</paragraph>
      <paragraph indent="0">2.   On a large scale map such as the Street Map of Montgomery County, Maryland, prepared by The Maryland-National Capital Park and Planning Commission (scale 1" = 3000'), show the location of existing towers or monopoles, indicate whether each is owned or leased, and show where new antenna sites are anticipated. Locate as accurately as possible, preferably within 0.2 mile or less, or indicate specific sites, if known.</paragraph>
      <paragraph indent="0">3.   If specific sites are known, state addresses and how each site is presently utilized, e.g., water tank, apartment building, shopping center, fire station, open (or wooded) lot, etc. If antennas will be placed on an existing tower or monopole on the site, who owns it?</paragraph>
      <paragraph indent="0">4.   If any new structures are planned, describe anticipated configuration (monopole, self-support lattice tower, guyed tower, etc.) and height at each site, if known.</paragraph>
      <paragraph indent="0">5.   How much physical capacity on each proposed structure will be available for co-location by other service providers? Will antenna space be offered to other parties for rent? If one or more potential tenants have expressed an interest in the site, who are they?</paragraph>
      <paragraph indent="0">6.   Any other information relevant to the County tower database.</paragraph>
    </subsection>
  </regulation>
  <regulation heading="COMCOR 02.58E.02 Telecommunications Transmission Facilities Coordination Fees">
    <subsection heading="02.58E.02.01">
      <paragraph indent="2">The non-refundable fees applicants must pay for the review and coordination of the siting of telecommunications facilities are:</paragraph>
      <paragraph indent="2">Charge Categories</paragraph>
      <paragraph indent="2">1.   Annual fee $500.00 - Fee to be paid when the annual plan is submitted.  The annual fee is charged for updating and maintaining the database, oversight, and the review of the annual plan.</paragraph>
      <paragraph indent="2">2.   Minor Modification $500.00 - The application fee for any of the following minor modifications that require a building permit:</paragraph>
      <paragraph indent="3">i.   a modification of existing antennas at a single site; or</paragraph>
      <paragraph indent="3">ii.   the addition of antennas at a single existing site; or</paragraph>
      <paragraph indent="3">iii.   a change or addition of equipment at a single existing site.</paragraph>
      <paragraph indent="2">3.   Multiple Modifications $1,500.00 - The application fee for any of the following multiple modifications that require a building permit:</paragraph>
      <paragraph indent="3">i.   a modification of antennas at two or more sites; or</paragraph>
      <paragraph indent="3">ii.   the addition of antennas at two or more existing sites; or</paragraph>
      <paragraph indent="3">iii.   a change or addition of equipment at two or more existing sites.</paragraph>
      <paragraph indent="2">4.   Co-location on existing structure $1,000.00 - The application fee for the use of an existing structure to support new antennas permitted by right under the zoning ordinance.</paragraph>
      <paragraph indent="2">5.   New support structure, permitted use $2,000.00 - The application fee for the construction of a new antenna support structure that is permitted by right under the zoning ordinance.</paragraph>
      <paragraph indent="2">6.   New support structure, special exception or mandatory referral $2,500.00 - The application fee for the construction of a new antenna support structure that must be authorized as a special exception or reviewed by the Maryland-National Capital Park and Planning Commission.</paragraph>
      <paragraph indent="2">All fees must be submitted to the Office of Cable Communications, 100 Maryland Ave., Suite #250, Rockville, MD 20850, prior to submitting the application and annual plans.</paragraph>
    </subsection>
  </regulation>
</section>