<section heading="Sec. 8-14 Standards Applicable - Regulations">
  <regulation heading="COMCOR 08.14.01 Schedule of Fees for Permits, Licenses and Certifications - Method 2">
    <subsection heading="08.14.01.01Building Permits">
      <paragraph indent="1">A.   General</paragraph>
      <paragraph indent="2">1.   All fees required by this section must be paid before release of the permit. Construction, including excavation, must not begin until all fees are paid.</paragraph>
      <paragraph indent="2">2.   A filing fee must be paid when the application is submitted. Filing fees are included in the permit fee.</paragraph>
      <paragraph indent="2">3.   Permit fees are calculated and collected for each permit application. When an application includes multiple buildings, a separate fee will be assessed to each building or for each mailing address.</paragraph>
      <paragraph indent="2">4.   For the purpose of calculating the permit fee for commercial buildings, the following shall apply:</paragraph>
      <paragraph indent="3">Each portion of a building separated by one or more fire walls, or horizontal assemblies (3 hours) shall be considered as a separate building. Two or more buildings on the same lot shall be treated as separate buildings.</paragraph>
      <paragraph indent="2">5.   For the purposes of calculating the permit fee residential is defined as detached one- and two-family dwellings and townhouses not more than three stories above grade plane in height with a separate means of egress.</paragraph>
      <paragraph indent="2">6.   Plan revision fees are in addition to the original fees.</paragraph>
      <paragraph indent="2">7.   Plan revisions are considered changes made by the applicant to the approved construction documents.</paragraph>
      <paragraph indent="2">8.   Permit fees are calculated on gross square footage of construction or area affected or created by construction (except commercial alteration).</paragraph>
      <paragraph indent="1">B.   One- and Two-Family Dwellings and Related Accessory Structures</paragraph>
      <paragraph indent="2">1.   Application filing fee for new building construction   50% of permit fee or $700 whichever is greater</paragraph>
      <paragraph indent="2">2.   Application filing fee for addition, alteration or repair   50% of permit fee or $265 whichever is greater</paragraph>
      <paragraph indent="2">3.   Application filing fee for residential rooftop solar panel meeting standard requirements                     $133</paragraph>
      <paragraph indent="2">4.   One- and Two-family detached dwelling unit</paragraph>
      <paragraph indent="3">a.   up to 5000 SF of construction area          $0.71 per SF</paragraph>
      <paragraph indent="3">b.   5001 SF of construction area and above      $0.71 per SF for first 5000SF + $0.30 per SF of area exceeding 5000 SF</paragraph>
      <paragraph indent="2">5.   One- and two-family attached dwelling unit per dwelling unit   $1,400</paragraph>
      <paragraph indent="2">6.   One- and Two-Family attached dwelling unit constructed under the MPDU program                        $1,000</paragraph>
      <paragraph indent="2">7.   Additions                        $0.71 per SF</paragraph>
      <paragraph indent="2">8.   Alterations or repairs                  $0.63 per SF</paragraph>
      <paragraph indent="2">9.   Private in-ground swimming pool (including fence)       $290</paragraph>
      <paragraph indent="2">10.   Private above-ground swimming pool (including fence)      $215</paragraph>
      <paragraph indent="2">11.   Decks (opened unenclosed) 500 SF or less in area       $180</paragraph>
      <paragraph indent="2">12.   Decks (opened unenclosed) more than 500 SF in area      $0.71 per SF</paragraph>
      <paragraph indent="2">13.   Retaining Walls                  $180</paragraph>
      <paragraph indent="2">14.   Accessory Buildings 200 SF or less            $110</paragraph>
      <paragraph indent="2">15.   Accessory Buildings more than 200 SF            $0.71 per SF</paragraph>
      <paragraph indent="2">16.   Solar Panels                     $210</paragraph>
      <paragraph indent="2">17.   Rooftop Solar Panels                  $210</paragraph>
      <paragraph indent="2">18.   Rooftop Solar Panels Refer-backs            $105</paragraph>
      <paragraph indent="1">C.   Residential Plan revisions: $0.71 per SF of new construction or the application filing fee per occurrence, whichever is greater; $0.63 per SF of alteration or repair or the application filing fee per occurrence, whichever is greater. Each revision occurrence may include revision to one or more disciplines. Revisions submitted on different dates are considered separate occurrences.</paragraph>
      <paragraph indent="1">D.   Demolition Permit                        $145</paragraph>
      <paragraph indent="1">E.   Fence Permit                           $72</paragraph>
      <paragraph indent="1">F.   Commercial Buildings and Structures and Ownership Units</paragraph>
      <paragraph indent="2">1.   Application filing fee for new building construction, addition, alteration or repair   50% or permit fee or $670 whichever is greater</paragraph>
      <paragraph indent="2">2.   New construction and additions</paragraph>
      <paragraph indent="3">a.   Up to 500,000 SF of construction area         $1.19 per SF</paragraph>
      <paragraph indent="3">b.   500,001 SF of construction area and above          $1.19 per SF for first 500,000SF + $0.60 per SF of area exceeding 500,000 SF</paragraph>
      <paragraph indent="2">3.   Commercial dwelling unit (reviewed under the IBC) constructed under the MPDU program                  $1.14 per SF</paragraph>
      <paragraph indent="2">4.   Repairs, alterations and accessory structures: Permit fee is based on the cost of construction as provided by the applicant multiplied by 0.024, the local permit fee multiplier. However, the department may verify and recalculate the cost estimation submitted by the applicant. The applicant may be required to provide construction bid documents. The Director will provide a worksheet and a formula that includes the latest numerical values of the valuation data to be used in determining the fee. An applicant must provide building dimensions, square footage, use group, construction type, and numbers of floors including basements, in order for the fee to be calculated.</paragraph>
      <paragraph indent="2">5.   Ownership Units               $1,400 per unit created</paragraph>
      <paragraph indent="1">G.   Commercial Plan revisions: $670 or calculated under sections F.2. or F.3. above per occurrence, whichever is greater. Each revision occurrence may include revision to one or more disciplines. Revisions submitted on different dates are considered separate occurrences.</paragraph>
      <paragraph indent="1">H.   Use and Occupancy Certificates</paragraph>
      <paragraph indent="2">1.   The fee for any Use-and-Occupancy Certificate must be paid when the application is submitted.</paragraph>
      <paragraph indent="2">2.   Residential Use-and Occupancy Certificate         $94</paragraph>
      <paragraph indent="2">3.   The fee for any commercial Use-and-Occupancy Certificate for each building or portion of a building or use is per square foot of area, as follows:</paragraph>
      <paragraph indent="3">0 – 5000 SF                  $355</paragraph>
      <paragraph indent="3">5,001 – 10,000 SF            $520</paragraph>
      <paragraph indent="3">10,001 – 20,000 SF            $795</paragraph>
      <paragraph indent="3">20,001 SF and up   $1,240 +$.024 per SF of area exceeding 20,000 SF</paragraph>
      <paragraph indent="2">4.   The fee for Use-and Occupancy Certificate for lots or parcels without buildings/structures on them               $575</paragraph>
      <paragraph indent="1">I.   Mechanical Permit</paragraph>
      <paragraph indent="2">1.   A minimum fee of $65 applies to all Mechanical permits issued to one- and two-family attached and detached dwellings. This fee is in addition to the equipment fee listed in this section.</paragraph>
      <paragraph indent="2">2.   A minimum fee of $105 applies to all other Mechanical permits. This fee is in addition to the equipment fee listed in this section.</paragraph>
      <paragraph indent="2">3.   Except for one-and two-family attached and detached dwellings, the base mechanical fee is 1.59% of the cost difference between the contract value and the value of listed equipment. The Department may require evidence of the contract value and equipment value. The fee is in addition to the equipment fees listed in this section. The following fee schedule applies to each piece of equipment.</paragraph>
      <paragraph indent="3">New or replacement equipment:</paragraph>
      <paragraph indent="3">a.   Heating equipment (includes, but is not limited to, heat pump auxiliary heat, heating capacity of packaged units, duct heaters, VAV box heating elements, gas-fired fireplaces, geo-thermal units, etc.): Each 100 MBH or fraction      $23</paragraph>
      <paragraph indent="3">b.   Cooling equipment (includes but is not limited to, cooling capacity of heat pumps, packaged units, cooling boxes, cooling equipment with compressors, etc.): Each five ton capacity or fraction    $23</paragraph>
      <paragraph indent="3">c.   Fuel Tanks: Each 500 water gallons      $52</paragraph>
      <paragraph indent="3">d.   Expansion Tanks: Each 50 water gallons    $52</paragraph>
      <paragraph indent="3">e.   Pre-fabricated fireplace            $26</paragraph>
      <paragraph indent="3">f.   Pre-fabricated chimney            $14</paragraph>
      <paragraph indent="2">4.   Commercial Consultation inspection (per hour or fraction)   $135</paragraph>
    </subsection>
    <subsection heading="08.14.01.02 Electrical Permits and License Fees">
      <paragraph indent="1">A.   General</paragraph>
      <paragraph indent="2">1.   All fees required by this section must be paid before any permit is released, before any electrical work may begin, and before any inspection may be made.</paragraph>
      <paragraph indent="2">2.   A minimum fee of $90 applies to all electrical permits issued to one- and two-family attached and detached dwellings. This fee is in addition to the equipment fee listed in this section.</paragraph>
      <paragraph indent="2">3.   A minimum fee of $150 applies to all other electrical permits. This fee is in addition to the equipment fee listed in this section.</paragraph>
      <paragraph indent="1">B.   Electrical Permits</paragraph>
      <paragraph indent="2">1.   Air conditioners: (see motor schedule, item 18)</paragraph>
      <paragraph indent="2">2.   Appliance, small*                  $ 9</paragraph>
      <paragraph indent="1">*Such as air filters, automatic-vent amperes, clothes washers or dryers, cooking appliances (stoves, ranges, built-ins), dishwashers, disposals, fans (exhaust, attic), humidifiers, sump pumps, trash compactors, water heaters or other water-treatment appliances</paragraph>
      <paragraph indent="2">3.   Arc-vapor lamps, rectifiers, rheostat chargers for storage batteries (each)   $13 each</paragraph>
      <paragraph indent="2">4.   Battery packs (each)                  $ 9</paragraph>
      <paragraph indent="2">5.   Commercial new construction: This includes all branch circuit wiring, temporaries-pending-final, equipment/appliances within the structure. These fees are applicable to alternative power sources - such as, but not limited to: photovoltaic, wind turbine and generators.</paragraph>
      <paragraph indent="3">Not over 100 Amps               $600</paragraph>
      <paragraph indent="3">101 – 200 Amps            $745</paragraph>
      <paragraph indent="3">201 – 300 Amps               $895</paragraph>
      <paragraph indent="3">301 – 400 Amps               $1,055</paragraph>
      <paragraph indent="3">Over 400 Amps               $1,055</paragraph>
      <paragraph indent="3">PLUS $140 for each additional 100 Amps or fraction</paragraph>
      <paragraph indent="2">6.   Commercial tenant fit-ups, alterations, additions (includes all branch circuit wiring, temporaries-pending-final and equipment/appliances within the space)</paragraph>
      <paragraph indent="3">For low voltage or up to 20 devices          $155</paragraph>
      <paragraph indent="3">For single story up to 5,000 SF            $230</paragraph>
      <paragraph indent="3">For single story 5001 – 10,000 SF          $380</paragraph>
      <paragraph indent="3">For single story 10,001 – 20,000 SF          $450</paragraph>
      <paragraph indent="3">Over 20,001 SF or multi-story            $520 per story</paragraph>
      <paragraph indent="2">7.   Control wiring for heating, air conditioning, duct heaters, air handlers, and motor-control centers                  $21</paragraph>
      <paragraph indent="2">8.   Dental chairs                  $13</paragraph>
      <paragraph indent="2">9.   Electrical heating equipment (see motor schedule, item 18)</paragraph>
      <paragraph indent="2">10.   Fire/security alarm systems            $38</paragraph>
      <paragraph indent="2">11.   Single-station smoke detectors (each) installed separately   $ 4</paragraph>
      <paragraph indent="2">12.   First 20 Fixtures               $13</paragraph>
      <paragraph indent="3">Each additional 10 (or fraction thereof)      $ 9</paragraph>
      <paragraph indent="2">13.   Gasoline pumps (each)                  $ 9</paragraph>
      <paragraph indent="2">14.   Heating equipment (other than strictly electrical)</paragraph>
      <paragraph indent="3">Residential or commercial: oil burners and gas burners, including controls (each)    $13</paragraph>
      <paragraph indent="2">15.   Modular/mobile home                  $90</paragraph>
      <paragraph indent="2">16.   Motion-picture booths and equipment (each)         $90</paragraph>
      <paragraph indent="2">17.   Meter stacks - replacements (each meter)         $31</paragraph>
      <paragraph indent="2">18.   Motors, rotating machinery, transformers, switch boards, electrical heaters, air conditioners, manually operated generators (assumes 1kwor 1kva 1hp):</paragraph>
      <paragraph indent="3">Under ½ HP            charge d as fixture s</paragraph>
      <paragraph indent="3">½ HP – 10 HP (each)            $16</paragraph>
      <paragraph indent="3">11 HP – 20 HP (each)                $21</paragraph>
      <paragraph indent="3">21 HP – 30 HP (each)                $31</paragraph>
      <paragraph indent="3">31 HP – 50 HP (each)                $38</paragraph>
      <paragraph indent="3">51 HP – 75 HP (each)                $46</paragraph>
      <paragraph indent="3">75 HP (each)               $52</paragraph>
      <paragraph indent="2">19.   Outlets and rough wiring (1 – 20 lights, switches or receptacles)   $16</paragraph>
      <paragraph indent="3">Each additional 10 outlets (or fraction thereof)      $ 7</paragraph>
      <paragraph indent="2">20.   Radio, television, telephone (towers, dishes, microwave, relay systems, etc.)   $97</paragraph>
      <paragraph indent="2">21.   Service equipment, heavy-up, replacement, sub-panel, or relocation (Residential only)</paragraph>
      <paragraph indent="3">0 – 400 Amps                  $38</paragraph>
      <paragraph indent="3">Over 400 Amps               $76</paragraph>
      <paragraph indent="2">22.   Signs (each sign)                  $90</paragraph>
      <paragraph indent="2">23.   New Multi-family buildings (apartments, condominium dwelling units)</paragraph>
      <paragraph indent="3">Each dwelling unit               $230</paragraph>
      <paragraph indent="3">(Common areas such as stairwells, laundry, and storage rooms are charged as individual units for each panel or sub-panel required)</paragraph>
      <paragraph indent="2">24.   Existing Multi-family buildings (apartments, condominium dwelling units)</paragraph>
      <paragraph indent="3">Each dwelling unit               $150</paragraph>
      <paragraph indent="3">(Common areas such as stairwells, laundry, and storage rooms are charged as individual units for each panel or sub-panel required)</paragraph>
      <paragraph indent="2">25.   One- and two-family dwellings and townhouses: This includes all branch circuit wiring, temporaries-pending-final and equipment/appliances within the structure. These fees are also applicable to alternative power sources (such as but not limited to: photovoltaic, wind turbine and generators switched with an automatic transfer switch). The flat fees for all wiring, fixtures, appliances, etc., including temporaries-pending-final are as follows:</paragraph>
      <paragraph indent="3">Up to 200 Amps               $230</paragraph>
      <paragraph indent="3">201 – 400 Amps            $335</paragraph>
      <paragraph indent="3">Over 400 Amps            $450</paragraph>
      <paragraph indent="2">26.   Special deck inspections, slab concealment (each)       $46</paragraph>
      <paragraph indent="2">27.   Sub-panels (Commercial)</paragraph>
      <paragraph indent="3">0 – 400 Amps                  $38</paragraph>
      <paragraph indent="3">Over 400 Amps               $76</paragraph>
      <paragraph indent="2">28.   Swimming pools, hot tubs, and spas (including circulating pumps, fixtures and receptacles)                     $76</paragraph>
      <paragraph indent="3">Bonding                  $21</paragraph>
      <paragraph indent="2">29.   Temporary wiring - carnivals, fairs, holiday decorations and tree lots, etc. (includes panels and fixtures)               $110</paragraph>
      <paragraph indent="2">30.   Temporary for construction (Residential only)         $76</paragraph>
      <paragraph indent="2">31.   Transformers (see motor schedule, item 18)</paragraph>
      <paragraph indent="2">32.   Transformer vaults, duct banks</paragraph>
      <paragraph indent="3">(outdoor transformer, enclosure substation, or a switch-and-meter vault on private property including wiring)            $97</paragraph>
      <paragraph indent="2">33.   X-ray machines (each)                  $16</paragraph>
      <paragraph indent="2">34.   Any low-voltage work not previously specified</paragraph>
      <paragraph indent="3">1 – 10 devices                  $33</paragraph>
      <paragraph indent="3">Each additional 10 or fraction thereof          $ 7</paragraph>
      <paragraph indent="2">35.   Rooftop Solar Photovoltaic (up to 200 amps)         $115</paragraph>
      <paragraph indent="2">36.   Electrical Charging Station               $50</paragraph>
      <paragraph indent="1">C.   Electrical License Fees</paragraph>
      <paragraph indent="2">1.   Electrical Examinations</paragraph>
      <paragraph indent="3">a.   Master Electrician and Master Limited      $75</paragraph>
      <paragraph indent="3">b.   Journeyman Electrician            $75</paragraph>
      <paragraph indent="3">c.   Homeowner’s Electrical Examination Fee   $75</paragraph>
      <paragraph indent="3">d.   Homeowner’s Electrical Re-Examination Fee   $75</paragraph>
      <paragraph indent="2">2.   License and License Renewal Fees (per year)</paragraph>
      <paragraph indent="3">a.   Electrical Contractor            $88</paragraph>
      <paragraph indent="3">b.   Master Electrician            $88</paragraph>
      <paragraph indent="3">c.   Master Electrician (Limited)         $88</paragraph>
      <paragraph indent="3">d.   Journeyman Electrician            $88</paragraph>
      <paragraph indent="3">e.   Apprentice Electrician (identification card)   $88</paragraph>
      <paragraph indent="2">3.   Duplicate license or identification card         $31</paragraph>
      <paragraph indent="2">4.   Re-examination fee               $31</paragraph>
      <paragraph indent="2">5.   Late renewal fee               $59</paragraph>
      <paragraph indent="2">6.   Electrical contractor change of business name or status   $59</paragraph>
      <paragraph indent="2">7.   Electrician Good Standing Letter         $31</paragraph>
    </subsection>
    <subsection heading="08.14.01.03Fire Code Fees">
      <paragraph indent="1">A.   General</paragraph>
      <paragraph indent="2">1.   All fees required by this section must be paid before any permit is released and construction is started.</paragraph>
      <paragraph indent="2">2.   The minimum application filing fee for new installation or revision is $155.</paragraph>
      <paragraph indent="2">3.   Plan revisions are considered changes made by the applicant to the approved construction documents. Revision fees are in addition to the original or maximum permit fees. Revisions submitted on different dates are considered separate occurrences.</paragraph>
      <paragraph indent="1">B.   Fire-Protection-Systems Fees</paragraph>
      <paragraph indent="2">1.   Fire-alarm and -detection systems (devices, main control panels, or household devices and control panels (per device)         $31</paragraph>
      <paragraph indent="2">2.   CO2 or Clean Agent systems (per system)      $760</paragraph>
      <paragraph indent="2">3.   Sprinkler systems (per sprinkler head)         $ 7</paragraph>
      <paragraph indent="2">4.   Fire pumps (per pump)               $600</paragraph>
      <paragraph indent="2">5.   Added hose valves on existing standpipe (per hose)    $355</paragraph>
      <paragraph indent="2">6.   Dry or Wet Chemical Extinguishing systems (per system)   $465</paragraph>
      <paragraph indent="2">7.   Standpipe systems (per riser)            $525</paragraph>
      <paragraph indent="1">C.   Plan Revisions</paragraph>
      <paragraph indent="2">1.   Fire Alarm (per device)                  $31</paragraph>
      <paragraph indent="2">2.   Sprinkler Systems (per sprinkler head)            $ 7</paragraph>
      <paragraph indent="2">3.   Other - per device (includes CO2 and Clean Agent systems, Fire pumps, added hose valves on existing standpipe, Dry or Wet Chemical extinguishing systems)   $155</paragraph>
    </subsection>
    <subsection heading="08.14.01.04Certificate Fees">
      <paragraph indent="1">Capacity Certificate fee is $115 per assembly room; $5.00 for each duplicated certificate.</paragraph>
    </subsection>
    <subsection heading="08.14.01.05Well-Location Permit">
      <paragraph indent="1">Well-Location Permit (Each well)                  $160</paragraph>
    </subsection>
    <subsection heading="08.14.01.06Vendor Fees">
      <paragraph indent="1">A.   Operator Permit fee</paragraph>
      <paragraph indent="2">1.   For Non-Certified Agricultural Producers and their operators   $70</paragraph>
      <paragraph indent="2">2.   For Certified Agricultural Producers and their operators      $56</paragraph>
      <paragraph indent="1">B.   Point-of-Sale License for Vendors Who are not Certified Agricultural Producers</paragraph>
      <paragraph indent="2">1.   Per site for Site-Specific               $315</paragraph>
      <paragraph indent="2">2.   Door-to-Door                     $140</paragraph>
      <paragraph indent="2">3.   Regular Route                     $245</paragraph>
      <paragraph indent="1">C.   Temporary Sales License</paragraph>
      <paragraph indent="2">1.   60 consecutive days                  $175</paragraph>
      <paragraph indent="2">2.   Daily Rate                        $175</paragraph>
      <paragraph indent="1">D.   Performance Bond for Future-Delivery Vendor            $1,305</paragraph>
    </subsection>
    <subsection heading="08.14.01.07Benefit Performances">
      <paragraph indent="1">A.   A benefit performance may not be conducted without a permit and all fees required by this section must be paid before release of the permit for a benefit performance.</paragraph>
      <paragraph indent="1">B.   A bona fide non-profit organization must pay the following permit fee for a permit for a benefit performance.</paragraph>
      <paragraph indent="2">Benefit Performance                     $175</paragraph>
    </subsection>
    <subsection heading="08.14.01.08Storage of Vendor-Confiscated Goods">
      <paragraph indent="1">This regulation sets a fee for the storage of goods confiscated by the Department of Permitting Services enforcement staff from vendors illegally offering goods for sale.</paragraph>
      <paragraph indent="2">Storage Fee                           $140</paragraph>
    </subsection>
    <subsection heading="08.14.01.09Miscellaneous">
      <paragraph indent="1">A.   Filing fees and permit fees are based on fees in effect on the date the application was filed. All other fees are based on fees in effect at the time the service is requested (revision fee, extension fee, etc.).</paragraph>
      <paragraph indent="1">B.   All fees in this schedule are subject to the Automation Enhancement Fee per COMCOR 08.24B.02.</paragraph>
      <paragraph indent="1">C.   Refunds: Minimum permit filing and license fees are non-refundable, except in the case of an administrative error. In the case of an abandonment or discontinuance of a project under permit, the person who has paid the permit fee may return the permit for cancellation and, upon cancellation, may be refunded up to 50% of the fee paid, less the filing fee or minimum fee, as appropriate, provided: (1) No construction has occurred, and (2) the written request for a refund is made before the expiration date of the permit. Revoked, suspended, or invalid permits or licenses, or licenses or permits in litigation, are not eligible for refunds.</paragraph>
      <paragraph indent="1">D.   Application Extensions: The fee to extend an application (before the permit is issued) is 15% of the filing fee.</paragraph>
      <paragraph indent="1">E.   Permit Extensions: The fee to extend a permit, after written application and before expiration of the original permit, is 15% of the total permit fee.</paragraph>
      <paragraph indent="1">F.   Inspection Fees:</paragraph>
      <paragraph indent="2">1.   First or second approved inspection of the same item or stage of construction for permitted work:  Included in permit fee.</paragraph>
      <paragraph indent="2">2.   Initial inspection of sites or property where work is proceeding without a permit   $150</paragraph>
      <paragraph indent="2">3.   Applicant requested partial inspection for residential (each occurrence). Each re-inspection (residential or commercial) of the same item or stage of construction after two disapprovals            $97</paragraph>
      <paragraph indent="2">4.   The re-inspection fee must be paid before an additional inspection is scheduled.</paragraph>
      <paragraph indent="1">G.   Permit Application Revisions: The fee for revisions to permit information after submission by the applicant                  $49</paragraph>
      <paragraph indent="1">H.   Plan revision, residential - room description name change      $49</paragraph>
      <paragraph indent="1">I.   Construction codes modifications or interpretations         $510</paragraph>
      <paragraph indent="1">J.   Permit Denials: All permit requests that are denied because the applicant must apply to the Board of Appeals for a variance must include a non-refundable $62 processing fee.</paragraph>
    </subsection>
    <subsection heading="08.14.01.10Indexing Of Fees To Labor and Operating Cost Changes and to Manage Reserves">
      <paragraph indent="1">The Director of Permitting Services must calculate an enterprise fund stabilization factor (EFSF) each year to be applied to each fee set in or under this regulation on July 1 or each year. The EFSF is the factor by which the fee calculation is adjusted, up or down, to cover DPS labor and operating costs and to manage the DPS reserve policy in accordance with the 2002 Principles of the Fiscal Management of the Permitting Services Fund. The Director must publish the EFSF for each upcoming fiscal year not later than March 15 of the current fiscal year. For any year in which the EFSF will be less than .80 or greater than 1.20, the Department must review its fee rates and functional analysis behind the fee rates to determine if changes need to be made to the fee rates.</paragraph>
    </subsection>
    <subsection heading="08.14.01.11Severability">
      <paragraph indent="1">The provisions of this regulation are severable. If a court of competent jurisdiction holds that a provision is invalid or inapplicable, the remainder of the regulation remains in effect.</paragraph>
    </subsection>
  </regulation>
</section>