<?xml version='1.0' encoding='utf-8'?>
<section number="2-253.63" name="Fees and Charges" law="code" slug="sec-2-253.63" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_2AD_DIV14CFECH_S2-253.63FECH">
  <level label="a">
    <text>This fee schedule applies to fees and charges assessed by Prince George's County, Maryland for regulated activities that occur within its jurisdiction.</text>
  </level>
  <level label="b">
    <text>The fees prescribed in this schedule will supersede previous fees and charges assessed by Prince George's County, Maryland for regulated activities that occur within its jurisdiction.</text>
  </level>
  <level label="c">
    <text>All fees and charges are subject to a 5% technology fee with the exception of the multi-family rental license fee and the single-family rental license fee.</text>
  </level>
  <level label="d">
    <text>Subject to Subsection (j), below, the Director of the Department of Permitting, Inspections and Enforcement shall establish and maintain a comprehensive Table of Fees, as referenced and included in this Bill, for all types of permits. The Director or the County Council shall have the authority to change the fees from time to time as is determined necessary; and the Director shall republish the Table of Fees which shall be posted in the Department of Permitting, Inspections and Enforcement's Permit Office and on its website. Prior to implementing a change in the fees, the Director of the Department of Permitting, Inspections and Enforcement shall hold public informational sessions to allow for public comment as part of this process. The Director shall also submit the proposed Table of Fees to the County Executive for approval and for transmittal to the County Council for legislative review and approval by resolution, after notice and public hearing.</text>
  </level>
  <level label="e">
    <text>The Director of the Department of Permitting, Inspections and Enforcement shall promulgate written regulations to establish and govern a method of notification for increases as a result of the International Code Council and industry standard increases. The Director shall also promulgate written regulations for the administration of the provisions of this Section and shall, at his or her discretion, hold public informational sessions to allow for public comment as part of this process.</text>
  </level>
  <level label="f">
    <text>Fees may be adjusted using a method established by the International Code Council and industry standards pursuant to paragraphs (d) and (e) of this Section. Any changes to fees and charges that are not connected to the International Code Council or industry standards, except for those prescribed in Subsection (j), below, shall be changed by County Council approval by resolution, after notice and public hearing.</text>
  </level>
  <level label="g">
    <text>Each fee set forth in the schedule shall be paid in advance of the issuance of a permit, license, plan or item as set forth in the schedule. If the application review is pending through no fault of the licensee after the expiration date, then that application will not be subject to administrative late fees. Fees shall not be refunded in whole or in part once work has begun, licenses or permits have been issued or funds have been encumbered. Prior to those itemized occurrences and within six (6) months of payment, it is within the discretion of the Director of the Department of Permitting, Inspections and Enforcement to issue a refund.</text>
  </level>
  <level label="h">
    <text>The fees and charges shall be designated in a Table of Fees section 2-253.63, Attachment A and as published on the DPIE website.</text>
  </level>
  <level label="i">
    <text>Fees and charges pursuant to this section assessed to a Locally owned and Operated Business as defined in Section 10-335(a)(4) shall be discounted by 50% at the time of such assessment.</text>
  </level>
  <level label="j">
    <text>Special Quality of Life Impact Uses.</text>
    <level label="1">
      <text>The following fees shall apply and be remitted in advance of the issuance of Use and Occupancy permits for the following uses:</text>
      <level label="A">
        <text>Any business that is a commercial use with a Class A beer, wine, and liquor license pursuant to Title 26, Subtitle 9 of the Alcoholic Beverages and Cannabis Article, Annotated Code of Maryland - $5000;</text>
      </level>
      <level label="B">
        <text>Any business that is a tobacco shop, electronic cigarette shop, retail tobacco business, or convenience store use, as prescribed under Part 27-5 of Subtitle 27 of the Code, with a tobacco retail license issued by the Maryland Alcohol, Tobacco, and Cannabis Commission - $5000;</text>
      </level>
      <level label="C">
        <text>Any business that is a commercial use operating pursuant to a State of Maryland Regulated Firearms Dealer's License under Title 5, Subtitle 1 of the Public Safety Article, Annotated Code of Maryland - $5000; and</text>
      </level>
      <level label="D">
        <text>Any business that is a consolidated storage use, as prescribed under Part 27-5 of Subtitle 27 of the Code - $5000</text>
      </level>
    </level>
    <level label="2">
      <text>Renewal fee. Each business to which Paragraph (1), above, is applicable shall be required to remit an annual Use and Occupancy permit renewal fee in the amount of $5000 per year due every 12 months after the date of initial use and occupancy permit approval. Any business defined under (A), (B), (C), or (D) in Paragraph (1), above, with an existing Use and Occupancy permit as of the effective date of this Subsection shall commence remitting an annual Use and Occupancy permit renewal fee due no later than January 1, 2027 of $5000 and by every January 1st thereafter. The Use and Occupancy permit of any business that does not comply with this Paragraph shall be invalid and revoked by the Director of the Department of Permitting Inspections and Enforcement.</text>
    </level>
    <level label="3">
      <text>Revocation. The Use and Occupancy permit of any business that does not comply with this Paragraph shall be invalid and revoked by the Director of the Department of Permitting, Inspections, and Enforcement. Prior to the revocation of a permit under this paragraph, the Director shall give written notice to the permittee setting forth the basis of the revocation. Any person whose permit is revoked under this paragraph may appeal the decision of the Director to the Board of Administrative Appeals for Prince George's County within ten (10) calendar days after receipt of notice of revocation.</text>
    </level>
    <level label="4">
      <text>As a courtesy, the Director of the Department of Permitting Inspections and Enforcement may notify in writing any business that is subject to a Use and Occupancy permit renewal fee requirement pursuant to this Subsection of its renewal fee obligation at least 90 days before the renewal fee due date and may grant up to a 90-day grace period for late renewal fee payments. Failure to provide this discretionary renewal notice is not a legal basis to challenge the revocation of the Use and Occupancy permit or any other enforcement action taken pursuant to this Subtitle.</text>
    </level>
    <level label="5">
      <text>On February 1st of each year, the Director of the Department of Permitting, Inspections, and Enforcement shall increase the fees prescribed in this Subsection by the greater of (i) the average Consumer Price Index for All Urban Consumers (CPI-U) for the Washington-Arlington-Alexandria area published by the Federal Bureau of Labor Statistics for the previous calendar year or (ii) zero percent.</text>
    </level>
    <level label="6">
      <text>Quality of Life Improvement Fund. The Office of Finance shall establish and administer a Quality of Life Improvement Fund, a nonlapsing fund into which all fees remitted in accordance with this Subsection shall be deposited and that shall not revert to the County fund balance at the end of each fiscal year. Funds from the Quality of Life Improvement Fund shall be used solely for the following:</text>
      <level label="A">
        <text>Quality of life improvements for the residents of Prince George's County, which may include, but are not limited to including:</text>
        <level label="i">
          <text>Youth, child care, and educational programs, projects, and initiatives;</text>
        </level>
        <level label="ii">
          <text>Public health and senior wellness programs, projects, and initiatives;</text>
        </level>
        <level label="iii">
          <text>Public safety, pedestrian safety, and road and transit safety programs, projects, and initiatives; and</text>
        </level>
        <level label="iv">
          <text>Economic assistance programs, projects, and initiatives for residents and businesses in socioeconomically disadvantaged circumstances; and</text>
        </level>
        <level label="v">
          <text>Administrative costs associated with operating quality of life improvement programs identified in this subparagraph.</text>
        </level>
      </level>
      <level label="B">
        <text>At the time of remittance, 10% of the fees remitted to the Quality of Life Improvement Fund shall be disbursed to the Prince George's County Early Start Child Care Scholarship Fund and 5% of the fees remitted to the Quality of Life Improvement Fund shall be disbursed to the Child Care Facilities Loan Program.</text>
      </level>
      <level label="C">
        <text>Except for disbursements mandated by Subparagraph (B), above, any disbursements from the Quality of Life Improvement Fund shall be proposed and approved by County Council resolution.</text>
      </level>
    </level>
    <level label="7">
      <text>This Subsection shall not apply to any use that is operating as a gas station.</text>
    </level>
  </level>
  <level label="k">
    <text>Sit-down Restaurant Permitting Incentive Program.</text>
    <level label="1">
      <text>Definition. For the purposes of this subsection, Sit-down restaurant means a restaurant, as defined pursuant to Part 27-2 of Subtitle 27 of the Code, whose principal method of operation consists of sit-down table service provided by dedicated waitstaff for on-site food and beverage consumption. A sit-down restaurant must provide table service to at least ninety percent (90%) of its patrons, and one hundred percent (100%) of its patrons must be served by dedicated waitstaff. Restaurants whose principal method of operation is counter service, quick service, or carryout food and beverage service for offsite consumption are not sit-down restaurants under this Subsection. Restaurants that provide drive through service are not sit-down restaurants under this Subsection.</text>
    </level>
    <level label="2">
      <text>Sit-down Restaurant Permitting Incentive. Fees and charges pursuant to this section assessed to a business that is a sit-down restaurant or to an applicant to operate as a sit-down restaurant shall be discounted by fifty percent (50%) at the time of such assessment.</text>
    </level>
    <level label="3">
      <text>The Director of the Department of Permitting, Inspections, and Enforcement:</text>
      <level label="A">
        <text>shall interpret this Section and assess the features of a business applicant to determine whether the business is a sit-down restaurant in accordance with this Subsection before applying the discount prescribed herein; and</text>
      </level>
      <level label="B">
        <text>is authorized to promulgate regulations to administer this Act, subject to approval by resolution of the County Council.</text>
        <table>
          <row>
            <cell>ATTACHMENT A. TABLE OF FEES DPIE FEE SCHEDULE - Date 8-15-2024 This table is as referenced in Prince George's County Code Subtitle 2, Division 14C, Section 2-253.63</cell>
          </row>
          <row>
            <cell>DPIE Fee Description</cell>
            <cell>Minimum Permit Fee (not Including Other Applicable Fees)</cell>
            <cell>Fee Rule - Fee Calculation(if Higher than Minimum)</cell>
          </row>
          <row>
            <cell>GENERAL PERMIT FEES</cell>
          </row>
          <row>
            <cell>After-Hours Permit</cell>
            <cell>$72</cell>
            <cell>Total Fee = Administrative Fee $66 + Permit Fee $72. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Developer Contribution - Road Construction Fee in Lieu - Offsite Improvement PB Condition — LMS Note: When depositing payment, prepare receipt with customer number account that each payment should be deposited.</cell>
            <cell>Fee based on Planning Board Condition with Annual Escalation</cell>
            <cell>No Technology Fee. Only applicable if required by PB Condition. These fees are typically collected with each applicable building permit.</cell>
          </row>
          <row>
            <cell>Duplicate Documents - at discretion of staff</cell>
            <cell>$0.32 per Page</cell>
            <cell>Plus Technology Fee - 10%</cell>
          </row>
          <row>
            <cell>Duplicate Permit</cell>
            <cell>$6.60</cell>
            <cell>Plus Technology Fee - 10%</cell>
          </row>
          <row>
            <cell>M-NCPPC Review Fee</cell>
            <cell>$5</cell>
            <cell>Plus Technology Fee - 10%. This fee is collected with all permits that require MNCPPC review.</cell>
          </row>
          <row>
            <cell>Miscellaneous Document Searches (for MPIA and Staff Searches)</cell>
            <cell>$82 per hour over two hours; $0.32 per letter-sized page; $6.60 per document (permits, U&amp;O certificates, oversized sheets, inspection history, census reports, certified copies); $53 plus $6.60 per page for re-stamped plans).</cell>
            <cell>Plus Technology Fee - 10%</cell>
          </row>
          <row>
            <cell>New Plan Review Fee</cell>
            <cell>$120</cell>
            <cell>$120 per discipline per hour. Plus Technology Fee - 10%</cell>
          </row>
          <row>
            <cell>Post Construction Permit Fee - Residential - 1st Offense</cell>
            <cell>Building $500, Electrical $500, Mechanical $500, Fire Protection $500, Geotechnical $500, Civil $500</cell>
            <cell>Fees are assessed in addition to normal building permit fees. Plus Technology Fee - 10%. Refer to County Code Section 4-352(i)(53)</cell>
          </row>
          <row>
            <cell>Post Construction Permit Fee - Commercial - 1st Offense</cell>
            <cell>Building $2000, Electrical $2000, Mechanical $2000, Fire Protection $2000, Geotechnical $2000, Civil $2000</cell>
            <cell>Fees are assessed in addition to normal building permit fees. Plus Technology Fee - 10%. Refer to County Code Section 4-352(i)(53)</cell>
          </row>
          <row>
            <cell>Post Construction Permit Fee - Residential - 2nd Offense</cell>
            <cell>Building $1000, Electrical $1000, Mechanical $1000, Fire Protection $1000, Geotechnical $1000, Civil $1000</cell>
            <cell>Fees are assessed in addition to normal building permit fees. Plus Technology Fee - 10%. Refer to County Code Section 4-352(i)(53)</cell>
          </row>
          <row>
            <cell>Post Construction Permit Fee - Commercial - 2nd Offense</cell>
            <cell>Building $3000, Electrical $3000, Mechanical $3000, Fire Protection $3000, Geotechnical $3000, Civil $3000</cell>
            <cell>Fees are assessed in addition to normal building permit fees. Plus Technology Fee - 10%. Refer to County Code Section 4-352(i)(53)</cell>
          </row>
          <row>
            <cell>Preliminary Design Meeting</cell>
            <cell>$990</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Technology Fee</cell>
            <cell>10%</cell>
            <cell>As Appropriate</cell>
          </row>
          <row>
            <cell>Universal Design for Housing Waiver Request Fee</cell>
            <cell>$245</cell>
            <cell>Plus 5% Technology Fee</cell>
          </row>
          <row>
            <cell>Variance Application Fee</cell>
            <cell>$231.00</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell />
          </row>
          <row>
            <cell>Note: All DPIE/Health permitting and licensing fees are assessed an additional ten percent (10%) Technology Fee</cell>
          </row>
          <row>
            <cell>Abbreviations: DU — Dwelling Unit LF — Linear Foot R/W — Right-of-Way SF — Square Foot</cell>
          </row>
          <row>
            <cell>Govolution Fees: The Govolution servicing fees for ACH, credit and debit card payment processing are as follows: * eCheck/ACH payments incur a servicing fee of $1.50. * Visa Consumer Debit Transactions incur a flat rate service fee of $3.95. * All other Credit &amp; Debit card transactions incur a service fee of 2.45% of the payment amount.</cell>
          </row>
          <row>
            <cell>Visit ePayments to make online payments.</cell>
          </row>
          <row>
            <cell />
          </row>
          <row>
            <cell>BUILDING PERMIT FEES</cell>
          </row>
          <row>
            <cell>RESIDENTIAL BUILDING PERMIT FEES</cell>
            <cell />
            <cell />
          </row>
          <row>
            <cell>Addition - Residential</cell>
            <cell>$1.17 per SF plus $1.30/SF over 3500 SF</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee (SF × $1.17 plus $1.30/SF over 3500 SF) + $53 Grading Fee + $112 U&amp;O + $5 M-NCPPC - Plus Technology Fee 10%.</cell>
          </row>
          <row>
            <cell>Alteration/Repair - Interior</cell>
            <cell>$220</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($220 or 1% of Construction Cost, whichever is greater) + $112 U&amp;O if applicable. Plus Technology Fee 10%. Fees.</cell>
          </row>
          <row>
            <cell>Alteration/Repair without U&amp;O - Exterior</cell>
            <cell>$220</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($220 or 1% of Construction Cost, whichever is greater). Plus Technology Fee 10%.</cell>
          </row>
          <row>
            <cell>Application Filing Fee for New Buildings, Structures</cell>
            <cell>$66.00</cell>
            <cell>Administrative $66 plus Up to 50% of the Estimated Cost of the Permit (Refundable less Administrative and Plan Review Costs Incurred if Application is Cancelled). Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Areaway/External Stair Addition</cell>
            <cell>See Alteration/Repair without U&amp;O - Exterior</cell>
            <cell />
          </row>
          <row>
            <cell>Basement Finishing</cell>
            <cell>See Alteration/Repair interior</cell>
            <cell />
          </row>
          <row>
            <cell>Bike Signage Fee (based on Planning Board Condition)</cell>
            <cell>Varies</cell>
            <cell>No Technology Fee. Collect only if required by Planning Board Condition</cell>
          </row>
          <row>
            <cell>Building Permit - Modification/Revision After Issuance - Residential</cell>
            <cell>$132</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $132 + $53 Grading Fee if applicable + $5 MNCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Building Permit - Modification/Revision Prior To Issuance - Residential</cell>
            <cell>$66</cell>
            <cell>$66 + $53 Grading Fee if applicable + $5 MNCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Carport</cell>
            <cell>$1.17 per SF plus $1.30/SF over 3500 SF</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee (SF × $1.17 plus $1.30/SF over 3500 SF) + $53 Grading Fee + $5 M-NCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Deck or Pergola</cell>
            <cell>$151.00</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $151 + $53 Grading Fee + $5 M-NCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Demolition (Not Full Raze)</cell>
            <cell>$172</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $172 + $53 Grading Fee if Exterior + $5 M-NCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Enclose Existing Porch/Deck - or - New Porch</cell>
            <cell>See Alteration/Repair interior</cell>
            <cell />
          </row>
          <row>
            <cell>Fair Share Contribution (based on Planning Board Condition)</cell>
            <cell>Varies</cell>
            <cell>No Technology Fee. Collect only if required by Planning Board Condition</cell>
          </row>
          <row>
            <cell>Fence - Residential</cell>
            <cell>$145</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $145 + $53 Grading Fee + $5 MNCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Fire Damage - Residential</cell>
            <cell>$660</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($660 or 1% of Construction Cost, whichever is greater) + $53 Grading Fee + $5 MNCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Fire Sprinkler - Residential - NFPA 13R or 13 System</cell>
            <cell>$220.00</cell>
            <cell>Total Fee = Administrative Fee $66 + $4 per head or minimum $220. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Fire Sprinkler - Residential (one and two family dwelling and townhouses not more than 3 stories) - NFPA 13D System</cell>
            <cell>$152 residential</cell>
            <cell>Total Fee = Administrative Fee $66 + $152 residential. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Fireplace with Chimney</cell>
            <cell>See Alteration/Repair interior</cell>
            <cell />
          </row>
          <row>
            <cell>Fireplace/Wood Stove - Prefabricated</cell>
            <cell>See Alteration/Repair interior</cell>
            <cell />
          </row>
          <row>
            <cell>Garage - Attached and Detached</cell>
            <cell>$1.17 per SF</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee (SF × $1.17) + $53 Grading Fee + $5 M-NCPPC + $112 U&amp;O. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Gazebo - Residential</cell>
            <cell>$151</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $151 + $53 Grading Fee + $5 M-NCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Home Builder Guarantee Fund</cell>
            <cell>$60</cell>
            <cell>No Technology Fee. (DPIE Keeps $1 for Administrative Processing) - Assessed on New Residential - Per Dwelling Unit</cell>
          </row>
          <row>
            <cell>Light Pole Base (Private Street Lights)</cell>
            <cell>$99</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $99 + $46 for each Additional Pole Base + $53 Grading Fee. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Master File - Plans On File (POF) - fees charged for one building permit only</cell>
            <cell>See Single Family Dwelling (New Construction House)</cell>
            <cell />
          </row>
          <row>
            <cell>Mobile Home Replacement (Existing Parks Only)</cell>
            <cell>$1,485</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $1485 + $53 Grading Fee + $5 M-NCPPC + $112 U&amp;O. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Open Pit</cell>
            <cell>$151</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $151 + $53 Grading Fee + $5 M-NCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Patio - Residential &gt; 500 Sq Ft</cell>
            <cell>$151</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $151 + $53 Grading Fee + $5 M-NCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Permit Application Renewal, Extension - or - Extension of Expired Permit</cell>
            <cell>$132</cell>
            <cell>Plus Technology Fee 10%; Add $5 MNCPPC</cell>
          </row>
          <row>
            <cell>Permit Renewal - Residential</cell>
            <cell>$132</cell>
            <cell>Plus Technology Fee 10%; Add $5 MNCPPC</cell>
          </row>
          <row>
            <cell>Pole Barn</cell>
            <cell>$132</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($132 or 1% of Construction Cost, whichever is greater) + $53 Grading Fee + $5 MNCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Post Construction Permit Fees</cell>
            <cell>See General Permit Fees Section</cell>
            <cell />
          </row>
          <row>
            <cell>Public Safety and Behavioral Health Surcharge Fee - all other locations - subject to determination by MNCPPC</cell>
            <cell>$9,680 (July 1, 2024 to June 30, 2025)</cell>
            <cell>Per Building; No Technology Fee</cell>
          </row>
          <row>
            <cell>Public Safety and Behavioral Health Surcharge Fee - locations inside Transportation Service Area 1, as defined by MNCPPC in Approved General Plan and for construction in an area included in a basic plan or conceptual site plan abutting existing or planned mass transit rail station site operated by WMATA and complies with requirements of any sector plan, master plan or overlay zone - subject to determination by MNCPPC</cell>
            <cell>$3,229 (July 1, 2024 to June 30, 2025)</cell>
            <cell>Per Building; No Technology Fee</cell>
          </row>
          <row>
            <cell>Public Safety Fee - Mitigation for Police</cell>
            <cell>$4,983</cell>
            <cell>Per Building; No Technology Fee; Collect Fee if Required by Planning Board Conditions</cell>
          </row>
          <row>
            <cell>Public Safety Fee - Mitigation for Fire</cell>
            <cell>$1,741</cell>
            <cell>Per Building; No Technology Fee; Collect Fee if Required by Planning Board Conditions</cell>
          </row>
          <row>
            <cell>Ramp</cell>
            <cell>$151.00</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $151 + $53 Grading Fee + $5 M-NCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Raze - Residential</cell>
            <cell>$396</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($396 or 1% of Construction Cost, whichever is greater) + $53 Grading Fee + $5 MNCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Retaining Wall - &gt; 2 ft. - Residential</cell>
            <cell>$120 per wall</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $120 per wall + $53 Grading fee + $5 M-NCPPC. Plus Technology Fee 10%.</cell>
          </row>
          <row>
            <cell>Roofing - Shingles &amp; Plywood - Residential</cell>
            <cell>See Alteration/Repair without U&amp;O - Exterior</cell>
            <cell />
          </row>
          <row>
            <cell>Satellite Dish - Residential</cell>
            <cell>$99</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $99 + $5 MNCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>School Surcharge Fee - All Other Locations - subject to determination by MNCPPC</cell>
            <cell>$20,500 per DU (July 1, 2024 to June 30, 2025)</cell>
            <cell>Per DU; No Technology Fee</cell>
          </row>
          <row>
            <cell>School Surcharge Fee - locations inside Transportation Service Area 1 and locations within a Basic Plan or Conceptual Site Plan that abuts a mass transit rail stations with certain MNCPPC approvals - subject to determination by MNCPPC</cell>
            <cell>$11,950 per DU (July 1, 2024 to June 30, 2025)</cell>
            <cell>Per DU; No Technology Fee</cell>
          </row>
          <row>
            <cell>Shed &gt; 150 Sq Ft</cell>
            <cell>$1.17 per SF</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee (SF × $1.17) + $53 Grading Fee + $5 M-NCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Single Family Dwelling (New Construction House) &lt; 3,500 Sq Ft</cell>
            <cell>$4,095</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $4095 + $53 Grading Fee + $112 U&amp;O + $5 M-NCPPC. Plus Technology Fee 10%. Add School Facility Surcharge and Public Safety and Behavioral Health Surcharge Fees.</cell>
          </row>
          <row>
            <cell>Single Family Dwelling (New Construction House) &gt; 3,500 Sq Ft</cell>
            <cell>$4,095</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($1.17 plus $1.30/SF over 3500 SF) + $53 Grading Fee + $112 U&amp;O + $5 MNCPPC. Plus Technology Fee 10%. Add School Facility Surcharge and Public Safety and Behavioral Health Surcharge Fees.</cell>
          </row>
          <row>
            <cell>Solar Panels (Ground-mounted) - Residential</cell>
            <cell>$158</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($0.03 per watt or $158, whichever is greater) + $53 Grading Fee + $5 MNCPPC + $112 U&amp;O. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Solar Panels (Roof-mounted) - Residential</cell>
            <cell>$158</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($0.03 per watt or $158, whichever is greater) + $5 MNCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Sun Room</cell>
            <cell>See Addition - Residential</cell>
            <cell />
          </row>
          <row>
            <cell>Swimming Pool (Above-ground/Restoration) - Residential</cell>
            <cell>$132</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($132) + $53 Grading Fee + $5 MNCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Swimming Pool (In-ground) - Residential</cell>
            <cell>$297</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($297) + $53 Grading Fee + $5 MNCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Townhouse (New Construction House)</cell>
            <cell>See Single Family Dwelling (New Construction House)</cell>
            <cell />
          </row>
          <row>
            <cell>Underpinning - Residential or Commercial</cell>
            <cell>See Alteration/Repair without U&amp;O - Exterior</cell>
            <cell />
          </row>
          <row>
            <cell>Use &amp; Occupancy - 1 &amp; 2 Family Dwelling</cell>
            <cell>$112</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Waterproofing</cell>
            <cell>See Alteration (Interior or Exterior), Repair, Accessory, or Miscellaneous Building Permit</cell>
            <cell />
          </row>
          <row>
            <cell>Window Well</cell>
            <cell>See Alteration/Repair without U&amp;O - Exterior</cell>
            <cell />
          </row>
          <row>
            <cell>COMMERCIAL BUILDING PERMIT FEES</cell>
            <cell />
            <cell />
          </row>
          <row>
            <cell>ADA Chairlift/Vertical Lift (Exterior) - Commercial</cell>
            <cell>$220</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($220 or 2% of verifiable construction cost prepared by A/E or GC, whichever is greater) + $53 Grading Fee + $5 MNCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>ADA Chairlift/Vertical Lift (Interior) - Commercial</cell>
            <cell>$220</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($220 or 2% of verifiable construction cost prepared by A/E or GC, whichever is greater) + $5 MNCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Addition/Enlargement - Commercial</cell>
            <cell>See New Construction, Addition, Enlargement - Commercial</cell>
            <cell />
          </row>
          <row>
            <cell>Alteration (Interior or Exterior), Repair, Accessory, or Miscellaneous Building Permit - Commercial</cell>
            <cell>$220</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($220 or 2% of verifiable construction cost prepared by A/E or GC, whichever is greater) + $53 Grading Fee + $5 MNCPPC + $277 U&amp;O if applicable. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Alteration/Repair - Interior - Commercial</cell>
            <cell>See Alteration (Interior or Exterior), Repair, Accessory, or Miscellaneous Building Permit - Commercial</cell>
            <cell />
          </row>
          <row>
            <cell>Alteration/Repair without U&amp;O - Exterior - Commercial</cell>
            <cell>See Alteration (Interior or Exterior), Repair, Accessory, or Miscellaneous Building Permit - Commercial</cell>
            <cell />
          </row>
          <row>
            <cell>Application Filing Fee for New Buildings, Structures - Commercial</cell>
            <cell>$500</cell>
            <cell>Administrative Fee $66 + 50% of the Estimated Cost of the Permit or $500 (Whichever is higher) (Refundable of application filing fee, less Administrative and Plan Review Costs Incurred if Application is Cancelled). Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Awning - Commercial</cell>
            <cell>See Alteration (Interior or Exterior), Repair, Accessory, or Miscellaneous Building Permit - Commercial</cell>
            <cell />
          </row>
          <row>
            <cell>Building Permit - Modification/Revision After Issuance - Commercial</cell>
            <cell>$660</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $660 + $53 Grading Fee + $5 M-NCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Building Permit - Modification/Revision Prior to Issuance - Commercial</cell>
            <cell>$198</cell>
            <cell>Total Fee = $198 + $53 Grading Fee + $5 M-NCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Building Permit - Revision After Issuance - with No Changes to Plans - Commercial</cell>
            <cell>$99</cell>
            <cell>Total Fee = Administrative Fee $66 + Revision Fee $99. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Cell Towers</cell>
            <cell>$900</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($900 or 2% of Verifiable Construction Cost estimate prepared by A/E or GC, whichever is greater) + $53 Grading Fee + $5 MNCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Demolition (Not Full Raze) - Commercial</cell>
            <cell>$220</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($220 or 2% of Verifiable Construction Cost estimate prepared by A/E or GC, whichever is greater) + $53 Grading Fee + $5 M-NCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Elevator - Interior - Commercial</cell>
            <cell>See Alteration (Interior or Exterior), Repair, Accessory, or Miscellaneous Building Permit - Commercial</cell>
            <cell />
          </row>
          <row>
            <cell>Fence - Commercial</cell>
            <cell>$198</cell>
            <cell>Total Permit Fee = Administrative Fee $66 + Building Permit Fee ($198 per fence or 2% of Verifiable Construction Cost estimate prepared by A/E or GC, whichever is greater) + $53 Grading Fee + $5 MNCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Fire - Miscellaneous</cell>
            <cell>$110</cell>
            <cell>Total Fee = Administrative Fee $66 + Fire Fee $110. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Fire Alarm - Commercial</cell>
            <cell>$264</cell>
            <cell>Total Fee = Administrative Fee $66 + Fire Fee $264 Per Floor. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Fire Damage - Commercial</cell>
            <cell>$440</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($440) + $53 Grading Fee + $5 MNCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Fire Revision</cell>
            <cell>$132 per review cycle</cell>
            <cell>Total Fee = Administrative Fee $66 + Fire Fee $132 per cycle. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Fire Sprinkler - Commercial - NFPA 13D System</cell>
            <cell>$231</cell>
            <cell>Total Fee = Administrative Fee $66 + Fire Fee $231. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Fire Sprinkler - Commercial - NFPA 13R or 13 System</cell>
            <cell>$220</cell>
            <cell>Total Fee = Administrative Fee $66 + Fire Fee ($220 minimum, $4 per head, whichever is greater). Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Fire Suppression Hood - Commercial</cell>
            <cell>$231</cell>
            <cell>Total Fee = Administrative Fee $66 + Fire Fee $231. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Foundation Only - Commercial</cell>
            <cell>20% of permit fee for overall project</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee (20% of fee for overall project) + $53 Grading Fee + $5 MNCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Light Pole Base - Commercial</cell>
            <cell>$220</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($220 or 2% of verifiable construction cost prepared by A/E or GC, whichever is greater) + $53 Grading Fee + $5 MNCPPC + $277 U&amp;O. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Mechanical Permit - Commercial/Residential</cell>
            <cell>$86</cell>
            <cell>Total Fee = Administrative Fee $66 + Mechanical Fee ($86 or 1.3% of Mechanical Construction Cost, whichever is greater). Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>New Construction, Addition, Enlargement - Commercial</cell>
            <cell>$220</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($220 or $1.65 per SF, whichever is greater) + $53 Grading Fee + $5 MNCPPC + $277 U&amp;O. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Observation Stand - Commercial</cell>
            <cell>$220</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($220 or 2% of verifiable construction cost prepared by A/E or GC, whichever is greater) + $53 Grading Fee + $5 MNCPPC + $277 U&amp;O. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Permit Extension - Commercial</cell>
            <cell>$264</cell>
            <cell>$264. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Permit Renewal - Commercial</cell>
            <cell>$264</cell>
            <cell>$264. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Raze - Commercial</cell>
            <cell>$990</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit $990 + $53 Grading + $5 M-NCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Retaining Wall - Commercial</cell>
            <cell>$198</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($198 per wall or 2% of Verifiable Construction Cost estimate prepared by A/E or GC, whichever is greater) + $53 Grading Fee + $5 MNCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Roofing - Covering - Commercial</cell>
            <cell>See Alteration (Interior or Exterior), Repair, Accessory, or Miscellaneous - Commercial - Exterior</cell>
            <cell />
          </row>
          <row>
            <cell>Satellite Dish - Commercial or Residential</cell>
            <cell>$151</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $151 + $5 MNCPPC. Plus Technology Fee 10%.</cell>
          </row>
          <row>
            <cell>Signs, Freestanding/Ground Mounted - Commercial or Residential</cell>
            <cell>$264</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $264 + $53 Grading Fee + $5 M-NCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Signs, Reface (Wall Mounted or Reface) - Commercial or Residential</cell>
            <cell>$73</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $73 + $5 MNCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Solar Panels (Ground-mounted/Pole) - Commercial</cell>
            <cell>$220</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($200 minimum or $0.02 per watt for 100kW to 2MW; $0.016 per watt for over 2 MW; whichever is greater) + $53 Grading Fee + $5 MNCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Solar Panels (Roof Mounted) - Commercial</cell>
            <cell>$220</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($200 minimum or $0.02 per watt for 100kW to 2MW; $0.016 per watt for over 2 MW, whichever is greater) + $5 MNCPPC. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Special Event (Use and Occupancy Temporary Structures)</cell>
            <cell>$198 plus $26 for each structure over 10</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($198 plus $26 per structure over 10). Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Special Event - Expedited Review Fee - Application Filed and Accepted 1 business day prior to event</cell>
            <cell>$1,000 plus cost of county overtime and contracted inspection</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Special Event - Expedited Review Fee - Application Filed and Accepted 11 business days to 15 business days prior to event - More than 10 Structures (Tents, Stages, Inflatables) and/or More than 500 Expected Attendees</cell>
            <cell>$350</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Special Event - Expedited Review Fee - Application Filed and Accepted 11 business days to 15 business days prior to event - Up to 10 Structures (Tents, Stages, Inflatables) and no more than 500 Expected Attendees</cell>
            <cell>$250</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Special Event - Expedited Review Fee - Application Filed and Accepted 6 business days to 10 business days prior to event - More than 10 Structures (Tents, Stages, Inflatables) and/or More than 500 Expected Attendees</cell>
            <cell>$550</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Special Event - Expedited Review Fee - Application Filed and Accepted 6 business days to business days prior to event - Up to 10 Structures (Tents, Stages, Inflatables) and no more than</cell>
            <cell>$450</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Special Event - Expedited Review Fee - Application Filed and Accepted 4 business days to 5 business days prior to event</cell>
            <cell>$600</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Special Event - Expedited Review Fee - Application Filed and Accepted 3 business days or less prior to event</cell>
            <cell>$1,000</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Special Event (Including Farmers' Market) - Organizer's Temporary U&amp;O Fee</cell>
            <cell>$143 filed before April 30th, $238 all others</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($143 if filed before April 30th, $238 all others). Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Swimming Pool - Restoration - Commercial</cell>
            <cell>$220</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $220. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Swimming Pool In Ground - Commercial</cell>
            <cell>$990</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $990 + $53 Grading Fee + $277 U&amp;O + $5 M-NCPPC</cell>
          </row>
          <row>
            <cell>Tanks (Above Ground or Below Ground); Add, Remove or Replace</cell>
            <cell>$172</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $172 + $53 Grading Fee + $5 M-NCPPC. Plus Technology Fee 10%.</cell>
          </row>
          <row>
            <cell>Telecommunication Antennas/Cell Towers Permit Fee - (Co-Location)</cell>
            <cell>$450</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $450. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Telecommunication Antennas/Cell Towers Permit Fee - (Minor Modification)</cell>
            <cell>$270</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $270. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Telecommunication Antennas/Cell Towers Permit Fee - (New)</cell>
            <cell>$900</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee ($900 or Construction Cost × 0.0096, whichever is greater) + $53 Grading Fee + $5 M-NCPPC + $277 U&amp;O. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Telecommunications Transmission Facility Application Fee (Co-Location)</cell>
            <cell>$1,800</cell>
            <cell>Total Fee = Administrative Fee $66 + $1,800 Building permit fee</cell>
          </row>
          <row>
            <cell>Telecommunications Transmission Facility Application Fee (Master Plan Update Fee)</cell>
            <cell>$600</cell>
            <cell>Total Fee = Administrative Fee $66 + $600 Building permit fee</cell>
          </row>
          <row>
            <cell>Telecommunications Transmission Facility Application Fee (Minor Modification)</cell>
            <cell>$600</cell>
            <cell>Total Fee = Administrative Fee $66 + $600 Building permit fee</cell>
          </row>
          <row>
            <cell>Telecommunications Transmission Facility Application Fee (New)</cell>
            <cell>$3,000</cell>
            <cell>Total Fee = Administrative Fee $66 + $3,000 Building permit fee</cell>
          </row>
          <row>
            <cell>Telecommunications Transmission Facility Application or Plan Revision Fee</cell>
            <cell>$300</cell>
            <cell>Total Fee = Administrative Fee $66 + $300 Building permit fee</cell>
          </row>
          <row>
            <cell>Tenant Fit-out - Commercial</cell>
            <cell>See Alteration (Interior or Exterior), Repair, Accessory, or Miscellaneous Building Permit - Commercial</cell>
            <cell />
          </row>
          <row>
            <cell>Tower Crane</cell>
            <cell>$660</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $660. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Use &amp; Occupancy - Food Facility - Commercial</cell>
            <cell>$178</cell>
            <cell>Total Fee = Administrative Fee $66 + U&amp;O Fee $178. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Use &amp; Occupancy - New Building or Addition, Alteration, Repair to Existing Building - Commercial</cell>
            <cell>$277</cell>
            <cell>Total Fee = Administrative Fee $66 + U&amp;O Fee $277. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Use &amp; Occupancy - No Construction, New Tenant or Owner Change - Commercial</cell>
            <cell>Administrative Fee $66 + U&amp;O Fee $198 to be paid by a new tenant or owner, when there is a change in ownership</cell>
            <cell>Plus 10% Technology Fee</cell>
          </row>
          <row>
            <cell>Use &amp; Occupancy - No Construction, New Owner with Existing Tenant - Commercial</cell>
            <cell>Administrative Fee $66 + U&amp;O Fee $198 to be paid by the new owner, on behalf of the existing tenant when there is a change in ownership, only</cell>
            <cell>Plus 10% Technology Fee</cell>
          </row>
          <row>
            <cell>Use &amp; Occupancy - Temporary - Commercial or Residential</cell>
            <cell>See Use &amp; Occupancy Fees Temporary - Inspections Section</cell>
            <cell />
          </row>
          <row>
            <cell>Use &amp; Occupancy - Non Food Facility- Commercial</cell>
            <cell>$172</cell>
            <cell>Total Fee = Administrative Fee $66 + U&amp;O Fee $172. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Use &amp; Occupancy - Temporary Construction Trailer</cell>
            <cell>$264 per trailer</cell>
            <cell>Total Fee = Administrative Fee $66 + U&amp;O Fee $264 per trailer. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Use &amp; Occupancy - Temporary Office Trailer</cell>
            <cell>$198 per trailer</cell>
            <cell>Total Fee = Administrative Fee $66 + U&amp;O Fee $198 per trailer. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Waterproofing</cell>
            <cell>$198</cell>
            <cell>Total Fee = Administrative Fee $66 + Building Permit Fee $198. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>ELECTRICAL TRADE PERMIT FEES</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - A/C Equipment Unit</cell>
            <cell>$50</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $50. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Appliance</cell>
            <cell>$50</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $50. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Audio/Visual Equipment</cell>
            <cell>$90</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $90. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Bonding Only</cell>
            <cell>$99</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $99. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Data/Telephone Equipment</cell>
            <cell>$90</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $90. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Dental Chair</cell>
            <cell>$50</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $50. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Dispenser with Pump</cell>
            <cell>$90</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $90. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Electrical Demolition</cell>
            <cell>$90</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $90. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Electrical Sign</cell>
            <cell>$50</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $50. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Electric Vehicle Charging Per New Outlet</cell>
            <cell>$110</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $110 per outlet. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Fire Alarm</cell>
            <cell>$90</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $90. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Generator</cell>
            <cell>$50</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $50. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Heating Equipment Unit</cell>
            <cell>$50</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $50. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Imaging Equipment (CT Scan, MRI, X-ray)</cell>
            <cell>$90</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $90. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Light Fixture, Exclude Light Pole (Segment of 15)</cell>
            <cell>$50</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $50. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Light Pole</cell>
            <cell>$50</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $50. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Motor</cell>
            <cell>$50</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $50. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Motor Control Center</cell>
            <cell>$162</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $162. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - New Home (Up to 400 Amps)</cell>
            <cell>$198</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $198. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - New Home (Over 400 Amps)</cell>
            <cell>$277</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $277. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Office Partition (Relocatable) Furniture Whip</cell>
            <cell>$50</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $50. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Radio/TV/Satellite Communication Station</cell>
            <cell>$90</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $90. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Re-Introduction of Power</cell>
            <cell>$119</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $119. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Rough Wire Outlet, Segment of 15</cell>
            <cell>$50</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $50. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Security Alarm</cell>
            <cell>$90</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $90. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Service Equipment/Heavy Up (Up to 300 Amps)</cell>
            <cell>$90</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $90. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Service Equipment/Heavy Up (Over 300 Amps)</cell>
            <cell>$162</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $162. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Spray Paint Booth</cell>
            <cell>$198</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $198. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Sub Panel (Up to 300 Amps)</cell>
            <cell>$90</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $90. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Sub Panel (Over 300 Amps)</cell>
            <cell>$119</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $119. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Swimming Pool</cell>
            <cell>$162</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $162. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Temporary Fire Alarm</cell>
            <cell>$90</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $90. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Therapeutic Pool, Spa, Tub, Hydro-massage</cell>
            <cell>$90</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $90. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Transfer Switch</cell>
            <cell>$50</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $50. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Transformer and UPS System</cell>
            <cell>$99</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $99. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Work with Power Company</cell>
            <cell>$50</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $50. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Whole House Low Voltage</cell>
            <cell>$198</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $198. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Cut-in Power</cell>
            <cell>$119</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $119. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Disconnect - Amp</cell>
            <cell>$119</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $119. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Exit Sign (Segment of 15)</cell>
            <cell>$50</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $50. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Fire Pump</cell>
            <cell>$363</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $363. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Meter Stack/Replacement (Individual Meter)</cell>
            <cell>$50</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $50. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee -Miscellaneous</cell>
            <cell>$99</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $99. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Multi-Family Dwelling - Apts/Condos (Individual Meters)</cell>
            <cell>$119</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $119. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Smoke Detector (Segment of 15)</cell>
            <cell>$50</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $50. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Solar PV System - (Group of 100 Panels) - Commercial and Residential</cell>
            <cell>$95</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $95. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Temporary Wiring</cell>
            <cell>$162</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $162. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Thermostat</cell>
            <cell>$50</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $50. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Trench</cell>
            <cell>$119</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $119. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical Permit Fee - Work Started by Others</cell>
            <cell>$198</cell>
            <cell>Total Fee = Administrative Fee $66 + Electrical Permit Fee $198. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>SITE ROAD PERMIT FEES</cell>
          </row>
          <row>
            <cell>Bond Recall Fee</cell>
            <cell>$330</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Bond Reduction Fee</cell>
            <cell>$330</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Bus Shelter Fee In Lieu</cell>
            <cell>$19,800</cell>
            <cell>No Technology Fee. Planning Board Conditions require bus shelters case by case basis. Permittee shall install pad for shelter. DPW&amp;T will furnish and install shelter. Pay fee in lieu of Shelter, prior to issuance of site road permit.</cell>
          </row>
          <row>
            <cell>Developer Contribution - Fee in Lieu of Frontage — LMS Note: When depositing payment, prepare receipt with customer number account that each payment should be deposited.</cell>
            <cell>Based on County Approved Design and Design/Construction Cost</cell>
            <cell>No Technology Fee. Only applicable if waiver has been approved by DPIE Director. Collected with Grading or Street Construction Permit.</cell>
          </row>
          <row>
            <cell>Extra Review Cycle Fee</cell>
            <cell>$180 (1 residential lot); $2,400 all other permits</cell>
            <cell>Fee Required after 4th Review Cycle, each Cycle. This fee applies to Site Development Concepts, Street Grade Establishment, Street Construction Permits, Site Development Rough Grading Permits, Site Development Fine Grading Permits. Add 10% Technology Fee. Refer to County Code Section 23-115(e).</cell>
          </row>
          <row>
            <cell>Floodplain Information Request</cell>
            <cell>$66</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Floodplain Modeling (GIS by County) - 1 Residential Lot</cell>
            <cell>$330</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Floodplain Modeling (GIS by county) - Existing Conditions</cell>
            <cell>$3,300</cell>
            <cell>$3,300 Fee is Assessed Per Tributary. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Floodplain Modeling (GIS by county) - Existing &amp;/or Proposed Conditions</cell>
            <cell>$4,620</cell>
            <cell>$4,620 Fee is Assessed Per Tributary. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Floodplain Study/Delineation Review - Length of Stream</cell>
            <cell>$0.66</cell>
            <cell>$0.66 Per LF of Stream. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Floodplain Study/Delineation Review - Structures</cell>
            <cell>$264</cell>
            <cell>$264 Per Structure. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Floodplain Study/Delineation Review - Set Elevation</cell>
            <cell>$66</cell>
            <cell>$66 Per Structure. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Grading, Street Construction, Special and Restoration Permit Fees - PART ONE - Road Construction*</cell>
            <cell>N/A</cell>
            <cell>Road Construction Permit Fee = 11% of approved construction cost of all work in public r/w - and - private streets for Single Family and Townhouse Residential. Construction cost based on County Approved Construction Price List. One third is collected at time of permit application and remainder prior to permit issuance. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Grading, Street Construction, Special and Restoration Permit Fees - PART TWO - Grading*</cell>
            <cell>$53</cell>
            <cell>$0.01056 per SF of Disturbed Area Outside of Public R/W. One Third is collected at time of permit application. Remainder is collected prior to permit issuance. Plus Technology Fee 10%.</cell>
          </row>
          <row>
            <cell>Grading, Street Construction, Special and Restoration Permit Fees - PART THREE - SWM/SD Outside R/W*</cell>
            <cell>$44</cell>
            <cell>SWM/SD Outside R/W Permit Fee = 11% of approved construction cost of all SD and SWM work outside public r/w, based on County Approved Construction Price List. One third is collected at time of permit application and remainder prior to permit issuance. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>*These fee categories are applicable to Street Construction Permits, Site Development Rough or Fine Grading Permits, Special Permits. These fees are applicable to Restoration Permits that include restoration of new subdivision roads to enable use of new roadway for Construction Traffic.</cell>
            <cell />
            <cell />
          </row>
          <row>
            <cell>Grading, Street Construction, Special and Restoration Permit Extensions - PART ONE*</cell>
            <cell>N/A</cell>
            <cell>Road Construction Permit Extension Fee 25% of original permit fee (based on 11% of Construction Cost). Plus Technology Fee 10%.</cell>
          </row>
          <row>
            <cell>Grading, Street Construction, Special and Restoration Permit Extensions - PART TWO*</cell>
            <cell>$53</cell>
            <cell>Grading Permit Extension Fee $0.01056 per SF of Disturbed Area Outside of Public R/W. Plus Technology Fee 10%.</cell>
          </row>
          <row>
            <cell>Grading, Street Construction, Special and Restoration Permit Extensions - PART THREE*</cell>
            <cell>N/A</cell>
            <cell>SWM/SD Permit Extension Fee 25% of original permit fee (based on 11% of construction cost). Plus Technology Fee 10%.</cell>
          </row>
          <row>
            <cell>Grading, Street Construction, Special and Restoration Permit Extensions - Minor*</cell>
            <cell>$132</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Grading, Street Construction, Special and Restoration Permit Extensions - Major Revision*</cell>
            <cell>$132</cell>
            <cell>Grading Fee = Cost of Plan Review Services; Road Construction Fee = 11% of construction cost of incremental change; SWM/SD Outside R/W Fee= 11% of construction cost of revised portion. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Haul Road/Logging-Timber Transport Permit</cell>
            <cell>$1,584 Haul Road, $120 + Grading Fee Logging/Timber Transport</cell>
            <cell>Plus Technology Fee 10%. Pay 1/3 of permit fee at time of application and remainder prior to issuance.</cell>
          </row>
          <row>
            <cell>Haul Road/Logging-Timber Transport Permit Extension</cell>
            <cell>$396 Haul Road, 25% of Logging/Timber Transport Original Permit Fee</cell>
            <cell>25% of Original Permit Fee. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Haul Road/Logging-Timber Transport Permit Revision</cell>
            <cell>$132</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Letter of Responsibility</cell>
            <cell>$152</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Oversize/Overweight Vehicle Permit</cell>
            <cell>$1,584</cell>
            <cell>Plus Technology Fee 10%. Pay 1/3 of permit fee at time of application and remainder prior to issuance.</cell>
          </row>
          <row>
            <cell>Oversize/Overweight Vehicle Permit Extension</cell>
            <cell>$330</cell>
            <cell>25% of Original Permit Fee. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Oversize/Overweight Vehicle Permit Revision</cell>
            <cell>$132</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Post Construction Permit Fees</cell>
            <cell>Refer to General Fees Section</cell>
            <cell />
          </row>
          <row>
            <cell>Residential Driveway Apron Rural Double (Driveway Width &gt; 15 to 20 ft)</cell>
            <cell>$446</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Residential Driveway Apron Rural Single (Driveway Width = 10 to 15 ft)</cell>
            <cell>$302</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Residential Driveway Apron Urban Double Standard (Driveway Width &gt; 15 to 20 ft)</cell>
            <cell>$330</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Residential Driveway Apron Urban Single Standard (Driveway Width = 10 to 15 ft)</cell>
            <cell>$224</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Residential Driveway Parking Pad Permit</cell>
            <cell>$125</cell>
            <cell>$125 + $53 Grading Fee + $5 M-NCPPC</cell>
          </row>
          <row>
            <cell>Residential Driveway Permit Extension</cell>
            <cell>Varies</cell>
            <cell>25% of Original Permit Fee</cell>
          </row>
          <row>
            <cell>Residential Driveway Permit Revision</cell>
            <cell>$132</cell>
            <cell>Plus Technology fee 10%</cell>
          </row>
          <row>
            <cell>Restoration Permit Fee - Residential Minor Work</cell>
            <cell>$158</cell>
            <cell>$158 + Grading Fee. These Restoration Permit Fees are applicable to minor restoration work, for example pools, pool removal, residential additions/alterations. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Restoration Permit Fee - Commercial Minor Work</cell>
            <cell>$264</cell>
            <cell>$264 + Grading Fee. These Restoration Permit Fees are applicable to restoration work due to minor commercial construction. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Restoration Permit Revision</cell>
            <cell>$132</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Restoration Permit Extension</cell>
            <cell>25% of original permit fee</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Road Plan Deficiency Fee</cell>
            <cell>$180 (1 residential lot); $1,800 all other permits</cell>
            <cell>Fee is assessed if applicant submits a permit without including all required roads in the permit scope. This fee is applicable to Site Development Fine Grading Permits and Street Construction Permits. Add 10% Technology Fee. Refer to County Code Section 23-115(f).</cell>
          </row>
          <row>
            <cell>Site Development Concept Plan Review - Church or Non-Profit</cell>
            <cell>$330</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Site Development Concept Plan Review - Commercial</cell>
            <cell>$660</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Site Development Concept Plan Review (1 Residential Lot)</cell>
            <cell>$198</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Site Development Concept Plan Review (2 or More Residential Lots)</cell>
            <cell>$660</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Site Development Concept Plan Revision</cell>
            <cell>$132</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Site Development Concept Plan Extension</cell>
            <cell>$132</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Small Wireless Facility Administrative Permit Fee (Filing Fee)</cell>
            <cell>$480</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Small Wireless Facility Permit Fee - utility facility installed under roadway pavement in public right-of-way</cell>
            <cell>$3.12</cell>
            <cell>$3.12 Per LF Utility Facility Under Roadway Pavement in Public ROW. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Small Wireless Facility Permit Fee - utility facility installed outside roadway pavement in public right-of-way</cell>
            <cell>$0.78</cell>
            <cell>$0.78 Per LF Utility Facility Outside Roadway Pavement in Public ROW. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Small Wireless Facility Permit Fee - aerial utility facility in public right-of-way</cell>
            <cell>$0.36</cell>
            <cell>$0.36 Per LF Aerial Utility Facility in Public ROW. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Small Wireless Facility Permit Fee - per structure</cell>
            <cell>$60</cell>
            <cell>$60 Per Structure. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Small Wireless Facility Permit Fee Moratorium Road - roadway pavement cut</cell>
            <cell>$15.60</cell>
            <cell>$15.60 Per LF Roadway Pavement Cut. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Small Wireless Facility Permit Revision Fee (before issuance) - for each review cycle after first</cell>
            <cell>$180</cell>
            <cell>$180 Per Review Cycle after First Cycle. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Small Wireless Facility Permit Revision Fee (after issuance)</cell>
            <cell>$132</cell>
            <cell>Calculate based on the above for revised portion of permit. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Small Wireless Facility Permit Extension Fee</cell>
            <cell>$156</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Small Wireless Facility Maintenance Utility Permit Fee - Issuance</cell>
            <cell>No charge</cell>
            <cell>(Additional fees due at renewal of Small Wireless Facility Maintenance Utility Permit, based on work performed in prior year)</cell>
          </row>
          <row>
            <cell>Small Wireless Facility Maintenance Utility Permit Fee - Renewal (due annually, beginning on first anniversary)</cell>
            <cell>$324 per facility</cell>
            <cell>Due Annually. Plus Technology Fee 10%. (Additional fees due at renewal of Small Wireless Facility Maintenance Utility Permit, based on work performed in prior year)</cell>
          </row>
          <row>
            <cell>Small Wireless Facility Maintenance Utility Permit Fee - roadway pavement cuts</cell>
            <cell>$225</cell>
            <cell>$225 Per Cut. Plus Technology Fee 10%. (Additional fees due at renewal of Small Wireless Facility Maintenance Utility Permit, based on work performed in prior year)</cell>
          </row>
          <row>
            <cell>Small Wireless Facility Maintenance Utility Permit Fee - above ground aerial installation</cell>
            <cell>$27.60</cell>
            <cell>$27.60 Per LF. Plus Technology Fee 10%. (Additional fees due at renewal of Small Wireless Facility Maintenance Utility Permit, based on work performed in prior year)</cell>
          </row>
          <row>
            <cell>Special Utility Permit - Administrative Fee</cell>
            <cell>$360</cell>
            <cell>Pay at time of permit application (filing fee). Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Special Utility Permit - Not Under Roadway</cell>
            <cell>$0.60/LF of Utility Not Under Roadway</cell>
            <cell>Pay 1/3 of permit fee at time of application and remainder prior to issuance. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Special Utility Permit - Aerial Utility in ROW</cell>
            <cell>$0.24/LF of Aerial Utility in ROW</cell>
            <cell>Pay 1/3 of permit fee at time of application and remainder prior to issuance. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Special Utility Permit Impact Fee (Moratorium Roads)</cell>
            <cell>$12/LF of Roadway Cut</cell>
            <cell>Pay 1/3 of permit fee at time of application and remainder prior to issuance. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Special Utility Permit - Under Roadway</cell>
            <cell>$2.40/LF of Utility Under Roadway</cell>
            <cell>Pay 1/3 of permit fee at time of application and remainder prior to issuance. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Special Utility Permit Extension</cell>
            <cell>$120</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>(Special Utility) Maintenance Utility Permit Annual Fee</cell>
            <cell>$6,000</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>(Special Utility) Maintenance Utility Permit A&amp;I Fee - Pavement Cuts</cell>
            <cell>$173 per cut</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>(Special Utility) Maintenance Utility Permit A&amp;I Fee - Aerial Installation</cell>
            <cell>$21 per LF</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Street Name Signs Fee in Lieu</cell>
            <cell>$330 per sign</cell>
            <cell>No Technology Fee; This fee is assessed for public street name signs, which are fabricated and furnished by DPW&amp;T Sign Shop.</cell>
          </row>
          <row>
            <cell>SWM/SD As Built Plan</cell>
            <cell>$495</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>SWM/SD As Built Plan - Non- profit, Church, Tax Exempt</cell>
            <cell>$248</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>SWM/SD Plans Update if Permit Not Issued 24 Months after "Technical" Approval</cell>
            <cell>$132</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>SWM Fee in Lieu</cell>
            <cell>Based on Concept Letter</cell>
            <cell>No Technology Fee. This fee is paid at time of Grading Permit for most projects. For small projects that do not require grading permit, this fee is collected at time of Site Development Concept approval. Refer to County Code Section 32-120(a)(9)</cell>
          </row>
          <row>
            <cell>Stormwater Management Pond Maintenance (public ponds)</cell>
            <cell>$11,000</cell>
            <cell>11% of total construction cost for public ponds. Plus Technology Fee. This fee is paid at time of Grading or Street Construction Permit.</cell>
          </row>
          <row>
            <cell>Tree Preservation, Reforestation, and/or Chesapeake Bay Critical Area Mitigation - Fee in Lieu</cell>
            <cell>Amount Approved by M-NCPPC</cell>
            <cell>No Technology Fee. This fee is paid at time of Grading or Street Construction Permit.</cell>
          </row>
          <row>
            <cell>Temporary Gravel Access Permit</cell>
            <cell>$396</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Temporary Gravel Access Permit Extension</cell>
            <cell>$99</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Special Drain Permit</cell>
            <cell>$132</cell>
            <cell>$132 per Connection. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Road Construction Permit</cell>
            <cell>Based on Grading and Street Construction Permit Fees Listed Above</cell>
            <cell />
          </row>
          <row>
            <cell>W/S Final Plat Review</cell>
            <cell>$462</cell>
            <cell>$462 Per Plat Mylar. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>W/S Final Plat Review Surcharge - Expedite</cell>
            <cell>$132</cell>
            <cell>$132 Per Plat Mylar (additional). Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>W/S Category Amendment Residential (1 DU)</cell>
            <cell>$462</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>W/S Category Amendment Residential (2—10 DU's)</cell>
            <cell>$1,320</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>W/S Category Amendment Residential (11—25 DU's)</cell>
            <cell>$2,970</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>W/S Category Amendment Residential (26—100 DU's)</cell>
            <cell>$4,620</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>W/S Category Amendment Residential (101+ DU's)</cell>
            <cell>$19,800</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>W/S Category Amendment Commercial (2 acres or less)</cell>
            <cell>$2,640</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>W/S Category Amendment Commercial (&gt; 2 acres)</cell>
            <cell>$8,580</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>W/S Category Amendment Mixed Use (residential fee + commercial fee)</cell>
            <cell>Based on Residential Plus Commercial Fees Listed Above</cell>
            <cell>Based on Residential Plus Commercial Fees Listed Above. Plus Technology Fee</cell>
          </row>
          <row>
            <cell>W/S Category Amendment Late Fee</cell>
            <cell>11% of W/S Category Amendment Fee</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Water Category Waiver - Public Connection</cell>
            <cell>$462</cell>
            <cell>Per DU. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Sewer Category Waiver - Public Connection</cell>
            <cell>$462</cell>
            <cell>Per DU. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Well Waiver - Residential Interim System</cell>
            <cell>$660</cell>
            <cell>Per DU. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Septic Waiver - Residential Interim System</cell>
            <cell>$660</cell>
            <cell>Per DU. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Well Waiver - Non-Residential Interim System</cell>
            <cell>$1,122</cell>
            <cell>Per DU. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Septic Waiver - Non-Residential Interim System</cell>
            <cell>$1,122</cell>
            <cell>Per DU. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>W/S Plan (report)</cell>
            <cell>$264</cell>
            <cell>Per Copy. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>W/S Category Map (36" × 60")</cell>
            <cell>$370</cell>
            <cell>Per Copy. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>W/S Category Map (11" × 17")</cell>
            <cell>$132</cell>
            <cell>Per Copy. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>W/S Category Map Excerpt</cell>
            <cell>$66</cell>
            <cell>Per Copy. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>BUSINESS LICENSE FEES</cell>
          </row>
          <row>
            <cell>Benefit Performance - Bingo, Benefit Dinner, Pull Tabs, Silent Auction, Bazaar</cell>
            <cell>$99</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $99. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Benefit Performance - Carnival Permit (0—7 Days)</cell>
            <cell>$363</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $363. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Benefit Performance - Carnival Permit (Each Week or Portion of a Week Thereafter)</cell>
            <cell>$198</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $198. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Benefit Performance - Carnival Permit (per Ride)</cell>
            <cell>$33</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $33. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Benefit Performance - Charitable Gaming Event Permit (per Event)</cell>
            <cell>$297</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $297. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Benefit Performance - Charitable Gaming Event Permit (per Mechanical Device)</cell>
            <cell>$99</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $99. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Benefit Performance - Raffle Permit</cell>
            <cell>$33</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $33. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Building Contractor License</cell>
            <cell>$158</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $158. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Building Contractor License Renewal</cell>
            <cell>$99</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $99. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Duplicate Business Licenses</cell>
            <cell>Building Contractor $13; Motor Vehicle Repair Facility $7; Electrical $26</cell>
            <cell>Per Copy. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical - Contractor License Limited License (New, Renewal)</cell>
            <cell>$264</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $264. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical - Master Exam (Limited)</cell>
            <cell>$158</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $158. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical - Master Limited (New, Renewal) License</cell>
            <cell>$158</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $158. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical - Master Limited Late Fee - License Renewal within 30 Days After Expiration**</cell>
            <cell>$198</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $198. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Electrical - Master Limited Late Fee - License Renewal within 60 Days After Expiration**</cell>
            <cell>$264</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $264. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Fortune-Telling License</cell>
            <cell>$495</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $495. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Late fee for business licenses not renewed before the expiration date</cell>
            <cell>$132 added to license renewal fee</cell>
            <cell>Per Copy. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Letter of Reciprocity</cell>
            <cell>$33</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $33. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Motor Vehicle Repair Facility License</cell>
            <cell>$99</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $99. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Multi-Family Rental License Fee</cell>
            <cell>See Enforcement Fees</cell>
            <cell />
          </row>
          <row>
            <cell>Off-Road Vehicle License</cell>
            <cell>$40</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $40. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Pawn Dealer Employee License Renewal</cell>
            <cell>$132</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $132. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Pawn Dealer License Renewal</cell>
            <cell>$1,320</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $1,320. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Pawn Dealer New Employee License</cell>
            <cell>$198</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $198. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Peddlers &amp; Itinerant Vendors (Ice Cream Trucks Only)</cell>
            <cell>$152</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $152. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Public Dance License</cell>
            <cell>$1,980</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $1,980. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Secondhand Dealer Employee's License Renewal</cell>
            <cell>$132</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $132. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Secondhand Dealer License</cell>
            <cell>$1,320</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $1,320. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Secondhand Dealer New Employee's License</cell>
            <cell>$198</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $198. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Short-Term Rental License Fee - Host</cell>
            <cell>See Enforcement Fees</cell>
            <cell />
          </row>
          <row>
            <cell>Short-Term Rental License Fee - Platform</cell>
            <cell>See Enforcement Fees</cell>
            <cell />
          </row>
          <row>
            <cell>Single-Family House/Townhouse Rental License Fee</cell>
            <cell>See Enforcement Fees</cell>
            <cell />
          </row>
          <row>
            <cell>Solicitor (Door-to-Door) License</cell>
            <cell>$66</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $66. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>HEALTH PERMITS AND LICENSES</cell>
          </row>
          <row>
            <cell>Agricultural Well Certification</cell>
            <cell>$198</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $198. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Duplicate Health Licenses - Public Swimming Pool, Public Swimming Pool Operator, Public Spa, Food Service Manager Certification, Food Service Facility, Vending Machine, and Open Fire Permit. (Specified in Subtitle 12)</cell>
            <cell>$18</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Facility Closure Reinspection - Non-Office Hours (Specified in Subtitle 12)</cell>
            <cell>$210</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $210. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Facility Closure Reinspection - Office Hours (Specified in Subtitle 12)</cell>
            <cell>$120</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $120. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Service - (Food Protection Program) FPP Pre-settlement Inspection</cell>
            <cell>$495</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $495. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Service Facility - Chronic Offender* (Specified in Subtitle 12)</cell>
            <cell>$600 to $1,200</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $600 to $1,200. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Service Facility - Farmers Market License Fee - For-Profit, Non-Profit or Government Agency (If applied after April 30th for participation in up to 2 markets)</cell>
            <cell>$330</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $330. If Applied for after April 30th for Participation in up to Two Markets. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Service Facility - Farmers Market License Fee - For-Profit, Non-Profit or Government Agency (if applied for on or before April 30th for participation in up to 2 markets)</cell>
            <cell>$231</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $231. If applied by April 30th for Participation in up to Two Markets. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Service Facility - Farmers Market License Fee - Single Day License</cell>
            <cell>$99</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $99. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Service Facility - Farmers Market Samplers License</cell>
            <cell>$33</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $33. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Service Facility - High HACCP Priority (Hazard Analysis Critical Control Point)</cell>
            <cell>$845</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $845. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Service Facility - Moderate HACCP Priority</cell>
            <cell>$660</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $660. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Service Facility - Low HACCP Priority</cell>
            <cell>$449</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $449. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Service Facility - Mobile Unit Reciprocity (Specified in Subtitle 12)</cell>
            <cell>$360</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $360. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Service Facility - Non-Profit</cell>
            <cell>$330</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $330. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Service Facility - Operating without a Certified FSM* (Specified in Subtitle 12)</cell>
            <cell>$600</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $660. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Service Facility - Permit Late Fee per Day** (Specified in Subtitle 12)</cell>
            <cell>$24</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $24. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Service Facility - Temporary Event</cell>
            <cell>$165</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $165. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Service Facility - Temporary Event - Government/Municipal Sponsored Event</cell>
            <cell>$99</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $99. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Service Facility - Temporary Event - Non-Profit</cell>
            <cell>$0</cell>
            <cell />
          </row>
          <row>
            <cell>Food Service Facility - Vending Machine</cell>
            <cell>$264</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $264. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Service Manager Certification - Food Service Manager Card</cell>
            <cell>$73</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $73. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Service Manager Certification - Training Class</cell>
            <cell>$59</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $59. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Food Service Manager Certification - Training Class Recertification</cell>
            <cell>$33</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $33. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Health Department Conference Fee (Specified in Subtitle 12)</cell>
            <cell>$120</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $120. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Inspection Request - (Permit and Plan Review) PPR On-site Equipment Evaluation</cell>
            <cell>$198</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $198. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Inspection Request - EEP Prospective Inspection (Environmental Engineering Program)</cell>
            <cell>$198</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $198. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Inspection Request - FPP Prospective Inspection (Food Protection Program)</cell>
            <cell>$198</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $198. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Mobile Vendor - Food Truck</cell>
            <cell>$396</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $396. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Open Burning - Agricultural</cell>
            <cell>$53</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $53. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Open Burning - Recreational</cell>
            <cell>$53</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $53. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Operating Without a Permit</cell>
            <cell>$1,200</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $1,200. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Percolation Test - Existing Lot</cell>
            <cell>$337</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $337. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Percolation Test - Innovative or Alternative Plumbing Permits</cell>
            <cell>$495</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $495. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Percolation Tester License</cell>
            <cell>$495</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $495. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Pool Operator Challenge Exam</cell>
            <cell>$99</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $99. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Pool Operator License</cell>
            <cell>$99</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $99. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Pool Operator Refresher Course</cell>
            <cell>$66</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $66. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Pool Reopening Inspection</cell>
            <cell>$297</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $297. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Pool Prospective Inspection</cell>
            <cell>$198</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $198. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Pool Re-Opening Inspection after Closure</cell>
            <cell>$297</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $297. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Public Swimming Pool/Spa License - Indoor</cell>
            <cell>$1,188</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $1,188. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Public Swimming Pool/Spa License - Outdoor</cell>
            <cell>$792</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $792. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Raze Inspection - Commercial</cell>
            <cell>$660</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $660. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Raze Inspection - Residential</cell>
            <cell>$396</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $396. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Review - Plan Review - New Facilities Non-FSF</cell>
            <cell>$264</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $264. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Review - Plan Review - New Swimming Pool/Spa</cell>
            <cell>$990</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $990. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Review - Plan Review FSF - New</cell>
            <cell>$594</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $594. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Review - Plan Review FSF - Remodel</cell>
            <cell>$396</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $396. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Review - Plan Review Non-FSF - Remodel - Pools/Spas/Septic</cell>
            <cell>$264</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $264. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Review - Plan Review - 2nd Resubmittal for Pool</cell>
            <cell>$53</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $53. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Review - Plan Review - 2nd Resubmittal for Septic</cell>
            <cell>$99</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $99. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Review - Plan Review - 2nd Resubmittal FSF</cell>
            <cell>$99</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $99. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Scavenger Vehicle</cell>
            <cell>$297</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $297. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Second Reinspection for Approval to Operate a New or Remodeled Facility - Food Service Facility</cell>
            <cell>$132</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $132. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Second Reinspection for Approval to Operate a New or Remodeled Facility - Public Swimming</cell>
            <cell>$33</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $33. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Septic (12 mo.) - Commercial</cell>
            <cell>$594</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $594. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Septic (12 mo.) - Residential</cell>
            <cell>$594</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $594. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Septic Renewal (12 mo.) - Commercial</cell>
            <cell>$594</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $594. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Septic Renewal (12 mo.) - Residential</cell>
            <cell>$594</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $594. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Septic Renewal (6 mo. After Current Permit Expiration) - Commercial</cell>
            <cell>$449</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $449. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Septic Renewal (6 mo. After Current Permit Expiration) - Residential</cell>
            <cell>$449</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $449. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Septic Renewal (6 mo. Before Current Permit Expiration) - Commercial</cell>
            <cell>$152</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $152. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Septic Renewal (6 mo. Before Current Permit Expiration) - Residential</cell>
            <cell>$152</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $152. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Septic System Installer's Contractor License</cell>
            <cell>$495</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $495. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Well - Non-Potable Permit</cell>
            <cell>$158</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $158. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Well - Potable Permit</cell>
            <cell>$158</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $158. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Well Monitoring Permit for Up to 10 Monitoring Wells Per Site</cell>
            <cell>$158</cell>
            <cell>Total Fee = Administrative Fee $66 + Health Fee $158. If More than Ten Monitoring Wells, an Additional Application and Fee Must be Submitted for each Increment of Up to Ten Wells. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>BUILDING INSPECTION FEES</cell>
          </row>
          <row>
            <cell>Building Civil Citation - Unpermitted or Illegal Construction - See Below</cell>
            <cell>Up to $1,200 per Violation per Discipline</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Fine - Violation of Floodplain Code (County Code Section 32-211)</cell>
            <cell>Not More Than $1,200 per violation per day</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Fine - Violation of Road Code (County Code Sections 23-107 and 23-120)</cell>
            <cell>Not More Than $1,200 per day</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Fine - Violation of Stormwater Management, Drainage, Erosion Sediment Control, Grading (County Code Section 32-199)</cell>
            <cell>Not More Than $12,000 per violation and not more than $60,000 total</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Investigation Fee for Site Development - Commercial</cell>
            <cell>$450</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Investigation Fee for Site Development - Residential</cell>
            <cell>$198</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Post Construction Fine for Unpermitted Construction - Commercial - First Offense</cell>
            <cell>$1,200 per discipline</cell>
            <cell>Collect Fee for Applicable Disciplines Building, Electrical, Mechanical, Fire Protection, Geotechnical, Civil. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Post Construction Fine for Unpermitted Construction - Commercial - First Offense</cell>
            <cell>$1,200 per discipline</cell>
            <cell>Collect Fee for Applicable Disciplines Building, Electrical, Mechanical, Fire Protection, Geotechnical, Civil. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Post Construction Fine for Unpermitted Construction - Residential One- and Two-Family Dwellings - First Offense</cell>
            <cell>$300 per discipline</cell>
            <cell>Collect Fee for Applicable Disciplines Building, Electrical, Mechanical, Fire Protection, Geotechnical, Civil. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Post Construction Fine for Unpermitted Construction - Residential One- and Two-Family Dwellings - Subsequent Offense</cell>
            <cell>$600 per discipline</cell>
            <cell>Collect Fee for Applicable Disciplines Building, Electrical, Mechanical, Fire Protection, Geotechnical, Civil. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Re-Inspection Fee</cell>
            <cell>$73</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Use &amp; Occupancy - Temporary - Residential</cell>
            <cell>$200</cell>
            <cell>Total Fee = Administrative Fee $66 + U&amp;O Fee $200. Plus Technology Fee 10%. Fee Assessed per unit per month</cell>
          </row>
          <row>
            <cell>Use &amp; Occupancy - Temporary - Commercial</cell>
            <cell>$250</cell>
            <cell>Total Fee = Administrative Fee $66 + U&amp;O Fee $250. Plus Technology Fee 10%. Fee Assessed per floor per month</cell>
          </row>
          <row>
            <cell>ENFORCEMENT FEES</cell>
          </row>
          <row>
            <cell>Enforcement Civil Citation - Administrative Citation</cell>
            <cell>$360 First Citation, $720 Second Citation, $1,080 Third and Subsequent Citations Issued for the Same Violation per Unit.</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Enforcement Civil Citation - Commercial/Zoning</cell>
            <cell>$300 First Citation, $600 Second Citation, $1,200 Third and Subsequent Citations Issued for the Same Violation per Unit.</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Enforcement Civil Citation - Multi-Family Housing</cell>
            <cell>$120 First Citation, $240 Second Citation, $600 Third and Subsequent Citations Issued for the Same Violation per Unit.</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Enforcement Civil Citation - Short-Term Rental - Host</cell>
            <cell>$1,200</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Enforcement Civil Citation - Short-Term Rental - Platform</cell>
            <cell>$1,200</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Enforcement Civil Citation - Single Family Housing</cell>
            <cell>$120 First Citation, $240 Second Citation, $600 Third and Subsequent Citations Issued for the Same Violation per Unit.</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Enforcement Division-Zoning Inspection Fee (less than 72 hours prior)</cell>
            <cell>$660 Special Event expedited inspection (any inspection scheduled less than 72 hours prior to the event)</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Enforcement Division- Zoning Inspection Fee (after 1 hour wait)</cell>
            <cell>$660 after a one hour wait while on scene for special event compliance</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Multifamily Expired Rental License Fee</cell>
            <cell>$600</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $600. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Multi-Family Rental License Fee</cell>
            <cell>$99 per unit</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $99 per unit - Biannual; Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Nuisance Abatement Fine* (*Citations Issued for Same Violation Per Unit)</cell>
            <cell>$600 to $1,200</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Short Term Rental Second Application Review Fee</cell>
            <cell>$132 after 2nd incomplete application review</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Short-Term Rental License Fee - Host</cell>
            <cell>$198</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $198. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Short-Term Rental License Fee - Platform</cell>
            <cell>$3,300</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $3,300. Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Single Family Rental License Fee</cell>
            <cell>$152.00</cell>
            <cell>Total Fee = Administrative Fee $66 + License Fee $152 - Bi-annual; Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Single Family Rental Re-Inspection Fee</cell>
            <cell>$132 per re-inspection after failed 1st inspection</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Single Family Rental Second Application Review Fee</cell>
            <cell>$132 after the 2nd incomplete application review</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
          <row>
            <cell>Use and Occupancy Verification Letter Fee</cell>
            <cell>$300</cell>
            <cell>Plus Technology Fee 10%</cell>
          </row>
        </table>
      </level>
    </level>
  </level>
</section>