<?xml version='1.0' encoding='utf-8'?>
<unit kind="subtitle" number="23" name="Roads and Sidewalks" slug="subtitle-23" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI">
  <unit kind="division" number="1" name="General Provisions" slug="division-1" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV1GEPR">
    <section number="23-101" name="Short title; purpose" law="code" slug="sec-23-101" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV1GEPR_S23-101SHTIPU">
      <level label="a">
        <text>This Subtitle and all provisions herein shall be known and may be hereafter cited as "The Road Ordinance of Prince George's County, Maryland."</text>
      </level>
      <level label="b">
        <text>The purpose of this Subtitle shall be to promote the safety and welfare of the citizens of the County by regulating and establishing standards for all road construction, as herein defined, and to assure the provision of adequate and safe roads in connection with the development of, or construction upon, adjacent or nearby lands.</text>
      </level>
    </section>
    <section number="23-102" name="Definitions" law="code" slug="sec-23-102" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV1GEPR_S23-102DE">
      <level label="a">
        <text>Except as herein provided, the definitions of words and phrases used in this Subtitle shall be the same as stated in Subtitles 1, 4, 24, 26, and 27 of this Code. If not defined in the said Subtitles or herein, the words or phrases shall have the meanings generally recognized under Maryland law.</text>
      </level>
      <level label="b">
        <text>The following words and phrases are hereby defined with respect to their use in this Subtitle:</text>
        <level label="1">
          <text>Acceptance. The decision or ruling of the Director, or his duly authorized agent, that the construction specified in a permit, or under contract with the County, has been completed so as to allow the release of the permit and the assumption of County maintenance of the completed construction.</text>
        </level>
        <level label="2">
          <text>Applicant. Any person, as herein defined, who has applied for a permit to perform any construction regulated by this Subtitle.</text>
        </level>
        <level label="3">
          <text>Approval. The decision or ruling of the Director, or his duly authorized agent, that the plans, specifications, agreements, conditions, and other supporting documents submitted by an applicant are in order and meet the applicable standards and requirements of this Code, so that a permit may be issued.</text>
        </level>
        <level label="3.1">
          <text>Complete Street means a public street that safely and adequately accommodates motorized and non-motorized users, including pedestrians, bicycles, motor, freight, emergency and transit vehicles, in a manner appropriate to the function and context of the facility.</text>
        </level>
        <level label="4">
          <text>Default. The condition in which a permittee has failed to complete the work covered within the scope of the permit within the time prescribed in the permit, or the time prescribed by this Subtitle if not stated in the permit.</text>
        </level>
        <level label="5">
          <text>Department. The Department of Permitting, Inspections, and Enforcement of Prince George's County.</text>
        </level>
        <level label="6">
          <text>Design and Construction Standards. The "Specifications and Standards for Roadways and Bridges," the "Specifications and Standards for Highway Traffic Signals," and the Design Manual for Small Wireless Facilities of the Department of Public Works and Transportation, as adopted and amended from periodically as provided for by this Subtitle, together with the Design and Construction Standards specified herein, and the policies and procedures adopted pursuant to the authority of the Director of Public Works and Transportation as provided for by this Subtitle.</text>
        </level>
        <level label="7">
          <text>Developer. Any person, as herein defined, undertaking any building, alteration, reconstruction, or other development or redevelopment activity as herein defined.</text>
        </level>
        <level label="8">
          <text>Director. The Director of the Department of Permitting, Inspections, and Enforcement, or his duly authorized agent.</text>
        </level>
        <level label="8.1">
          <text>Green Street means a street or road that safely and adequately accommodates and incorporates best management practices of environmental site design for addressing stormwater runoff, including using small scale stormwater management practices, nonstructural techniques, and better site planning to minimize the impact of road and sidewalk development on water resources.</text>
        </level>
        <level label="9">
          <text>Inspector. A person authorized by the Director to observe and inspect conditions within or affecting the right-of-way, to include road construction and materials used in road construction to determine or enforce compliance with this Subtitle, the Design and Construction Standards, and the terms of any permit or contract requirement.</text>
        </level>
        <level label="9.1">
          <text>Litter. Litter as defined by Section 13-261 of this Code.</text>
        </level>
        <level label="10">
          <text>Park and Planning Commission. The Maryland-National Capital Park and Planning Commission.</text>
        </level>
        <level label="11">
          <text>Permit. An official document or certificate issued by the Director, or his duly authorized agent, authorizing performance of specified construction at a specified location and within a specified time, together with all supporting documents, agreements, conditions, plans, and specifications.</text>
        </level>
        <level label="12">
          <text>Permittee. Any person who has been granted a permit for construction. Also, any contractor, subcontractor, excavator, or other person undertaking construction pursuant to a permit.</text>
        </level>
        <level label="13">
          <text>Person. A person as defined by Section 1-102 of this Code; also any public utility, public agency, political subdivision, authority, or agent thereof.</text>
        </level>
        <level label="14">
          <text>Planning Board. The Planning Board for Prince George's County, as defined in the Land Use Article of the Annotated Code of Maryland.</text>
        </level>
        <level label="14.1">
          <text>Portable Storage Container. A non-vehicular outdoor container for the storage of household or other items greater in size than three cubic yards.</text>
        </level>
        <level label="15">
          <text>Public Utility. An organization franchised by the County or State Government or authorized by law to install, operate, and maintain facilities in public or private rights-of-way for the purpose of distribution of fuel or energy, for communication, or for distribution of a public water supply and collection and conveyance of sanitary sewage or storm water. This term does not include an organization franchised to construct, operate, or maintain a public transportation system.</text>
        </level>
        <level label="15.1">
          <text>Utility Designated Inspectors mean utility staff inspectors or third-party inspectors of the utility's choosing and approved by the County. Utility staff eligible for training must be currently working in the inspection field as engineering technicians, or the appropriate equivalent, with construction inspection work experience.</text>
        </level>
        <level label="16">
          <text>Right-of-Way. Any land area which has been dedicated to public use by a plat of subdivision or other instrument recorded in the land records of the County; also, any land area deeded to or acquired by the County for road or transportation purposes; also, any land area which has been conveyed to a public agency by easement for public use for road or transportation purposes; also, any land area which has been declared by competent authority to be a public right-of-way through use or through prescriptive usage in accordance with Maryland law; also, any land area along a County-maintained road which falls within the traveled way or the actively maintained shoulders and side ditches of the County-maintained road. With respect to a private road conforming to this Code, any land area contained in an easement or private right-of-way recorded in the land records of the County for ingress and egress, access, or terms of similar meaning. With respect to storm water management facilities, any land area contained in an easement or right-of-way recorded in the land records of the County for the installation, operation, or maintenance of the said facilities.</text>
        </level>
        <level label="17">
          <text>Road. Any travel way or right-of-way, whether open or not, and any land area dedicated to public use, in a recorded deed or recorded plat of subdivision, for the purpose of, or used for, passage of vehicular or pedestrian traffic, together with adjacent appurtenant drainage ditches, channels, support slopes, structures, walks, and traffic control devices. This term shall embrace all ways designated as roads, streets, alleys, lanes, paths, highways, avenues, or terms of similar meaning.</text>
          <level label="A">
            <text>County Road.</text>
            <level label="i">
              <text>County-maintained. A public road which has been accepted for full perpetual maintenance by the County.</text>
            </level>
            <level label="ii">
              <text>Other Public. A public road which has been dedicated, deeded, or assigned to public use through easement, and is open to the public, but over which no public agency has assumed the responsibility for full maintenance. Maintenance by the County is limited to the correction of dangerous conditions so as to permit all-weather use by emergency vehicles and to correct any condition that jeopardizes the lives of the motoring public.</text>
            </level>
            <level label="iii">
              <text>Other Public Surfaced. An other public road which has been improved with an all-weather surface by the County. Maintenance is limited to providing snow and ice control as necessary for emergency vehicle access, drainage work necessary to protect the all-weather surface, and repairs to the paved surface.</text>
            </level>
          </level>
          <level label="B">
            <text>Federal Road. A public road which is under the jurisdiction of the United States Government.</text>
          </level>
          <level label="C">
            <text>Historic Road. A public or private road, as designated by the County Council, which has been documented by historic surveys or maps, and which maintains its historic alignment and historic landscape context through views of natural features, historic landscape patterns, historic sites and structures, historic farmstead groupings, or rural villages.</text>
          </level>
          <level label="D">
            <text>Municipal Road. A public road which is under the jurisdiction of an incorporated municipality.</text>
          </level>
          <level label="E">
            <text>Park Road. A public road which is under the jurisdiction of the Park and Planning Commission.</text>
          </level>
          <level label="F">
            <text>Private Road. Any road which is not a public road. Alleys are considered private roads that are not maintained by the County.</text>
          </level>
          <level label="G">
            <text>Public Road. A road which has been accepted for maintenance by a public agency, political subdivision, or incorporated municipality; also, any road which lies within a right-of-way owned by, or under the jurisdiction of, the County or dedicated to public use by a recorded deed or recorded plat of subdivision; also, any road which has become recognized as public under Maryland law through long use by the general public.</text>
          </level>
          <level label="H">
            <text>Scenic Road. A public or private road, as designated by the County Council, which provides scenic views along a substantial part of its length through natural or manmade features such as forest or extensive woodland, cropland, pasturage, or meadows; distinctive topography, including outcroppings, streambeds, or wetlands; traditional building types; historic sites; or roadway features such as curving, rolling roadway alignment and "leaf tunnels."</text>
          </level>
          <level label="I">
            <text>State Road. A public road which is under the jurisdiction of the State of Maryland.</text>
          </level>
        </level>
        <level label="18">
          <text>Road Construction. Any act of opening, cutting into, clearing, grading, cultivating, excavating, maintaining, repairing, building, constructing, improving, or otherwise altering any road or any part thereof; also, placing any structure, plant, or other permanent object in a road, whether authorized by permit or not; also, any act of establishing or creating an entrance into any road.</text>
        </level>
        <level label="18.1">
          <text>Road Restoration means the temporary or permanent act of road restoration following road construction.</text>
        </level>
        <level label="19">
          <text>Roadside Tree. Any tree or shrub growing within the right-of-way of any public road.</text>
        </level>
        <level label="20">
          <text>S.H.A. The State Highway Administration of Maryland.</text>
        </level>
        <level label="20.1">
          <text>Small Wireless Facility means a facility that meets each of the following conditions:</text>
          <level label="i">
            <text>the facility:</text>
            <level label="1">
              <text>is mounted on a structure 50 feet or less in height, including the antenna, or</text>
            </level>
            <level label="2">
              <text>is mounted on a structure no more than 10 percent taller than other adjacent structures, or</text>
            </level>
            <level label="3">
              <text>does not extend the existing structure on which it is located to a height of more than 50 feet or by more than 10 percent, whichever is greater;</text>
            </level>
          </level>
          <level label="ii">
            <text>each antenna associated with the facility, excluding associated equipment, is no more than three cubic feet in volume;</text>
          </level>
          <level label="iii">
            <text>all other wireless equipment associated with the structure, including the equipment associated with the antenna and any pre-existing associated equipment on the structure, is no more than 28 cubic feet in volume; and</text>
          </level>
          <level label="iv">
            <text>the facility does not result in human exposure to radio frequency (RF) radiation in excess of all applicable FCC safety standards.</text>
          </level>
        </level>
        <level label="20.2">
          <text>Small Wireless Facility Permit means a permit authorizing placement of a small wireless facility in the public right-of-way.</text>
        </level>
        <level label="20.3">
          <text>Small Wireless Facility Permittee means a person applying for or holding a permit to place a small wireless facility in the public right-of-way</text>
        </level>
        <level label="21">
          <text>Specifications. The "General Specifications and Standards for Roadways and Bridges" and the "Specifications and Standards for Highway Traffic Signals," and the Design Manual for Small Wireless Facilities of the Department of Public Works and Transportation, as adopted by this Subtitle and as amended from periodically as provided by this Subtitle, along with any construction specifications, general specifications, special conditions, and terms of any covenant or agreement referenced in a construction contract or a permit for road construction, as adopted pursuant to the authority of the Director as provided for by this Subtitle.</text>
        </level>
        <level label="21.1">
          <text>Urban Design. Design standards focused on the public streetscape within urban areas, such as streets, sidewalks, street furniture and amenities, including bicycle facilities that form a high-quality, pedestrian-friendly sense of place.</text>
        </level>
        <level label="22">
          <text>WSSC. The Washington Suburban Sanitary Commission.</text>
        </level>
        <level label="23">
          <text>Weeds. Weeds as defined by Section 13-261 of this Code.</text>
        </level>
      </level>
    </section>
    <section number="23-103" name="Obligation for road improvements" law="code" slug="sec-23-103" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV1GEPR_S23-103OBROIM">
      <level label="a">
        <text>Any person seeking to undertake building, alteration, reconstruction, or other development or redevelopment on land which fronts on an existing or proposed public road shall be responsible for constructing or upgrading said road to an approved standard. No person shall undertake any building, alteration, reconstruction, or other development or redevelopment on a property, and no building permit shall be issued for such activities unless the Department has determined compliance with the requirements of this Subtitle. The road shall be constructed to its ultimate cross section in accordance with the Design and Construction Standards, to an alignment approved by the Department.</text>
      </level>
      <level label="b">
        <text>Any person required to obtain a haul road permit pursuant to the provisions of this Subtitle shall be required to install pavement for a sufficient distance, as determined by the inspector, from an existing road onto the site wherein the facility is located, as would effectively prevent the deposit of debris, fill, refuse, or other sediment on an existing road during the ordinary course of hauling operations, unless other methods consistent with said purpose, and approved by the inspector, are employed.</text>
      </level>
      <level label="c">
        <text>No person shall undertake any road construction without having first obtained a permit from the Department in accordance with the provisions of this Subtitle, unless specifically exempted.</text>
      </level>
      <level label="d">
        <text>All road construction shall conform to the requirements of this Subtitle and to the approved plans, specifications, and terms of a permit issued by the Department, and, unless otherwise stated in the approved plans and the permit, to the Design and Construction Standards.</text>
      </level>
      <level label="e">
        <text>Where the Director has waived or deferred requirements for improvements to an other public road, any further improvements to the roadway shall be at the sole expense of the owners of the abutting properties to the extent that the improvements to be made include those improvements which were previously waived or deferred. The County shall not be obligated to assume responsibility for the maintenance, repair, or improvement of the road or portion of the road where road construction requirements have been waived or deferred.</text>
      </level>
      <level label="f">
        <text>Where the Director has waived or deferred requirements for improvements on or along County-maintained roads, any further improvements to the roadway shall be at the sole expense of the owners of the abutting properties to the extent that the improvements to be made include those improvements which were previously waived or deferred.</text>
      </level>
      <level label="g">
        <text>No person shall establish or create an entrance or intersection of a road, driveway, haul road, or other vehicular way into any County road unless the Director has determined compliance with the requirements of this Subtitle.</text>
      </level>
    </section>
    <section number="23-104" name="Exemptions" law="code" slug="sec-23-104" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV1GEPR_S23-104EX">
      <level label="a">
        <text>The following road construction activities do not require a permit from the Department:</text>
        <level label="1">
          <text>Road construction by the United States Government, or an agency thereof, incidental to construction or development on property under the jurisdiction of the United States Government;</text>
        </level>
        <level label="2">
          <text>Road construction by the Maryland State Highway Administration in connection with the construction, improvement, or maintenance of a State road;</text>
        </level>
        <level label="3">
          <text>Road construction by, or under, a permit or contract issued by an incorporated city, town, or village upon a municipal road under the jurisdiction of said city, town, or village;</text>
        </level>
        <level label="4">
          <text>Road construction by a person working in conformance with a contract with the Department of Public Works and Transportation for construction, improvement, or maintenance;</text>
        </level>
        <level label="5">
          <text>Activities pursuant to mandatory requirements for removal of snow and ice and incidental upkeep of sidewalks, entrances, and grass areas in the public right-of-way by, or on behalf of, the owner of abutting property;</text>
        </level>
        <level label="6">
          <text>Placement of mailboxes, newspaper delivery boxes, and similar facilities, provided that they conform to standards established by the Department of Public Works and Transportation;</text>
        </level>
        <level label="7">
          <text>Erection of temporary real estate directional signs in conformance with this Code;</text>
        </level>
        <level label="8">
          <text>Activities for which the Director has granted a waiver.</text>
        </level>
      </level>
    </section>
    <section number="23-105" name="Authority of the Director" law="code" slug="sec-23-105" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV1GEPR_S23-105AUDI">
      <level label="a">
        <text>The Director shall administer and enforce this Subtitle except as specifically provided otherwise. In addition, the Director is authorized and empowered to make, adopt, and amend such rules and regulations as are reasonably necessary to implement the requirements and purpose of this Subtitle, and to fully exercise the authority of Article 25A of the Annotated Code of Maryland and the County Charter, to protect the public safety and health with respect to public roads under the jurisdiction of the County.</text>
      </level>
      <level label="b">
        <text>The Director shall review the Design and Construction Standards and may recommend amendments or revisions as he deems necessary, from time to time, except as otherwise specifically prohibited. Prior to implementing a revision to the Design and Construction Standards, the proposed revision shall be made available to the public for input.</text>
      </level>
      <level label="c">
        <text>The Director may disapprove the issuance of a permit for all or part of the proposed road construction where the work will interfere with the access to adjacent properties or the abutting lots, will not provide adequate traffic safety or circulation or continuation of the road, or the road construction may have an adverse effect on the public roads or nearby properties.</text>
      </level>
      <level label="d">
        <text>At any time prior to acceptance of the completed road construction under a permit issued by the Department, the Director may find that the limits or details of the work called for in the permit will not provide proper grading, will interfere with access to adjacent properties or the abutting lots, or will not provide adequate drainage or traffic circulation or continuation of the road, and for these and other reasons indicating that the road construction may have an adverse effect on the public roads or nearby properties may:(1)Alter the permit requirements to extend, reduce, or modify the extent or details of the road construction; or(2)Revoke the permit where work has not started pursuant to the procedures contained herein.</text>
      </level>
      <level label="e">
        <text>Where the Director finds that road construction has been performed by an owner, occupant, or developer of property abutting a road, or by another person, whether the work was under a permit or not, and a situation has been created which constitutes or creates a hazard or interference to the users of the road, results in a nuisance, or is otherwise not in compliance with the County Code or the Design and Construction Standards, the Director may order the owner or developer of the abutting properties, or the person who created the situation, to correct or remove the construction or correct the situation within a specified period of time. If the owner or developer of the abutting property fails to take corrective action as specified in the order within the designated period of time, in conformance with this Subtitle, the Director may cause the necessary corrections to be made, and the costs of this action may be assessed to the owner in accordance with the provisions of Section 23-109. If a person who is not the owner, developer, or representative of same for the abutting property creates a situation, as set forth above, which the person fails to correct when notified by the Department, the Department may perform the necessary corrective action and the person who created the situation shall be guilty of a misdemeanor.</text>
      </level>
      <level label="f">
        <text>The</text>
        <text>Director of Public Works and Transportation shall establish and apply standards for the maintenance of all County roads.</text>
      </level>
      <level label="g">
        <level label="1">
          <text>The Director is authorized to waive, defer, or accept payment in lieu of compliance with the requirements of this Subtitle (except as provided in Subsection (h)), in whole or in part, where construction of road improvements is not practicable or desirable due to scattered ownership of lots in the area, insufficient right-of-way, or other factors determined by the Director to constitute an unreasonable hardship to the applicant or permittee, or hazard or nuisance to the public. Nothing herein shall be deemed to authorize the Director to waive or reduce any private right-of-way or easement standards set forth in Subtitle 24 of this Code, but the Director may increase these standards when deemed appropriate.</text>
        </level>
        <level label="2">
          <text>As relates to a small wireless facility permit only, upon an Applicant's showing that enforcement of a requirement found in this Subtitle or in the Design Manual for Small Wireless Facilities and this Subtitle would conflict with any applicable law, the Director is authorized to waive any such requirement but only to the minimum extent required for compliance.</text>
        </level>
      </level>
      <level label="h">
        <text>The Director must verify for land located within the Chesapeake Bay Critical Area, that any and all proposed grading and/or construction is in accordance with the requirements of the Conservation Manual and Subtitles 4, 5B, 24, and 27 of the County Code prior to the approval or issuance of any permit within the Critical Area. The Director may not waive or grant a variance from this Subsection.</text>
      </level>
      <level label="i">
        <text>Notwithstanding Section 23-105 of this Division, if the Director disapproves a permit complying with Urban Street Design standards, they shall provide formal findings with full documentation that includes detailed evidence, analysis, and justification for a permit disapproval. These findings shall be published within the annual report.</text>
      </level>
    </section>
    <section number="23-106" name="Validity of prior ordinance limited" law="code" slug="sec-23-106" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV1GEPR_S23-106VAPRORLI">
      <text>Any valid permit, issued in conformance with this Subtitle prior to the effective date of this Section and in force on said date, shall continue in force subject to the requirements of law in effect at the time of its issuance; however, such permit shall be subject to the requirements of the fee schedule and bond requirements in force at the time of any request for extension.</text>
    </section>
    <section number="23-107" name="Penalty" law="code" slug="sec-23-107" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV1GEPR_S23-107PE">
      <level label="a">
        <text>Any person who does any road construction in a public right-of-way without a valid permit, or performs work in conflict with the detailed plans submitted and approved for work to be performed under permit, or creates a situation within the right-of-way which requires corrective action shall immediately take those actions necessary to reinstate a pre-existing permit where the permit has expired or been suspended, or obtain a permit where none existed, and then correct or remove said work or correct said situation to bring it into conformance with established requirements or standards within the time specified in a written Notice of Violation from the Department. Noncompliance on the part of the responsible person shall be a violation of this Subtitle.</text>
      </level>
      <level label="b">
        <text>Any person required by this Subtitle to have a permit who performs work which is in violation of the provisions of this Subtitle, approved permit plans, or a lawful order issued thereunder, or creates a situation in the right-of-way which constitutes a hazard to public safety, shall be guilty of a misdemeanor punishable by a fine of not more than One Thousand Dollars ($1,000.00), by imprisonment for not more than ninety (90) days, or by both such fine and imprisonment for each offense. Each day that a violation continues shall be deemed a separate offense.</text>
      </level>
      <level label="c">
        <text>The application of such penalty shall not preclude the enforced removal, abatement, or correction of the conditions, which were found to be in noncompliance, through appropriate proceedings in a court of competent jurisdiction. In addition, the County may take those actions necessary to correct the situation, and all costs therefor shall be billed to the responsible person in accordance with the provisions of Section 23-109, or be recovered through legal recourse.</text>
      </level>
    </section>
    <section number="23-108" name="Appeals; right of appeal" law="code" slug="sec-23-108" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV1GEPR_S23-108APRIAP">
      <level label="a">
        <text>Prior to the commencement of any appeal, any person aggrieved, with the exception of a person aggrieved under Section 23-117(a), shall, within fifteen (15) days of a decision, action, or nonaction by an authorized representative of the Department, make known in writing the basis of his complaint to the individual responsible for the decision, action, or nonaction, together with a request for review. If a satisfactory resolution cannot be reached within fifteen (15) days of the receipt of the written complaint, the person aggrieved may request a review of the decision by the next higher level of authority (as established by the Director).</text>
      </level>
      <level label="b">
        <text>Any person may file an appeal to the Board of Administrative Appeals within thirty (30) days (except for a Notice of Violation which shall require the appeal to be filed within fifteen (15) days) after the resolution period provided for in Subsection (a), above, or within thirty (30) days after the expiration of a thirty (30) day period allowed for such resolution. No appeal (with the exception of a Notice of Violation) shall be considered by the Board of Administrative Appeals until the person aggrieved has obtained a decision by the Director, or the thirty (30) day period for resolution has passed without such decision.</text>
      </level>
    </section>
    <section number="23-109" name="Enforcement; charges; recorded statement; lien" law="code" slug="sec-23-109" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV1GEPR_S23-109ENCHRESTLI">
      <level label="a">
        <text>Whenever the Director has provided notice to a person and instructed said person to perform corrective action within or adjacent to a public right-of-way, or to perform construction which has been deferred in accordance with the terms of an agreement or covenant, which said person fails to perform within the amount of time specified by the Director, the Director may cause the necessary corrective action or construction to be made at County expense and initiate the procedure for reimbursement of the cost as set forth herein.</text>
      </level>
      <level label="b">
        <text>When the County has effected the removal of a hazard, or taken necessary corrective action to correct a problem within or adjacent to a public right-of-way, or has paid for said removal or corrective action, or has performed construction which was the responsibility of the permittee, adjacent property owner, or another responsible person, the actual cost thereof, if not paid by the permittee, owner, or person within thirty (30) days, shall be collected by initiating one or more of the following courses of action:</text>
        <level label="1">
          <text>The recordation of a statement from the Director creating a lien against the adjacent property to be collected through a supplemental tax bill where the owner is responsible; or</text>
        </level>
        <level label="2">
          <text>Action against any bonds posted by the responsible party where the permittee is responsible; or</text>
        </level>
        <level label="3">
          <text>Legal action, including action for injunction relief, in a court of competent jurisdiction.</text>
        </level>
      </level>
      <level label="c">
        <text>Where the full amount due the County is not paid by such owner within thirty (30) days after notice of the charges for the removal of a hazard or correction of a problem, the Director shall cause to be recorded with the Office of Finance for Prince George's County a sworn statement showing the cost and expense incurred for the work, the date the work was done, and the location of the property on which, or adjacent to which, said work was done. The sworn statement shall be available for public inspection. Recordation of such a statement shall constitute a lien on the subject property, and the amount of such lien shall be collected in the same manner as the County tax on real property.</text>
      </level>
    </section>
    <section number="23-110 through 23-111" name="Reserved" law="code" slug="sec-23-110-through-23-111" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV1GEPR_S23-110._THROUGH_SEC._23-111RE" />
  </unit>
  <unit kind="division" number="2" name="Permits, Bonds, Fees" slug="division-2" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV2PEBOFE">
    <section number="23-112" name="Application for permit" law="code" slug="sec-23-112" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV2PEBOFE_S23-112APPE">
      <level label="a">
        <text>Application for a road construction permit shall be made on forms provided by the Director, and shall, when required by the Director, be accompanied by:</text>
        <level label="1">
          <text>The specifications applicable to the scope of work covered by the permit;</text>
          <level label="A">
            <text>For utility permits for non-emergency work, the plan for meeting the public notification requirements, including how the public will be notified, which neighborhoods will be impacted, and whether any change of traffic patterns will be part of the notification, as approved by the Department;</text>
          </level>
          <level label="B">
            <text>The plan for meeting the milling, overlay, and greenspace restoration requirements, per the approved utility policy;</text>
          </level>
        </level>
        <level label="2">
          <text>The maintenance of traffic plan;</text>
        </level>
        <level label="3">
          <text>The proposed inspection plan;</text>
        </level>
        <level label="4">
          <text>Suitable prints of detailed plans of the work;</text>
        </level>
        <level label="5">
          <text>A filing fee in accordance with Section 23-115 for each application;</text>
        </level>
        <level label="6">
          <text>Estimated cost of the work; and</text>
        </level>
        <level label="7">
          <text>The signature of the owner or authorized agent.</text>
        </level>
      </level>
      <level label="b">
        <text>The Director may refuse to accept an application for a road construction permit from any applicant, as principal, who is or was in default on a previously issued permit, or who is the permittee listed on an expired permit which is not currently in the process of being extended by County administrative action.</text>
      </level>
      <level label="c">
        <text>Before the Department may issue a road construction permit, or concur in the issuance of a building permit, all bonds required shall be approved by the Director and the County Attorney.</text>
      </level>
      <level label="d">
        <text>Application for a small wireless facility permit shall be made on forms provided by the Director, and shall, when required by the Director, be accompanied by any document required in the application, including, but not limited to:</text>
        <level label="1">
          <text>The name of the applicant, applicant's Maryland address and contact information, and if a corporation, documentation of authority to do business in the state of Maryland;</text>
        </level>
        <level label="2">
          <text>The specifications applicable to the scope of work covered by the permit;</text>
        </level>
        <level label="3">
          <text>The maintenance of traffic plan, if applicable;</text>
        </level>
        <level label="4">
          <text>The proposed inspection plan;</text>
        </level>
        <level label="5">
          <text>Suitable prints of detailed plans of the work;</text>
        </level>
        <level label="6">
          <text>A filing fee in accordance with Section 23-115 for each application;</text>
        </level>
        <level label="7">
          <text>Estimated cost of the work;</text>
        </level>
        <level label="8">
          <text>The signature of the owner or authorized agent;</text>
        </level>
        <level label="9">
          <text>Detailed construction plans describing proposed installation of the small wireless facility and/or wireless support structure to be deployed, including any details, images, manufacturer information and/or material specifications required by the County, including pre-construction work, construction work, and restoration work required, along with a description of the facilities and property that are subject of or affected the by application(s). This plan shall clearly show existing features, utilities and right of way limits, and shall define required limits of restoration of the county right of way;</text>
        </level>
        <level label="10">
          <text>Written description of the proposed design and installation, including a statement with intent with respect to location or co-location, as that term is defined in Subtitle 5A of this Code;</text>
        </level>
        <level label="11">
          <text>In the case of a proposed attachment to an existing utility pole not owned by the County in the public right-of-way, an executed agreement or authorization from the owner of the utility pole;</text>
        </level>
        <level label="12">
          <text>In the case of a proposed attachment to a County-owned facility located in the public right-of-way, an executed agreement with the County authorizing the attachment;</text>
        </level>
        <level label="13">
          <text>A written report signed by a third-party licensed professional engineer that identifies all equipment that has RF emissions and will be installed at the site, and all factors relevant to the calculation of RF emissions, the formula used to calculate emissions, drawings showing RF emission levels, horizontal and vertical areas where exposures will be exceeded and recommended measures to mitigate exposure rates; and</text>
        </level>
        <level label="14">
          <text>In the case of a proposed placement in the public right-of-way, a Master License Agreement executed by the applicant, as established and required by Subtitle 5A of this Code;</text>
        </level>
        <level label="15">
          <text>Proof of Insurance in an amount commensurate to that required by application and property access agreement.</text>
        </level>
        <level label="16">
          <text>Proof that the proposed facilities will not generate noise above the level allowable in Subtitle 19 — Pollution, Division 2 — Noise Control of this Code.</text>
        </level>
        <level label="17">
          <text>A valid maintenance permit.</text>
        </level>
        <level label="18">
          <text>A bond approved prior to permit issuance.</text>
        </level>
      </level>
    </section>
    <section number="23-113" name="Submittal and approval of plans required" law="code" slug="sec-23-113" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV2PEBOFE_S23-113SUAPPLRE">
      <level label="a">
        <text>No permit shall be issued until plans have been submitted to the Department and approved by the Director as conforming to the requirements of this Subtitle, and the Director has determined that all required fees have been paid to the County and all required security has been posted.</text>
      </level>
      <level label="b">
        <text>All plans which are submitted in compliance with Subsection (a) of this Section shall conform to the Design and Construction Standards.</text>
      </level>
      <level label="c">
        <text>All plans submitted for approval of road construction shall be on polyester drafting film or comparably durable drafting media, 24 inches by 36 inches, suitable for reproduction on a Diazo white printer or similar copier.</text>
      </level>
      <level label="d">
        <text>All plans submitted for approval shall be accompanied by such supporting documentation, calculations, drawings, and correspondence as may be required to establish the suitability and correctness of the design.</text>
      </level>
      <level label="e">
        <text>All plans submitted for approval shall be prepared by, or under the direct supervision of, a professional engineer or professional land surveyor registered in Maryland, who shall affix his or her seal and signature to the plans and computations. Plans that include the design of storm drains, storm water management facilities, or load-bearing structures of any kind shall be prepared by, or under the direct supervision of, a professional engineer registered in Maryland who shall affix his or her seal and signature to the plans and associated computations.</text>
      </level>
      <level label="f">
        <text>The engineer or land surveyor, as the case may be, shall certify on the plan that:</text>
        <level label="1">
          <text>All public utilities have reviewed the plans for conflicts with their systems and have approved the plans; and</text>
        </level>
        <level label="2">
          <text>All existing and proposed utilities within or adjacent to the planned work areas have been properly located and shown on the plans.</text>
        </level>
      </level>
      <level label="g">
        <text>When application is made for maintenance work to be done on an other public road, the type and number of plans required to be submitted shall be specified by the Director.</text>
      </level>
      <level label="h">
        <text>Types of plans required.</text>
        <level label="1">
          <text>Proposed Road Profile. The proposed road profile shall be on plan and profile sheets showing the adjacent properties with lot and block or parcel designations. The profile section shall show the computed proposed grade with vertical curve information, curb fillet profiles, and existing ground lines at the center line, both right-of-way lines, and the building restriction lines. All ground lines shall be extended a minimum of five hundred (500) linear feet past the grade limit or the distance required to assure proper grade design elements as determined by the Department. The proposed grade on all roads shall be approved by the Department. Where SHA or WSSC facilities may be affected by the proposed grade, the permittee must obtain the approval of the respective agencies prior to approval by the Department.</text>
        </level>
        <level label="2">
          <text>Street Construction Plan. The Street construction plan shall show the following:</text>
          <level label="A">
            <text>All existing or proposed storm drainage and other utilities located within the right-of-way (water, sewer, electric, telephone, etc.) in plan and profile;</text>
          </level>
          <level label="B">
            <text>Ground profiles and other design data for all storm drainage;</text>
          </level>
          <level label="C">
            <text>Right-of-way, road names, dimensions, location map (on a 2000 scale, showing all vicinity streets and located in upper right-hand corner of plan), north point, scale, datum, survey controls, property lines, curb and gutter, sidewalks, hiker-biker trails, driveways, traffic signals and street lights, types of paving, existing specimen trees to be retained, new trees, storm drainage inlets with elevations shown, and sufficient elevations at all intersections for the curb, gutter, and paving to assure adequate drainage of the intersection. The Director may require topography and coordinates to be added to the plan;</text>
          </level>
          <level label="D">
            <text>Approval by governmental agencies affected where applicable;</text>
          </level>
          <level label="E">
            <text>Where determined necessary by the applicant due to the amount of material necessary to be shown on the plan, the applicant may use two (2) plans to separately show the drainage and paving related information.</text>
          </level>
        </level>
        <level label="3">
          <text>Sediment Control Plans.</text>
          <level label="A">
            <text>No street grading or street construction permit shall be issued without the approval of the sediment control plans by the Prince George's Soil Conservation District.</text>
          </level>
        </level>
      </level>
      <level label="i">
        <text>Approval; phases. The Director may separately approve plans for the various phases of construction, including, but not limited to, grading, storm drainage, and paving. The phases and scope of work covered by the approved sediment control plans submitted to the Prince George's Soil Conservation District must be the same scope and phasing submitted to the Department of Permitting, Inspections, and Enforcement for permitting purposes.</text>
      </level>
      <level label="j">
        <text>Modification of plans previously approved. Prior to or during construction, the Director may require additional data and design revisions pertinent to the scope of the work covered by the permit and/or require such work changes as are deemed necessary to provide a completed facility in accordance with the Design and Construction Standards, or as determined to be necessary by the Director for the general safety of the public. When the Director requires design revisions or additional work to be performed as part of a permit, the applicant or permittee shall coordinate and obtain all associated permit approvals from the other governmental agencies having jurisdiction.</text>
        <level label="1">
          <text>Street Construction Plan Approvals. Approval of a street construction plan shall expire three (3) years after the date of approval or upon expiration of the permit and any extension thereof, whichever is longer.</text>
        </level>
      </level>
    </section>
    <section number="23-114" name="Review of application for permit" law="code" slug="sec-23-114" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV2PEBOFE_S23-114REAPPE">
      <level label="a">
        <text>If the Department, upon review of the application, determines that the proposed work conforms with the Design and Construction Standards, the Department shall notify the applicant of the amount of the permit fee and the amount and types of bond required.</text>
      </level>
      <level label="b">
        <text>If the Department, upon review of the application, determines that the proposed work does not conform to the Design and Construction Standards, the Department shall notify the applicant of its objection to the proposed work and inform him of the actions which shall be required to bring the plans into compliance so that the applicant may amend his application.</text>
      </level>
      <level label="c">
        <text>If the applicant does not post bond and pay the required permit fee within six (6) months from the date the application is filed, and such failure is not created by governmental action or inaction, the permit application shall be void and the filing fee will be forfeited at the discretion of the Director.</text>
      </level>
      <level label="d">
        <text>Substantive modifications by the applicant to an existing permit application which result in significant changes to the plans will require the payment of a new filing fee in an amount based upon the incremental change in the estimated construction cost. The amount shall be equal to ten percent (10%) of the incremental change, but in no case less than Twenty-five Dollars ($25.00). The new filing fee shall be dedicated solely to the provision of staff and administrative services used to process applications, subject to appropriation.</text>
      </level>
    </section>
    <section number="23-115" name="Permit fees" law="code" slug="sec-23-115" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV2PEBOFE_S23-115PEFE">
      <level label="a">
        <text>The fee as prescribed in the Table of Fees, section 2-253.63, Attachment A and as published on the DPIE website, for issuance of any road construction permit required by this ordinance, excepting a utility permit fee for a public utility, small wireless facility permit fee for work in the public right-of-way, or a haul road permit fee for operation of a haul road, shall be ten percent (10%) of the cost of the work as estimated by the Department. The estimated cost for this purpose shall not include the contingency allowance. In no event, shall the amount of the fee be less than Twenty-Five Dollars ($25.00). The fee for issuance of any road construction permit shall be dedicated solely to the provision of staff and administrative services used to issue road construction permits, subject to appropriation.</text>
      </level>
      <level label="b">
        <text>The Director shall establish and maintain a Table of Fees for all types of permits and shall have the authority to change the fees from time to time pursuant to Section 2-253.63(d) and (e).</text>
      </level>
      <level label="c">
        <text>A nonrefundable filing fee shall be charged to process an application for a road construction permit. The filing fee for a road construction permit shall be as prescribed in the Table of Fees, section 2-253.63, Attachment A and as published on the DPIE website, but not less than Twenty-five Dollars ($25.00). If bond and fee are posted within the time allotted as set forth in Section 23-114(c), the filing fee will be credited toward payment of the permit fee. Where an application fails to result in the issuance of a permit, the filing fee will be retained to offset the administrative costs incurred.</text>
      </level>
      <level label="d">
        <text>The fee for issuance of a utility permit and a small wireless facility permit for work in the public right of way are established in the Table of Fees published by the Director. These fees are further explained in the "Specifications and Standards for Roadways and Bridges," the "Design Manual for Small Wireless Facilities," and the "Policy and Specification for Utility Installation and Maintenance."</text>
      </level>
      <level label="e">
        <text>Extra Review Cycle Fee for Site Road Applications: If the permittee has not addressed all County review comments in the first three plan review cycles, such that the approval or permit is not issued on the 4th cycle, the permittee shall pay an extra review cycle fee as identified in the Table of Fees in Subtitle 2-253.63 for each extra review cycle prior to the approval and issuance of the permit. This extra review cycle fee applies to site development concepts, street grade establishments, street construction permits, site development rough grading permits, and site development fine grading permits. The Director or their designee shall have the authority to waive this fee. If the extra review cycle is due to new comments from the County that could have been made during earlier review cycles which then resulted in review cycles exceeding 4 cycles, then the fee shall not be assessed.</text>
      </level>
      <level label="f">
        <text>Road Plan Deficiency Fee for Site Road Permit Applications: Site Road permits shall include the construction of all public roads shown on the preliminary plan of subdivision and final subdivision plats, and shall include the frontage road improvements as required by Subtitle 23-105. In the instance of a phased project, all public roads within a phase of development shall be included in the phased permit application. The Department shall approve multiple phases of a project during the Site Development Concept Plan approval. If the improvements to the existing frontage road are submitted as a separate permit, that application shall be submitted prior to or concurrently with submission of the onsite permit. If the frontage improvements are submitted as a separate permit, the onsite permit will not be issued until the existing frontage road permit has been issued. For phased projects, the existing frontage road improvements shall be included in the first permit phase that abuts the frontage road. The Director or their designee may waive the requirements of this Paragraph and authorize a reduced scope for a permit application on a Site Development Concept Plan.</text>
      </level>
      <level label="g">
        <text>Phasing of Site Road Permit Applications: For phased projects, the permit application and plans must include all roads within the phase limit, including the full width of the roads adjacent to and near the lots and parcels in that phase. The phasing shall be established by an approved Site Development Concept Plan. For phased projects, the existing frontage road improvements shall be included in the first permit phase that abuts the frontage road.</text>
      </level>
      <level label="h">
        <text>Road Plan Deficiency Fee: If the scope of the permit submission does not conform to the requirements of Paragraph (f) and (g) above, the permit submission will be returned for correction and the permittee will be required to pay a Road Plan Deficiency Fee with the subsequent submission submissions. This fee will not be required if a waiver letter was granted by the Director or their designee prior to permit submission which matches the extent of roadwork on the submitted permit plans. This fee applies to street construction permits and site development find grading permits. For phased projects, the permit application and plans must include all roads within the phase limit, including the full width of the roads adjacent to and near the lots and parcels in that phase. The phasing shall be established by a previously approved site development concept. For phased projects, the existing frontage road improvements shall be included in the permit phase that abuts the frontage road. If the existing frontage road improvements are submitted as a separate permit, prior to submission of the onsite permit, the fee will not be required. If the existing frontage improvements are submitted as a separate permit, the onsite permit will not be issued until the existing frontage road permit has been issued. This fee applies to street construction permits and site development fine grading permits.</text>
      </level>
    </section>
    <section number="23-116" name="Bonds; required" law="code" slug="sec-23-116" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV2PEBOFE_S23-116BORE">
      <level label="a">
        <text>Requirement of Bond. Permits required by this Subtitle shall not be issued until the applicant, as principal, has posted a performance bond in favor of Prince George's County to ensure the satisfactory performance and completion of all work covered by the permit; and/or, where applicable, a payment bond to ensure timely payment to the County, subcontractors, and/or suppliers for work performed under the permit. Said payment bond shall be held by the Department until one (1) year after the date of final acceptance of the permit in order to adequately protect subcontractors and suppliers for work performed under the permit. However, notwithstanding the above, the Director (at his sole discretion) may release a payment bond earlier than the one-year period upon receipt of documentation which proves that all supplies and subcontractors have been paid. Where the estimated cost of the work is less than One Thousand Dollars ($1,000.00), no performance bond will be required. The limits for a labor and materialman's bond shall be as stated in Section 23-116(e)(2)(A). The acceptable forms of security are:</text>
        <level label="1">
          <text>Irrevocable letter of credit from a financial institution with automatic renewal until released by the County;</text>
        </level>
        <level label="2">
          <text>Irrevocable assignment of funds in favor of Prince George's County;</text>
        </level>
        <level label="3">
          <text>Corporate surety bond;</text>
        </level>
        <level label="4">
          <text>Cash bond;</text>
        </level>
        <level label="5">
          <text>Irrevocable assignment of certificate of deposit or of savings certificate;</text>
        </level>
        <level label="6">
          <text>Irrevocable assignment of savings account; or</text>
        </level>
        <level label="7">
          <text>Certificate of guarantee as provided for in Section 2-463 of this Code.</text>
        </level>
      </level>
      <level label="b">
        <text>Waiver of Bond for Public Utilities and Governmental Agencies and Authorities. The Director may waive the requirement for bond for any permit issued to a public utility, governmental agency, or authority where it is determined that the utility, agency, or authority has equivalent financial resources and responsibility.</text>
      </level>
      <level label="c">
        <text>Amount of Bond. Except as otherwise provided, the amount of any bond required to be posted under this Section shall be equal to, or greater than, the total cost of the project as estimated by the Department, including an additional twenty-five percent (25%) of the estimated cost for contingencies. The maximum amount of a restoration bond shall not exceed One Hundred Thousand Dollars ($100,000.00).</text>
      </level>
      <level label="d">
        <text>Conditions Imposed Upon Obligation of Permittee to Post Performance Bond. Notwithstanding the presence of a document identified as a performance bond and the terms of such document, if filed, the following conditions shall be a part of the terms of the performance bond posted by the applicant or permittee, as principal, with the County, and such performance bond may be forfeited in the entire amount of the value of the work remaining to be completed, including an additional twenty-five percent (25%) of the estimated cost for contingencies, upon breach of any of the following conditions by the permittee:</text>
        <level label="1">
          <text>To comply with all of the applicable terms, conditions, provisions, requirements, standards, and specifications of this ordinance;</text>
        </level>
        <level label="2">
          <text>To faithfully and timely complete the work for which the permit was issued;</text>
        </level>
        <level label="3">
          <text>To save harmless the County from:</text>
          <level label="A">
            <text>Any expense incurred because of noncompletion of the work;</text>
          </level>
          <level label="B">
            <text>Any damages growing out of the performance or nonperformance of the work; or</text>
          </level>
          <level label="C">
            <text>Any failure to pay any bills incurred by the County arising out of the work covered by the permit.</text>
          </level>
        </level>
      </level>
      <level label="e">
        <text>Types of Bonds. The following types of bonds shall be required, as applicable, in accordance with Subsection (g) of this Section:</text>
        <level label="1">
          <text>Performance Bonds.</text>
          <level label="A">
            <text>Restoration Bond. A restoration bond will be required to insure restoration of any damage done to existing curb, gutter, sidewalk, hiker-biker trail, driveway, pavement, sod, tree, or any other items within the right-of-way adjacent to the lots being developed or within the area of road adjacent to grading, filling, or mining sites.</text>
            <level label="i">
              <text>A restoration bond shall also be required to gain the Department's concurrence for release of building permits in areas where roads are completed and maintained, or under permit to another developer, to insure restoration of any damage to the existing public facility as a result of the on-site construction, or for additions to an existing building, installation of in-ground swimming pools, or other types of construction where heavy equipment will cross the right-of-way. For minor work on a single lot, a letter from the property owner accepting responsibility for restoration of the facilities adjacent to the residential property may be acceptable to the Director in lieu of a bond.</text>
            </level>
            <level label="ii">
              <text>Where restoration is required to repair damage within the right-of-way, it shall be the duty of the applicant to apply to the Department for a permit, pay the established fee, and post bond if a restoration bond was not posted previously, the bond amount posted is less than the value of the corrective work, or the work to be performed is beyond the scope of the bonds posted.</text>
            </level>
            <level label="iii">
              <text>A restoration bond will be released when all damaged facilities, if any, have been restored to the satisfaction of the Director, in accordance with accepted standards.</text>
            </level>
          </level>
          <level label="B">
            <text>Uncompleted Work Bond. Where the permittee cannot complete the work under a permit due to a future roadway construction project, uncompleted construction of a utility, inability to obtain adjacent rights-of-way, difficulties produced by the character of adjacent terrain, or other circumstances as the Director may determine, the permittee shall be required to post a bond for the uncompleted work plus a twenty-five percent (25%) contingency, including the cost as determined by the Director for acquisition of any required rights-of-way or easements.</text>
            <level label="i">
              <text>The original bond and Department concurrence for building permits within areas adjacent to uncompleted work may be released after receipt of the uncompleted work bond by the Department.</text>
            </level>
            <level label="ii">
              <text>In the event it becomes practical or feasible for the permittee, who posted the uncompleted work bond, to complete the work covered by the bond, the Director shall promptly notify the permittee to complete the work covered by the bond. Where the permittee fails to perform and complete the previously uncompleted work within two (2) years of the date of notification to proceed, the total value of the bond will be forfeited to the County.</text>
            </level>
            <level label="iii">
              <text>If, after the permittee has posted bond for the uncompleted work, the Director determines that the work cannot be performed within three (3) years from the date of acceptance of the previously completed work, the total value of the bond may be released by the County.</text>
            </level>
          </level>
          <level label="C">
            <text>Payment in Lieu of Construction. As an alternative to, or to replace an existing Uncompleted Work Bond in whole or in part, the Director may instruct the permittee to make a payment to the County in lieu of construction for all or part of the remaining work in an amount equal to the value of the work as currently estimated by the Department, plus the twenty-five percent (25%) contingency provided for by this Subtitle. The payment of the said Payment in Lieu of Construction shall satisfy all, or a portion of, the requirements of the permit depending on the amount of Bond to be either released or reduced in value to reflect the value of the remaining work.</text>
          </level>
        </level>
        <level label="2">
          <text>Payment Bonds.</text>
          <level label="A">
            <text>Labor and Materialman's Bond. A labor and materialman's bond shall be provided by the applicant prior to the issuance of a permit, and retained by the County to ensure payment of persons supplying labor or material for work performed under the permit. A labor and materialman's bond shall be posted whenever the form of security posted as a performance bond is a corporate surety bond and for all other types of security posted if the estimated cost of the work is Twenty-five Thousand Dollars ($25,000.00), or more. The labor and materialman's bond shall remain in full force and effect until such time as all outstanding bills and obligations for labor and materials supplied for performance of the work defined in the permit are paid for in full, and a certified release of liens and claims is received by the Department.</text>
          </level>
          <level label="B">
            <text>Reimbursement Bond. A reimbursement bond will be required where the permittee enters into a contract with the County for the County to perform work within the right-of-way which cannot be performed by the permittee, but which the permittee is obligated to perform. Said bond is to insure payment to Prince George's County for work performed by the County under this contract. At the time of completion of construction for work performed under this contract, the County will bill the permittee for the total cost of the work.</text>
          </level>
          <level label="C">
            <text>Traffic Signal Bond. If it is determined by the Director that a land development requires new, or impacts existing, traffic signal(s), a bond will be required to insure that the cost of the new or corrective work will be borne by the developer. The Director may authorize a permit applicant to design and install traffic control signals. The bond will be released when the traffic signals have been installed or reconstructed, accepted, and all expenses paid.</text>
          </level>
          <level label="D">
            <text>Overhead Structures Bond. The applicant, pursuant to the provisions of this Subtitle, shall be required to post a bond which shall indemnify the County, for a period of five (5) years from the time of completion of the construction, from any harm which the County may suffer as a result of the construction and maintenance of an overhead structure in a road. The amount of the bond shall be one hundred twenty-five percent (125%) of the estimated cost of demolition and removal of the structure as determined at the time the bond is posted. The bond shall be posted prior to the issuance of a permit.</text>
          </level>
        </level>
      </level>
      <level label="f">
        <text>Utility. Each public utility which is qualified as a public service company under Maryland law shall, at the time of issuance of the public utility permit, submit to the Director a letter of responsibility in lieu of a bond. Any other public or private utility shall be required to post a bond.</text>
      </level>
      <level label="g">
        <text>Approval of Bonds Required Before Issuance of Permit. Before the Department may issue a permit, or concur in the issuance of a permit, all required bonds shall be approved by the Director and the County Attorney.</text>
      </level>
      <level label="h">
        <text>Refund Agreements for Phases of Work Completed.</text>
        <level label="1">
          <text>Cash, letters of credit, certificates of guarantee, and other instruments, not to include surety bonds, posted by the permittee and accepted by the County may be refunded upon request of the permittee on a prorated basis, depending on the value of the completed and approved work, as follows:</text>
          <table>
            <row>
              <cell>% OF WORK COMPLETED</cell>
              <cell>% REFUND AMOUNT</cell>
            </row>
            <row>
              <cell>50</cell>
              <cell>25</cell>
            </row>
            <row>
              <cell>80</cell>
              <cell>75</cell>
            </row>
            <row>
              <cell>Acceptance</cell>
              <cell>100</cell>
            </row>
          </table>
        </level>
        <level label="2">
          <text>Reduction in the Amount of a Surety Bond Posted for Urban Road Classifications. When all work is completed on a permit except the placement of sod and the planting of trees, the permittee may request a reduction in the surety bond amount to fifty percent (50%) of the original amount or Twenty-five Thousand Dollars ($25,000.00), whichever is greater, provided that all of the storm water drainage systems have been constructed by the permittee and approved by the Director.</text>
        </level>
        <level label="3">
          <text>There shall be no reduction in the amount of a surety bond posted for rural road classifications.</text>
        </level>
        <level label="4">
          <text>Release of Claims. In no event shall any labor and materialman's bond be reduced or released until all claims by laborers and material suppliers have been paid, and a release of claims covering the work completed has been filed with the Department.</text>
        </level>
      </level>
      <level label="i">
        <text>Release of Bonds. Bonds covering construction shall not be released until the construction covered by such bonds has been finally approved by the Director in accordance with this Subtitle and subject to such requirements to comply with Subsections (e)(1)(B) and (C) of this Section. Upon acceptance of the work by the Director, the security posted to insure performance shall be certified as discharged. Discharge of the security posted to insure performance shall not operate as a discharge of any other bond.</text>
      </level>
      <level label="j">
        <text>Action on Defaulted Permit.</text>
        <level label="1">
          <text>Where the Director determines that a permit is in default and the work is guaranteed by a surety bond, the Department shall immediately notify the bonding institution or agent to undertake and complete the work in accordance with the permit.</text>
        </level>
        <level label="2">
          <text>Where the Director has determined that a permit is in default and the work is guaranteed by a form of bond other than a surety bond, and the bonding institution or agent fails to commit to undertake completion of the work within thirty (30) days of having been given notice by the Department, the Director shall immediately move to collect all performance bonds which have been posted.</text>
        </level>
        <level label="3">
          <text>Upon a decision to collect the bonds, the Director shall evaluate the work remaining to be done, determine whether the work covered by the permit should be completed, the work site should be restored to its original condition, or other modifications to the permitted work site should be made. The Director shall then determine whether the bonds posted are sufficient to carry out the required completion, restoration, or modified work.</text>
        </level>
        <level label="4">
          <text>After evaluating the work to be performed as specified above, the Director shall develop an estimate of the costs for said work, to include an amount equal to twenty-five percent (25%) of the anticipated construction cost as a contingency, and compare the estimated amount to the amount of bond posted by the permittee. If the amount of bond posted is in excess of the estimate, the Department shall immediately move to collect the bonds and carry out the necessary work. The entire amount of the bonds posted may be used either in or near the permit site as may be determined by the Director to be necessary.</text>
        </level>
        <level label="5">
          <text>If the bonds posted are not sufficient, the Department shall develop and implement a course of action as determined by the Director. The Department shall immediately move to collect all of the bonds which have been posted.</text>
        </level>
        <level label="6">
          <text>If the bonds which have been posted are in excess of the amount required to carry out the completion, restoration, or modified work determined by the Director to be necessary, the excess amount shall be released to the payer after all work has been finished by the Department and all costs of same have been accounted for.</text>
        </level>
        <level label="7">
          <text>Upon notification that a bond has been forfeited in accordance with this Subtitle, the bonding institution or agent providing the bond shall have thirty (30) days to issue payment to the County. If the bonding institution or agent fails to render payment within thirty (30) days of the notice from the Director to make payment, the bonding institution or agent may be barred from issuing any subsequent bonds for any other road construction work within the County for a period of five (5) years. The right to reissue bonds after having been previously barred shall be allowed only after all outstanding amounts have been paid, plus an amount equal to ten percent (10%) a year, compounded annually.</text>
        </level>
      </level>
    </section>
    <section number="23-117" name="Suspension or revocation of a permit" law="code" slug="sec-23-117" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV2PEBOFE_S23-117SUREPE">
      <level label="a">
        <text>Suspension or Revocation. The Director may suspend or revoke any permit required by this Subtitle for one or more of the following reasons:</text>
        <level label="1">
          <text>Violation of this Subtitle;</text>
        </level>
        <level label="2">
          <text>Violation of the permit;</text>
        </level>
        <level label="3">
          <text>Assignment or transfer of the permit; or</text>
        </level>
        <level label="4">
          <text>Violation of a stop work order issued by the Director.</text>
        </level>
      </level>
      <level label="b">
        <text>Before the Director may revoke a permit, he shall advise the permittee of his intent in writing. If a written request is made by the permittee within fourteen (14) calendar days from the date of the notice of intent to revoke, the Director shall conduct a hearing on the record. Requested hearings shall be held after reasonable notice to any interested person, to include the permittee. The notice shall include the time and place of the hearing, a brief description of the permit being considered for revocation, and the ground(s) for the revocation. The Director shall render a decision in writing on the matter within ten (10) calendar days after the date of the hearing.</text>
      </level>
      <level label="c">
        <text>Forfeiture of Bonds. When a permit is revoked, the bond amounts posted shall be forfeited to the County after the administrative appeal process has been completed.</text>
      </level>
    </section>
    <section number="23-118" name="Haul road permit" law="code" slug="sec-23-118" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV2PEBOFE_S23-118HAROPE">
      <text>No person shall operate a grading, filling, or mining facility without first obtaining a haul road permit from the Department.</text>
    </section>
    <section number="23-119" name="Permit for overweight/oversize vehicles" law="code" slug="sec-23-119" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV2PEBOFE_S23-119PEOVOVVE">
      <text>Permits for overweight/oversize vehicles issued by the SHA shall be valid for County roads provided weight restrictions for structures are observed.</text>
    </section>
    <section number="23-120" name="Other types of permits" law="code" slug="sec-23-120" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV2PEBOFE_S23-120OTTYPE">
      <level label="a">
        <text>Utility Permit. Utilities shall be required to apply for and obtain a permit from the Department for all work performed within the public right-of-way related to the repair or modification of their systems. A separate permit may be required for each new installation, major repair, or modification to the system located within the paved portion of the right-of-way. The Director may issue to a utility, at his discretion, a maintenance permit or permits for the performance of work within the right-of-way, and establish the conditions for operation under the permit(s) so issued. Utility construction specifications and a quality control plan for road resurfacing shall be reviewed annually by the Department and submitted with the maintenance permit application.</text>
        <level label="1">
          <text>Maintenance permits may be issued for a period of up to one year.</text>
        </level>
        <level label="2">
          <text>If a contractor has performed work for a utility in the County without a utility permit three or more times within one year, the contractor after written notification of each instance of noncompliance shall be prohibited from performing work in the right-of-way for that utility for a period of up to 12 months. Pursuant to the provisions of Section 23-108 of this Code, there is a right of appeal to the Director of the Department of Permitting, Inspections, and Enforcement. Decisions of the Director of the Department of Permitting, Inspections, and Enforcement may be appealed to the Board of Administrative Appeals. Bonding and permit fees for utility permits shall be in accordance with this Subtitle. Utilities performing work without a utility permit may be fined One Thousand Dollars ($1,000.00) per day in accordance with Subtitle 23.</text>
        </level>
      </level>
      <level label="b">
        <text>Permit for Overhead Structures. No overpass, bridge, elevated walkway, or roadway may be constructed over a public right-of-way without a permit issued by the Director.</text>
        <level label="1">
          <text>The Director is authorized to grant permits for the construction and maintenance of bridges, overpasses, elevated walkways, roadways, and any other structure which will occupy in any manner, temporarily or permanently, the air space above any road.</text>
        </level>
        <level label="2">
          <text>The construction location or design of said overhead structures shall not in any manner affect any private rights-of-way of any adjacent landowner with respect to light, air, and access to the public highway, nor shall the County be deprived of the right to control and regulate the use of the public highway over which the structure extends to the minimum elevation above the surface of the road in accordance with the applicable standards, including those of the American Association of State Highway and Transportation Officials.</text>
        </level>
        <level label="3">
          <text>Where the Director determines that a proposed overhead structure would reduce the natural illumination of the public road to less than the level required for the safety of the public, he may require the permittee to provide artificial illumination sufficient to meet the requirements for safety to the public. The design of such illumination shall be subject to the approval of the Director.</text>
        </level>
      </level>
      <level label="c">
        <text>Driveway Entrance/Access Permit. Any person undertaking to construct or improve an entrance of a driveway, private road, or other vehicular access from an abutting property into a County road shall be required to obtain a driveway entrance/access permit from the Department for all work performed in the public right-of-way. A separate permit may be required for each such entrance; however, this does not prohibit the inclusion of such entrances/access points within a road construction permit when such entrances are within the extent of the road construction covered by said permit.</text>
        <level label="1">
          <text>The Director may approve or require changes in the type or standard and the width to be required for each such entrance or access point in accordance with the use of the abutting property, its location, the classification and condition of the public road to be entered, and the volume of traffic thereon.</text>
        </level>
        <level label="2">
          <text>The Director may deny a permit for an entrance/access point at any location deemed to present a hazard to the users of the public road or to the users of the proposed entrance/access point, provided that a reasonable means of access to the abutting property can be provided at some other, safer location.</text>
        </level>
        <level label="3">
          <text>The Director may require such nearby road, roadside, or drainage improvements as are necessary in conjunction with the construction of the entrance to alleviate any hazards, operational and maintenance burdens, or nuisances that would otherwise be created by the existence of the entrance.</text>
        </level>
      </level>
      <level label="d">
        <text>Small Wireless Facility Permit.</text>
        <level label="1">
          <text>Placement of small wireless facilities requires a recommendation of approval from the Telecommunications Transmission Facility Coordinating Committee as required by Subtitle 5A prior to the issuance of any permits.</text>
        </level>
        <level label="2">
          <text>Placement of small wireless facilities in the public right-of-way requires a permit from the Department for all work performed within the public right-of-way related to new installation or the repair or modification of the facility. A separate permit shall be required for each new installation, major repair, or modification to the system located within the improved portion of the public right-of-way.</text>
        </level>
        <level label="3">
          <text>The scope of work for a permit for a new installation of a small wireless facilities shall include all work necessary to make the facility ready for the actual provision of telecommunications services. Accordingly, the scope of work that must be completed under a small wireless facility permit shall include, at a minimum, the installation and provisioning of all power and backhaul components necessary for the operation of the facility.</text>
        </level>
        <level label="4">
          <text>The Director may issue, at his discretion, but consistent with the Design Manual, a maintenance permit or permits for the performance of maintenance and minor repair work within the public right-of-way, and establish the conditions for operation under the permit(s) so issued. Maintenance permits may be issued for a period of up to one year.</text>
        </level>
        <level label="5">
          <text>If a contractor has performed work on behalf of small wireless permittee in the County without a permit three or more times within one year, the contractor after written notification of each instance of noncompliance shall be prohibited from performing work in the public right-of-way for a period of up to 12 months. Pursuant to the provisions of Section 23-108 of this Code, there is a right of appeal to the Director. Decisions of the Director may be appealed to the Board of Administrative Appeals. Bonding and permit fees shall be in accordance with this Subtitle. Persons performing work without a permit may be fined in accordance with Subtitle 23.</text>
        </level>
      </level>
    </section>
    <section number="23-121" name="Time for work; commencement and expiration of permit" law="code" slug="sec-23-121" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV2PEBOFE_S23-121TIWOCOEXPE">
      <level label="a">
        <text>Commencement. When a permit has been issued, the permittee shall commence work within sixty (60) days from the date of issuance of the permit, except for good cause shown. Thereafter, the permittee shall have a duty to diligently perform the work to the conclusion of all work covered by the permit.</text>
      </level>
      <level label="b">
        <text>Expiration.</text>
        <level label="1">
          <text>Road Construction Permits.</text>
          <level label="A">
            <text>Where the estimated cost of work is not more than Five Hundred Thousand Dollars ($500,000.00), the permit shall expire not more than two (2) years from date of issuance of permit.</text>
          </level>
          <level label="B">
            <text>Where the estimated cost of permitted work is equal to, or more than, Five Hundred Thousand Dollars ($500,000.00), the permit shall expire not more than three (3) years from date of issuance of permit.</text>
          </level>
          <level label="C">
            <text>The estimated cost of work for this determination shall include twenty-five percent (25%) for contingencies.</text>
          </level>
        </level>
        <level label="2">
          <text>Other Types of Permits. Permits for other than road and storm drainage construction, such as utilities, small wireless facilities, driveways, leadwalks, planting, sodding or seeding, minor grading, or haul roads, shall be valid for a period of time consistent with the scope of work, but in no case, less than six (6) months.</text>
        </level>
        <level label="3">
          <text>No work will be allowed on an expired permit.</text>
        </level>
      </level>
    </section>
    <section number="23-122" name="Extension; fees for extension" law="code" slug="sec-23-122" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV2PEBOFE_S23-122EXFEEX">
      <level label="a">
        <text>Extension. The Director is authorized to grant or deny a request for extension of time for a permit, where a permittee is or will be unable to complete the work, as determined by the Director, within the time allowed.</text>
        <level label="1">
          <text>It shall be the responsibility of the permittee to apply for an extension not less than thirty (30) days prior to the expiration date of the permit. Such request shall be in writing and shall state the reasons for extension and the time required to complete the work.</text>
        </level>
        <level label="2">
          <text>Where the permittee has requested an extension of a valid permit prior to its expiration and, through no fault of his own, the extension has not yet been granted or denied by the Department, the permittee may continue work under the permit. If the request for extension of the permit is denied, all work will cease immediately. Such denial may be appealed as provided herein.</text>
        </level>
        <level label="3">
          <text>Where the Director determines that an additional bond amount is necessary because of inflation or other factors, the permittee shall be required to post the additional bond in an amount determined by the Director before the extension of time is granted. Where the permittee is working under the provisions of Section 23-122(a)(2), a grace period of ten (10) working days will be allowed for the posting of additional bond. Failure to post the additional bond during the ten (10) day period will cause the permit to be automatically suspended.</text>
        </level>
        <level label="4">
          <text>The Director shall decide upon the request for extension and shall notify, in writing, the affected bonding institution and the applicant of his decision within twenty (20) working days of a formal request. This decision shall be contingent upon the payment of the necessary extension fee and notification to the Department of the consent of the bonding agent.</text>
        </level>
      </level>
      <level label="b">
        <text>Fee for extension:</text>
        <level label="1">
          <text>A fee in the amount of twenty-five percent (25%) of the original permit fee as prescribed in the Table of Fees, section 2-253.63, Attachment A and as published on the DPIE website, but not less than Twenty-Five Dollars ($25.00), shall be charged for an extension of a valid permit (not to include road construction, utility permits, small wireless facility permits, or haul road permits).</text>
        </level>
        <level label="2">
          <text>The fee for an extension of a road construction permit shall be twenty-five percent (25%) of the original permit fee. Where the percentage of completion of a road construction permit exceeds ninety percent (90%) as determined by the Department, the permit fee shall be a maximum as prescribed in the Table of Fees, section 2-253.63, Attachment A and as published on the DPIE website.</text>
        </level>
        <level label="3">
          <text>The fee for extension of a utility permit and a small wireless facility permit for work in the public right of way are established in the Table of Fees published by the Director. These fees are further explained in the "Specifications and Standards for Roadways and Bridges," the "Design Manual for Small Wireless Facilities," and the "Policy and Specification for Utility Installation and Maintenance."</text>
        </level>
      </level>
      <level label="c">
        <text>Security. The only forms of security which shall be acceptable to the County for the extension of a permit shall be either a Cash Bond, an Irrevocable Letter of Credit, Surety Bond, or a Certificate of Guarantee.</text>
      </level>
    </section>
    <section number="23-123" name="Inspection and notice" law="code" slug="sec-23-123" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV2PEBOFE_S23-123INNO">
      <level label="a">
        <text>Notice. For utility and small wireless facility permits, the permittee shall post notice in the following situations:</text>
        <level label="1">
          <text>For non-emergency work, the permittee shall notify the Department and the public in impacted neighborhoods of the time of commencement of road construction, if the duration of work is expected to be more than five (5) working days, or if there will be a change in traffic patterns, at least ten (10) working days before commencement of any construction under said permit;</text>
        </level>
        <level label="2">
          <text>For non-emergency work, a project information sign provided by the permittee and approved by the Department shall be posted in a conspicuous place on each project site near or within an existing road five (5) working days in advance of the start of construction unless waived by the Department;</text>
        </level>
        <level label="3">
          <text>Where work is interrupted for a period of five (5) working days or more, the permittee shall, at the end of each interruption, notify the Department of his intent to actively resume work under the permit;</text>
        </level>
        <level label="4">
          <text>Where the permittee has completed work on the subgrade and concrete forms, he shall give notice to the Department that the work is ready for inspection and approval.</text>
        </level>
        <level label="5">
          <text>After written notification of noncompliance, the permittee may be fined Five Hundred Dollars ($500.00) per day of noncompliance with the public notification plan.</text>
        </level>
      </level>
      <level label="b">
        <text>Inspection; penalty for noninspection.</text>
        <level label="1">
          <text>Upon request from a utility or small wireless facility permittee, the Department shall provide training and approval to utility designated inspectors and third-party inspectors to inspect permitted work to verify that the compaction and roadway restoration and repaving work has been performed in compliance with the Prince George's County Code and Specifications. For non-emergency work, all utilities and small wireless facility permittees, or their contractors doing compaction, right-of-way and roadway restoration and repaving work under a utility permit or a maintenance permit are required to provide for a utility designated staff inspector or an independent third-party inspector both of whom must be approved by the County to perform an inspection to ensure that the permitted compaction, right of way and roadway restoration and repaving work is in compliance with the Prince George's County Code and Specifications. The permittee shall, during the hours of work, make available to the inspector and to other employees of the Department the construction work, materials, plans, and specifications.</text>
        </level>
        <level label="2">
          <text>The permittee may not commence construction of storm drainage, sidewalk, curb and gutter, or pavement unless the Department or Department-approved independent third-party inspector has conducted an inspection and given approval to the subgrade and concrete form work. In addition, where water and sewer utilities are involved, the permittee shall notify WSSC immediately after base paving to obtain a preliminary paving clearance certificate, and notify WSSC again after final paving to obtain a final paving clearance certificate.</text>
        </level>
        <level label="3">
          <text>Where the permittee performs any work under the permit without an inspection, such work shall be considered improper, and such conduct on the part of the permittee may result in removal and replacement of all said construction by the permittee at his expense. In the event that proper notice is provided to the Department for inspection services to be performed on a permit, but no inspection is provided by the Department within two working days (48 hours) of the time of the request, the permittee, after verbal notification to the Director's designee, may proceed with the work using independent inspection certification of the work or materials. The independent inspection certification must be provided by an agency approved by the Director.</text>
        </level>
        <level label="4">
          <text>Where the permittee performs any work under a permit (with or without an inspection), and the work does not comply with this Subtitle, the inspector is empowered to issue written notice to require the work to be removed and replaced by the permittee at his expense.</text>
        </level>
      </level>
      <level label="c">
        <text>Notice of Violation. Whenever the Director finds and determines that the requirements of this Subtitle have been violated, he shall notify the responsible person, owner, or permittee, in writing, and detail the corrective action required and the amount of time within which the corrective work must be performed. Such notice may be delivered in person or by United States Postal Service regular mail and addressed to the said responsible person, owner, or permittee at the last known address or the address shown on the real property tax records in the Treasurer's Office for Prince George's County. Such notice, when delivered in person or so addressed and deposited with the Postal Service with proper postage paid, shall be deemed complete and sufficient.</text>
      </level>
      <level label="d">
        <text>Compliance; penalties.</text>
        <level label="1">
          <text>The permittee, including utilities, small wireless facility permittees, agents, contractors, and subcontractors shall comply with all requirements of the permit, including sediment and erosion control, either before or during the course of construction.</text>
        </level>
        <level label="2">
          <text>Where the permittee fails to comply with the requirements cited in the Notice of Violation, said noncompliance may result in the following:</text>
          <level label="A">
            <text>Issuance of a stop work order. A stop work order may be issued for work that commences without a permit. A stop work order shall be issued by the Director and constitute a suspension of the applicable permit, and shall prohibit the violator from doing any further work under the permit except such work as shall bring any previous work into compliance. When the permittee corrects the work to the satisfaction of the Department in accordance with the applicable requirements, the Director shall rescind the stop work order in writing at which time the permittee may resume further work under the permit; or</text>
          </level>
          <level label="B">
            <text>The County may complete the required work and charge the permittee on a cost basis, including the costs of administration and overhead.</text>
          </level>
        </level>
        <level label="3">
          <text>Any governmental agency not required to obtain a permit from the Department or post a bond shall be subject to the provisions of Subsections (d)(1) and (d)(2), above. In addition, nonpayment by any governmental agency of any outstanding balance due to the County within the time allotted shall subject said governmental agency to liability in the amount of nonpayment, except where state or federal law provides to the contrary.</text>
        </level>
      </level>
      <level label="e">
        <text>Safety hazards; work in noncompliance. Safety hazards, or work which is determined not to be in compliance with the provisions of this Subtitle, which occur within the right-of-way as a result of the work performed by the permittee and the resolution of which is considered urgent by the Department, shall be resolved by contacting the person whose name appears on the sign required under Section 23-129. If that person cannot be contacted, the inability of the Department to contact the permittee at the 24-hour telephone number shall constitute notice, and the Department shall be authorized to proceed with the necessary corrective action and bill the permittee accordingly for all costs incurred in accordance with Section 23-109. Failure of the permittee to pay the amount billed within thirty (30) days may be sufficient grounds for suspension or revocation of the permit.</text>
      </level>
      <level label="f">
        <text>Inspection by others. Subject to prior written arrangement, the Director may accept reports of inspection by approved agencies for work performed under permits issued by the Department. All reports of such inspections shall be in writing and certified by a responsible officer of such approved agency. The Director shall develop criteria for the approval of individual agencies for the purpose of performing inspections, and promulgate policy and procedures for the conducting of such inspections.</text>
      </level>
    </section>
    <section number="23-124" name="Approval and acceptance of work" law="code" slug="sec-23-124" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV2PEBOFE_S23-124APACWO">
      <level label="a">
        <text>Final approval of construction work shall be given by the Director upon verification through inspection that the work conforms in all respects with the permit and includes all work required thereby. Notification by the Director that all work under the permit has been approved and accepted by the County shall serve as formal notice to the permittee and the bonding institution that all requirements of the permit have been satisfied.</text>
      </level>
      <level label="b">
        <text>Acceptance. Where the road construction adds to or extends the County maintained road system mileage, the Director shall verify in writing to the County Executive that the construction work has received final approval. The Director's verification shall constitute a recommendation to the County Executive that the work be accepted into the County road system for perpetual maintenance. The County Executive, or his designee, shall, in each individual case, have the authority to accept roads into the County road system for perpetual maintenance.</text>
      </level>
      <level label="c">
        <text>Partial acceptance. A permittee may request a final approval of part of the work covered by the permit, provided that the limits of work requested for partial acceptance be completed in accordance with this ordinance. Such request and approval, if any, shall be in writing and may be verified by the Director and accepted by the Executive upon the recommendation of the Director. Partial acceptance may, at the discretion of the Director, result in a reduction in the amount of bond posted for the permit.</text>
      </level>
      <level label="d">
        <text>Status of Permit Obligations. Permit obligations not completed shall remain in force and survive permit suspension, expiration, revocation, and default. Permit obligations may be satisfied by completion and acceptance of the work or delivery of a cash payment to the County in an amount sufficient to complete the work.</text>
      </level>
    </section>
    <section number="23-125 through 23-127" name="Reserved" law="code" slug="sec-23-125-through-23-127" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV2PEBOFE_S23-125._THROUGH_SEC._23-127RE" />
  </unit>
  <unit kind="division" number="3" name="Design and Construction Standards and Requirements" slug="division-3" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE">
    <section number="23-128" name="Requirement of conformity to Subtitle, specifications, and standards" law="code" slug="sec-23-128" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-128RECOSUSPST">
      <level label="a">
        <text>The "General Specifications and Standards for Highway and Street Construction" and the "Specifications and Standards for Highway Traffic Signals" of the Department of Public Works and Transportation of Prince George's County, copies of which have been filed with the Clerk's Office, are hereby adopted with the same authority and force as if set forth in their entirety herein. Amendments and revisions shall be made by Council resolution.</text>
      </level>
      <level label="b">
        <text>The Department of Public Works and Transportation shall make available for inspection current copies of this Subtitle and the Design and Construction Standards. The Design and Construction Standards referred to herein may be purchased from the Department of Public Works and Transportation at the established prevailing price.</text>
      </level>
    </section>
    <section number="23-129" name="General construction requirements for existing or proposed County roads" law="code" slug="sec-23-129" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-129GECOREEXPRCORO">
      <level label="a">
        <text>All road construction shall conform to this Subtitle.</text>
      </level>
      <level label="b">
        <text>All roads to be constructed shall be graded to the full width of the right-of-way or as shown on the approved plans.</text>
      </level>
      <level label="c">
        <text>Grading shall include clearing and grubbing, the removal and replacement of all unsuitable material, and the proper preparation of subgrade.</text>
      </level>
      <level label="d">
        <text>Sufficient underdrains shall be installed as directed by the Department.</text>
      </level>
      <level label="e">
        <text>No work on road pavement shall be started until all underground utilities within areas of public dedication have been installed and properly backfilled in accordance with accepted standards as determined by the inspector. In the case of water and sewer utilities, the permittee is required to notify WSSC immediately after base paving operations so WSSC can schedule an inspection of its facilities within ten (10) working days and issue a preliminary paving clearance certificate. Notification shall include the project name, location, Department permit number, and contact person's name at the site. Upon completion of final paving, the permittee is also required to notify the WSSC so that WSSC can schedule an inspection of its facilities within ten (10) working days and issue a final paving clearance certificate.</text>
      </level>
      <level label="f">
        <text>All materials used in construction shall conform in every detail to the Design and Construction Standards. The Director is authorized to accept materials which are substantially equivalent to the materials required by the Design and Construction Standards.</text>
      </level>
      <level label="g">
        <text>A street name sign shall be installed at each intersection where required by the Director. The Department of Public Works and Transportation shall be responsible for the manufacturing and installation of street signs and for the development of standards for their design and installation. Permittees responsible for the construction of new roadways shall be responsible for all costs associated with manufacturing and installing new signs.</text>
      </level>
      <level label="h">
        <text>The permittee shall erect barricades of a design approved by the Director at locations as shown on approved plans or in accordance with accepted standards as determined by the inspector.</text>
      </level>
      <level label="i">
        <text>Until such time as the Director accepts the work, the permittee, including a public utility, shall safely maintain pedestrian and vehicular traffic on the roadway within the permit limits of the work, and provide materials, labor, and equipment in accordance with accepted standards as directed by the inspector, including construction of warning signs, flagmen, lights, and barricades to properly maintain traffic in accordance with the latest edition of the Manual on Uniform Traffic Control Devices for Streets and Highways as published by the U.S. Department of Transportation. Except as provided in this Section, sidewalks shall remain open or an alternate route shall be provided to pedestrian traffic. A sidewalk may be closed and no alternative route provided if a regulated utility, bi-county agency or the Department determines that it is not feasible to keep the sidewalk open or provide an alternative route. The inspector may, in cooperation with police and/or traffic authorities, discontinue traffic temporarily where public safety absolutely requires same. The permittee shall also have a duty to:</text>
        <level label="1">
          <text>Properly illuminate, mark, and barricade excavations or other hazards at all times;</text>
        </level>
        <level label="2">
          <text>Provide adequate access, to include the removal of snow and ice from partially constructed roadways, to all driveways and sidewalks within the permit limits;</text>
        </level>
        <level label="3">
          <text>Control dust conditions within the area covered by the permit by placing calcium chloride or water, or both, as directed;</text>
        </level>
        <level label="4">
          <text>Shape up the roadway by blading, as directed;</text>
        </level>
        <level label="5">
          <text>Correct muddy or soft subgrade conditions by placing temporary gravel or stone thereon;</text>
        </level>
        <level label="6">
          <text>Promptly remove any dirt and debris on streets in, and adjacent to, the work area during the construction period as directed by the inspector; and</text>
        </level>
        <level label="7">
          <text>Utilize only the roadways designated by the Department for access and egress of construction vehicles.</text>
        </level>
        <level label="8">
          <text>Failure of construction vehicles to adhere to signed prohibitions of use may result in revocation of permits issued to the permittee by the Department.</text>
        </level>
      </level>
      <level label="j">
        <text>Utility cuts.</text>
        <level label="1">
          <text>No person, including any utility and/or small wireless facility permittee, shall cut any road for the purpose of installing, connecting, repairing, or otherwise modifying underground gas, electric power, water, sewer, storm water, telephone or cable lines, or other utility without first obtaining a permit from the Director. Any person, including utilities with a valid utility permit or small wireless facility permit, shall be required to provide the Department with forty-eight (48) hours' notice prior to cutting the pavement. Said notice shall include the location, type, timing, and extent of the cut.</text>
        </level>
        <level label="2">
          <text>Except in an emergency, no utility, small wireless facility permittee, or person shall be allowed to cut into any road pavement for a period of five years from the date of acceptance of the road construction in the case of new road construction, or completion of pavement resurfacing in the case of maintenance or improvement to an existing road. The placement of all new utilities and small wireless facilities shall be accomplished, to the maximum practicable extent as determined by the Director, by tunneling, jacking, boring, or other means which will avoid disturbing the pavement. This subparagraph shall not be effective until two (2) years after a utility location protocol is approved as part of the Design and Construction Standards.</text>
        </level>
        <level label="3">
          <text>Any utility and/or small wireless facility permittee which cuts, and then subsequently repairs a pavement with either a temporary or permanent patch, shall mark the patch or adjacent pavement surface to identify the utility responsible for the pavement cut. Temporary patches may be designated using paint or other approved markers. Permanent pavement patches shall be designated using an approved marker manufactured and installed in accordance with the Design and Construction Standards. After written notification of noncompliance, utilities and small wireless facility permittees not in compliance with this standard may be fined Five Hundred Dollars ($500.00) per violation of Subsection 23-129(j)(3) of this Code.</text>
        </level>
        <level label="4">
          <text>The permittee or its contractor shall have in his or her possession on site, and make available to an inspector, on request, a copy of the subject permit and detailed plans showing the location of all existing utilities within the area of the cut.</text>
        </level>
        <level label="5">
          <text>Prior to actual excavation, the permittee, or his agent, shall contact the Utility Service Protection Center and nonmember utilities requesting that the utility locate all underground lines in the area of the cut.</text>
        </level>
        <level label="6">
          <text>Prior to actual excavation within four hundred (400) feet of a signalized intersection, the permittee shall contact the Traffic Engineering Division of the Department of Public Works and Transportation to allow for the marking or protection of wiring and detectors associated with the intersection.</text>
        </level>
        <level label="7">
          <text>Operations. When excavation approaches the estimated location of an underground installation, the permittee or his agent shall conduct such excavation by careful hand probing and/or hand digging. In the event that utility lines are uncovered, the permittee shall provide proper supports for the existing installation as determined by the inspector in conjunction with the utility company affected.</text>
        </level>
        <level label="8">
          <text>Emergencies. In case of an emergency cut, the utility desiring to make the cut shall proceed immediately. After the emergency is corrected, the utility shall give verbal notice to the Department within twenty-four (24) hours or by the beginning of the next working day, indicating the location, time, type, and nature of the emergency, and shall give written notice within five (5) working days.</text>
        </level>
        <level label="9">
          <text>Restoration and Repairs.</text>
          <level label="A">
            <text>Where a pavement cut has been made, the permittee shall be responsible for the following in accordance with the Design and Construction Standards:</text>
            <level label="i">
              <text>Restore road base and surface to comply with County standards and specifications;</text>
            </level>
            <level label="ii">
              <text>Repair pavement failure;</text>
            </level>
            <level label="iii">
              <text>Repair settlements; and</text>
            </level>
            <level label="iv">
              <text>Construct permanent patches in the cut area.</text>
            </level>
          </level>
          <level label="B">
            <text>The permittee shall also be responsible for all future repairs to the cut area which are the result of consolidation, subsidence, or inadequate compaction of the subgrade, or any other type of failure of the patch.</text>
          </level>
          <level label="C">
            <text>It shall be the sole responsibility of the permittee to protect property adjacent to, and within the area of, the cut, including sidewalks, driveways, shrubbery, trees, buildings, lawns, or other objects during construction and maintenance. In the event that a utility(ies) or small wireless facility permittee cuts the pavement in so many places or in such a way that the road surface or subgrade deteriorates over time resulting in numerous pavement failures or a poor riding surface such that the road must be resurfaced or reconstructed as a direct result of the utility cuts and pavement repairs, the Director may instruct the utility company(ies) or small wireless facility permittee to resurface or reconstruct the roadway as the Director may determine. Failure to repair the roadway in a timely fashion shall result in the suspension of any existing permits.</text>
          </level>
          <level label="D">
            <text>For any pavement cut, the following pavement rehabilitation considerations apply as determined by the Director or his designee:</text>
            <level label="i">
              <text>When the pavement cut is within a roadway intersection (i.e. up to the outside fillet points that define the roadway intersection), the mill and overlay requirements, as a minimum, apply to the full surface area of said intersection; and</text>
            </level>
            <level label="ii">
              <text>When the pavement cut is within a cul-de-sac bulb, (i.e. up to the outside fillet points where the cul-de-sac bulb meets the regular section roadway), the mill and overlay requirements, as a minimum, apply to the full surface area of said cul-de-sac bulb.</text>
            </level>
          </level>
        </level>
        <level label="10">
          <text>In the event that the permittee fails to verify the location of underground utilities and damages any underground utility thereby, as determined by the inspector in conjunction with the affected utility(ies), and the permittee has not undertaken to perform repairs, the Director may suspend any applicable road permit until such time as the utility company whose property has been damaged determines that the damage has been repaired or corrected to its satisfaction, at the expense of the permittee. The same requirements apply to traffic signs and signals. In the event any individual utility company fails to furnish the requisite information to the permittee within a reasonable time, as determined by the Director under all of the circumstances, then the aforegoing provision as to suspension shall not apply.</text>
        </level>
      </level>
      <level label="k">
        <text>Signage. Permittees, to include but not be limited to public utilities and small wireless facility permittees, working in or immediately adjacent to a public right-of-way shall be required to post a sign on the property line, or in such other location as the Director may prescribe, which shall be clearly visible from the road without creating a traffic safety problem and shall remain in place until such time as all work has been completed. Where the work is performed by a public utility and/or small wireless facility provider, the sign shall remain in place until such time as the permanent pavement repair has been completed. The sign shall be constructed of all-weather material, be a minimum of twelve (12) inches by twenty-four (24) inches in size, with black letters on a white background stating a minimum of the following:</text>
        <level label="1">
          <text>The name of the firm performing work under the permit;</text>
        </level>
        <level label="2">
          <text>The Department's permit number;</text>
        </level>
        <level label="3">
          <text>The name of a responsible individual within the firm who may be contacted twenty-four (24) hours a day to resolve problems which develop as a consequence of performing work under the permit; and</text>
        </level>
        <level label="4">
          <text>The phone number(s) where the individual identified in (3), above, may be contacted twenty-four (24) hours a day.</text>
        </level>
      </level>
    </section>
    <section number="23-130" name="Limits of work" law="code" slug="sec-23-130" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-130LIWO">
      <level label="a">
        <text>The limits of work within rights-of-way in a subdivision area will generally be set at the farthest property lines of the abutting lots which are being developed, or for which building permits are applied. Intersecting roads must be improved to the farthest lot line(s) of the corner building site(s).</text>
        <level label="1">
          <text>If the limit of work extends to an outlot or intersecting alley, the work must be extended to the far line of the outlot or alley. Work will not extend into or across a utility right-of-way or easement unless the property on the far side of the utility right-of-way or easement is concurrently under construction, or the public right-of-way on the far side of the utility right-of-way or easement has been constructed or is under construction.</text>
        </level>
        <level label="2">
          <text>If the limit of work ends at an intersection of an existing or dedicated road, then said intersection shall be completed and, where there are no such existing or dedicated roads, the permittee shall provide temporary or permanent turnarounds in accordance with the Design and Construction Standards.</text>
        </level>
      </level>
    </section>
    <section number="23-131" name="Connecting roads" law="code" slug="sec-23-131" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-131CORO">
      <text>The County Executive, or his designee, or any public agency which maintains a road in Prince George's County, shall not accept, for perpetual maintenance, any proposed road which is not connected to a maintained road, unless a suitable connecting road is either under separate permit for construction or is improved to standards approved by the Director.</text>
    </section>
    <section number="23-132" name="Partial road construction" law="code" slug="sec-23-132" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-132PAROCO">
      <level label="a">
        <text>Where capacity and/or safety considerations require a full road in accordance with the Design and Construction Standards, partial road construction shall not be permitted, except:</text>
        <level label="1">
          <text>Where the applicant is developing property on only one side of the road. In such a case, the Director may waive certain items of construction required by this Subtitle. The waiver would apply for certain items of construction where the work would be adjacent to the property located on the opposite side of the street, including, but not limited to, curb and gutter, sidewalks, storm drainage, trees, and a portion of the paving where such construction is not necessary to accommodate traffic or to provide proper maintenance of the road as determined by the Director.</text>
        </level>
        <level label="2">
          <text>Where the applicant does not plan or propose to develop the adjacent private property by constructing buildings or other facilities thereon, the Director may defer the construction of certain items of construction required by this Subtitle limited to driveway entrances, sidewalks, trees, and street lights. Where such deferral has been granted, a subsequent applicant for a building permit shall be required to complete the work deferred from the original road permit.</text>
        </level>
        <level label="3">
          <text>Where the Department determines that no current purpose would be served in requiring road improvements to be made along a residential road, the Director may defer the construction of the improvements upon petition by the affected property owner. Where the Director grants a deferral of construction, the requirements for construction shall be stated in a covenant to be executed by the owner of record of the private property adjacent to the limits of the deferred road construction. The covenant shall be filed in the land records and run with the land, binding the owner and all successors in interest to perform the deferred road construction when notified by the Department that the improvements are necessary.</text>
        </level>
        <level label="4">
          <text>Where the Director determines that no current purpose would be served in requiring street improvements to be made along roads which are other than residential roads, the Director shall require the applicant to make a payment in lieu of construction prior to the release of a building permit for the site. The amount of the payment shall be not less than the value of an estimate for the deferred street improvements, as estimated by the Department, plus an amount equal to twenty-five (25) percent to cover the cost of contingencies. The value of the estimate shall be updated to make the value of the payment current when payment is made to the County.</text>
        </level>
      </level>
      <level label="b">
        <text>In circumstances where the width of the right-of-way compromises roadway capacity or safety and the applicant is unable to obtain the right-of-way necessary to widen a road or install or construct necessary facilities, the County may obtain the necessary right-of-way and charge all costs incurred to the applicant/permittee.</text>
      </level>
    </section>
    <section number="23-133" name="Road widths" law="code" slug="sec-23-133" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-133ROWI">
      <text>The permittee shall construct widths of roads consistent with the Design and Construction Standards and the ultimate development of the roadway.</text>
    </section>
    <section number="23-134" name="Storm drainage" law="code" slug="sec-23-134" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-134STDR">
      <level label="a">
        <text>A storm drainage system covered by a specific permit shall be completed within the limits of work established for the permit, including facilities and storm drainage easements lying in or partially in lots or parcels abutting the proposed street right-of-way to be improved.</text>
      </level>
      <level label="b">
        <text>Plans for the proposed drainage system shall be submitted to the Department for review and approval.</text>
      </level>
      <level label="c">
        <text>Final inspection and acceptance of the storm drainage construction shall be performed by the Department before release of any bonds posted for the construction of the storm drainage system as provided for on the approved plans.</text>
      </level>
    </section>
    <section number="23-135" name="Curb and gutter; hiker-biker trails; sidewalk" law="code" slug="sec-23-135" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-135CUGUHIKETRSI">
      <level label="a">
        <text>Curb and gutter shall be required in the following circumstances:</text>
        <level label="1">
          <text>Where the majority of individual lots abutting any road have a frontage of one hundred (100) feet or less;</text>
        </level>
        <level label="2">
          <text>Where any road abuts property in the process of development for multidwelling residential, commercial, or industrial use which is not being subdivided into individual building lots;</text>
        </level>
        <level label="3">
          <text>Where any road abuts property in the process of development for townhouses, cluster, or similar uses in which individual building lots are interior to the subdivision and the road abuts common or open space areas of the subdivision;</text>
        </level>
        <level label="4">
          <text>Where curb and gutter construction is required by traffic or pedestrian conditions as determined by the Director.</text>
        </level>
      </level>
      <level label="b">
        <text>Hiker-biker trails. Hiker-biker trails with appropriate ramps may be required in accordance with the Design and Construction Standards within the road right-of-way along routes designated as such on the Adopted and Approved Countywide Trails Plan or Area Master Plans maintained by the Maryland-National Capital Park and Planning Commission. The Department will accept the trail for maintenance only where the trail is located within, or parallel to and touching, the road right-of-way, and upon completion and acceptance of the construction. In addition, the Director may require construction of such trails along primary residential, collector, arterial, and industrial-commercial roads. Except as provided in this Section, hiker-biker trails shall stay open or an alternate route shall be provided. A hiker-biker trail may be closed and no alternative route provided if a regulated utility, bi-county agency or the Department determines that it is not feasible to keep the sidewalk open or provide an alternative route.</text>
      </level>
      <level label="c">
        <text>Sidewalks. Sidewalks shall be required along urban roads in the following circumstances:</text>
        <level label="1">
          <text>Arterials - both sides.</text>
        </level>
        <level label="2">
          <text>Collectors - both sides.</text>
        </level>
        <level label="3">
          <text>Commercial/Industrial - as determined by the Director.</text>
        </level>
        <level label="4">
          <text>Primary Residential - on one side. Where existing sidewalks are located on both sides of the street, construction of the sidewalks on both sides of the street shall be continued to the next intersection where the sidewalk construction will transition to one-sided construction. Except as provided in this Section, the alternate sidewalk shall remain open to pedestrian traffic. A sidewalk may be closed and no alternative route provided if a regulated utility, bi-county agency or the Department determines that it is not feasible to keep the sidewalk open or provide an alternative route.</text>
        </level>
        <level label="5">
          <text>Secondary Residential - on one side. Where existing sidewalks are located on both sides of the street, construction of the sidewalks on both sides of the street shall be continued to the next intersection where the sidewalk construction will transition to one-sided construction. Except as provided in this Section, the alternate sidewalk shall remain open to pedestrian traffic. A sidewalk may be closed and no alternative route provided if a regulated utility, bi-county agency or the Department determines that it is not feasible to keep the sidewalk open or provide an alternative route.</text>
        </level>
      </level>
      <level label="d">
        <text>Sidewalks on State roads. Sidewalks may be required along all State roads that have concrete curb and gutter, or where it is required by the SHA. A permit issued by the Department will be required for this work where a SHA permit is not required.</text>
      </level>
    </section>
    <section number="23-136" name="Grades" law="code" slug="sec-23-136" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-136GR">
      <level label="a">
        <text>Grades shall be approved by the Director in accordance with the relevant specifications of the American Association of State Highway and Transportation Officials (AASHTO), as amended, and with the following:</text>
        <level label="1">
          <text>No grade shall be less than one percent (1%) or more than ten percent (10%) except under extraordinary circumstances, as determined by the Director.</text>
        </level>
        <level label="2">
          <text>Where roads are constructed with concrete curb and gutter, a minimum of one and one-half percent (1.5%) grade will be required through the intersection of intersecting roads.</text>
        </level>
        <level label="3">
          <text>Where roads are constructed without curb and gutter, the minimum street grade shall be two percent (2%). Where a street grade of less than two percent (2%) is used, ditches shall have positive drainage.</text>
        </level>
        <level label="4">
          <text>All new roads shall be constructed to remain passable during a 100-year flood event along any adjacent or nearby watercourse having a watershed of fifty (50) acres or more. The determination of the 100-year flood level with respect to the roadway for purposes of this Subsection shall include the effects of the roadway itself and any appurtenant structures and adjacent or nearby developments, but not the effects of partial or complete blockage of the approved drainage systems or structures. Exceptions to this requirement may be allowed at the discretion of the Director when:</text>
          <level label="A">
            <text>The watercourse is to be conveyed in an approved storm drain system running along the right-of-way and depending on the roadway as the overflow path for storms in excess of the 10-year storm, provided the watershed area does not exceed four hundred (400) acres, and provided that the Department approves the resultant 100-year floodway with respect to affected properties; or</text>
          </level>
          <level label="B">
            <text>The roadway must be constructed to a lower elevation in order to serve existing development or to connect with an existing publicly maintained road, provided the extent of the lowering is the minimum practicable while meeting the requirements of paragraphs (1), (2), and (3) of this Subsection; or</text>
          </level>
          <level label="C">
            <text>The roadway would be overtopped solely by reason of computed flood elevations and flow routing resulting from assumed partial or complete blockage of the approved drainage systems or structures;</text>
          </level>
          <level label="D">
            <text>The roadway is a private road, right-of-way, or easement serving no more than four (4) lots or dwelling units.</text>
          </level>
        </level>
      </level>
    </section>
    <section number="23-137" name="Alignment" law="code" slug="sec-23-137" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-137AL">
      <level label="a">
        <text>Roads shall be centered in the dedicated public right-of-way unless variations are approved by the Director.</text>
      </level>
      <level label="b">
        <text>If the established right-of-way is not of sufficient width to construct the roadway in accordance with the Design and Construction Standards currently in effect, the applicant may be required to obtain and dedicate to public use, or deed to the County, additional right-of-way and/or easements, as needed, to construct the road to the approved standard. Where the applicant has been unable to acquire the necessary right-of-way and/or easements, the County may obtain the right-of-way or easements and charge all costs incurred to the applicant/permittee.</text>
      </level>
    </section>
    <section number="23-138" name="Standard paving sections" law="code" slug="sec-23-138" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-138STPASE">
      <text>The Director of Public Works and Transportation shall establish minimum standards for paving sections for each class of roadway and incorporate such standards into the Design and Construction Standards. Where determined by the Director of Public Works and Transportation to be necessary by reason of engineering criteria, special designs may be allowed or required.</text>
      <text>The Department of Public Works and Transportation shall submit to the County Council for review the list of roads to be repaved on an annual basis. The repaving list shall be prepared in December, and the Department shall present it to the County Council for general feedback.</text>
    </section>
    <section number="23-139" name="Driveway entrance" law="code" slug="sec-23-139" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-139DREN">
      <level label="a">
        <text>Residential, commercial, and industrial driveway aprons may not be constructed within, or partially within, any intersection curb returns. Driveway entrances shall be placed across the parkway strip in accordance with County standards and in accordance with the following requirements:</text>
        <level label="1">
          <text>Residential Driveway Entrances. The required width of the apron shall be not less than ten (10) feet. Widths may be required to correspond to the width of the driveway or parking pad, including any garage, carport, or open parking pad within twenty-five (25) feet of the street right-of-way line, but, generally, shall not be wider than twenty (20) feet.</text>
          <level label="A">
            <text>A residential driveway apron may not be constructed within, or partially within, any intersection curb filet.</text>
          </level>
          <level label="B">
            <text>No residential driveway apron may be:</text>
            <level label="i">
              <text>Closer than three and one-half (3 1/2) feet to the nearest abutting property line;</text>
            </level>
            <level label="ii">
              <text>Closer than three and one-half (3 1/2 feet) to the outside line of a storm drainage inlet; or</text>
            </level>
            <level label="iii">
              <text>Closer than eighteen (18) feet of full curb height to the beginning of the flare of another driveway on any one (1) building site.</text>
            </level>
          </level>
        </level>
        <level label="2">
          <text>Not less than one (1) standard driveway apron shall be provided for each dwelling unit abutting the permit limit in every detached, two-family, or three-family residential dwelling, as defined in the Zoning Ordinance.</text>
        </level>
      </level>
      <level label="b">
        <text>Nonresidential Driveway Entrances.</text>
        <level label="1">
          <text>Driveway entrances to commercial or industrial property shall have a minimum width of thirty (30) feet and a maximum width of forty-five (45) feet and shall be limited to a maximum of two (2) on each road. The Director may, in his discretion, approve additional driveways, width or dualization, or may deny the construction of a driveway entrance(s) on a street, provided access is available on another public road.</text>
        </level>
        <level label="2">
          <text>In the case of a corner lot, a driveway entrance shall not be located less than twenty (20) feet from the point of curvature of the curb return as measured at the property line.</text>
        </level>
      </level>
    </section>
    <section number="23-140" name="Street lighting" law="code" slug="sec-23-140" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-140STLI">
      <level label="a">
        <text>The permittee shall be responsible for the cost of any street lights required by the Department.</text>
      </level>
      <level label="b">
        <text>Street lights shall be required on all County roadways, and on such other roads where deemed necessary by the Director.</text>
      </level>
      <level label="c">
        <text>In accordance with the Design and Construction Standards, the permittee shall be responsible for preparing an engineering plan for lighting all County roadways within and adjoining the permit area and, upon review and approval of the plan by the County and the utility company, for having the lights installed.</text>
      </level>
      <level label="d">
        <text>The permittee shall be responsible for ordering the installation of the street lights from the utility company and for the payment of all associated costs related to the installation to the utility company.</text>
      </level>
      <level label="e">
        <text>When the utility company has notified the County that the installation of the street lights has been ordered and the costs for the installation have been paid in full, the road construction permit which is in effect will be processed for acceptance, provided the street construction is complete. The bonds posted for the construction of the roads should not be released until the utility has notified the County of receipt of payment for the street lights, all other permit requirements having been met.</text>
      </level>
      <level label="f">
        <text>The utility company shall be responsible for notifying the County when it has completed the installation of the street lights covered by a particular permit.</text>
      </level>
      <level label="g">
        <text>All small wireless facility permittees shall comply with Sec. 23-144, the Design and Construction Standards, and the Design Manual for Small Wireless Facilities when locating small wireless facilities on street light poles.</text>
      </level>
    </section>
    <section number="23-141" name="Planting and removal of roadside trees" law="code" slug="sec-23-141" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-141PLREROTR">
      <level label="a">
        <text>Purposes. The following requirements shall be interpreted consistently with the purpose of this Section, which is to plant, control, protect, regulate, and improve roadside trees within the right-of-way, within nonutility easements adjacent to the right-of-way, or on adjacent private property where the Director determines that a public hazard exists requiring remedial action to correct.</text>
      </level>
      <level label="b">
        <text>Planting required. The permittee shall be required to plant roadside trees within the limits of the permit area and shall be responsible for all costs associated with such planting.</text>
        <level label="1">
          <text>In accordance with the Design and Construction Standards, the applicant shall be responsible for preparing an engineering plan detailing the location of the trees, their coordination with driveway aprons, street lights, utilities, etc., and specifying the species to be planted. The applicant shall consider such things as conflicts with utilities and traffic control devices when preparing the design. The plan shall be referred to the Urban Design Division of the Park and Planning Commission for design comments on street tree plantings in relationship to on-site landscaping. The plan shall be subject to review and approval by the Department.</text>
        </level>
        <level label="2">
          <text>Where the Director finds that trees or other plantings planted in the standard locations would be in conflict with existing or required public utilities, traffic control devices, illumination, or sight distance, the Director may designate alternative locations for trees or modify the standards for their placement.</text>
        </level>
      </level>
      <level label="c">
        <text>Prohibited acts during road and building construction and maintenance: No person shall do or cause any of the following acts to be done to any roadside tree:</text>
        <level label="1">
          <text>Place salt, brine, oil, herbicide, or other substances injurious to roadside trees on, or in the area of, a roadside tree;</text>
        </level>
        <level label="2">
          <text>Build any fire or station any kettle, construction equipment, or other engine on or along any road in such a manner that the hot vapors or fumes therefrom may injure any roadside tree;</text>
        </level>
        <level label="3">
          <text>Erect, alter, or repair any building or structure without placing such guards around all roadside trees within a reasonable distance of the building site that will, as determined by the inspector, effectively prevent injury to such trees;</text>
        </level>
        <level label="4">
          <text>Operate or use vehicles or equipment in such a manner as would damage or destroy any roadside tree;</text>
        </level>
        <level label="5">
          <text>Attach or fasten any wire, insulator, or other device for holding any wires to any roadside tree;</text>
        </level>
        <level label="6">
          <text>Provide an open space of less than two (2) feet on all sides of the base of any roadside tree, except where limited by previously established curb and/or sidewalk;</text>
        </level>
        <level label="7">
          <text>Attach by any means any sign, poster, or advertisement to any tree in the public right-of-way or any tree located in an easement adjacent to the right-of-way.</text>
        </level>
      </level>
      <level label="d">
        <text>Permission required prior to certain acts. No person shall do or cause to be done any of the following acts to any roadside tree without the permission of the Department:</text>
        <level label="1">
          <text>Plant, spray, or trim any roadside tree;</text>
        </level>
        <level label="2">
          <text>Place any stone, concrete structure, or other substance in the public right-of-way, or an easement adjacent to the right-of-way, which may impede the free access of air and water to any roadside tree;</text>
        </level>
        <level label="3">
          <text>Excavate within the area of branch spread of any roadside tree or, during excavation, to expose or cut roots more than one inch in diameter of any roadside tree;</text>
        </level>
        <level label="4">
          <text>Remove or damage any guard or device placed to protect any roadside tree.</text>
        </level>
      </level>
      <level label="e">
        <text>Permits from the Department of Natural Resources of the State of Maryland are also required in accordance with the provisions pertaining to roadside trees within the Natural Resources Article of the Annotated Code of Maryland.</text>
      </level>
      <level label="f">
        <text>Where the permission of the Department of Natural Resources is required by this or by any other law, any permittee required to obtain such permission may first make application therefor to the Department.</text>
      </level>
      <level label="g">
        <text>Conflict. The provisions of this Section are to be construed, where reasonable, as consistent with any State law, rule, or regulation concerning roadside trees. Any part of this Section found to be in conflict therewith shall be of no force or effect.</text>
      </level>
      <level label="h">
        <text>Public or private utilities. When the Director of Public Works and Transportation determines that it is necessary to prune, top, or remove any roadside tree, the affected utility shall have the option of either temporarily removing its overhead wire(s) within forty-eight (48) hours after notice from the Director of Public Works and Transportation or pruning, topping, or removing such tree(s) under the direction of the Department of Public Works and Transportation.</text>
      </level>
      <level label="i">
        <text>The Department of Public Works and Transportation shall be responsible for the removal and replacement of dead specimen trees within the public right-of-way.</text>
      </level>
      <level label="j">
        <text>Dead or dying trees on private property that constitute a public nuisance. Where a tree exists on private property adjacent to a public right-of-way with dead or decaying branches overhead which protrude into the right-of-way, and the Director of Public Works and Transportation determines that such tree creates a public nuisance, the property owner shall remove the tree or the dead or decaying branches, thereby removing the hazard to the public.</text>
        <level label="1">
          <text>The Department of Public Works and Transportation shall notify the property owner in writing that the hazard must be removed within a specified time period. The time period may vary depending upon the severity of the hazard.</text>
        </level>
        <level label="2">
          <text>In the event that the property owner fails to remove the hazard within the specified period, the Department of Public Works and Transportation shall proceed to abate the nuisance by applying to a court of proper jurisdiction for injunctive relief. The Department of Public Works and Transportation shall recover the costs pursuant to the provisions of this Subtitle.</text>
        </level>
        <level label="3">
          <text>Notwithstanding the above where, in the opinion of the Director of Public Works and Transportation, the hazard constitutes an immediate threat to the safety of the public, the Department of Public Works and Transportation shall be authorized to take immediate action to eliminate the hazard and recover the cost for same from the property owner.</text>
        </level>
      </level>
      <level label="k">
        <text>Coordination between Beautification Committee and Department of Public Works and Transportation. The Committee may advise and make recommendations to the Director of Public Works and Transportation as to plans of planting, maintaining, and protecting roadside trees. The Committee may recommend species to be planted and the methods and times for plantings. The Department of Public Works and Transportation shall coordinate, where possible, with the recommendations of the Committee.</text>
      </level>
    </section>
    <section number="23-142" name="Right-of-way" law="code" slug="sec-23-142" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-142RI-W">
      <level label="a">
        <text>Responsibility for obtaining rights-of-way. No permit shall be issued for road construction unless all rights-of-way and easements necessary for the work are dedicated, or otherwise lawfully conveyed for public use, and have been duly recorded among the land records of the County.</text>
      </level>
      <level label="b">
        <text>Private right-of-way. In order to regulate the opening of street surfaces in all new developments in the County, the Department shall have the authority to prescribe design standards and to require road construction on private rights-of-way in accordance with the Zoning Ordinance and Subdivision Regulations of Prince George's County, without responsibility on the part of the County to maintain the private right-of-way after completion of the work to the satisfaction of the Director.</text>
      </level>
      <level label="c">
        <text>Dedication of right-of-way. Where an applicant proposes to develop a property abutting an existing or proposed County-maintained road, the applicant shall be required to obtain dedication, or otherwise lawful conveyance to public use, of sufficient right-of-way, as identified within this Subtitle, and provide the necessary easements to enable the road to be constructed consistently with the Design and Construction Standards or ultimate planned needs. The recording of the rights-of-way and easements in the land records of the County without the approval of the Director does not constitute acceptance. The right-of-way plats shall be prepared consistently with standards set forth by the Director.</text>
      </level>
      <level label="d">
        <text>The requirement to dedicate or otherwise lawfully convey right-of-way shall apply to all properties proposed for development whether or not there already exists an approved plat of subdivision.</text>
      </level>
      <level label="e">
        <text>Where a property located within a municipality abuts a County-maintained road, the owner of record who proposes to develop the property shall be required to deed, or otherwise lawfully convey to the County, right-of-way as stated above. In addition, the owner shall be responsible for constructing or upgrading the section of roadway abutting his property to current standards, as determined by the Director. Municipalities within the County shall not process and issue a building permit for the property until the right-of-way has been deeded or otherwise lawfully conveyed to the County, bonds have been posted in favor of the County, and a road construction permit fee has been paid to the County for the improvement of the road.</text>
      </level>
      <level label="f">
        <text>Where road construction requires the dedication of right-of-way or the acquiring of easements from a parcel(s) of land not owned by the applicant or permittee, the Department may acquire the necessary right-of-way or easements, as necessary for the work, at the applicant's or permittee's expense.</text>
      </level>
    </section>
    <section number="23-143" name="Improvements to County-maintained roads" law="code" slug="sec-23-143" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-143IMCOINRO">
      <level label="a">
        <text>A person who desires to develop land abutting a County-maintained road, or other public road, shall be responsible for providing all work required to improve a road maintained by the County to conform to the applicable standards for alignment and cross-section when the person proposes to develop the property adjacent thereto. Where a County road is not in conformance with the applicable standards, the person will be responsible for improvements, including, but not limited to, curb and gutter, sidewalks, trails, and street lights on that portion of the road adjacent to his property.</text>
        <level label="1">
          <text>Where the property proposed for development has a frontage of less than three hundred (300) feet:</text>
          <level label="A">
            <text>Traffic Hazard. If the existing County-maintained road is not constructed to an approved line and grade, such that the required construction would constitute a traffic hazard, as determined by the Director, the person will be required to submit plans for approval for the construction of a special rural design consistent with the existing roadway features. Such rural design may include road widening, shoulder widening, side ditches, driveway entrances, and such other design features as the Director determines.</text>
          </level>
          <level label="B">
            <text>No Traffic Hazard. If the existing County-maintained road is not constructed to an approved line and grade, but required construction would not constitute a traffic hazard as determined by the Director, the person will be required to perform the work, including the construction of curb and gutter, in accordance with the Design and Construction Standards. The person shall provide pavement tying in the curb and gutter and existing pavement.</text>
          </level>
        </level>
        <level label="2">
          <text>Where the property proposed for development has a frontage of greater than three hundred (300) feet:</text>
          <level label="A">
            <text>If the alignment and grade of the existing County road is satisfactory, construction as described in Subsection (a)(1)(B), above, will be required.</text>
          </level>
          <level label="B">
            <text>If the circumstances set forth in Subsection (a)(1)(B), above, are not feasible, the person may be required to regrade the road and do all construction to provide a minimum of thirty (30) feet of pavement for primary residential streets and higher class roadways, or twenty four (24) feet of pavement for secondary residential streets. If the person is required to regrade the road, the County will assist in obtaining the necessary rights-of-way beyond the extent of lands owned or controlled by the person for which the person has been unable to obtain right-of-way. The County will be responsible for acquiring and providing these rights-of-way only after the person has submitted evidence satisfactory to the Director of a bona fide effort to obtain or negotiate such rights-of-way. The person will reimburse the County for all expenses experienced by the County while acquiring said rights-of-way on behalf of the person.</text>
          </level>
        </level>
        <level label="3">
          <text>Where the road adjacent to the property proposed for development is already constructed to an approved line and grade, but where all elements of the standard cross-section or existing intersections have not been constructed, the person will be required to provide that construction necessary to complete the road to the applicable standards for that cross-section and/or intersection.</text>
        </level>
      </level>
    </section>
    <section number="23-144" name="Location of utilities" law="code" slug="sec-23-144" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-144LOUT">
      <text>Installations of new utility systems, major alterations to existing systems, and major replacements to existing systems shall be located either within the public right-of-way or in an easement adjacent to the right-of-way. Utility installations in new subdivisions and along new public right-of-way may be installed in utility easements, provided the utility easements are acquired either by dedication on the subdivision plat(s) or by the County when the new public right-of-way is acquired. On existing public right-of-way or new public right-of-way where utility easement(s) have not been dedicated or acquired by the County, utilities will be installed in the public right-of-way out of the paved roadway wherever possible.</text>
    </section>
    <section number="23-145" name="Traffic signals" law="code" slug="sec-23-145" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-145TRSI">
      <text>When the Director determines that a subdivision proposed for development may generate sufficient traffic to warrant the installation of a traffic signal during the build out of the subdivision, the Director may require the owner to sign a covenant and post bond whereby the owner shall acknowledge responsibility to install a traffic signal(s) at the entrance road or driveway entrance to the subdivision. Said covenant shall be signed by the owner and recorded among the land records of the County. The covenant shall require the owner to bear all costs associated with design and installation of the traffic signal(s), the conveyance to the County of any associated rights-of-way necessary for the installation of the signals and geometric improvements to the intersection, and all design and construction costs associated with any modifications to the intersection where and when the signal is installed. The traffic signal and intersection improvements shall be made by the owner immediately upon notification by the Director that said installation is necessary. Failure by the owner to immediately perform the necessary improvements shall result in the work being performed by the Department, the cost of which shall be billed to the owner. Where said owner fails to pay any cost incurred by the County within thirty (30) days of the date of billing by the County, said nonpayment shall result in a tax lien being placed against the affected property. Upon certification of a tax lien to the Director of Finance by the Director, the amount of such lien shall be collected in the same manner as the County tax on real property.</text>
    </section>
    <section number="23-146" name="Urban Street Design Policy and Standards" law="code" slug="sec-23-146" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-146URSTDEPOST">
      <level label="a">
        <text>The County hereby adopts an urban street design policy and standards pursuant to the 2023 Urban Streets Design Standards, incorporated in the Department of Public Works and Transportation's "Specifications and Standards for Roadways and Bridges" (2007), as revised in 2023, consistent with the Council's 2014 approval of its most current general plan for the County, Plan Prince George's 2035.</text>
      </level>
      <level label="b">
        <text>All planned County financed and approved road, sidewalk, trail and transit-related construction and reconstruction projects within Regional Transit Districts and Local Centers in the County shall be constructed pursuant to the adopted County Urban Street Design Standards and the applicable master, sector, or functional master plan.</text>
      </level>
      <level label="c">
        <text>The Department will review and revise, as deemed necessary by the Director, plans, manuals, policies, processes, and the capital improvement program to foster the implementation of a complete and green street on public roadways projects, including privately built projects approved by the Department or on non-County projects funded in part or entirely by County funds.</text>
      </level>
      <level label="d">
        <text>Notwithstanding any other provision of this Subtitle, the requirements of the County's adopted Urban Street Design Standards may only be adjusted as is minimally necessary to address existing geotechnical, approved development or environmental constraints, and/or existing development, that inhibits construction of the Urban Street to its required buildout. In such cases, the Director may only authorize the following alternatives to the applicable required Urban Street Design Standard:</text>
        <level label="1">
          <text>Reduction in number of travel lanes; and/or,</text>
        </level>
        <level label="2">
          <text>Reduction in width of travel lanes; and/or,</text>
        </level>
        <level label="3">
          <text>Reduction in width or elimination of median; and/or,</text>
        </level>
        <level label="4">
          <text>Reduction in width or elimination of center turn lane; and/or,</text>
        </level>
        <level label="5">
          <text>Replacement of an off-street bicycle facility with a barrier- or parking-separated on-street facility; and/or,</text>
        </level>
        <level label="6">
          <text>Reduction in width or elimination of on-street parking.</text>
        </level>
      </level>
      <text>Under no circumstances shall any bicycle, pedestrian, or transit facility or accommodation required by the Urban Street Design Standards be reduced or eliminated except as permitted by that Standard or as identified in Section 23-146(d). If the Director determines that circumstances require modifications deviating from the standards and as identified in Section 23-146(d), they shall document their findings, to include analysis and justification for the modification or deviation. That shall be published in the annual report. The findings and documentation shall explain how the facilities will achieve a 25-mph design speed (or lower), and how the facility will achieve future compliance with the applicable standard. The findings shall be made available to the Council, Planning Board, and Public upon request.</text>
    </section>
    <section number="23-147" name="Installation of Small Wireless Facilities" law="code" slug="sec-23-147" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-147INSMWIFA">
      <level label="a">
        <text>Small wireless facilities installed on a utility pole, street light pole, or other replacement or new pole require:</text>
        <level label="1">
          <text>issuance of all permits required by this Code;</text>
        </level>
        <level label="2">
          <text>compliance with all provisions of this Code, the Master License Agreement required by Subtitle 5A, any applicable regulations, and the County's Design and Construction Standards.</text>
        </level>
      </level>
      <level label="b">
        <text>Permittees shall install small wireless facilities pursuant to the location requirements listed in Subtitle 5A, Section 5A-159.</text>
      </level>
      <level label="c">
        <text>The small wireless facility provider shall bear the cost to repair, replace or relocate their facility and pole if damaged or when it must be relocated and to remove an existing pole that was replaced.</text>
      </level>
    </section>
    <section number="23-148 through 23-149" name="Reserved" law="code" slug="sec-23-148-through-23-149" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV3DECOSTRE_S23-148._THROUGH_SEC._23-149RE" />
  </unit>
  <unit kind="division" number="4" name="Required Removal of Snow, Ice, Weeds, Litter, and Debris from Sidewalks and Debris from Roadways" slug="division-4" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV4RERESNICWELIDESIDERO">
    <section number="23-150" name="Duty to remove snow, ice, weeds, litter, and debris" law="code" slug="sec-23-150" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV4RERESNICWELIDESIDERO_S23-150DURESNICWELIDE">
      <level label="a">
        <text>For the purposes of this Section only, "commercial property" shall mean any property that is used to conduct a trade or business that provides goods or services to the public. It shall also include properties that are zoned industrial or commercial (or, collectively, nonresidential), residential, rural and agricultural, Transit-Oriented/Activity Center, or planned development under the provisions of Subtitle 27 of this Code that are used to provide goods or services to the public.</text>
      </level>
      <level label="b">
        <text>It shall be the duty of the owner or lessor, as the case may be, of a residential dwelling unit or commercial property, unless such duty has been delegated to a lessee in actual possession, to remove snow and ice from any sidewalk abutting the subject property within forty-eight (48) hours after snow has fallen or ice has formed as a result of inclement weather or runoff from abutting surfaces.</text>
      </level>
      <level label="c">
        <text>It shall be the duty of the owner or lessor, as the case may be, of a residential dwelling unit or commercial property, unless such duty has been delegated to a lessee in actual possession, to remove litter and debris from the property line of that building, lot, or land to the edge of the concrete curb and gutter adjoining the roadway in the case of an urban (closed) section roadway, and from the private property line to the edge of the paved roadway surface in the case of a rural (open) section roadway.</text>
      </level>
      <level label="d">
        <text>It shall be the duty of the owner or lessor, as the case may be, of a residential dwelling unit or commercial property, unless such duty has been delegated to a lessee in actual possession, to keep all weeds, as defined in Section 23-102 of this Subtitle, located in the public space set forth in Subsection (c) of this Section, cut to a height of not over six (6) inches.</text>
      </level>
      <level label="e">
        <text>The Police Department or other appropriate County enforcement agency shall be responsible for enforcing the provisions of this Section.</text>
      </level>
      <level label="f">
        <text>Any person primarily responsible for the removal of snow, ice, weeds, or debris who breaches said duty shall be subject to a civil fine not to exceed One Hundred Dollars ($100.00) for each separate offense. Any person primarily responsible for the removal of litter who breaches said duty shall be subject to a civil fine of One Thousand Dollars ($1,000.00) for each separate offense.</text>
      </level>
      <level label="g">
        <text>This Section shall not apply to materials left within the public right-of-way as a result of a lawfully executed eviction action, from a single family rental facility as defined in Section 13-138 of the Code or for bulky trash left in the right-of-way as a result of illegal dumping by others.</text>
      </level>
    </section>
    <section number="23-151" name="Duty to prevent deposit of sediment or other materials in road right-of-way" law="code" slug="sec-23-151" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV4RERESNICWELIDESIDERO_S23-151DUPRDESEOTMARORI-W">
      <level label="a">
        <text>It shall be the duty of the owner or lessor of any real property, improved or unimproved, unless such duty has been delegated to a lessee in actual possession, as the case may be, to prevent the deposit of dirt, sediment, debris, gravel, oil, litter, or any other matter, including portable storage containers in a road right-of-way, or in any drain or ditch designed to carry surface water from a road right-of-way, whether improved or not. For the purpose of this Section, the deposit of oil shall include the drainage or leakage of oil, transmission fluid, antifreeze, and similar substances from a vehicle or machine in addition to the discharge or dumping of such substances by any other means. The prevention of the deposit of silt in the road right-of-way shall not apply where a temporary approved sediment trapping device has been constructed in the right-of-way as part of an ongoing development construction project. It shall also be the responsibility of said person to prevent the formation of algae on sidewalks located within the right-of-way.</text>
      </level>
      <level label="b">
        <text>Any person primarily responsible for the said duty will be required to correct any cited condition within the date of written notice by the Department or immediately if the condition cited is determined hazardous. Noncompliance on the part of the responsible person within the required time will result in correction or removal of the cited condition by the County, and all costs therefor shall be billed to the responsible person. Failure to pay any cost incurred by the County within thirty (30) days of the billing date shall result in a tax lien being placed against the affected property in accordance with the provisions of this Subtitle.</text>
      </level>
      <level label="c">
        <text>Any person primarily responsible for the deposition of dirt, sediment, debris, gravel, oil, litter, or other foreign matter, including portable storage containers into a public right-of-way shall be subject to a civil fine not to exceed One Thousand Dollars ($1,000.00) for each separate offense. The procedures of Subdivision 1, Division 3, Subtitle 28 of this Code shall apply. In addition, any person responsible for a violation of this Section may also be subject to the following criminal penalties:</text>
        <level label="1">
          <text>A person who dumps litter in violation of this Section in an amount not exceeding 100 pounds in weight or 27 cubic feet in volume and not for commercial purposes is guilty of a misdemeanor and is subject to a fine of not more than One Thousand Dollars ($1,000) or by imprisonment for not more than thirty (30) days, or both;</text>
        </level>
        <level label="2">
          <text>A person who dumps litter in violation of this Section in an amount exceeding 100 pounds in weight or 27 cubic feet in volume, but not exceeding 500 pounds in weight or 216 cubic feet in volume, and not for commercial purposes is guilty of a misdemeanor and subject to a fine of not more than Ten Thousand Dollars ($10,000) or imprisonment for not more than one (1) year, or both;</text>
        </level>
        <level label="3">
          <text>A person who dumps litter in violation of this Section in an amount exceeding 500 pounds in weight or 216 cubic feet in volume or in any quantity for commercial purposes is guilty of a misdemeanor and subject to a fine of not more than Twenty-five Thousand Dollars ($25,000) or imprisonment for not more than five (5) years, or both.</text>
        </level>
      </level>
      <level label="d">
        <text>In addition to the sentences provided by this Section, a court may order the violator to:</text>
        <level label="1">
          <text>Remove or render harmless the litter dumped in violation of this Section;</text>
        </level>
        <level label="2">
          <text>Repair or restore property damaged by, or pay damages for, any damage arising out of dumping the litter in violation of this Section;</text>
        </level>
        <level label="3">
          <text>Perform public service relating to the removal of litter dumped in violation of this Section or to the restoration of an area polluted by litter dumped in violation of this Section; or</text>
        </level>
        <level label="4">
          <text>Reimburse the State, County, municipal corporation, or bicounty agency for any costs incurred by the State, County, municipal corporation, or bicounty agency in the removal of litter dumped in violation of this Section.</text>
        </level>
      </level>
      <level label="e">
        <text>The placement of personal property in the right-of-way as the result of an eviction from a single family rental facility as defined in Section 13-138 of the Code, shall not be subject to the prohibitions of this Section.</text>
      </level>
    </section>
    <section number="23-152" name="Illegal Dumping" law="code" slug="sec-23-152" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV4RERESNICWELIDESIDERO_S23-152ILDU">
      <level label="a">
        <text>Scope. This Section applies to a violation of the State illegal dumping and litter control law or local law or ordinance relating to the unlawful disposal of litter that occurs at a dumping site monitored by a surveillance system.</text>
      </level>
      <level label="b">
        <text>Definitions. In this section the following words have the meanings indicated:</text>
        <level label="1">
          <text>"Department" means the Department of the Environment (DOE), or any other agency designated by the County Executive or their designee.</text>
        </level>
        <level label="2">
          <text>"Dumping site" means a location within Prince George's County that is:</text>
          <level label="A">
            <text>owned by the County or the State; and</text>
          </level>
          <level label="B">
            <text>identified by the Department as property that has been repeatedly used for the disposal of litter in violation of State law or local law or ordinance.</text>
          </level>
        </level>
        <level label="3">
          <text>"Owner" means the registered owner of a motor vehicle or a lessee of a motor vehicle under a lease of six (6) months or more.</text>
          <level label="A">
            <text>"Owner" does not include:</text>
            <level label="i">
              <text>a motor vehicle rental or leasing company; or</text>
            </level>
            <level label="ii">
              <text>a holder of a special registration plate issued under Title 13, Subtitle 9, Part III of the Maryland Transportation Article.</text>
            </level>
          </level>
        </level>
        <level label="4">
          <text>"Surveillance image" means an image recorded by a surveillance system.</text>
          <level label="A">
            <text>An image shall be recorded on:</text>
            <level label="i">
              <text>A photograph;</text>
            </level>
            <level label="ii">
              <text>A micrograph;</text>
            </level>
            <level label="iii">
              <text>An electronic image;</text>
            </level>
            <level label="iv">
              <text>Videotape; or</text>
            </level>
            <level label="v">
              <text>Any other medium.</text>
            </level>
          </level>
          <level label="B">
            <text>A surveillance image must show the front or rear of a motor vehicle, on at least one (1) image or portion of the tape, clearly identifying the registration plate number of the motor vehicle.</text>
          </level>
          <level label="C">
            <text>A surveillance image must show an individual committing a violation of the State illegal dumping and litter control law or a local law or ordinance relating to the unlawful disposal of litter.</text>
          </level>
        </level>
        <level label="5">
          <text>"Surveillance system" means a collection of one (1) or more cameras located at a dumping site that produces a surveillance image.</text>
        </level>
      </level>
      <level label="c">
        <text>Surveillance systems. The Department may:</text>
        <level label="1">
          <text>Place surveillance systems at dumping sites; and</text>
        </level>
        <level label="2">
          <text>Use surveillance images to enforce the provisions of the State illegal dumping and litter control law or a local law or ordinance relating to the unlawful disposal of litter.</text>
        </level>
      </level>
      <level label="d">
        <text>Citation.</text>
        <level label="1">
          <text>The District Court, in consultation with the Department, shall prescribe:</text>
          <level label="A">
            <text>a uniform citation forms consistent with Section 23-151 of this code and 7-302 of the Courts Article of the Maryland Annotated Code; and</text>
          </level>
          <level label="B">
            <text>a civil penalty, which shall be indicated on the citation to be paid by persons who choose to prepay the civil penalty without appearing in District Court.</text>
          </level>
        </level>
        <level label="2">
          <text>A citation shall include:</text>
          <level label="A">
            <text>the name and address of the registered owner of the vehicle;</text>
          </level>
          <level label="B">
            <text>the registration number of the motor vehicle involved in the violation;</text>
          </level>
          <level label="C">
            <text>the violation charged;</text>
          </level>
          <level label="D">
            <text>the location where the violation occurred;</text>
          </level>
          <level label="E">
            <text>the date and time of the violation;</text>
          </level>
          <level label="F">
            <text>a copy of the surveillance image;</text>
          </level>
          <level label="G">
            <text>the amount of the civil penalty imposed and the date by which the civil penalty must be paid;</text>
          </level>
          <level label="H">
            <text>a signed statement by a duly authorized agent of the Department that, based on inspection of surveillance images, the motor vehicle was being used by an individual who was committing a violation;</text>
          </level>
          <level label="I">
            <text>a statement that surveillance images are evidence of a violation;</text>
          </level>
          <level label="J">
            <text>information advising of the manner and time the citation may be contested in the District Court; and</text>
          </level>
          <level label="K">
            <text>information advising that failure to pay the civil penalty or to contest liability in a timely manner:</text>
            <level label="i">
              <text>is an admission of liability;</text>
            </level>
            <level label="ii">
              <text>may result in the refusal by the Motor Vehicle Administration to register the motor vehicle; and</text>
            </level>
            <level label="iii">
              <text>may result in the suspension of the motor vehicle registration.</text>
            </level>
          </level>
        </level>
        <level label="3">
          <text>The Department shall send the owner, via mail, a citation or a warning notice no later than two (2) weeks after the alleged violation.</text>
        </level>
        <level label="4">
          <text>A person who receives a citation under this subsection may:</text>
          <level label="i">
            <text>Pay the civil penalty, in accordance with the instructions on the citation, directly to the Department; or</text>
          </level>
          <level label="ii">
            <text>Elect to stand trial in the District Court for the alleged violation.</text>
          </level>
        </level>
      </level>
      <level label="e">
        <text>Certificate. A certificate alleging that a violation occurred, sworn to or affirmed by a duly authorized agent of the Department, based on the inspection of surveillance images produced by a surveillance system, shall be admissible as evidence in a proceeding alleging a violation.</text>
      </level>
      <level label="f">
        <text>Contesting a Citation.</text>
        <level label="1">
          <text>An adjudication of liability shall be based on a preponderance of the evidence.</text>
        </level>
        <level label="2">
          <text>The District Court may consider the following in defense of a violation:</text>
          <level label="A">
            <text>The motor vehicle was stolen before the violation occurred and was not under the control or possession of the owner at the time of the violation;</text>
            <level label="i">
              <text>the owner shall submit proof that a police report regarding the stolen motor vehicle or registration plates was filed prior to the alleged incident.</text>
            </level>
          </level>
          <level label="B">
            <text>Evidence that the person named in the citation was not the person in the surveillance image committing the violation of the state illegal dumping and litter control law or a local law or ordinance relating to the unlawful disposal of litter;</text>
            <level label="i">
              <text>the owner shall provide the District Court with evidence to the satisfaction of the court of the identity of the person in the surveillance image who was committing the violation, including, at a minimum, the person's name and current address.</text>
            </level>
          </level>
          <level label="C">
            <text>any other issues and evidence that the District Court deems pertinent.</text>
          </level>
        </level>
        <level label="3">
          <text>If the District Court finds that the owner did not commit the violation, the Clerk of the Court shall provide the Department with a copy of any substantial evidence.</text>
        </level>
        <level label="4">
          <text>Upon receipt of any substantiating evidence, the Department may issue a citation to the person that the evidence indicates committed the violation and shall be mailed no later than two (2) weeks after the receipt of the evidence.</text>
        </level>
      </level>
      <level label="g">
        <text>Penalties.</text>
        <level label="1">
          <text>The owner is subject to a civil penalty if the violation and the motor vehicle used to commit the violation are recorded on a surveillance image by a surveillance system while the individual is committing a violation.</text>
        </level>
        <level label="2">
          <text>A civil penalty under this section may not exceed $1,000.</text>
        </level>
        <level label="3">
          <text>If the person named in the citation does not pay the civil penalty and does not contest the violation, then the following may occur as a result:</text>
          <level label="A">
            <text>the Motor Vehicle Administration may not register or transfer registration of the vehicle cited in the violation pursuant to Md. Transportation Code Ann. §26-305(a);</text>
          </level>
          <level label="B">
            <text>the Motor Vehicle Administration may suspend the registration of the motor vehicle cited in the violation pursuant to Md. Transportation Code Ann. §26-305(b);</text>
          </level>
          <level label="C">
            <text>The Department may immobilize the vehicle with a parking boot if the person receives a third violation within six (6) months; or</text>
          </level>
          <level label="D">
            <text>The Department may impound your vehicle without additional notice if the person receives a fifth violation within twelve (12) months.</text>
          </level>
        </level>
      </level>
    </section>
    <section number="23-153 through 23-155" name="Reserved" law="code" slug="sec-23-153-through-23-155" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV4RERESNICWELIDESIDERO_S23-153._THROUGH_SEC._23-155RE" />
  </unit>
  <unit kind="division" number="5" name="Road Closings" slug="division-5" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV5ROCL">
    <section number="23-156" name="Authority to close roads" law="code" slug="sec-23-156" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV5ROCL_S23-156AUCLRO">
      <text>The County Executive may, upon recommendation of the Director of Public Works and Transportation, authorize the closing of any road under the jurisdiction of the County in accordance with the procedures set forth in this Division.</text>
    </section>
    <section number="23-157" name="Procedures" law="code" slug="sec-23-157" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV5ROCL_S23-157PR">
      <level label="a">
        <text>Where users of the road or portion of road to be closed will not be denied access to any property or area which was previously accessible, the County Executive may authorize the closing upon the certification of such facts by the Director of Public Works and Transportation.</text>
      </level>
      <level label="b">
        <text>Where the closing of the road will deny access to public users to areas or properties accessible from the road to be closed, or will take from abutting or nearby property owners the only direct access to a public road, or the Director of Public Works and Transportation finds or is advised that there is potential local objection to the closing, the Director of Public Works and Transportation shall first hold a public hearing. If the Director of Public Works and Transportation finds that local opposition to the closing is unlikely, he may notify the property owners served by the road, in writing, and post notices, in accordance with the following procedure, offering the opportunity to request a hearing; and, if no request is received, he may proceed as in Subsection (a), above. The purpose of the hearing shall be to take testimony to determine that reasonable or alternative means of access exist to property formerly accessible by the road to be closed, and that the road is no longer needed as a public way or that other public needs outweigh the need for the road as a public way. Each property owner as shown on the assessment books of the County abutting a portion of the road to be closed or any utilities which may gain access to their facilities by means of the portion of the road to be closed shall be notified in writing of the closing and of the date, time, and place a hearing will be held. In addition thereto, a notice shall be posted in such manner and size to give reasonable notice to the users of the road of the intended closing and time and place of hearing.</text>
      </level>
    </section>
    <section number="23-158" name="Effect of closing" law="code" slug="sec-23-158" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV5ROCL_S23-158EFCL">
      <text>A closing of a road shall constitute the termination of the right of the general public to use the right-of-way but shall have no effect on private rights of ownership or easements in the roadway.</text>
    </section>
    <section number="23-159" name="Barricades" law="code" slug="sec-23-159" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV5ROCL_S23-159BA">
      <text>Upon a closing of the road, the Department of Public Works and Transportation may barricade the road or may permit the abutting owners to place barricades, fences, or gates in such a manner as not to deny individual property rights.</text>
    </section>
    <section number="23-160" name="Roads in subdivision" law="code" slug="sec-23-160" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV5ROCL_S23-160ROSU">
      <text>The provisions of this Division shall have no effect on the procedure for vacation of subdivision plats. Where, however, vacation of a subdivision plat affects a road which is being utilized at the time by the general public, the Director of Public Works and Transportation shall not consent to such vacation until such time as the County Executive has issued an Executive Order authorizing the closing of the road.</text>
    </section>
    <section number="23-161" name="Roads within municipalities" law="code" slug="sec-23-161" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV5ROCL_S23-161ROWIMU">
      <text>The provisions of this Division shall not apply to any road within the boundaries of a municipality which is not under the County's jurisdiction.</text>
    </section>
    <section number="23-162" name="Temporary closures of public roads" law="code" slug="sec-23-162" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV5ROCL_S23-162TECLPURO">
      <level label="a">
        <text>No person, except as otherwise specifically permitted by law, shall close a County road without first obtaining the permission of the Director of Public Works and Transportation. An applicant seeking a road closure shall provide information to the Department of Public Works and Transportation in a format as determined by the Director of Public Works and Transportation.</text>
      </level>
      <level label="b">
        <text>The Director of Public Works and Transportation, in his sole discretion, may authorize the temporary closing of any County-maintained or other public road, or any part thereof, for the purposes of performing road construction, installation, maintenance, or repair of public utilities, or for similar activities.</text>
      </level>
      <level label="c">
        <text>No temporary closing of a road shall deny to any person the legal access to his property, without his permission, nor interrupt through traffic on any primary, collector, or arterial road unless the Director of Public Works and Transportation determines that there is an acceptable alternate route or that the interruption will be of such short duration not to cause unreasonable inconvenience to the users of the road.</text>
      </level>
      <level label="d">
        <text>A request from any person to temporarily close any road or any part thereof must be submitted in writing to the Department of Public Works and Transportation not less than ten (10) working days in advance of the date of the proposed closing. The Director of Public Works and Transportation may waive the ten (10) day notice requirement in cases of emergency beyond the control of the requester. The request shall include not less than the following information:</text>
        <level label="1">
          <text>Explanation of the road construction, utility work, or event for which the closing is requested, and a statement of why closing is necessary for the proposed activity;</text>
        </level>
        <level label="2">
          <text>The location and precise limits of the requested closing;</text>
        </level>
        <level label="3">
          <text>The date, time, and duration of the requested closing;</text>
        </level>
        <level label="4">
          <text>A traffic control plan acceptable to the Department of Public Works and Transportation showing all required traffic signs, barricades, alternate routes, and such other traffic control measures as the Director of Public Works and Transportation may require;</text>
        </level>
        <level label="5">
          <text>Evidence of permission from any property owner or tenant who will be temporarily denied access to his property from the public road system.</text>
        </level>
      </level>
      <level label="e">
        <text>Where a public utility experiences an emergency condition which requires the immediate temporary closure or partial closure of a public road for reasons of public safety due to a failure of their system, the utility shall immediately contact the Department of Public Works and Transportation. During the day, notification shall be made to the Office of Highway Maintenance. During nonworking hours, notification shall be made to the Department of Public Works and Transportation's dispatcher.</text>
      </level>
      <level label="f">
        <text>Upon review by the Department of Public Works and Transportation, the Director of Public Works and Transportation may deny the request for temporary closing or may grant permission for the temporary closing in writing, as requested or as revised upon recommendation of the Department of Public Works and Transportation, with a statement of any conditions of the permission. The written permission and conditions must be acknowledged in writing by the person requesting the temporary closing, and shall be complied with throughout the duration of the activity for which the closing is requested.</text>
      </level>
      <level label="g">
        <text>Failure of the requester to comply with any condition of the written permission for temporary closing shall result in immediate revocation of the permission, and the Director of Public Works and Transportation may require the roadway to be restored to a safe condition and to be reopened to public use immediately.</text>
      </level>
      <level label="h">
        <text>Prior to expiration of the time stated in the written permission for the temporary closing, the requester shall be required to restore the road to a safe condition and shall reopen the road to public use at the end of the time stated. However, the Director of Public Works and Transportation may, in his sole discretion, grant an extension of the time for reopening, upon his determination that such extension is necessary for public safety or convenience or is necessitated by reasons beyond the control of the requester.</text>
      </level>
      <level label="i">
        <text>The denial by the Director of Public Works and Transportation of permission to temporarily close a road or any part thereof or to extend the time of closing shall not be subject to review by the Board of Appeals for Prince George's County.</text>
      </level>
    </section>
  </unit>
  <unit kind="division" number="6" name="Uses Within the County Right-Of-Way" slug="division-6" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV6USWICORI-W">
    <section number="23-601" name="Applicability" law="code" slug="sec-23-601" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV6USWICORI-W_S23-601AP">
      <level label="a">
        <text>This division governs the placement of all signs, objects, and other private property within the County right-of-way.</text>
      </level>
      <level label="b">
        <text>Any sign or object authorized in this Division may contain noncommercial copy or commercial copy as long as the sign remains in conformance with applicable design standards.</text>
      </level>
      <level label="c">
        <text>Any sign or object required to be placed in the County right-of-way by County, State, or Federal law shall be governed by those laws and not by this Division. The display of street addresses shall not be subject to the provisions of this Division.</text>
      </level>
    </section>
    <section number="23-602" name="Prohibited signs or objects" law="code" slug="sec-23-602" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV6USWICORI-W_S23-602PRSIOB">
      <level label="a">
        <text>The following items are prohibited within the County right-of-way:</text>
        <level label="1">
          <text>Any sign or object not expressly permitted in this Division;</text>
        </level>
        <level label="2">
          <text>Pennants, pinwheels, and similar circus- or carnival-type attractors;</text>
        </level>
        <level label="3">
          <text>Signs or objects which obstruct any pedestrian path intended to provide ingress or egress for any building or structure, access to a crosswalk, or on the sidewalk or any other paved portion of the right-of-way;</text>
        </level>
        <level label="4">
          <text>Signs or objects which obstruct the view of traffic control devices;</text>
        </level>
        <level label="5">
          <text>Signs or objects which, because of their shape, color, or wording, may be confused with any traffic control device or which may mislead motorists;</text>
        </level>
        <level label="6">
          <text>Signs or objects which are not clean, legible, or in a state of good repair;</text>
        </level>
        <level label="7">
          <text>Signs which are illegal under State or Federal regulations;</text>
        </level>
        <level label="8">
          <text>Signs or objects that obstruct traffic; and</text>
        </level>
        <level label="9">
          <text>Signs or objects or that are placed on or in a municipal, County, or State street right-of-way, except those of, or authorized by, public authorities or agencies, unless specifically authorized elsewhere in this Division.</text>
        </level>
      </level>
      <level label="b">
        <text>Signs placed or remaining within the County rights-of-way in violation of this Division shall be considered abandoned and illegal at the time the sign is placed.</text>
      </level>
    </section>
    <section number="23-603" name="Application for permit" law="code" slug="sec-23-603" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV6USWICORI-W_S23-603APPE">
      <level label="a">
        <text>Except as provided in this Division, signs or objects shall not be placed within the County right-of-way unless a permit has been issued by the Department.</text>
      </level>
      <level label="b">
        <text>An application for a permit shall be submitted on forms provided by the Department.</text>
      </level>
      <level label="c">
        <text>Each application shall be accompanied by plans, sketches, or photographs which indicate the following:</text>
        <level label="1">
          <text>Size and location of the sign or object;</text>
        </level>
        <level label="2">
          <text>Design of the sign or object;</text>
        </level>
        <level label="3">
          <text>Method of erecting or placing the sign or object; and</text>
        </level>
        <level label="4">
          <text>Other information the Director may require to insure compliance with this Division and other regulations of the County.</text>
        </level>
      </level>
    </section>
    <section number="23-604" name="Issuance" law="code" slug="sec-23-604" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV6USWICORI-W_S23-604IS">
      <text>Permits may only be obtained when the proposed sign or object meets the requirements of this Division.</text>
    </section>
    <section number="23-605" name="Display of issuance certificate; number plate" law="code" slug="sec-23-605" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV6USWICORI-W_S23-605DIISCENUPL">
      <text>The permit number shall be conspicuously displayed on the sign or object itself, or on its supporting structure. If a single permit is issued for multiple signs or objects, the same number may be displayed on all signs or objects authorized by the permit.</text>
    </section>
    <section number="23-606" name="Revocation of permits" law="code" slug="sec-23-606" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV6USWICORI-W_S23-606REPE">
      <text>All permits are only licenses, and are revocable at any time by the Director for failure to meet any of the requirements of this Division. The failure to comply with any of the regulations, or a valid order by the Director, shall subject the owner or user of the sign or object to the penalties prescribed by this Division.</text>
    </section>
    <section number="23-607" name="Signs or objects exempt from permit" law="code" slug="sec-23-607" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV6USWICORI-W_S23-607SIOBEXPE">
      <text>Types of signs exempt from sign permit, subject to the limitations provided:</text>
      <level label="a">
        <text>Public: Signs or objects of a noncommercial nature which are erected by, or ordered to be erected by, a public official in the performance of official duty, or by a governmental agency, such as: safety signs; traffic control signs; signs of historical interest; and names or locations of cities, towns, and villages.</text>
      </level>
      <level label="b">
        <text>Temporary real estate directional: Temporary signs, not located on the premises being advertised, containing a directional arrow and advertising real estate for sale or lease,</text>
        <level label="1">
          <text>Maximum area of 1.5 square feet.</text>
        </level>
        <level label="2">
          <text>Located within the County rights-of-way and within 25 feet of the corner of a street intersection.</text>
        </level>
        <level label="3">
          <text>Maximum of 4 per each property advertised, with a maximum of 25 for multiple properties with an on-site common sales office.</text>
        </level>
        <level label="4">
          <text>At any one intersection, there shall be only one sign facing each direction of traffic.</text>
        </level>
        <level label="5">
          <text>Maximum height of 3 feet above finished grade at base of sign.</text>
        </level>
        <level label="6">
          <text>Signs may only be erected between the hours of 5:00 p.m. Friday and 5:00 p.m. of the following Sunday.</text>
        </level>
        <level label="7">
          <text>Signs placed or remaining within the County rights-of-way in violation of these conditions shall be considered abandoned and illegal at the time the sign is placed.</text>
        </level>
      </level>
      <level label="c">
        <text>Temporary institutional: Temporary signs pertaining to events sponsored by a church; library; school; hospital; fire station; community center; day care center for children; service, fraternal, or civic organizations; or other similar group.</text>
        <level label="1">
          <text>Maximum area of 12 square feet.</text>
        </level>
        <level label="2">
          <text>Located within the County rights-of-way and within 25 feet of the corner of a street intersection.</text>
        </level>
        <level label="3">
          <text>Maximum of 4 per sponsoring institution.</text>
        </level>
        <level label="4">
          <text>Maximum height of 3 feet above finished grade at base of sign.</text>
        </level>
        <level label="5">
          <text>Signs may only be erected a maximum of 15 calendar days prior to the date of the event and 1 calendar day after the conclusion of the event.</text>
        </level>
        <level label="6">
          <text>Signs placed or remaining within the County rights-of-way in violation of these conditions shall be considered abandoned and illegal at the time the sign is placed.</text>
        </level>
      </level>
    </section>
    <section number="23-608" name="Illegal signs or illegal objects" law="code" slug="sec-23-608" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV6USWICORI-W_S23-608ILSIILOB">
      <level label="a">
        <text>Except for signs or objects allowed to be placed without a permit, any sign or object placed in the County right-of-way without a permit shall be deemed abandoned by its owner at the time the sign or object was placed shall be deemed illegal and may be subject to removal by the Department without notice. The cost of removal shall be borne by the owner of the sign or object with a minimum cost of $50.00 per sign or object removed. Unless rebutted by clear and convincing evidence, any such sign or object shall be presumed to be owned by and attached by the person whose business name, business address, business telephone number, website, email address, trademark or servicemark is contained on the face of the sign or object.</text>
      </level>
      <level label="b">
        <text>Except to the extent permitted by Subtitle 27 of this Code, it shall be unlawful for a person to attach any sign or object to a traffic control device, roadside tree, public utility pole, or any other structure located within the County right-of-way. Unless rebutted by clear and convincing evidence, any such sign or object shall be presumed to be owned by and attached by the person whose business name, business address, business telephone number, website, email address, trademark or servicemark is contained on the face of the sign or object.</text>
      </level>
    </section>
    <section number="23-609" name="Unsafe or illegal signs" law="code" slug="sec-23-609" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV6USWICORI-W_S23-609UNILSI">
      <level label="a">
        <text>Except as to illegal signs in the public right-of-way whenever the Director of Public Works and Transportation, or a designated representative determines that a sign or object is unsafe or illegal, the Director or designated representative shall (in writing) order that the sign or object be made safe or removed. The order shall be complied with by the person owning or using the sign or object or, in the case of a gateway sign, the Homeowners' Association or other entity responsible for maintenance within fifteen (15) days after the mailing of the order by the Director. In the event of an emergency situation (when there is an immediate danger to public safety), the unsafe sign shall be made safe or removed without any delay or written order.</text>
      </level>
      <level label="b">
        <text>If the unsafe or illegal sign or object is not removed or maintained in accordance with the order, the Director or designated representative may have the sign or object removed. The cost of removal shall be borne by the owner, user, Homeowners' Association, or entity responsible for the sign or object. For purposes of this Division, all illegal signs or objects in the County right-of-way shall be deemed an immediate danger to public safety and may be removed by the Department without any delay or written order. Costs of removal by the Department shall be borne by the person or entity responsible for the sign or object with a minimum cost of $50.00 per sign or object removed. Unless rebutted by clear and convincing evidence, any such sign or object shall be presumed to be owned by and attached by the person whose business name, business address, business telephone number, website, email address, trademark or servicemark is contained on the face of the sign or object.</text>
      </level>
      <level label="c">
        <text>The penalties prescribed in Subtitle 27 of this Code may be invoked if the sign is not removed or maintained in accordance with the order.</text>
      </level>
      <level label="d">
        <text>The maintenance of an entrance feature, including gateway signs and associated landscaping, shall be the responsibility of a Homeowner's Association or any other entity or person designated in a maintenance arrangement approved by the Department of Public Works and Transportation. Any entrance which has not been maintained in a safe and attractive manner may, for the purpose of this Section, be deemed by the Department of Public Works and Transportation to be an unsafe sign or object.</text>
      </level>
      <level label="e">
        <text>It shall be unlawful for any person to attach any sign or object to any public utility pole or to the exterior of any other public structure. Unless rebutted by competent evidence, any such sign or object shall be presumed to be owned by and attached by the person whose business name, business address, business telephone, website, email address, trademark is contained on the face of the sign or object.</text>
      </level>
    </section>
    <section number="23-610" name="Violations and civil penalties" law="code" slug="sec-23-610" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV6USWICORI-W_S23-610VICIPE">
      <level label="a">
        <text>If a sign or object is placed or erected in the County right-of-way in violation of any of the requirements of the applicable ordinances existing at the time of its erection or placement, the person who erected or placed the sign or object and the person who is presumed to own the sign or object are subject to a civil fine of one hundred dollars ($100) for the first violation, five hundred dollars ($500) for the second violation, and one thousand dollars ($1,000) for the third and subsequent violations and shall be liable for all costs incurred by the County to remove such sign or object. The civil fine shall continue to accrue on a daily basis until the sign or object is removed.</text>
      </level>
      <level label="b">
        <text>The County may recover all civil penalties and costs of removal of illegal signs or objects through an action in law.</text>
      </level>
      <level label="c">
        <text>In an action in law to recover civil penalties or cost for the removal of signs or objects in the public rights-of-way, an affidavit by the Director or the Director's designee that describes the illegal sign or object in the public right-of-way, the removal of such sign or object by the Department, the amount of civil penalties, and the costs of removal incurred by the Department shall be deemed prima facie evidence entitling the County to judgment and shall be accorded a strong presumption of correctness and validity, absent clear and convincing evidence to the contrary provided by the defendant.</text>
      </level>
    </section>
    <section number="23-611 through 23-614" name="Reserved" law="code" slug="sec-23-611-through-23-614" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV6USWICORI-W_S23-611._THROUGH_SEC._23-614RE" />
  </unit>
  <unit kind="division" number="7" name="Complete and Green Streets" slug="division-7" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV7COGRST">
    <section number="23-615" name="Complete and Green Streets Policy" law="code" slug="sec-23-615" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_23ROSI_DIV7COGRST_S23-615COGRSTPO">
      <level label="a">
        <text>The County hereby adopts a complete and green street policy and principles, consistent with the adopted Complete Street Policy by National Capital Region Transportation Planning Board and the National Complete Streets Coalition, as revised by the County Code.</text>
      </level>
      <level label="b">
        <text>All planned County financed and approved road, sidewalk, trail, and transit related construction and reconstruction projects shall include environmental site design and facilities for the combined use of motor, emergency and freight vehicles, transit, bicycles and pedestrians, and shall be constructed pursuant to the adopted County Urban Street Design Standards and the applicable master, sector, or functional master plan.</text>
      </level>
      <level label="c">
        <text>The Department will review and revise, as deemed necessary by the Director, plans, manuals, policies, processes, and the capital improvement program to foster the implementation of a complete and green street on public roadways projects, including privately built projects approved by the Department or on non-County projects funded in part or entirely by county funds.</text>
      </level>
    </section>
  </unit>
</unit>