<?xml version='1.0' encoding='utf-8'?>
<unit kind="division" number="2" name="Woodland and Wildlife Habitat Conservation Ordinance" slug="division-2" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_25TRVE_DIV2WOWIHACOOR">
  <section number="25-117" name="Policy; Purpose" law="code" slug="sec-25-117" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_25TRVE_DIV2WOWIHACOOR_S25-117POPU">
    <level label="a">
      <text>Policy.</text>
      <level label="1">
        <text>It is the policy of the Prince George's County government to conserve and protect trees, woodlands, and wildlife habitat by requiring site planning techniques and construction practices that prevent adverse effects on these sensitive environmental features. These efforts shall be coordinated with the implementation of the Prince George's County approved General Plan, the approved Countywide Green Infrastructure Plan, and the regulations regarding sensitive environmental features in the County Code.</text>
      </level>
      <level label="2">
        <text>To implement this policy the County has established:</text>
        <level label="A">
          <text>Policies and strategies for the conservation of trees, tree canopy, woodlands and wildlife habitat for present and future citizens of Prince George's County in the General Plan; that provides for the preservation, enhancement, and restoration of our natural and built ecosystem to improve human health, strengthen our resilience to changing climate conditions, and facilitate sustainable economic development.</text>
        </level>
        <level label="B">
          <text>A Countywide Green Infrastructure Plan that provides a long-term vision for the preservation, enhancement and restoration of designated lands within the network and measurable objectives for plan implementation;</text>
        </level>
        <level label="C">
          <text>Requirements for the preservation and protection of trees, woodlands and wildlife habitat having local, state, or national significance, particularly those trees of notable size, species, historical context or ecological role and those wildlife habitats that are scarce and in need of protection;</text>
        </level>
        <level label="D">
          <text>Procedures to manage the necessary clearing and disturbance of woodlands in ways that promote habitat protection and the maintenance of healthy vegetation;</text>
        </level>
        <level label="E">
          <text>Standards for the protection and enforcement of conservation areas containing trees, woodlands and wildlife habitat sufficient to maintain and improve water quality and to safeguard ecological and aesthetic values;</text>
        </level>
        <level label="F">
          <text>Incentives to conserve and preserve woodland elements through the appropriate use of alternative and innovative designs; and</text>
        </level>
        <level label="G">
          <text>Fines for removing trees, woodlands, or wildlife habitat without an approved Tree Conservation Plan or in violation of an approved Tree Conservation Plan.</text>
        </level>
      </level>
    </level>
    <level label="b">
      <text>Purpose.</text>
      <level label="1">
        <text>The purpose of this Division is to:</text>
        <level label="A">
          <text>Preserve, maintain, enhance, and restore woodlands and wildlife habitat for the benefit of County residents and future generations;</text>
        </level>
        <level label="B">
          <text>Establish procedures, standards, and requirements to minimize woodland loss and to protect trees and woodlands before, during, and after construction or other land disturbing activities;</text>
        </level>
        <level label="C">
          <text>Establish procedures, standards and requirements for woodland conservation;</text>
        </level>
        <level label="D">
          <text>Establish a fund for future woodland conservation efforts, including afforestation, reforestation, maintenance, land acquisition and the establishment of tree canopy coverage; and</text>
        </level>
        <level label="E">
          <text>Provide a focused and coordinated approach for County woodland conservation activities.</text>
        </level>
      </level>
    </level>
  </section>
  <section number="25-118" name="Definitions" law="code" slug="sec-25-118" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_25TRVE_DIV2WOWIHACOOR_S25-118DE">
    <level label="a">
      <text>Definitions in other Subtitles of this Code shall apply to this Division except to the extent of any conflict with the definitions in this Section or the goals and purposes of this Division.</text>
    </level>
    <level label="b">
      <text>The following terms used in this Division are defined as follows:</text>
      <level label="1">
        <text>Abutting and adjacent property owner: The owner of property sharing a common boundary line, including property separated by a public right-of-way, with property subject to a proposed Tree Conservation Plan (TCP).</text>
      </level>
      <level label="2">
        <text>Activity: Any grading, site development or forest harvest which requires a permit under Subtitle 4 of the Prince George's County Code.</text>
      </level>
      <level label="3">
        <text>Afforestation: The establishment of a biological community of perpetual woodlands either through the planting of trees on an area from which trees have always or very long been absent, or the planting of open areas which are not presently in forest cover.</text>
      </level>
      <level label="4">
        <text>Afforestation threshold: The minimum amount of afforestation or reforestation that is required where the calculation of a woodland conservation threshold is greater than the acreage of the existing woodlands on-site, unless a condition of zoning approval has set the threshold to a specific percentage other than that established in this Division.</text>
      </level>
      <level label="5">
        <text>Agricultural activity: Aquaculture and farming activities including plowing, tillage, cropping, installation of best management practices, seeding, cultivating, the grazing and raising of livestock, sod production and other products cultivated as part of a recognized commercial enterprise, and harvesting for production of food and fiber products, excluding forest products. The definition includes tobacco, orchards, nursery stock, Christmas trees, aquaculture ponds, and other ponds used to conduct farming activities. Activities that result in a change to a land use other than agriculture are not agricultural activities. Structures or temporary storage areas related to sale of products are excluded from this definition.</text>
      </level>
      <level label="6">
        <text>Agricultural support structure: A structure, other than a building used for living facilities, necessary to sustain an agricultural activity.</text>
      </level>
      <level label="7">
        <text>Applicant: A person or persons applying for any land development-related plans or permits, including grading and sediment and erosion control permits.</text>
      </level>
      <level label="8">
        <text>Application: A package submitted for review under this Division.</text>
      </level>
      <level label="9">
        <text>Approving authority: The body that is responsible for approval of the application, in conformance with this Division and other applicable sections of County Code.</text>
      </level>
      <level label="10">
        <text>Associated plan or application: The application that generates the need for a TCP or Letter of Exemption.</text>
      </level>
      <level label="11">
        <text>Caliper: The diameter of a tree measured at two inches above the root collar.</text>
      </level>
      <level label="12">
        <text>Champion tree: The largest tree of its species within the United States, the State of Maryland, County, or municipality.</text>
      </level>
      <level label="13">
        <text>Clearing: The removal of any components which comprise a biological community of woodlands as allowed herein.</text>
      </level>
      <level label="14">
        <text>Conservation area: See "woodland conservation area".</text>
      </level>
      <level label="15">
        <text>Conservation easement: See Subtitle 24 of the County Code.</text>
      </level>
      <level label="16">
        <text>Conservation easement, woodland and wildlife habitat: See Subtitle 24 of the County Code.</text>
      </level>
      <level label="17">
        <text>Critical habitat: A habitat currently occupied by a rare, threatened, or endangered (RTE) species as determined by the U.S. Fish and Wildlife Service or the Maryland Department of Natural Resources.</text>
      </level>
      <level label="18">
        <text>Critical habitat area: The critical habitat of a rare, threatened or endangered species and its surrounding protection area. A critical habitat area shall:</text>
        <level label="A">
          <text>Be likely to contribute to the long-term survival of the species;</text>
        </level>
        <level label="B">
          <text>Be likely to be occupied by the species for the foreseeable future; and</text>
        </level>
        <level label="C">
          <text>Constitute habitat of the species which is considered critical by the U.S. Fish and Wildlife Service or the Maryland Department of Natural Resources.</text>
        </level>
      </level>
      <level label="19">
        <text>Declaration of Intent: A signed and notarized statement by a property owner or the property owner's agent as required by this Division certifying that the forest harvesting activities on the property owner's property:</text>
        <level label="A">
          <text>Are exempt under this Division;</text>
        </level>
        <level label="B">
          <text>Do not circumvent the requirements of this Division or Natural Resources Article, §§ 5-103 and 5-1601—5-1612, Annotated Code of Maryland; and</text>
        </level>
        <level label="C">
          <text>Do not conflict with the purposes of any other Declaration of Intent.</text>
        </level>
      </level>
      <level label="20">
        <text>Destruction of woodland: Any activity that significantly decreases the health or viability of woody vegetation, including individual trees, in an on-site woodland area. Destruction of woodlands includes, but is not limited to severe pruning, cutting, girdling, root mat disturbance, understory clearing or chemical/biological poisoning. Destruction of woodlands does not include control or removal of exotic, invasive or noxious plant species, removal of dead, dying or hazardous trees and/or forest management conducted in conformance with an approved forest management plan.</text>
      </level>
      <level label="21">
        <text>Development: Any activity that materially affects the condition or use of dry land, land under water, or any structure.</text>
      </level>
      <level label="22">
        <text>Development Review Division application (DRD application): For the purposes of this subtitle, development review division application is the application submitted to the Development Review Division. It does not include a grading permit application submitted to the Department of Permits, Inspections and Enforcement and applications subject to Mandatory Referral.</text>
      </level>
      <level label="23">
        <text>Diameter at breast height (DBH): The diameter of a tree measured at 4.5 feet above the ground.</text>
      </level>
      <level label="24">
        <text>Disturbance: The movement or removal of soil, impervious surfaces, or vegetation and/or leaf litter.</text>
      </level>
      <level label="25">
        <text>Erosion and sediment control plan: A signed and stamped plan approved by the Soil Conservation District.</text>
      </level>
      <level label="26">
        <text>Environmental Technical Manual (Technical Manual): A technical manual, as approved and amended by the Planning Board from time to time, that contains the requirements for submissions for conformance with the environmental regulations of the County Code. The manual includes a chapter titled Woodland and Wildlife Habitat Conservation Technical Manual that establishes standards for the implementation of this Division.</text>
      </level>
      <level label="27">
        <text>Exotic plants: Plants that are not native to the mid-Atlantic region but have been introduced to this region and may displace native species, changing the structure and composition of native plant communities.</text>
      </level>
      <level label="28">
        <text>Fee-in-lieu: Funds received by the County associated with compliance with this Division.</text>
      </level>
      <level label="29">
        <text>Forest: See "Woodland."</text>
      </level>
      <level label="30">
        <text>Forest conservation: See "Woodland conservation."</text>
      </level>
      <level label="31">
        <text>Forest Conservation Act: MD Code, Natural Resources, Title 5, Subtitle 16, et seq.</text>
      </level>
      <level label="32">
        <text>Forest conservation plan: See "Tree Conservation Plan."</text>
      </level>
      <level label="33">
        <text>Forest Conservation Program: See "Woodland Conservation Program".</text>
      </level>
      <level label="34">
        <text>Forest cover: See "Woodland."</text>
      </level>
      <level label="35">
        <text>Forest edge: See the Technical Manual.</text>
      </level>
      <level label="36">
        <text>Forest harvesting: A tree-cutting operation affecting one or more acres of forest within a one-year interval that disturbs 5,000 square feet or more of forest floor. Forest harvesting does not include grubbing and clearing of root mass. Forest harvesting is also known as "timber harvesting".</text>
      </level>
      <level label="37">
        <text>Forest harvest plan: A plan drawn to scale showing the regulated environmental features, the areas to be harvested, staging areas, proposed stream crossings, and the forest harvesting methods proposed for each area to be harvested.</text>
      </level>
      <level label="38">
        <text>Forest interior: Woodlands that are located a minimum of 300 feet from the nearest forest edge.</text>
      </level>
      <level label="39">
        <text>Forest interior dwelling species (FIDS): Species of birds which require large, connected forested tracts in order to breed successfully as described in the Technical Manual.</text>
      </level>
      <level label="40">
        <text>Forest interior dwelling species (FIDS) habitat: Woodland areas of sufficient size as to be favorable to the breeding of forest interior dwelling bird species which are assumed to be present if the majority of the forest is dominated by pole-sized or larger trees (five inches or greater diameter at breast height), or has a closed canopy; and meets one the following conditions:</text>
        <level label="A">
          <text>The woodlands are a minimum of 50 acres in size and contain at least 10 acres of "forest interior" habitat which is located more than 300 feet from the nearest forest edge; or</text>
        </level>
        <level label="B">
          <text>Riparian forests at least 50 acres in size with a minimum average width of 300 feet within the watershed of a regulated stream.</text>
        </level>
      </level>
      <level label="41">
        <text>Forest management activity: Activities such as the harvesting of forest products, thinning, wildlife habitat management, and watershed protection as identified on a Forest Management Plan as prepared by a licensed forester.</text>
      </level>
      <level label="42">
        <text>Forest Management Plan: A plan signed and sealed by a licensed forester that establishes best conservation and management practices for a property owner in assessment of the resource values of forested properties. A Forest Management Plan shall be prepared in conformance with the Technical Manual and shall outline forest management activities needed to meet the stated objectives for a minimum of ten years. May also be referred to as a Forest Stewardship Plan.</text>
      </level>
      <level label="43">
        <text>Forest products: Trees removed from a site using selective or clear-cutting methods for commercial use. Forest products do not include mushrooms, nuts, berries or similar items.</text>
      </level>
      <level label="44">
        <text>Forest Stand Delineation (FSD): A detailed accounting of existing woody vegetation on a site, prepared in plan and document form, as required by this Division, and as explained in the Technical Manual.</text>
      </level>
      <level label="45">
        <text>Government project: Projects conducted by or for any public or quasi-public agency. A project is deemed a government project if all or a portion of the funding comes from governmental sources.</text>
      </level>
      <level label="46">
        <text>Green infrastructure: The interconnected natural areas benefiting wildlife and humans, as designated on the Green Infrastructure Network Map, as defined further in the approved Countywide Green Infrastructure Plan. Green infrastructure may also refer to green stormwater solutions that use plants or mimic natural systems.</text>
      </level>
      <level label="47">
        <text>Hazardous tree: Any tree where a hazardous condition is present which would lead a knowledgeable person trained in the field of arboriculture to believe that the specific condition could result in the tree or a portion of the tree falling and striking a structure or activity area (target), thus threatening property damage and/or personal injury.</text>
      </level>
      <level label="48">
        <text>Habitat enhancement: The removal of exotic or invasive species and/or the planting of native plants to improve the quality of the vegetation within an area designated for woodland conservation.</text>
      </level>
      <level label="49">
        <text>Historic tree: A tree that is 2 inches DBH located within the environmental setting of a historic site or historic resource that is included in the County's Master Plan for Historic Preservation, or that is associated with a historic cemetery or historic structure not included in the master plan.</text>
      </level>
      <level label="50">
        <text>Invasive non-native vegetation: See "invasive species".</text>
      </level>
      <level label="51">
        <text>Invasive species: A plant as identified in the Technical Manual or authoritative related sources that shows a tremendous capacity for reproduction and distribution which results in a negative impact on native plant species or environmental, economic, or public welfare priorities.</text>
      </level>
      <level label="52">
        <text>Landscaping: The installation of trees and shrubs in an area that is formally maintained over time. Landscaped areas that are not planted to meet the minimum stocking levels or design criteria required by this subtitle are not considered afforestation areas.</text>
      </level>
      <level label="53">
        <text>Letter of Exemption: A letter prepared based on required information to verify that the site or the proposed activity is exempt from this Division.</text>
      </level>
      <level label="54">
        <text>Licensed forester: An individual who is licensed by the Maryland State Board of Foresters to practice forestry.</text>
      </level>
      <level label="55">
        <text>Linear project: A project whose configuration is elongated with nearly parallel sides and is used to transport a utility product or public service not contained in a DRD application, such as electricity, gas, water, sewer, communications, trains, and vehicles. Linear projects may traverse fee simple properties through defined project boundaries, or established easement rights.</text>
      </level>
      <level label="56">
        <text>Logging: See "forest harvesting."</text>
      </level>
      <level label="57">
        <text>Maintenance agreement: The short-term management agreement associated with afforestation or reforestation plans required under this Division and the Natural Resources Article, Annotated Code of Maryland.</text>
      </level>
      <level label="58">
        <text>Mitigation: The off-setting of forest lost due to the destruction of woodlands without a permit or contrary to an approved TCP by replanting woodlands or other means in conformance with this Division.</text>
      </level>
      <level label="59">
        <text>Licensed Tree Expert: A tree expert licensed by the Maryland Department of Natural Resources.</text>
      </level>
      <level label="60">
        <text>Municipal tree planting plan or program: A plan or program prepared and adopted by a municipality for tree planting, tree preservation, or both within the jurisdiction.</text>
      </level>
      <level label="61">
        <text>Native plant species: Plants that are native to the Mid-Atlantic region, as identified in the Technical Manual.</text>
      </level>
      <level label="62">
        <text>Natural regeneration: The establishment or re-establishment of a biological community of woodlands from nearby seed sources without afforestation with at least 400 free-to-grow woody native seedlings per acre that are capable of reaching a height of at least 20 feet at maturity.</text>
      </level>
      <level label="63">
        <text>Natural Resource Inventory (NRI): A plan map and supporting documentation that provides all required information regarding the existing physical, cultural and environmental conditions on a site that is approved by the Planning Director as described in the Technical Manual.</text>
      </level>
      <level label="64">
        <text>Net tract area: For the purposes of this Division, the gross tract area minus the approved 100-year floodplain and minus any areas previously dedicated for public use.</text>
      </level>
      <level label="65">
        <text>Off-site: Land that is not part of the subject application.</text>
      </level>
      <level label="66">
        <text>Off-site clearing: Clearing related to the subject application that occurs outside the limits of the subject application</text>
      </level>
      <level label="67">
        <text>Off-site woodland conservation: The fulfillment of any portion of the conservation requirement for a property at an off-site location.</text>
      </level>
      <level label="68">
        <text>One hundred (100) year floodplain: See Subtitle 32 of the County Code.</text>
      </level>
      <level label="69">
        <text>On-site: On the same lot or parcel or combination of lots and parcels as identified in the subject application.</text>
      </level>
      <level label="70">
        <text>Permittee: Any person to whom a permit is issued pursuant to this Division.</text>
      </level>
      <level label="71">
        <text>Planning Director: The director of the Prince George's County Planning Department of the Maryland-National Capital Park and Planning Commission or the Director's designee.</text>
      </level>
      <level label="72">
        <text>Preservation: The protection of existing woodlands for the purpose of meeting the requirements of this Division.</text>
      </level>
      <level label="73">
        <text>Previously dedicated land: Land that was dedicated for public use prior to submission of the first TCP application. This term typically applies to road dedications.</text>
      </level>
      <level label="74">
        <text>Primary Management Area (PMA): See Subtitle 24 of the County Code.</text>
      </level>
      <level label="75">
        <text>Priority Funding Area: The Priority Funding Areas of Prince George's County as determined by the Maryland Department of Planning.</text>
      </level>
      <level label="76">
        <text>Qualified conservation: the conservation of all or part of an existing forest that:</text>
        <level label="A">
          <text>Has been approved by the appropriate State or local forest conservation program for the purpose of establishing off-site woodland conservation; and</text>
        </level>
        <level label="B">
          <text>Is encumbered in perpetuity by a restrictive easement, covenant, or other similar mechanism recorded in the County land records to conserve its character as woodlands.</text>
        </level>
      </level>
      <level label="77">
        <text>Qualified professional: A licensed forester, a licensed landscape architect, or other qualified professional approved by the State of Maryland Department of Natural Resources.</text>
      </level>
      <level label="78">
        <text>Reforestation: The re-establishment of a biological community of perpetual woodlands through the planting of trees on an area from which trees were recently removed.</text>
      </level>
      <level label="79">
        <text>Regulated Environmental Features: See Subtitle 24 of the County Code.</text>
      </level>
      <level label="80">
        <text>Regulated stream: See Subtitle 24 of the County Code.</text>
      </level>
      <level label="81">
        <text>Seedling: An un-branched woody plant, less than 24 inches in height and having a caliper of less than one-half inch measured at two inches above the root collar.</text>
      </level>
      <level label="82">
        <text>Selective clearing: The deliberate and planned removal of tree shrubs and plants using specific standards and protection measures in accordance with an approved TCP.</text>
      </level>
      <level label="83">
        <text>Significant tree: A tree of any species that is 24 inches or greater in diameter at 4.5 feet above the ground.</text>
      </level>
      <level label="84">
        <text>Specimen tree: Trees having a diameter at breast height of 30 inches or more; trees having 75% or more of the diameter at breast height of the current champion of that species; or a particularly impressive or unusual example of a species due to its size, shape, age or any other trait that epitomizes the character of the species. This definition includes all champion trees designated by the United States, the State of Maryland, the County, or a municipality.</text>
      </level>
      <level label="85">
        <text>Stormwater Management Structure: See Subtitle 32 of the County Code.</text>
      </level>
      <level label="86">
        <text>Stream: see "Regulated stream".</text>
      </level>
      <level label="87">
        <text>Stream buffer: See Subtitle 24 of the County Code. Stream buffers are delineated in accordance with the Technical Manual.</text>
      </level>
      <level label="88">
        <text>Stream restoration: An activity that:</text>
        <level label="A">
          <text>Is designed to stabilize stream banks or enhance stream function or habitat located within an existing stream, waterway, or floodplain;</text>
        </level>
        <level label="B">
          <text>Avoids and minimizes impacts to forests and provides for replanting on-site an equivalent number of trees to the number removed by the project;</text>
        </level>
        <level label="C">
          <text>May be performed under a municipal separate storm sewer system permit, a watershed implementation plan growth offset, or another plan administered by the State or local government to achieve or maintain water quality standards; and</text>
        </level>
        <level label="D">
          <text>Is not performed to satisfy stormwater management, wetlands mitigation, or any other regulatory requirement associated with proposed development activity.</text>
        </level>
      </level>
      <level label="89">
        <text>Transit-oriented center: A transit-oriented center means: Transit-oriented developments which are consistent with Section 7-101 of the Transportation Article of the Annotated Code of Maryland and are identified within Plan 2035 as regional transit districts or local centers. This does not include those areas identified as Local Town Centers in Plan 2035.</text>
      </level>
      <level label="90">
        <text>Tree: A plant with a woody stem capable of achieving a height of at least 20 feet at maturity.</text>
      </level>
      <level label="91">
        <text>Tree Conservation Plan (TCP): A site map that delineates woodland conservation areas and associated text that includes items such as requirements, penalties, and mitigation in conformance with this Division and the Technical Manual.</text>
      </level>
      <level label="92">
        <text>Tree Management Plan: A plan and text prepared to describe specific methods to be implemented before, during, and after construction to ensure the preservation of designated specimen, champion, historic, or significant trees.</text>
      </level>
      <level label="93">
        <text>Tree protection devices: Those devices that are required to be installed prior to the clearing and grading of a site for the protection of preserved areas, areas to be planted, and around specimen, champion, and historic trees. These devices may be temporary or permanent as specified on the TCP. Tree protection devices for afforestation or reforestation areas may be installed after tree planting if the areas are shown to be graded.</text>
      </level>
      <level label="94">
        <text>Understory vegetation: Plants growing in association with trees in a woodland. The understory includes the biological community of plants that includes trees, shrubs, and forbs that grow under the shaded canopy of larger trees and is a vital component of a perpetual woodland.</text>
      </level>
      <level label="95">
        <text>WCO variance (variance): Relief from this Division as specified in Sub 25-119(d). WCO variance does not mean a zoning variance.</text>
      </level>
      <level label="96">
        <text>Watershed: The Maryland 12-digit watershed delineation as defined by the Maryland Department of the Environment.</text>
      </level>
      <level label="97">
        <text>Whip: An un-branched woody plant greater than 24 inches in height and having a caliper of less than one inch measured at two inches above the root collar.</text>
      </level>
      <level label="98">
        <text>Woodland: A perpetual biological community dominated by trees and other woody or herbaceous plants covering a land area of 10,000 square feet or greater. This includes areas that have at least 100 trees per acre with at least 50 trees that are 2 inches or greater in diameter at breast height. This also includes areas that have been forest harvested where the stumps remain in place for future regeneration. The terms "woodland," "forest," and "forest cover" are synonymous and do not include orchards or other areas without multiple layers of woody and herbaceous vegetation.</text>
      </level>
      <level label="99">
        <text>Woodland conservation area: An area of preservation of existing woodlands, reforestation, afforestation, natural regeneration, landscaping or other approved method that has been specifically identified for protection or restoration on an approved TCP in order to satisfy the requirements of this Division.</text>
      </level>
      <level label="100">
        <text>Woodland conservation threshold: The minimum requirement for any site calculated as a percentage of the net tract area with the percentage based on its zoning per Subtitle 25-121.</text>
      </level>
      <level label="101">
        <text>Woodland conservation bank: A lot or parcel, or portions of a lot or parcel, that has been intentionally preserved or afforested as perpetual woodlands and has been protected by the documents recorded in the land records for the purpose of meeting the requirements of this Division for land development activities occurring on another property in the County.</text>
      </level>
      <level label="102">
        <text>Woodland Conservation Fund: The County fund where fee-in-lieu funds excluding fee -in-lieu associated with the removal of Specimen and Historic Trees are held.</text>
      </level>
      <level label="103">
        <text>Woodland conservation replacement requirement: The minimum requirement for any site calculated as replacement for woodland cleared based on the criteria in Section 25-121.</text>
      </level>
      <level label="104">
        <text>Woodland retained - assumed cleared: Existing woodlands that are not proposed to be cleared with the initial development, which are not credited to meet the requirements of this Division, and have a high likelihood of being cleared in the future. In determining the woodland conservation requirement, areas labeled "woodland retained - assumed cleared" are calculated as cleared. Areas labeled "woodland retained - assumed cleared" may be removed during the development process or after bond release without requiring a revision to the TCP.</text>
      </level>
      <level label="105">
        <text>Woodland retained - not credited: Existing woodlands that are not proposed to be cleared and are not credited to meet to meet the requirements of this Division because the areas do not meet the required standards to be credited as woodland conservation. In the determination of the woodland conservation requirement, areas labeled "woodland retained - not credited" are not calculated as cleared. Areas labeled "woodland retained - not credited" on individual residential lots less than one acre in size may be removed after bond release on the project without a revision to the TCP.</text>
      </level>
      <level label="106">
        <text>Woody vegetation: Plants with persistent stems lasting more than one year and increasing in diameter annually.</text>
      </level>
      <level label="107">
        <text>Other Terms: Definitions in Title 5, Subtitle 16 of the Natural Resources Article of the Annotated Code of Maryland, COMAR 08.19.01.03, "Definitions," COMAR 08.19.03.01 "Forest and Tree Conservation Definitions," are incorporated by reference and shall apply to the extent such terms which are not defined in this Section or the Technical Manual.</text>
      </level>
    </level>
  </section>
  <section number="25-119" name="Applicability" law="code" slug="sec-25-119" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_25TRVE_DIV2WOWIHACOOR_S25-119AP">
    <level label="a">
      <text>General</text>
      <level label="1">
        <text>Except as provided in (b) below, this Woodland and Wildlife Habitat Conservation Division applies to:</text>
        <level label="A">
          <text>All DRD applications and grading permit applications, excluding applications which propose residential construction activity resulting in the disturbance of less than 10,000 square feet of woodlands on a single lot of any size or linear project that do not have a previously approved and valid TCP;</text>
        </level>
        <level label="B">
          <text>All activities by a public utility;</text>
        </level>
        <level label="C">
          <text>All activities of a unit of County or municipal government; and</text>
        </level>
        <level label="D">
          <text>All activities delegated to the local jurisdiction by the State.</text>
        </level>
      </level>
      <level label="2">
        <text>DRD applications shall include a Standard Letter of Exemption or the proper type of tree conservation plans (TCPs) as follows:</text>
        <level label="A">
          <text>DRD Applications for a Conceptual Site Plan, a Preliminary Plan of Subdivision, or other conceptual plans shall include a Type 1 Tree Conservation Plan (TCP1) or a Standard Letter of Exemption.</text>
        </level>
        <level label="B">
          <text>DRD applications for a Detailed Site Plan (including Minor and Major Detailed Site Plans), grading permit or other similarly detailed plans shall include a Type 2 Tree Conservation Plan (TCP2) or a Standard Letter of Exemption. If a site requires approval of a TCP2 with an associated DRD application, the TCP2 shall not be reviewed independently of the associated DRD application.</text>
        </level>
        <level label="C">
          <text>DRD applications for a Special Exception shall include:</text>
          <level label="i">
            <text>a TCP1 unless the special exception site plan will be used for grading permitting, or</text>
          </level>
          <level label="ii">
            <text>if there is an associated grading permit plan and no associated subdivision application is required, a TCP2 is required</text>
          </level>
        </level>
        <level label="D">
          <text>If a DRD application requires approval of a TCP1 or TCP2, the TCP shall be approved by the body with authority to approve the DRD application.</text>
        </level>
        <level label="E">
          <text>If a site requires approval of a TCP2 with an associated DRD application, the TCP2 shall not be reviewed independently of the associated plan.</text>
        </level>
      </level>
      <level label="3">
        <text>Permit applications shall include a Letter of Exemption or the proper type of tree conservation plan (TCPs) as follows:</text>
        <level label="A">
          <text>A TCP2 that was approved as a companion to an approved DRD application, or</text>
        </level>
        <level label="B">
          <text>A permit application not subject to a DRD approval, a stand-alone TCP2 approved by the Planning Director shall be required, or</text>
        </level>
        <level label="C">
          <text>A permit application for a revision to an approved TCP2 where a revision to the approved DRD application is not required, a stand-alone TCP2 shall be required, or</text>
        </level>
        <level label="D">
          <text>A TCP1 is approved as a companion to an approved DRD application but no subsequent DRD approved is not required, a stand-alone TCP2 is required, or</text>
        </level>
        <level label="E">
          <text>A state level forest conservation approval, or</text>
        </level>
        <level label="F">
          <text>A Letter of Exemption is required.</text>
        </level>
      </level>
      <level label="4">
        <text>All plans and associated information shall be prepared in conformance with the Technical Manual.</text>
      </level>
      <level label="5">
        <text>All submittals required by this Division shall be prepared by a qualified professional and shall contain a stamp or certification from the qualified professional who prepared the plans and the plans shall contain an original signature and date applied by the preparer. If there are three documented cases of plan submittals that do not meet the minimum threshold requirements for submittal in conformance with this Division and the Technical Manual within a time frame of one year, the Planning Director may recommend to the Maryland Department of Natural Resources that a qualified professional's ability to submit plans under this Division be suspended.</text>
      </level>
      <level label="6">
        <text>All land that has an approved TCP associated with it is subject to the notice requirements as defined in Subtitle 2, Sec. 2-162.01(e) of the County Code. At time of contract signing, the seller of any land subject to a TCP shall provide the buyer with a copy of the approved plan.</text>
      </level>
      <level label="7">
        <text>Within thirty (30) days from receipt of an application for a proposed TCP, the applicant shall be notified whether the application is complete. This deadline may be extended at the discretion of the Planning Director for good cause.</text>
      </level>
      <level label="8">
        <text>A Forest Stand Delineation (FSD), Natural Resource Inventory (NRI), or a TCP may be revoked by the Planning Director for good cause including, but not limited to, violation of conditions of the plan, obtaining a plan approval by misrepresentation of a material fact, failing to disclose a relevant or material fact, or a material change in conditions. The applicant, the holder of any permit issued pursuant to approval of the TCP, and the property owner shall be notified of the revocation in writing. Within thirty (30) days of the date of such notice, a hearing before the Planning Board may be requested by the applicant, permit holders, or property owner.</text>
      </level>
      <level label="9">
        <text>Proposed woodland conservation areas, either on-site, or off-site, shall be free of any previous encumbrance which is not consistent with the requirements of this Division including, but not limited to, easements which specifically protect woodlands for another purpose, utility easements, approved TCPs for other development, deed restrictions, and declarations of covenants for woodland conservation banking, prior to encumbering the area to fulfill on-site woodland conservation requirements or as an off-site woodland conservation bank. Property that is subject to an agricultural preservation easement shall not be precluded from having a woodland conservation easement.</text>
      </level>
    </level>
    <level label="b">
      <text>Exemptions from this Division</text>
      <level label="1">
        <text>General</text>
        <level label="A">
          <text>All DRD applications and grading permit applications for land inside of the Chesapeake Bay Critical Area.</text>
        </level>
        <level label="B">
          <text>Trimming, planting or removal of trees in the public right-of-way which require a permit in accordance with the Maryland Roadside Tree Care Law is required.</text>
        </level>
        <level label="C">
          <text>An agricultural activity that does not result in a change in land use category and the construction and use of agricultural support structures built using accepted best management practices;</text>
        </level>
        <level label="D">
          <text>Forest Management subject to compliance requirements in Section 25-124.</text>
        </level>
        <level label="E">
          <text>Mandatory Referrals are exempt from this Division but may be subject to this Division at time of grading permit.</text>
        </level>
      </level>
      <level label="2">
        <text>Modified Exemptions</text>
        <level label="A">
          <text>For certain applications that have to perform some but not all requirements in this Division. These applicants can apply for the following:</text>
          <level label="i">
            <text>Any stream restoration project for which the applicant for a grading or sediment control permit has executed a binding maintenance agreement of at least 5 years with the affected property owner and the activity:</text>
            <level label="aa">
              <text>Avoids and minimizes impacts to forests and provides for replanting on-site an equivalent number of trees to the number removed by the project;</text>
            </level>
            <level label="bb">
              <text>May be performed under a municipal separate storm sewer system permit, a watershed implementation plan growth offset, or another plan administered by the State or local government to achieve or maintain water quality standards;</text>
            </level>
            <level label="cc">
              <text>Is not performed to satisfy stormwater management, wetlands mitigation, or any other regulatory requirement associated with proposed development activity; and</text>
            </level>
            <level label="dd">
              <text>Requires a plan to demonstrate compliance with this subsection and tree replacement requirements in accordance with the Technical Manual.</text>
            </level>
          </level>
          <level label="ii">
            <text>Transit-Oriented Center projects for which the area of forest removed shall meet the woodland conservation thresholds and replacement requirements in accordance with Section 25-121 Table 1 and 2 and in accordance with the Technical Manual.</text>
          </level>
          <level label="iii">
            <text>When public utility projects exempted under the Forest Conservation Act are proposed as described below, they are considered exempt from this Division and a Letter of Exemption is not required. When this work occurs on a site where the affected woodlands have been used to meet a requirement of this Division, then the TCP for that site shall be revised to show the impacts and address woodland conservation requirements.</text>
            <level label="aa">
              <text>The cutting or clearing of public utility rights-of-way licensed under Public Utility Companies, §§ 7-207 and 7-208 or 7-205, Annotated Code of Maryland, for electric generating stations licensed under Public Utility Companies, §§ 7-207 and 7-208 or 7-205, Annotated Code of Maryland, if:</text>
              <level label="I">
                <text>Required certificates of public convenience and necessity have been issued in accordance with Natural Resources Article, § 5-1603(f), Annotated Code of Maryland; and</text>
              </level>
              <level label="II">
                <text>Cutting or clearing of the woodlands is conducted to minimize the loss of woodlands.</text>
              </level>
            </level>
            <level label="bb">
              <text>Routine maintenance or emergency repairs of public utility rights-of-way licensed under Public Utility Companies, §§ 7-207 and 7-208 or 7-205, Annotated Code of Maryland.</text>
            </level>
          </level>
        </level>
      </level>
      <level label="3">
        <text>If a Letter of Exemption is required:</text>
        <level label="A">
          <text>The Planning Director shall issue it prior to the submission of any DRD application requiring a review for conformance with this Division.</text>
        </level>
        <level label="B">
          <text>Requests for Letters of Exemption shall be made by the submission of an application package to the Planning Director. All application packages shall include an application form, a check for the appropriate fee made payable to the Maryland-National Capital Park and Planning Commission and a plan drawn to scale and signed by a professional engineer, land surveyor, landscape architect or qualified professional showing sufficient information so that a determination can be made regarding the exemption status. A Simplified FSD may be required to be submitted if the information submitted is not sufficient to make a determination regarding the exemption status of an application.</text>
        </level>
        <level label="C">
          <text>A letter either granting or denying the exemption shall be issued within 20 calendar days of acceptance of a complete application package.</text>
        </level>
        <level label="D">
          <text>Letters of Exemption are valid for five years from date of issuance. If the associated DRD application approval or grading permit expires, the Letter of Exemption also expires.</text>
        </level>
        <level label="E">
          <text>Letters of Exemption cannot be issued for properties that have a previously approved and valid TCP, unless the TCP has expired as per Section 25-119(c )(2).</text>
        </level>
        <level label="F">
          <text>If an application is revised to include additional lots or parcels the exemption status shall be re-evaluated.</text>
        </level>
      </level>
      <level label="4">
        <text>If an activity occurs on the property covered by a Letter of Exemption that results in the exemption no longer being valid:</text>
        <level label="A">
          <text>The exemption is considered null and void and a TCP shall be required as appropriate; and</text>
        </level>
        <level label="B">
          <text>Enforcement action may be taken by the County.</text>
        </level>
      </level>
      <level label="5">
        <text>Standard Letters of Exemption</text>
        <level label="A">
          <text>A Standard Letter of Exemption shall be issued when a lot or parcel or combination of lots and parcels is less than 40,000 square feet in area.</text>
        </level>
        <level label="B">
          <text>A Standard Letter of Exemption shall be issued when a lot or parcel or combination of lots and parcels of any size has less than 10,000 square feet of woodland and is not subject to a previously approved TCP. If a lot or parcel that was determined to be exempt using this provision becomes reforested to the point where more than 10,000 square feet of woodlands exist prior to issuance of a grading permit, the exemption may be revoked by the Planning Director or their designee.</text>
        </level>
        <level label="C">
          <text>A Standard Letter of Exemption is not required to be issued when the proposed activities are within the Chesapeake Bay Critical Area because activities within the Critical Area are subject to Subtitle 5B. If a portion of a property is outside the Critical Area, that portion of the property shall be evaluated for conformance with this Division.</text>
        </level>
        <level label="D">
          <text>A Standard Letter of Exemption shall be issued for any property that will be reviewed by the State of Maryland Department of Natural Resources. These properties include, but are not limited to, land owned by the State of Maryland. A letter from the State of Maryland Department of Natural Resources stating that they are taking jurisdiction over the review of a project shall be provided with any application package. The Standard Letter of Exemption and the state approved Forest Conservation Plan shall accompany all local DRD applications and grading permit applications.</text>
        </level>
        <level label="E">
          <text>A Standard Letter of Exemption may be issued when local government projects utilizing state funds are proposed and a letter from the State of Maryland Department of Natural Resources is provided stating that they will be reviewing the project.</text>
        </level>
        <level label="F">
          <text>A Standard Letter of Exemption may be issued when a proposal is submitted that shows the minimum cutting or clearing of trees or woodlands necessary in compliance with the requirements of 14 C.F.R. § 77.25 relating to objects affecting navigable airspace, provided that the Federal Aviation Administration has determined that the trees are a hazard to aviation.</text>
        </level>
      </level>
      <level label="6">
        <text>A Numbered Letter of Exemption may be issued when an activity or series of activities results in the cumulative disturbance of less than 5,000 square feet of woodland during a five-year period on a site that otherwise would be subject to this Division. A Numbered Letter of Exemption is issued so that the site can be tracked and mapped over the five-year period to ensure that the cumulative disturbance is less than 5,000 square feet.</text>
        <level label="A">
          <text>A Numbered Letter of Exemption shall not be issued for properties that are required to submit a DRD application as part of the process for the activity proposed.</text>
        </level>
        <level label="B">
          <text>A Numbered Letter of Exemption may be issued for linear projects that disturb less than 20,000 square feet of woodland if any of the land involved is not subject to a previously approved TCP. Linear projects that disturb less than 20,000 square feet of woodland are exempt and may obtain a Numbered Exemption Letter if none of the associated properties are subject to a previously approved TCP.</text>
        </level>
      </level>
      <level label="7">
        <text>A Numbered Letter of Exemption may be issued when commercial logging and forest harvesting operations are proposed on properties in the Reserved Open Space (ROS), Agricultural-Residential (AR), Residential Estate (RE), and the Residential, Rural (RR) Zones provided that the paragraphs (A) and (B) below have been addressed. If a permit other than a harvesting permit is applied for on the same portion of the property within five years of the exemption approval, a TCP shall be required and the exemption for harvesting shall be considered null and void.</text>
        <level label="A">
          <text>The Letter of Exemption application shall include an executed Declaration of Intent as provided for in Section 25-118 of this Division. The Declaration must be filed with and approved by the County; and</text>
        </level>
        <level label="B">
          <text>The Letter of Exemption application shall include an approved Forest Management Plan for the entire tract.</text>
        </level>
      </level>
    </level>
    <level label="c">
      <text>Plan Review and Conformance</text>
      <level label="1">
        <text>The approval authority for TCPs is the same as that of the associated DRD application. If there is no associated DRD application, the Planning Director is the approving authority.</text>
        <level label="A">
          <text>If a TCP1 has been approved for a site, all subsequent TCP2 plans must be in conformance with the TCP1.</text>
        </level>
      </level>
      <level label="2">
        <text>If the TCP2 is to be approved by the Planning Board, conformance with the TCP1, if applicable, shall be determined by the Planning Board.</text>
      </level>
      <level label="3">
        <text>If a TCP2 is to be approved by the Planning Director, it shall be in conformance with this Division, and in conformance with the TCP1, if applicable,</text>
      </level>
      <level label="4">
        <text>For TCP minor and major revisions:</text>
        <level label="A">
          <text>The following criteria constitutes a minor revision:</text>
          <level label="i">
            <text>The proposed TCP continues to meet all required elements of this Division.</text>
          </level>
          <level label="ii">
            <text>The TCP does not affect lots or parcels already sold to builders or homeowners.</text>
          </level>
          <level label="iii">
            <text>Revisions requested by builders or homeowners for single lots or parcels.</text>
          </level>
          <level label="iv">
            <text>The proposed change:</text>
            <level label="aa">
              <text>Is a revision as a result from governmental requirements as further defined in the Technical Manual; or</text>
            </level>
            <level label="bb">
              <text>Does not reduce the total woodland conservation on the site by the greater of 5,000 square feet or 5 percent (not to exceed five (5) acres) of the area of on-site woodland conservation originally approved; and</text>
            </level>
            <level label="cc">
              <text>Does not change the location or type of woodland conservation by the greater of 10,000 square feet or 10% of the area of woodland conservation originally approved; and</text>
            </level>
            <level label="dd">
              <text>Does not adversely affect specimen, champion or historic trees specifically identified for preservation.</text>
            </level>
          </level>
        </level>
        <level label="B">
          <text>For TCP major revisions:</text>
          <level label="i">
            <text>If a criterion in (A) above cannot be met, the TCP shall be duly advertised and the approval authority becomes the Planning Board and shall comply with the current regulations of this Division.</text>
          </level>
        </level>
        <level label="C">
          <text>If no TCP1 exists and one is not required, each TCP2 shall comply with the current regulations of this Division.</text>
        </level>
      </level>
      <level label="5">
        <text>Written notice shall be mailed for TCP applications in accordance with the following:</text>
        <level label="A">
          <text>For TCP applications that are companion to a DRD application that requires notification, a notification shall state that a TCP will be reviewed concurrently with the DRD application. The applicable mailing, signage, and opportunity to provide written or verbal comment shall follow the processes and procedures required by the associated DRD application. If the DRD does not require notification, the notification process will be in accordance with Subsection 25-119(c)(5)(B).</text>
        </level>
        <level label="B">
          <text>For those stand-alone TCP applications that are not associated with a DRD application and are proposing clearing, written notice shall be mailed to the parties listed in Subsection 27-3407(b)(1) of the Zoning Ordinance for Detailed Site Plans at least 20 days before the TCP is approved and the parties notified shall be advised of the process for providing written comments. If the application proposes clearing of 50% or more of woodland and the net tract area is four (4) acres or more, the parties notified shall be advised of the process for providing written and verbal comments.</text>
        </level>
      </level>
      <level label="6">
        <text>Plan validity requirements are as follows:</text>
        <level label="A">
          <text>TCP1s expire if the associated plan expires.</text>
        </level>
        <level label="B">
          <text>An application for a TCP2 approved on or after July 1, 2024, shall be valid for 5 years from the date of approval unless a grading permit has been issued.</text>
        </level>
        <level label="C">
          <text>Once a grading permit has been issued, TCP2s do not expire, and the requirements run with the land in perpetuity until an approved revision to the TCP2 is acquired.</text>
        </level>
        <level label="D">
          <text>Plans that are grandfathered are subject to the expiration provisions stated in Subsections 25-119(g) and (h).</text>
        </level>
      </level>
      <level label="7">
        <text>TCPs shall be prepared in conformance with the Technical Manual.</text>
      </level>
      <level label="8">
        <text>TCPs must include the legal boundaries of all lots or parcels in their entirety unless they are government or linear in nature. For linear projects, refer to Section 25-119(f) for the requirements. For government projects, refer to Section 25-119(e) for the requirements. TCPs shall include the same property as the associated application, unless a previous TCP approval covered a larger area or a larger area is warranted by supporting development on an adjacent lot, parcel or combination of lots or parcels.</text>
      </level>
      <level label="9">
        <text>TCP2s shall not be approved separately for sites that are either currently under review for a DRD application or that require the submittal of a DRD application prior to development.</text>
      </level>
    </level>
    <level label="d">
      <text>Variances</text>
      <level label="1">
        <text>An applicant may request a variance from this Division as part of the review of a TCP where owing to special features of the site or other circumstances, implementation of this Division would result in unwarranted hardship to an applicant.</text>
      </level>
      <level label="2">
        <text>An applicant shall request a variance from Section 25-122(b)(1)(G) and (H) as part of the review of the TCP when:</text>
        <level label="A">
          <text>Specimen trees, champion trees and trees that are part of a historic site or are associated with a historic structure are impacted or removed; or</text>
        </level>
        <level label="B">
          <text>Trees, plants, and vegetation identified on the national or state list of rare, threatened, and endangered lists are impacted or removed.</text>
        </level>
      </level>
      <level label="3">
        <text>To approve a variance, the approving authority shall find that:</text>
        <level label="A">
          <text>Special conditions peculiar to the property have caused the unwarranted hardship;</text>
        </level>
        <level label="B">
          <text>Enforcement of these rules will deprive the applicant of rights commonly enjoyed by others in similar areas;</text>
        </level>
        <level label="C">
          <text>Granting the variance will not confer on the applicant a special privilege that would be denied to other applicants;</text>
        </level>
        <level label="D">
          <text>The request is not based on conditions or circumstances which are the result of actions by the applicant;</text>
        </level>
        <level label="E">
          <text>The request does not arise from a condition relating to land or building use, either permitted or nonconforming, on a neighboring property; and</text>
        </level>
        <level label="F">
          <text>Granting of the variance will not adversely affect water quality.</text>
        </level>
      </level>
      <level label="4">
        <text>Notice of a request for a variance shall be given to the State of Maryland Department of Natural Resources within 15 days of receipt of a request for a variance.</text>
      </level>
      <level label="5">
        <text>Variances shall be approved by the Planning Board, Zoning Hearing Examiner, and/or the District Council for all TCPs that are associated with DRD applications heard by them. The Planning Director may approve variances for TCPs that are not associated with DRD applications heard by the Planning Board, Zoning Hearing Examiner and/or the District Council. The Planning Director's decisions are appealable to the Planning Board.</text>
      </level>
      <level label="6">
        <text>Variances under this Subtitle are not considered zoning variances.</text>
      </level>
      <level label="7">
        <text>Replacement for the removal of specimen or historic trees</text>
        <level label="A">
          <text>If the applicant is granted a variance to remove trees identified as a priority for retention in 25-119 (d)(5), the removal of a specimen tree or historic trees shall be subject to replacement requirements identified in the Technical Manual.</text>
        </level>
        <level label="B">
          <text>The replacement requirements of a Specimen or Historic Tree shall be separate and apart from any other planting requirements. If the applicant has demonstrated that it cannot meet the replacement requirement pursuant to Section 25-119(d)(7)(A) and the Technical Manual, the applicant shall pay a fee-in-lieu into the Specimen and Historic Tree Fund based upon the tree replacement requirement determined by the diameter of the Specimen or Historic Tree(s) subject to removal.</text>
        </level>
      </level>
    </level>
    <level label="e">
      <text>Government Projects</text>
      <level label="1">
        <text>The following types of governments projects shall be reviewed and enforced by the Maryland Department of Natural Resources: federal and state government projects, projects on federal and state-owned land, linear projects which cross multiple counties, and public utility projects including but not limited to utility projects conducted by and approved by the Washington Suburban Sanitary Commission. The County will review these types of projects only if specific written direction is provided by the State of Maryland Department of Natural Resources.</text>
      </level>
      <level label="2">
        <text>The following types of government development activities shall be reviewed and enforced at the County level with notification being provided by the applicant to the Maryland Department of Natural Resources Forest Service: public school projects; Maryland-National Capital Park and Planning Commission projects; County Department of Public Works and Transportation projects; County Department of Environment projects; state funded parks and recreation projects; County stormwater management projects; and any other County or municipal projects. The Maryland Department of Natural Resources will review these types of projects if requested by the County or if the project has state-wide impacts on significant forest resources and the state agrees to take jurisdiction over the review.</text>
        <level label="A">
          <text>Applications for the project types listed in (2) above shall include an FSD or an approved NRI.</text>
        </level>
        <level label="B">
          <text>The applications shall be in conformance with this Division.</text>
        </level>
        <level label="C">
          <text>The TCP shall provide calculations as described in the Technical Manual.</text>
        </level>
      </level>
      <level label="3">
        <text>Government projects that use fee-in-lieu may utilize the fee-in-lieu rates in effect at the state level at the time of plan approval.</text>
      </level>
      <level label="4">
        <text>Maintenance or retrofitting of a stormwater management structure that may include clearing of vegetation or removal and trimming of trees, so long as the maintenance or retrofitting is within the approved TCP limits of disturbance for construction of the existing structure, or within any maintenance easement for access to the structure shall be exempt.</text>
      </level>
    </level>
    <level label="f">
      <text>Linear Projects</text>
      <level label="1">
        <text>Linear projects that are not otherwise exempt from this Division shall submit a TCP2 depicting the area of work and all other information required on a TCP2.</text>
        <level label="A">
          <text>Linear projects are not required to show the full boundaries of all of the affected parcels or lots.</text>
        </level>
        <level label="B">
          <text>Linear projects shall submit a Simplified Forest Stand Delineation for that area of the subject properties where the project work will be performed.</text>
        </level>
        <level label="C">
          <text>Linear projects that disturb less than 20,000 square feet of woodland are exempt and may obtain a Numbered Exemption Letter if none of the associated properties are subject to a previously approved TCP. If not exempt, then the linear project shall meet the requirements of this Section.</text>
        </level>
        <level label="D">
          <text>Woodland conservation replacement requirement shall be provided at a ratio of one acre of woodland conservation for each acre of woodland disturbed. The requirement shall be met using the same priorities as listed in Section 25-121 of this Division.</text>
        </level>
        <level label="E">
          <text>If previously approved TCPs are affected by linear projects, the TCPs shall be revised accordingly prior to approval of the permit for the associated construction.</text>
        </level>
      </level>
    </level>
    <level label="g">
      <text>Grandfathering of Applications and Plans</text>
      <level label="1">
        <text>In this subsection and (h), the following term has the meaning indicated. Implementation or implemented shall be defined as: the issuance of a grading permit for at least twenty-five percent (25%) of the land area within the associated TCP, completion of a pre-construction meeting with the applicable permitting agency, and installation of tree protective devices verified by a qualified professional.</text>
      </level>
      <level label="2">
        <text>TCP applications that are accepted for review on or before June 30, 2024 shall be grandfathered and shall be subject to the regulations in place at the time of acceptance. Plans that are grandfathered are subject to the expiration provisions of this Division.</text>
      </level>
      <level label="3">
        <text>A project with an approved TCP that was approved on or before June 30, 2024 and has been implemented on the property or a portion thereof as confirmed by the county permitting authority shall be grandfathered and subject to the regulation in place at the time of its acceptance.</text>
      </level>
      <level label="4">
        <text>Grandfathered TCPs shall comply with the current regulations of this Division when being revised as a major revision in accordance with Subsection 25-119(c)(4)(B). When being revised as a minor revision in accordance with Subsection 25-119(c)(4)(A), grandfathered TCPs may comply with the regulations in place at the time of acceptance of the previously approved TCP.</text>
      </level>
      <level label="5">
        <text>Applications for woodland conservation banks that were submitted before December 31, 2020 that provide for conservation of all or part of an existing forest shall be grandfathered.</text>
      </level>
      <level label="6">
        <text>Standard and Numbered Letters of Exemption which were valid as of June 30, 2024, shall remain valid until June 30, 2026, on which date the exemption shall expire. Projects with expired Standard and Numbered Letters of Exemption shall comply with the current regulations of this Division.</text>
      </level>
      <level label="7">
        <text>The grandfathered projects may be subject to an impact fee to ensure that funds are available to provide for retention and reforestation. A study/assessment to be performed by the Department of Environment, that will be completed by March 1, 2025 and presented to Council for legislative approval shall determine whether an impact fee may be imposed, criteria for applying to projects, process and waiver provisions. Any impact fees resulting from the study will be used to plant or retain trees in the County.</text>
      </level>
    </level>
    <level label="h">
      <text>Expiration of Grandfathered Plans</text>
      <level label="1">
        <text>A TCP that was approved prior to September 1, 2010, and has not been implemented on all or a portion of the site as confirmed by the county permitting authority expires on July 1, 2024. Any new TCP shall be reviewed and approved subject to the provisions of this Division effective July 1, 2024.</text>
      </level>
      <level label="2">
        <text>A TCP that was approved on or after September 1, 2010, and before July 1, 2024, shall be grandfathered and shall be subject to the regulations in place at the time of approval. These plans will expire on July 1, 2029 if not implemented on the property or a portion thereof as confirmed by the county permitting authority. A new TCP shall be reviewed and approved subject to the provisions of this Division.</text>
      </level>
    </level>
  </section>
  <section number="25-120" name="Administration" law="code" slug="sec-25-120" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_25TRVE_DIV2WOWIHACOOR_S25-120AD">
    <level label="a">
      <text>Administration, Review, Reports and Fees</text>
      <level label="1">
        <text>This Division shall be administered by the Maryland-National Capital Park and Planning Commission's Planning Department and the County. Plan review and enforcement functions shall be coordinated between all applicable agencies and all required documentation shall be compiled to ensure that the provisions of the Forest Conservation Act and this Division are being administered properly.</text>
        <level label="A">
          <text>The plan review function shall be administered by the Maryland-National Capital Park and Planning Commission's Planning Department with input from the County.</text>
        </level>
        <level label="B">
          <text>Enforcement shall be conducted by the County with technical assistance provided by the Maryland-National Capital Park and Planning Commission's Planning Department.</text>
        </level>
      </level>
      <level label="2">
        <text>At the end of each fiscal year, the County shall prepare an Annual Report to be submitted to the State of Maryland Department of Natural Resources. All documentation required by the Code of Maryland Regulations (COMAR) shall be prepared and submitted in a timely manner.</text>
      </level>
      <level label="3">
        <text>Every two years, the State of Maryland Department of Natural Resources shall be provided an opportunity to review this Division and address its effectiveness in satisfying the requirements of The Maryland Forest Conservation Act. All documentation requested by the State of Maryland Department of Natural Resources shall be prepared and provided.</text>
      </level>
      <level label="4">
        <text>Fees for plan review shall be paid at time of plan submission per the fee schedule approved by the Planning Board. A fee reduction may be approved by the Planning Board if the Board finds that the payment of the fee will be an undue hardship on the applicant.</text>
      </level>
    </level>
    <level label="b">
      <text>Appeal of Decisions</text>
      <level label="1">
        <text>A final decision of the Planning Director may be appealed to the Planning Board within 30 days of the decision by the applicant, the owner of the property subject to the application, or an adjacent and abutting property owner aggrieved by the decision of the Planning Director.</text>
      </level>
      <level label="2">
        <text>A final decision of the Planning Board is subject to judicial review in the Circuit Court of Prince George's County by petition of the applicant, the owner of the property subject to the application, or an adjacent and abutting property owner aggrieved by the decision of the Planning Board in accordance with the Planning Board's procedures.</text>
      </level>
    </level>
    <level label="c">
      <text>Inspection and Enforcement</text>
      <level label="1">
        <text>Inspections before, during and after construction.</text>
        <level label="A">
          <text>County inspectors may enter properties subject to this Division for the purpose of inspection and enforcement. The Planning Director may enter properties to confirm information provided on an FSD, NRI or TCP submitted for review.</text>
        </level>
        <level label="B">
          <text>Prior to the issuance of the first grading permit for a site subject to this Division, a pre-construction meeting shall be held by the County inspector with all necessary site personnel of the permitee to discuss the provisions of the TCP. At a minimum, the limits of disturbance shown on the TCP2 shall be verified in the field by the County inspector and all appropriate conservation notes on the plans shall be discussed with the permitee. After all required temporary tree protection devices are in place, clearing and grading as depicted on the approved TCP2 may proceed.</text>
        </level>
        <level label="C">
          <text>If, during the development of the site, it is determined that additional woodland clearing is necessary, an area of up to 5,000 square feet may be approved by the County inspector in the field unless the clearing impacts streams or their associated buffers; wetlands or their associated buffers; or the one-hundred (100) year floodplain. Additional clearing of areas 5,000 square feet and greater; clearing impacts to streams and their associated buffers, wetlands and their associated buffers; or the one-hundred (100) year floodplain shall require the review and approval of a revision to the TCP2 prior to the additional clearing taking place. Failure to submit a revised TCP2 prior to clearing more than 5,000 square feet of woodland not previously approved constitutes a violation of this Division.</text>
        </level>
        <level label="D">
          <text>Periodic inspections throughout the site development process shall be conducted by a County inspector and the permitee to ensure that the work is proceeding in conformance with the approved TCP2.</text>
        </level>
        <level label="E">
          <text>Woodlands preserved to meet the requirements shall be protected from construction activities utilizing temporary protection devices following the details shown on the TCP2 and per the standards of the Technical Manual. Afforestation and reforestation areas shall be protected from soil compaction with temporary protection devices prior to planting to prevent soil compaction and permanent devices once planting has taken place.</text>
        </level>
        <level label="F">
          <text>Specimen, champion and historic trees shall be protected in conformance with the specific details provided on the TCP2. All conservation notes and practices shall be implemented in the field by the permitee.</text>
        </level>
        <level label="G">
          <text>Prior to the issuance of a use and occupancy permit, an inspection shall be conducted by the County inspector to ensure that all temporary and permanent tree protection devices are in place. If the tree protection devices are not in place the use and occupancy permit shall not be issued. Temporary tree protection devices shall remain in place until the bond has been released for the subject property. Permanent tree protection devices shall remain in place until satisfactory afforestation and reforestation survival is met.</text>
        </level>
        <level label="H">
          <text>Prior to the issuance of the use and occupancy permit for a subject lot or parcel, an inspection shall be performed by the County inspector to ensure that the provisions of the TCP2 for the subject lot have been completed. If woodland conservation areas are shown on the subject lot, the County inspector shall verify that the woodland conservation area is in conformance with the approved TCP2. If the woodland conservation area is less than that required to be conserved, either the additional area shall be conserved or a revised TCP2 shall be approved prior to issuance of the use and occupancy permit.</text>
        </level>
        <level label="I">
          <text>Prior to release of any bond or security related to woodland conservation, an inspection shall be conducted by the County inspector to ensure that all the requirements of the TCP2 have been met. If afforestation or reforestation areas are part of the TCP, the release of the bond or security shall not occur until the four-year management plan has been fulfilled and the County inspector has verified the work is complete.</text>
        </level>
      </level>
      <level label="2">
        <text>Enforcement</text>
        <level label="A">
          <text>A copy of the approved TCP2 shall be available on-site or through the applicant's representative from the time of the pre-construction meeting until the final bond for woodland conservation is released.</text>
        </level>
        <level label="B">
          <text>The County may issue a stop work order against any person who violates any provision of this Division or any regulation, order, approved plan, or management agreement.</text>
        </level>
        <level label="C">
          <text>The following actions constitute a violation of this Division:</text>
          <level label="i">
            <text>Failure to comply with an approved TCP2.</text>
          </level>
          <level label="ii">
            <text>The destruction of woodlands in an area greater than 5,000 square feet without a permit or contrary to an approved TCP2.</text>
          </level>
          <level label="iii">
            <text>Removal of stumps, leaf litter and/or removal of other native woody understory trees, shrubs, vines and groundcover in woodlands areas to create a visual open understory with canopy, except as provided for in (3) below.</text>
          </level>
          <level label="iv">
            <text>Seeding woodlands with grass seed.</text>
          </level>
          <level label="v">
            <text>Covering of woodland grounds with hay or other materials, that prevent woodland re-growth from occurring.</text>
          </level>
          <level label="vi">
            <text>Any activity that adversely affects the health, structure or integrity of a woodland including, but not limited to, sheds, garages, large fountains, retaining walls, permanent or temporary structures, active recreational activities requiring the placement of playground equipment, paving for basketball or tennis courts, swimming pools, and similar impacts that eliminate or compromise perpetual woodlands.</text>
          </level>
          <level label="vii">
            <text>Failure of a property owner to maintain approved preservation, afforestation or reforestation areas in accordance with the approved TCP2. This includes conservation areas established in woodland conservation banks.</text>
          </level>
        </level>
      </level>
      <level label="3">
        <text>The following activities do not constitute a violation and must be conducted by hand without the use of wheeled mechanical equipment:</text>
        <level label="A">
          <text>Removal of a documented dead, dying or hazardous tree. In order to be deemed dead, dying or hazardous, the tree must be evaluated by a qualified professional or licensed tree expert. To be considered a hazardous tree, the professional must provide documentation that the tree is in a position where it threatens property damage or could cause injury. Refer to the Technical Manual for required documentation of dead, dying or hazardous trees.</text>
        </level>
        <level label="B">
          <text>Removal of documented exotic, invasive or noxious plant species. Refer to the Technical Manual for required documentation and for lists of plant species that are exotic, invasive or noxious.</text>
        </level>
        <level label="C">
          <text>Passive activities such as herb gardens, sitting areas, and wildflower gardens only if existing woodland vegetation, such as native woody understory trees, shrubs, vines and groundcover, is not removed for installation.</text>
        </level>
        <level label="D">
          <text>Removal of severed trunks, dead branches and dead debris created as a result of storm damage.</text>
        </level>
        <level label="E">
          <text>Removal of trash and other human-made debris.</text>
        </level>
        <level label="F">
          <text>Work completed in conformance with a Forest Management Plan is not a violation and may be conducted with the use of wheeled mechanical equipment.</text>
        </level>
        <level label="G">
          <text>For project subject to bonding, the County inspector may make a decision with regard to the removal of hazardous trees on the edges of cleared areas and trees damaged as a result construction activities or storm events.</text>
        </level>
      </level>
      <level label="4">
        <text>A violation of this Division is subject to a fine of up to $9.00 per square foot of woodland area destroyed. The County shall determine the fine amount.</text>
        <level label="A">
          <text>The fine may be imposed in addition to the required mitigation.</text>
        </level>
        <level label="B">
          <text>The violation fine applies whether the entire woodland is removed or whether only the understory vegetation is removed with the canopy trees remaining.</text>
        </level>
        <level label="C">
          <text>The fine may be waived by the County if all appropriate mitigation and/or restoration is provided by the property owner or permitee.</text>
        </level>
        <level label="D">
          <text>If the County conducts the required restoration because the property owner or permitee fails to do so in a timely manner, the fine shall not be waived or reduced.</text>
        </level>
        <level label="E">
          <text>If the County conducts the required restoration because the property owner or permitee fails to do so, a lien may be placed on the subject property to recover the costs of the mitigation.</text>
        </level>
        <level label="F">
          <text>Fines collected for violations shall be placed in the Woodland Conservation Fund.</text>
        </level>
        <level label="G">
          <text>Each day a violation continues may be considered a separate violation after the period to correct the violation has expired.</text>
        </level>
      </level>
      <level label="5">
        <text>The County may seek an injunction requiring the person to cease a violation of this Division and may take corrective action to restore or reforest an area. If the County restores the area of the violation the property owner or permitee shall pay all costs associated with the restoration work that may include but not be limited to re-grading, afforestation, and reforestation.</text>
      </level>
      <level label="6">
        <text>A violation of this Division requires the preparation of a TCP for mitigation purposes that proposes how the required mitigation will be provided. Priority shall be given to restoration of the area destroyed.</text>
        <level label="A">
          <text>The required TCP for mitigation shall be submitted by the property owner or permittee within 30 days of receipt of a violation notice or within the timeframe provided in a decision by the County.</text>
        </level>
        <level label="B">
          <text>The implementation of all mitigation measures shall be the responsibility of the property owner.</text>
        </level>
        <level label="C">
          <text>Mitigation shall be accomplished on an acre for acre basis.</text>
        </level>
        <level label="D">
          <text>When specimen, champion, or historic trees designated for preservation have been damaged or destroyed, the mitigation to be provided shall be equal in value to the restoration or replacement cost as calculated using the latest edition of the "Guide for Plant Appraisal" published by the Council of Tree and Landscape Appraisers. Priority shall be given to restoring the tree(s) if possible, then replanting the area with trees that total the cost of the tree(s) lost if sufficient space is available for replanting. If replanting the area is not feasible, the next option is replanting in an approved location with the final option being payment of a fee-in-lieu equivalent to the amount calculated for restoration or replacement. The restoration or replacement value shall be calculated by a professional with experience using the "Guide for Plant Appraisal." A revision to the approved TCP shall be obtained to reflect the proposed mitigation measures, or, if the site does not have an approved TCP, a TCP2 shall be submitted for approval by the Planning Director. Other methods for calculating mitigation for damaged or destroyed trees may be considered and approved by the Planning Director.</text>
        </level>
        <level label="E">
          <text>The property owner or permittee shall provide a completion bond acceptable to the County to cover the required mitigation measures.</text>
        </level>
      </level>
      <level label="7">
        <text>Any violation notice issued pursuant to this Division may be appealed in writing to the County within fifteen (15) days of the issuance of the violation notice, unless the County has filed an injunction pursuant to Section 25-120(c)(5) of this Subtitle. For purposes of this subsection, "issuance of the violation notice" means the earlier of the date of posting, the date of personal service, or if mailed, the date that the notice was postmarked.</text>
      </level>
    </level>
    <level label="d">
      <text>Woodland Conservation Fund</text>
      <level label="1">
        <text>A Woodland Conservation Fund shall be established and shall receive the following funds:</text>
        <level label="A">
          <text>Fee-in-lieu payments associated with approved TCPs</text>
        </level>
        <level label="B">
          <text>Fines as a result of violations</text>
        </level>
        <level label="C">
          <text>Fee-in-lieu payments to mitigate violations</text>
        </level>
      </level>
      <level label="2">
        <text>Money deposited in the Woodland Conservation Fund may be used for afforestation/reforestation projects; street tree planting projects; maintenance of existing forests; activities related to achieving tree canopy goals; land acquisition for planting or conservation purposes; and/or administrative purposes associated with these projects or acquisitions.</text>
      </level>
      <level label="3">
        <text>The Woodland Conservation Fund shall be a fund separate from all other funds and specific amounts to be expended for specific projects or areas shall be tracked by the County and reported on an annual basis.</text>
      </level>
    </level>
    <level label="e">
      <text>Specimen and Historic Tree Fund. Specimen and Historic Tree Fund is a county fund that where fee-in-lieu funds associated with the removal of Specimen or Historic Trees are held</text>
      <level label="1">
        <text>A Specimen and Historic Tree Fund shall be established and shall receive the following funds:</text>
        <level label="A">
          <text>Fee-in-lieu payment associated with the mitigation for removal of a specimen or historic tree;</text>
        </level>
        <level label="B">
          <text>Money deposited in the Specimen and Historic Tree Fund may only be spent on reforestation and afforestation, including the costs directly related to site identification, acquisition, prepurchase, and preparation, maintenance of existing forest, and achieving urban canopy goals, and may not revert to any other general fund.</text>
        </level>
        <level label="C">
          <text>The fee amount shall be $500 per 2 inches of tree caliper required for replacement. This fee shall be adjusted for inflation in accordance with the Consumer Price Index for all urban consumers published by the United States Department of Labor, for the fiscal year preceding the year for which the amount is being calculated.</text>
        </level>
      </level>
    </level>
    <level label="f">
      <text>Maintenance</text>
      <level label="1">
        <text>Maintenance of areas designated on a TCP for woodland conservation shall be the responsibility of the property owner.</text>
      </level>
    </level>
  </section>
  <section number="25-121" name="Woodland and Wildlife Habitat Conservation Requirements" law="code" slug="sec-25-121" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_25TRVE_DIV2WOWIHACOOR_S25-121WOWIHACORE">
    <level label="a">
      <text>General.</text>
      <level label="1">
        <text>A TCP is required for all DRD applications and grading permits that are subject to this Division unless exempted per Section 25-119. The TCP shall be at the same scale as the plans in the associated application and shall contain all information required to clearly demonstrate that the provisions of this Division are being met. The Technical Manual provides guidance on the information required on all TCPs. Additional information or data deemed necessary for review of the proposed woodland conservation areas may also be required. All calculations shall be made to the nearest one-hundredth of an acre.</text>
      </level>
      <level label="2">
        <text>Plans shall be prepared for the entire legal boundaries of all subject lots and/or parcels unless the project is a linear project. For linear projects, refer to Section 25-119 for the requirements.</text>
      </level>
      <level label="3">
        <text>Conditions of approval of TCPs may be included in Planning Board, Zoning Hearing Examiner, District Council Resolutions, or Planning Director approvals to ensure compliance with this Division and any provisions of a specific TCP.</text>
      </level>
      <level label="4">
        <text>The first TCP approved for a subject property shall set the requirements for that property. All subsequent TCPs shall address the requirements of the initial approval and any additional requirements of the new associated plan or application unless the previous approvals expire.</text>
      </level>
      <level label="5">
        <text>Each TCP shall conform to the Countywide Green Infrastructure Plan and subsequent area master plan or sector plan revisions, including maps and text, unless the Planning Board finds that events have occurred to render the relevant plan recommendations no longer appropriate or, in the case of area master plans or sector plans, the District Council has not imposed the recommended zoning.</text>
      </level>
      <level label="6">
        <text>To be counted as woodland to meet the requirements, wooded areas must meet the definition of "woodlands" in Section 25-118 of this Division.</text>
      </level>
      <level label="7">
        <text>The design criteria contained in Section 25-122 of this Division shall be addressed on all TCPs.</text>
      </level>
      <level label="8">
        <text>Wildlife habitat shall be considered for preservation and maintained and restored wherever possible. Emphasis shall be placed on connectivity of natural or reforested areas.</text>
      </level>
      <level label="9">
        <text>Native plants shall be used for all required plantings.</text>
      </level>
      <level label="10">
        <text>Invasive non-native vegetation shall be evaluated for management and for potential credit per Section 25-122(d)(5) toward meeting the requirements of this Division when identified in the review of an FSD or NRI.</text>
      </level>
    </level>
    <level label="b">
      <text>Woodland and Wildlife Habitat Conservation Priority Areas</text>
      <level label="1">
        <text>Locational priorities for consideration as woodland conservation are as follows:</text>
        <level label="A">
          <text>Regulated streams and their buffers</text>
        </level>
        <level label="B">
          <text>Green infrastructure network elements designated in the Countywide Green Infrastructure Plan and any subsequent updates, or within the designated green infrastructure networks in master or sector plans.</text>
        </level>
        <level label="C">
          <text>Critical habitat areas.</text>
        </level>
        <level label="D">
          <text>Contiguous wooded areas with: high structural and species diversity; few nonnative and invasive species present; very good overall stand health; and high potential to provide a significant amount of habitat for forest interior dwelling plant, animal, and bird species.</text>
        </level>
        <level label="E">
          <text>Champion trees designated by the United States, the State of Maryland, the County or municipalities.</text>
        </level>
        <level label="F">
          <text>Specimen trees.</text>
        </level>
        <level label="G">
          <text>Forest Legacy Areas as defined by the state.</text>
        </level>
        <level label="H">
          <text>Historic trees and trees that are within the environmental setting of a historic site or associated with a historic resource.</text>
        </level>
        <level label="I">
          <text>Areas adjacent to Primary Management Areas that are not within the green infrastructure network</text>
        </level>
        <level label="J">
          <text>100-year floodplains</text>
        </level>
        <level label="K">
          <text>Wetlands and their buffers</text>
        </level>
        <level label="L">
          <text>Steep and severe slopes</text>
        </level>
        <level label="M">
          <text>Hydric soils associated with wetlands and highly erodible soils on slopes 15 percent and greater</text>
        </level>
        <level label="N">
          <text>Forest Interior Dwelling Species (FIDS) habitat</text>
        </level>
        <level label="O">
          <text>Tier II and Tier III Watersheds as identified by the State of Maryland Department of the Environment</text>
        </level>
        <level label="P">
          <text>Forest in urban areas as delineated by the State of Maryland Department of Natural Resources and the Maryland State Forest Conservation Technical Manual</text>
        </level>
      </level>
    </level>
    <level label="c">
      <text>Woodland Conservation Requirements</text>
      <level label="1">
        <text>Properties that are subject to this Division shall comply with the woodland conservation and afforestation threshold requirements established in Table 1. The threshold establishes the minimum acreage requirement of woodland conservation for a site (other calculations must be performed to determine the total amount of woodland conservation required) and is calculated as a percentage of the net tract area of the site.</text>
        <level label="A">
          <text>The threshold acreage is calculated by taking the gross tract area and subtracting the 100-year floodplain, and any previously dedicated land to determine the net tract area, and then multiplying the net tract area by the threshold percentage. Refer to the Technical Manual for more information and the worksheets required to perform these calculations. If a property contains more than one Zone, the threshold is calculated based on the proportion of the total acreage in each Zone and is applied to the entire site.</text>
        </level>
        <level label="B">
          <text>Except as provided in (C) of this section, the replacement requirement is determined as:</text>
          <level label="i">
            <text>The area of forest removed shall be replaced as described in Table 2 based on its zoning</text>
          </level>
          <level label="ii">
            <text>All existing forest cover located in a transit-oriented center, measured to the nearest 1/100 acre cleared on the net tract area, the area of forest removed shall be replaced at a ratio of ¼ acre (0.25 acre) planted for every one acre removed or conservation of forest at a ratio of ½ acre (0.50 acre) conserved for every one acre removed.</text>
          </level>
        </level>
        <level label="C">
          <text>After meeting the requirements in this section, all remaining unforested riparian buffers on-site shall be afforested and reforested unless the applicant demonstrates that planting in the riparian buffer:</text>
          <level label="i">
            <text>Would be in conflict with allowable uses as established for the riparian buffer in Subtitle 32 and the Technical Manual;</text>
          </level>
          <level label="ii">
            <text>Is located on public park property and conflicts with the mission and established stewardship practices of the park; or</text>
          </level>
          <level label="iii">
            <text>Is not suitable for the establishment and retention of the required planting material, in which case substitute environmental protection measures as defined by the State of Maryland Department of Natural Resources and the Maryland State Forest Conservation Technical Manual may be implemented.</text>
          </level>
        </level>
      </level>
      <level label="2">
        <text>A property that is subject to this Division shall comply with the woodland conservation and afforestation threshold calculated as follows in Table 1 based on its zoning.</text>
      </level>
      <level label="3">
        <text>The woodland conservation and afforestation threshold requirements shall be met on-site or the applicant shall submit a statement of justification and plan demonstrating that the threshold has been met onsite to the maximum extent practicable.</text>
        <table>
          <row>
            <cell>Table 1. Woodland Conservation and Afforestation Thresholds Requirements</cell>
          </row>
          <row>
            <cell>Zone Including and after April 1, 2022</cell>
            <cell>Woodland Conservation Requirements</cell>
          </row>
          <row>
            <cell />
            <cell>Woodland Conservation Threshold*</cell>
            <cell>Afforestation Threshold*</cell>
          </row>
          <row>
            <cell>ROS, AG, AR</cell>
            <cell>50%</cell>
            <cell>20%</cell>
          </row>
          <row>
            <cell>RE</cell>
            <cell>25%</cell>
            <cell>20%</cell>
          </row>
          <row>
            <cell>RR, RSF-95, RSF-65, RSF-A, RMF-12, RMF-20, RMF-48, RMH, R-PD</cell>
            <cell>20%</cell>
            <cell>15%</cell>
          </row>
          <row>
            <cell>CGO, CS, IH, IE, IE-PD, CN, NAC, TAC, LTO, RTO-L, RTO-H, NAC-PD, TAC-PD, LTO-PD, RTO-PD, MU-PD</cell>
            <cell>15%</cell>
            <cell>15%</cell>
          </row>
          <row>
            <cell>Transit-Oriented Center Base Zones: LTO, RTO-L, RTO-H, NAC Transit-Oriented Centers Planned Development Zones: NAC-PD, LTO-PD, RTO-PD</cell>
            <cell>15%</cell>
            <cell>15%</cell>
          </row>
          <row>
            <cell>LCD, LMXC, LMUTC</cell>
            <cell>Thresholds shall remain the same as conditioned with a Basic Plan or as shown on a TCP approved with a Conceptual Design Plan, Specific Design Plan, Conceptual Site Plan, Detailed Site Plan, Special Permit, or Preliminary Plan of Subdivision, which was approved under the prior Subtitle 24 and 27 and was in conformance with Subtitle 27 of the County Code at the time of approval. If no previously approved TCP exists, the thresholds shall be based on CB-27-2010 or the thresholds required by the Zoning Map Amendment which established the legacy zone.</cell>
          </row>
        </table>
      </level>
    </level>
    <text>*Percentage of net tract area</text>
    <level label="4">
      <text>The woodland conservation and afforestation thresholds for any Zone included in Subtitle 27 of the Prince George's County Code which is not specifically listed herein shall be based on the most similar Zone to the existing Zone. Thresholds for properties in Overlay Zones are determined by the underlying Zone, except as otherwise provided in this Division.</text>
    </level>
    <level label="d">
      <text>Conservation Requirement Calculations</text>
      <level label="1">
        <text>The amount of woodland conservation required is calculated using one of the worksheets provided in the Technical Manual. The completed worksheet shall be included on the cover sheet or first sheet of each TCP.</text>
      </level>
      <level label="2">
        <text>The amount of woodland conservation required is calculated using the conservation threshold acreage, with additional conservation acreage required as summarized in Table 2:</text>
        <level label="A">
          <text>The woodland replacement requirements as noted in Table 2 may be waived by the Prince George's County Planning Director when all of the following conditions apply:</text>
          <level label="i">
            <text>the application involves the construction of one single-family residential dwelling for the owner or a child of the owner;</text>
          </level>
          <level label="ii">
            <text>the total area of woodland disturbed does not exceed 20,000 square feet; and</text>
          </level>
          <level label="iii">
            <text>no woodland is disturbed below the Woodland Conservation Threshold.</text>
            <table>
              <row>
                <cell>Table 2. Woodland Conservation Replacement Requirements</cell>
              </row>
              <row>
                <cell>Location of Woodland Clearing</cell>
                <cell>Woodland Replacement Requirement (acres)</cell>
              </row>
              <row>
                <cell>Clearing inside transit-oriented centers</cell>
                <cell>0.25:1 (one quarter acre woodland replacement required for each acre cleared)</cell>
              </row>
              <row>
                <cell>Clearing outside transit-oriented centers</cell>
                <cell>1:1 (one acre woodland replacement required for each acre cleared)</cell>
              </row>
              <row>
                <cell>Clearing for Government or linear project</cell>
                <cell>1:1 (one acre woodland replacement required for each acre cleared)</cell>
              </row>
            </table>
          </level>
        </level>
      </level>
    </level>
  </section>
  <section number="25-122" name="Methods for Meeting the Woodland and Wildlife Conservation Requirements" law="code" slug="sec-25-122" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_25TRVE_DIV2WOWIHACOOR_S25-122MEMEWOWICORE">
    <level label="a">
      <text>General</text>
      <level label="1">
        <text>Woodland conservation shall be designed as stated in this Division unless a variance is approved by the approving authority for the associated case.</text>
      </level>
      <level label="2">
        <text>All required conservation measures shall be completed in the time period specified but no later than prior to approval of the associated building permit for the subject lot or parcel or an adjacent lot or parcel. If this is not feasible due to phasing, grading, staging or other on-site constraints, the conservation measures shall be completed prior to the issuance of any temporary or permanent use and occupancy certificate(s) for the subject phase. All timetables shall be set forth on the approved TCP.</text>
      </level>
      <level label="3">
        <text>If off-site woodland conservation is approved to meet the requirements, then the following locations shall be considered in the order listed: within the same eight-digit sub-watershed, within the same watershed, within the same river basin within Prince George's County. Applicants shall demonstrate to the Planning Director due diligence in seeking out opportunities for off-site woodland conservation locations following these priorities. All woodland conservation is required to be met within Prince George's County.</text>
      </level>
      <level label="4">
        <text>If the unforested riparian buffer planting is approved to meet the replacement requirements, the woodland conservation credit shall be at a ratio of 1:1 (one acre of conservation must be provided for each acre of requirements).</text>
      </level>
      <level label="5">
        <text>Unforested riparian buffer planting beyond that required for woodland conservation in Section 25-121 shall be placed under a woodland conservation easement and the woodland conservation credit shall be at a ratio of 1:1 (one acre of conservation for each acre of planting). Such credits in excess of the woodland conservation requirements may be utilized to meet the requirements of another TCP either on-site or off-site.</text>
      </level>
    </level>
    <level label="b">
      <text>Design Criteria</text>
      <level label="1">
        <text>The following design criteria shall be followed on all TCPs unless a variance has been approved by the appropriate approval authority per Section 25-119(d).</text>
        <level label="A">
          <text>Land development and the associated clearing and grading shall be designed to ensure that the long-term preservation of areas designated as woodland conservation or woodlands retained but not credited thrive in perpetuity.</text>
        </level>
        <level label="B">
          <text>Conceptual building footprints and associated infrastructure including but not limited to driveways, utilities, secondary structures, parking facilities that reflect the maximum limit of disturbance for the construction of buildings shall be shown and shall include add-on building features such as sun rooms and decks.</text>
        </level>
        <level label="C">
          <text>Conceptual grading in accordance with an approved stormwater concept plan shall be shown on all TCP1s and TCP2s. Detailed grading in accordance with erosion and sediment control plan shall be shown on all TCP2s.</text>
        </level>
        <level label="D">
          <text>The limits of disturbance shown shall allow for the construction of the proposed development using standard building techniques. If special techniques are proposed to reduce clearing, those techniques must be shown on the TCP with details related to the proposed construction method and limits of disturbance. The required clearing to address the provisions of all applicable provisions of the County Code shall be shown.</text>
        </level>
        <level label="E">
          <text>Woodland conservation areas shall be designed in such a way as to ensure their survival in perpetuity. At a minimum, woodland conservation areas shall be shown no closer than:</text>
          <level label="i">
            <text>40 feet of cleared area to the front and rear of all residential building footprints and 20 feet of cleared area to the sides of all building footprints within the subject lot or parcel. The TCP2 shall show these dimensions on all plans, including plans used for house type changes.</text>
          </level>
          <level label="ii">
            <text>10 feet from the top or bottom of retaining walls and from the rear lot lines of townhouse units or other attached buildings;</text>
          </level>
          <level label="iii">
            <text>20 feet from all sides of commercial and multifamily buildings.</text>
          </level>
          <level label="iv">
            <text>5 feet from road rights-of-way, 5 feet from travel aisles and parking areas in and adjacent to parking lots and</text>
          </level>
          <level label="v">
            <text>10 feet from areas used for truck loading, unloading, or service areas.</text>
          </level>
        </level>
        <level label="F">
          <text>Woodland conservation shall not be placed on lots one (1) acre or less in size.</text>
        </level>
        <level label="G">
          <text>Specimen trees, champion trees, and trees that are part of a historic site or are associated with a historic structure shall be preserved and the design shall either preserve the critical root zone of each tree in its entirety or preserve an appropriate percentage of the critical root zone in keeping with the tree's condition and the species' ability to survive construction as provided in the Technical Manual.</text>
        </level>
        <level label="H">
          <text>Trees, shrubs, and plants identified on the list of rare, threatened, and endangered list of the U.S. Fish and Wildlife Service or the State of Maryland Department of Natural Resources shall be preserved.</text>
        </level>
        <level label="I">
          <text>Within transit-oriented centers, all woodland conservation areas including landscape areas shall be a minimum of 5,000 square feet in area. If on-site conservation areas are proposed to be less than 5,000 square feet in area, abutting off-site areas may be used to meet the 5,000 square foot minimum contiguity requirements if they have been previously protected by a TCP or other prior approved mechanism.</text>
        </level>
        <level label="J">
          <text>Outside of transit-oriented centers, all woodland conservation areas shall be a minimum of 10,000 square feet in area. If on-site conservation areas are proposed to be less than 10,000 square feet in area, abutting off-site areas may be used to meet the 10,000 square foot minimum contiguity requirements if they have been previously protected by a TCP or other prior approved mechanism.</text>
        </level>
        <level label="K">
          <text>All woodland conservation areas shall be a minimum of 50 feet in width. If less than 50 feet is proposed on-site, abutting woodlands may be used if they have been previously protected by a TCP or other prior approved mechanism, such as a conservation easement. Landscaped areas may be 35 feet in width.</text>
        </level>
        <level label="L">
          <text>Woodlands retained on lots one acre or less in size shall be counted as cleared and shall be shown on the TCP as labeled "woodland retained - assumed cleared."</text>
        </level>
        <level label="M">
          <text>Woodlands retained on lots or parcels greater than one acre in size may show woodland that is retained and not counted as cleared, if it meets the other design criteria per (I), (J) and (K) above and is labeled "woodland retained - not credited."</text>
        </level>
        <level label="N">
          <text>Woodlands retained per (L) and (M) above may be counted toward meeting the tree canopy coverage requirements of Division 3 of this Subtitle.</text>
        </level>
        <level label="O">
          <text>The following areas shall be treated as follows:</text>
          <level label="i">
            <text>Land previously dedicated for public use shall not be counted toward meeting the requirements of this Division.</text>
          </level>
          <level label="ii">
            <text>Existing woodland within the 100-year floodplain shall not be counted toward meeting the preservation requirements. Planting in the floodplain may be credited with meeting the requirements of this Division.</text>
          </level>
          <level label="iii">
            <text>Land within all types of easements except surface drainage easements shall not be counted toward meeting the requirements and shall be counted as cleared. Surface drainage easements may be used to meet the requirements and shall not be counted as cleared unless shown as cleared on the TCP. Planting in the floodplain easement shall conform to the requirements of this Division and placed in a woodland conservation easement.</text>
          </level>
          <level label="iv">
            <text>Land currently protected by easements which specifically protect woodlands for another purpose, including but not limited to utility easements, approved TCPs for other development, deed restrictions, and declarations of covenants for woodland conservation banking, that would impair the land from being used to meet the requirements of this Division, cannot be counted toward meeting the requirements of this Division and cannot be subtracted from the gross tract area. Property that is subject to an agricultural preservation easement shall not be precluded from having a woodland conservation easement.</text>
          </level>
          <level label="v">
            <text>Land areas dedicated or to be dedicated for future road construction shall be counted as cleared if the associated development is required to construct the road. Land dedicated or to be dedicated shall not be counted toward meeting the requirements.</text>
          </level>
          <level label="vi">
            <text>Land within areas to be reserved for future road construction shall not be required to be counted as cleared and shall not be counted toward meeting the requirements.</text>
          </level>
        </level>
        <level label="P">
          <text>Woodlands within proposed septic fields and septic recovery areas are required to be counted as woodland retained — assumed cleared.</text>
        </level>
        <level label="Q">
          <text>Land development shall be designed to meet the requirements of this Division on-site to the fullest extent possible unless a variance is granted pursuant to Section 25-119(d).</text>
        </level>
      </level>
    </level>
    <level label="c">
      <text>Conservation Method Priorities.</text>
      <level label="1">
        <text>The recommended priorities for woodland conservation methods are as follows:</text>
        <level label="A">
          <text>Onsite preservation and conservation of stream buffers, including the planting of unforested stream buffers.</text>
        </level>
        <level label="B">
          <text>On-site preservation of connected woodland and wildlife habitat areas using woodlands in good condition with limited amounts of invasive or exotic plants.</text>
        </level>
        <level label="C">
          <text>On-site afforestation/reforestation of connected planting areas using transplanted native stock, relocated from the site or surrounding areas.</text>
        </level>
        <level label="D">
          <text>On-site afforestation/reforestation of connected planting areas using native whip and seedling stock.</text>
        </level>
        <level label="E">
          <text>On-site specimen, champion, and historic trees when the plan has been designed to ensure long-term survival.</text>
        </level>
        <level label="F">
          <text>On-site natural regeneration of connected areas in appropriate locations containing sufficient native seed sources with appropriate protection mechanisms and long-term management.</text>
        </level>
        <level label="G">
          <text>Off-site afforestation/reforestation of connected planting areas using transplanted native stock, relocated from the site or surrounding areas.</text>
        </level>
        <level label="H">
          <text>Off-site afforestation/reforestation of connected planting areas using native whip and seedling stock.</text>
        </level>
        <level label="I">
          <text>Off-site preservation of connected woodlands.</text>
        </level>
        <level label="J">
          <text>On or off-site habitat enhancement projects to connect areas of existing woodlands that result in improved wildlife habitat and forest vigor through the removal of invasive or exotic plant species and/or planting of native plant species.</text>
        </level>
        <level label="K">
          <text>Off-site natural regeneration of connected areas in appropriate locations containing sufficient seed sources with appropriate protection mechanisms and long-term management.</text>
        </level>
        <level label="L">
          <text>On-site landscaping using native species of field grown nursery stock that establish landscaped areas a minimum of 35 feet wide and 5,000 square feet in area in transit-oriented centers. At least 50 percent of the plants in the landscaped area must be trees.</text>
        </level>
        <level label="M">
          <text>Street trees on or adjacent to the site when located in transit-oriented centers outside rights-of-way; or in conformance with:</text>
          <level label="i">
            <text>A municipality's street tree planting plan or program, where the trees have been provided sufficient root zone space to ensure long-term survival and sufficient crown space is provided that is not limited by overhead utility lines and public utility easements that are existing or proposed.</text>
          </level>
          <level label="ii">
            <text>Section 25-122(d)(8) for criteria relating to the use of street trees.</text>
          </level>
        </level>
        <level label="N">
          <text>Fee-in-lieu may be used to meet the requirements of this Division, when all other options have been exhausted, as determined by the Planning Director pursuant to Sec. 25-122(d)(9) for criteria relating to the use of fee-in-lieu.</text>
        </level>
      </level>
    </level>
    <level label="d">
      <text>Woodland Conservation Options - Credit and Security</text>
      <level label="1">
        <text>On-site preservation.</text>
        <level label="A">
          <text>Credit: Woodland preserved may be credited toward the conservation requirements on an acre for acre basis (ratio of 1:1). To be eligible for use as woodland preservation, the areas must be designated as woodland on the FSD, the woodland shall not have been harvested in the last five (5) years, and the woodland must be in medium or better condition as rated per the guidelines in the Technical Manual and with 15% or less of invasive or exotic plants.</text>
          <level label="i">
            <text>Areas that have been harvested may be considered for use as woodland preservation if a report from a qualified professional states that the woodlands are in good condition, are in the process of regeneration, and contain 15% or less of invasive or exotic plants.</text>
          </level>
        </level>
        <level label="B">
          <text>Security: Woodlands preserved shall be placed in permanent protection recorded in the land records. Areas of reforestation shall be bonded separately from other site development components at an amount to be calculated as stated in the Technical Manual.</text>
        </level>
      </level>
      <level label="2">
        <text>On-site afforestation, on-site reforestation and on-site natural regeneration.</text>
        <level label="A">
          <text>Credit: Woodland planted or regenerated on-site may be credited toward the conservation requirements on an acre for acre basis (ratio of 1:1). To be eligible for use, the areas must be designated as afforestation and reforestation areas on the TCP, the natural regeneration must be in medium or better condition with 15% or less of invasive or exotic plants, and a five-year management plan must be prepared as part of the TCP2 following the guidelines provided in the Technical Manual.</text>
        </level>
        <level label="B">
          <text>Security: Woodlands planted or regenerated on-site shall be placed in permanent protection as recorded in the land records and shall be bonded separately from other site development components at an amount to be calculated as stated in the Technical Manual.</text>
        </level>
      </level>
      <level label="3">
        <text>On-site specimen, champion, and historic trees</text>
        <level label="A">
          <text>Credit: Specimen, champion, and historic trees may be credited by counting the square footage of the unimpacted critical root zone area if they are not within a designated woodland conservation area and if the site has been designed to ensure long-term survival. If the specimen, champion, or historic trees are within a woodland conservation area, additional credit shall not be calculated.</text>
        </level>
        <level label="B">
          <text>Security: A bond amount equal to the removal and replacement cost of the specimen, champion and historic tree shall be provided prior to permit issuance if the additional credit noted in (A) above is used. The replacement cost shall be calculated by the permittee using the latest edition of the "Guide for Plant Appraisal" prepared by the Council of Tree and Landscape Appraisers. If the tree does not survive construction, mitigation shall be provided as stated in Section 25-120(c)(6)(D). A tree management plan shall be prepared for each specimen, champion or historic tree preserved.</text>
        </level>
      </level>
      <level label="4">
        <text>Off-site preservation</text>
        <level label="A">
          <text>Credit: Woodlands preserved off-site may be credited toward meeting the conservation requirements at a ratio of two acres of off-site preservation for each acre of conservation required (ratio of 2:1). To be eligible for use as woodland preservation, the areas must be designated as woodland on the FSD, the woodland shall not have been harvested in the last five (5) years, and the woodland must be in medium or greater condition with 15% or less of invasive or exotic plants.</text>
        </level>
        <level label="B">
          <text>Security: Off-site preservation shall be provided in an approved TCP2. Permanent protection such as conservation easements recorded in land records shall be provided in accordance with the Technical Manual.</text>
        </level>
      </level>
      <level label="5">
        <text>Off-site reforestation and natural regeneration</text>
        <level label="A">
          <text>Credit: Woodlands planted or regenerated off-site may be credited toward meeting the conservation requirements at a ratio of one acre of planting or regeneration for each acre of conservation required (ratio of 1:1).</text>
        </level>
        <level label="B">
          <text>Security: Off-site planting and regeneration shall be provided in an approved TCP2. Permanent protection such as conservation easements recorded in land records shall be provided in accordance with the Technical Manual. Areas of reforestation shall be separately bonded at an amount equal to the current cost of installation and maintenance of the required plantings. To receive credit for off-site reforestation or natural regeneration a five-year management plan must be prepared as part of the TCP2 following the guidelines provided in the Technical Manual.</text>
        </level>
      </level>
      <level label="6">
        <text>On or off-site habitat enhancement projects</text>
        <level label="A">
          <text>Credit: Habitat enhancement projects may receive credit toward meeting the conservation requirements at a rate of up to a half-acre (up to ratio of 0.5:1) of additional credit for each acre of on-site or off-site habitat enhancement provided. Habitat enhancement shall be conducted within woodlands that have already received credit for preservation, afforestation, or natural regeneration.</text>
        </level>
        <level label="B">
          <text>Security: To receive credit for habitat enhancement a five-year management plan must be prepared as part of the TCP2 following the guidelines provided in the Technical Manual. If the additional credit is sought, habitat enhancement shall be bonded at an amount determined according to the direction provided in the Technical Manual and the proposed management plan activities.</text>
        </level>
      </level>
      <level label="7">
        <text>On-site landscaping within transit-oriented centers</text>
        <level label="A">
          <text>Credit: Landscaping may be credited toward meeting the conservation requirements at a ratio of one acre of planting for each acre of conservation required (ratio of 1:1).</text>
        </level>
        <level label="B">
          <text>Security: Landscaping credited to meet woodland conservation requirements shall be bonded at an amount equal to the current cost of installation and maintenance of the required plantings.</text>
        </level>
      </level>
      <level label="8">
        <text>Street trees within transit-oriented centers</text>
        <level label="A">
          <text>Credit: Street trees may receive credit toward meeting the conservation requirements by calculating the square footage of tree canopy coverage to be provided in ten (10) years (refer to the Technical Manual for calculations). Street trees must be located on or adjacent to the site and shall be planted by the applicant in order to receive credit.</text>
        </level>
        <level label="B">
          <text>Security: Street trees credited to meet woodland conservation requirements shall be bonded at an amount equal to the current cost of installation and maintenance of the required plantings by the permittee of the site receiving the woodland conservation credit. Permanent protection such as conservation easements recorded in land records shall be provided in accordance with the Technical Manual.</text>
        </level>
      </level>
      <level label="9">
        <text>Fee-in-lieu</text>
        <level label="A">
          <text>Credit: Fee-in-lieu may be used to meet the conservation requirements after all other options are exhausted and the appropriate credits generated by a forest mitigation bank in the same watershed are deemed unavailable or there is no other County-owned land available to meet conservation requirements. The fee rate can be adjusted to reflect inflation increases using the base rate of ninety cents ($0.90) per square foot of the conservation requirement within the designated Priority Funding Area and a rate of one dollar and eight cents ($1.08) per square foot of conservation requirement outside the designated Priority Funding Area. These funds shall be placed in the Woodland Conservation Fund. Appropriate credits generated by a forest mitigation bank shall be deemed unavailable if any of the following exist:</text>
          <level label="i">
            <text>There are no off-site woodland conservation banks with available acreage as tracked by the County; or</text>
          </level>
          <level label="ii">
            <text>If three or more available woodland conservation banks refuse to sell any credits, such refusal shall be provided in writing.</text>
          </level>
        </level>
        <level label="B">
          <text>Security: Proof of payment of fee-in-lieu to the County based on the development activity proposed shall be provided prior to the issuance of the first permit unless the project is phased. Phased projects shall pay the fee-in-lieu amount for each phase prior to the issuance of any permits for that phase if the entire fee is not paid prior to issuance of the first permit. The TCP2 shall show the breakdown of the fee-in-lieu payment due with each phase.</text>
        </level>
      </level>
      <level label="10">
        <text>Other options to meet the conservation requirements that are consistent with this Division may be considered by the approving authority. The amount of credit to be provided shall be evaluated on a case-by-case basis. Security shall be provided using the method that best fits the proposal and can include easements on the final plat, easements recorded in the land records, bonding or other methods that are appropriate to the proposal.</text>
      </level>
    </level>
    <level label="e">
      <text>Woodland Conservation Provided Off-site</text>
      <level label="1">
        <text>The woodland conservation requirements of this Division may be met at an off-site TCP2. If off-site woodland conservation credit is moved after it is established, it is once again subject to the provisions of this Division. Appropriateness of properties for establishment as a woodland conservation bank shall be evaluated using the priorities contained in Section 25-121 of this Division.</text>
        <level label="A">
          <text>A woodland conservation bank is defined as a property where specified portions are encumbered to meet the woodland conservation requirements of benefiting projects through the recordation of required documents in the County land records.</text>
        </level>
        <level label="B">
          <text>A woodland conservation bank:</text>
          <level label="i">
            <text>Preservation: Can be used to meet up to 60% of the replacement requirement and credit shall be granted at a 2:1 acre replacement ratio (two acres of preserved forest for each acre required).</text>
          </level>
          <level label="ii">
            <text>Planted: Can be used to meet the replacement requirement and the credit may be provided at 1:1 acre replacement ratio (one acre planted for each one acre required).</text>
          </level>
        </level>
        <level label="C">
          <text>If a property subject to a land development proposal has met all its requirements on-site and has excess woodland conservation available, the excess woodland conservation may become a woodland conservation bank provided:</text>
          <level label="i">
            <text>it is placed within a separate property description that is protected by documents recorded in the land records as provided in the Technical Manual;</text>
          </level>
          <level label="ii">
            <text>it is not less than two acres in size or less than 10 percent of the woodland conservation requirement for the project site whichever is greater;</text>
          </level>
          <level label="iii">
            <text>it is not placed on a private residential lot less than 10 acres in size; and</text>
          </level>
          <level label="iv">
            <text>it meets the other minimum standards of a woodland conservation bank.</text>
          </level>
        </level>
      </level>
      <level label="2">
        <text>Woodland conservation banks shall:</text>
        <level label="A">
          <text>Depict the method of woodland conservation on an approved TCP2 that meets all the requirements of this Division and is prepared in conformance with the Technical Manual;</text>
        </level>
        <level label="B">
          <text>Be protected by required documents recorded in the land records which require the land in the bank to remain as woodland in perpetuity and which are enforceable through an approved TCP;</text>
        </level>
        <level label="C">
          <text>Limit the use of the land in the bank to those activities which are consistent with woodland conservation such as recreational activities that do not result in vegetation removal; forest stewardship under a forest conservation and management agreement under Tax-Property Article, § 8-211, Annotated Code of Maryland; or activities specified in a Forest Management Plan prepared by a licensed forester and approved by the Planning Director;</text>
        </level>
        <level label="D">
          <text>Use native plant materials for afforestation;</text>
        </level>
        <level label="E">
          <text>Meet the woodland conservation area standards contained in this Division and as specified in the Technical Manual;</text>
        </level>
        <level label="F">
          <text>Retain at least one building site with a minimum area of one acre if the woodland conservation bank includes the entire parcel and developable areas unless a variance has been approved by the appropriate approval authority in accordance with Section 25-119(d);</text>
        </level>
        <level label="G">
          <text>Not initiate woodland conservation requirements unless the site is subject to this Division through some action of the owner;</text>
        </level>
        <level label="H">
          <text>Conform to the design criteria contained in Section 25-122 of this Division;</text>
        </level>
        <level label="I">
          <text>Not approve use of any portion of a woodland conservation bank using afforestation until four years of documented successful growth have been achieved unless the woodland conservation bank owner has posted a bond or alternate form of security; and to ensure that the trees will be cared for and maintained in perpetuity.</text>
        </level>
        <level label="J">
          <text>Shall provide conditions sufficient to ensure that the woodlands will survive in perpetuity. If afforestation or reforestation are proposed on a site that was previously used for sand and gravel mining or land or rubble filling operations, soil testing shall be performed to develop a soil amendment plan for the planting area to ensure the establishment of woodlands in perpetuity. The soil amendment plan shall be reviewed by the Soil Conservation District and approved as part of the TCP2.</text>
        </level>
      </level>
      <level label="3">
        <text>Applications for woodland conservation banks shall include the following information:</text>
        <level label="A">
          <text>A completed application form as provided in the Technical Manual.</text>
        </level>
        <level label="B">
          <text>A TCP2 for the woodland conservation bank which contains the information required in the Technical Manual.</text>
        </level>
      </level>
    </level>
    <level label="f">
      <text>Woodland Conservation Bonding</text>
      <level label="1">
        <text>Projects containing woodland conservation methods that require bonding as noted in this Division shall provide security in the form of a bond, an irrevocable letter of credit, or other security approved by the County. The security shall:</text>
        <level label="A">
          <text>Assure that the woodland conservation methods proposed are conducted and maintained in accordance with the approved TCP;</text>
        </level>
        <level label="B">
          <text>Be in an amount equal to the estimated cost of the work if it is required to be performed by the County in accordance with the requirements of this Division; and</text>
        </level>
        <level label="C">
          <text>Be in a form and of a content approved by the County.</text>
        </level>
      </level>
      <level label="2">
        <text>After a final inspection of the site by the County inspector confirms that the areas meet or exceed the requirements of the approved TCP and no sooner than five years after establishment, the bond or other security shall be returned or released.</text>
      </level>
      <level label="3">
        <text>The bond or other security may be subject to forfeiture if the approved TCP is not implemented fully and within the time frames specified on the plan. The County shall notify the permittee by certified mail of the intention of the County to initiate forfeiture proceedings.</text>
      </level>
      <level label="4">
        <text>Woodlands planted or regenerated on-site shall be placed in permanent protection as recorded in the land records and shall be bonded separately from other site development components at an amount to be calculated as stated in the Technical Manual.</text>
      </level>
      <level label="5">
        <text>All afforestation and reforestation, whether on-site or off-site, shall be bonded prior to the issuance of the first permit to ensure completion and long-term survivability.</text>
      </level>
      <level label="6">
        <text>If on-site conservation is approved to meet the requirements, all conservation areas shall receive credit at a ratio of 1:1 (one acre of conservation for each acre of requirement).</text>
      </level>
    </level>
  </section>
  <section number="25-123" name="Forest Stand Delineations" law="code" slug="sec-25-123" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_25TRVE_DIV2WOWIHACOOR_S25-123FOSTDE">
    <level label="a">
      <text>General</text>
      <level label="1">
        <text>A Forest Stand Delineation (FSD) shall be prepared for all applications for Letters of Exemption and Natural Resource Inventories (NRIs). When an FSD is prepared and reviewed as part of an NRI a separate review is not required.</text>
      </level>
      <level label="2">
        <text>The purpose of an FSD is to provide an accurate depiction of the existing forest species composition, age, condition, location, and acreage, in addition to documenting previous approvals, to determine the most suitable areas for woodland and wildlife habitat conservation.</text>
      </level>
      <level label="3">
        <text>FSDs shall contain all required information as described in the Technical Manual. When reviewing the plan, additional information or data deemed appropriate may be required to ensure compliance with this Division.</text>
      </level>
      <level label="4">
        <text>FSDs may be submitted at three levels of detail, depending on the associated application, as described in the Technical Manual.</text>
      </level>
      <level label="5">
        <text>The FSD must cover at least the area of the associated plan or application; it may cover a larger area if all acreages for the associated plan or application are calculated separately.</text>
      </level>
      <level label="6">
        <text>The FSD must be at the same scale as the associated plan or application. The FSD and NRI shall use the same base data as that used for all other plans.</text>
      </level>
      <level label="7">
        <text>FSDs are valid for five (5) years from the date of signature by the qualified professional. If the site is completely forested with mature woodlands that have not been harvested, a FSD may be valid for longer than five years after a review by the Planning Director. An FSD shall be updated sooner than five years if significant woodland changes have occurred since the date the initial FSD was prepared, such as if a portion of the site has been developed or forest management activities have occurred on-site.</text>
      </level>
      <level label="8">
        <text>If an associated plan or application has a previously reviewed FSD and the site has undergone development since that review, the FSD for subsequent associated plans or applications on the property shall be revised to reflect the existing conditions and previous approvals and shall reference the TCP that approved the clearing. All calculations shall be provided for both pre- and post-development conditions.</text>
      </level>
      <level label="9">
        <text>FSDs shall be reviewed by the Planning Director within 30 calendar days of receipt of a complete and accurate submission. If comments are not received within the 30-day timeframe, the information is considered adequate for review.</text>
      </level>
    </level>
  </section>
  <section number="25-124" name="Forest Management and Harvesting" law="code" slug="sec-25-124" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_25TRVE_DIV2WOWIHACOOR_S25-124FOMAHA">
    <level label="a">
      <text>General</text>
      <level label="1">
        <text>Properties that have been or will be harvested for forest products for commercial purposes within five (5) years of DRD or grading permit application submission shall be subject to this Division.</text>
      </level>
      <level label="2">
        <text>Forest harvesting for commercial purposes may be exempt from this Division and receive a Numbered Letter of Exemption if the criteria in Section 25-119(b)(6) are met.</text>
      </level>
      <level label="3">
        <text>Forests that have been harvested may be considered for use as woodland preservation if a report from a qualified professional states that the woodlands are in good condition, are in the process of regenerating, and contain limited amounts of invasive or exotic plants.</text>
      </level>
      <level label="4">
        <text>If a site has a pending DRD application, that application must receive signature approval prior to the commencement of forest harvesting operations.</text>
      </level>
    </level>
    <level label="b">
      <text>Forest Management Activities Not Requiring a Grading or Forest Harvest Permit</text>
      <level label="1">
        <text>The removal of less than five (5) cords or two thousand (2,000) board feet of wood per year for personal use is allowed if a stocking level of eighty (80) square feet of basal area is maintained, and the shrub layer, herbaceous layer, and the leaf litter remain intact.</text>
      </level>
      <level label="2">
        <text>Non-commercial forest management activities, such as trimming or stand improvement, are allowed performed in accordance with a Forest Management Plan prepared by a licensed forester when no forest products are removed from the site and acceptable stocking levels are maintained.</text>
      </level>
      <level label="3">
        <text>Non-commercial removal of other forest products such as mushrooms, nuts, or berries not requiring the use of motorized wheeled or tracked equipment is allowed, unless the activity will impair the health of the forest.</text>
      </level>
    </level>
    <level label="c">
      <text>Exemptions for Forest Harvesting</text>
      <level label="1">
        <text>A Numbered Letter of Exemption may be issued by the Planning Director for forest harvesting when the following apply:</text>
        <level label="A">
          <text>There is no approved TCP for the subject property except as noted in (d) below;</text>
        </level>
        <level label="B">
          <text>There are no zoning requirements, Planning Board, Zoning Hearing Examiner or District Council approvals, or decisions pending for the site that would be adversely impacted by the proposed forest harvest;</text>
        </level>
        <level label="C">
          <text>The environmental setting of a designated historic district or historic resource would not be adversely impacted;</text>
        </level>
        <level label="D">
          <text>A Forest Management Plan prepared by a licensed forester is submitted with the application for the Numbered Letter of Exemption; and</text>
        </level>
        <level label="E">
          <text>A Declaration of Intent is submitted that states the property owner's intent to conduct a commercial forest harvest and not to develop the land within five years of the completion of the forest harvest.</text>
        </level>
      </level>
      <level label="2">
        <text>Letters of Exemption for forest harvests shall remain valid for a period of five years following the date of issuance.</text>
      </level>
    </level>
    <level label="d">
      <text>Commercial Forest Harvesting on Properties with a Previously Approved TCP</text>
      <level label="1">
        <text>A property with an approved TCP shall not be issued a Numbered Letter of Exemption for forest harvesting.</text>
      </level>
      <level label="2">
        <text>Forest harvesting must be performed in accordance with a revised TCP2 approved for harvesting, and a Forest Management Plan prepared by a licensed forester.</text>
      </level>
      <level label="3">
        <text>A forest harvesting permit shall be obtained from the County permitting authority prior to commencement of the harvesting operation. The permit application shall include a forest harvest plan and an approved erosion and sediment control plan. The forest harvesting plan is a plan drawn to scale showing the regulated environmental features, the areas to be harvested, staging areas, proposed stream crossings, and the forest harvesting methods proposed for each area to be harvested.</text>
      </level>
    </level>
    <level label="e">
      <text>Commercial Forest Harvesting on Properties without a Previously Approved TCP</text>
      <level label="1">
        <text>If forest harvesting is proposed on a site without a previously approved TCP, a Numbered Letter of Exemption shall be issued by the Planning Director prior to the issuance of the forest harvesting permit by the County permitting authority.</text>
      </level>
      <level label="2">
        <text>A Forest Management Plan prepared by a licensed forester shall be submitted with the application for a Numbered Exemption.</text>
      </level>
      <level label="3">
        <text>A forest harvesting permit shall be obtained from the County permitting authority prior to the commencement of the harvesting operation. The permit application shall include an approved forest harvest plan and an approved erosion and sediment control plan. The forest harvesting plan is a plan drawn to scale showing the regulated environmental features, the areas to be harvested, staging areas, proposed stream crossings, and the forest harvesting methods proposed for each area to be harvested.</text>
      </level>
      <level label="4">
        <text>If a forest harvesting permit is issued for a property with an approved NRI or FSD, the NRI or FSD must be revised prior to the submittal of any subsequent DRD and grading permit applications to reflect the harvested area and the current condition of the woodlands remaining.</text>
      </level>
    </level>
  </section>
</unit>
