# Sec. 32-183. Changes to Plans

Codified through Bill No. CB-018-2026, adopted May 12, 2026, effective July 24, 2026. Source: Municode, Supplement 2026 Update 2. Editorial notes and legislative history omitted.

## Sec. 32-183. Changes to Plans

Prince George's County, Md., Code § 32-183 (2026)

(a) All changes or modifications to the approved final stormwater management plans must be submitted to and approved by the Department. All necessary substantiating reports shall be submitted with any proposal to modify the approved plan. No grading or other work in connection with any proposed modification shall be permitted without proper written approval of the Department. If the revision where the limits of disturbance affects the tree conservation area then a revised tree conservation plan shall also be required.

(b) When inspection of a site indicates that the approved final stormwater management plan requires a revision or change, the revision shall be in compliance with this Division. To obtain an approved revision, the permittee shall:

  (1) Submit a request for a revision to the approved final stormwater management plan to the Department to be processed appropriately. This includes revisions due to plan and site discrepancies and inadequacies at controlling stormwater as revealed through inspection; or

  (2) Request a field change approval for modifications to the approved final stormwater management plan and obtain County Engineer's approval. The modification shall be noted on a signed copy of the approved plan, signed and dated by a Department's inspector and documented on a field inspection report. These field modifications may include change of material type, adjustments to avoid field conflicts and other concerns that may not require recalculations and will not affect stormwater management controls.
