<?xml version='1.0' encoding='utf-8'?>
<section number="32-192" name="Final Inspection Reports" law="code" slug="sec-32-192" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_32WAREPRGRCO_DIV3STMA_SD3INMAEN_S32-192FIINRE">
  <level label="a">
    <text>The permittee shall provide "as-built" plans certified by a registered professional engineer to be submitted upon completion of a stormwater management facility.</text>
  </level>
  <level label="b">
    <text>The registered professional engineer shall certify that the facility has been constructed as shown on the "as-built" plan and meets the approved final stormwater management plan and specifications.</text>
  </level>
  <level label="c">
    <text>A final inspection shall be conducted upon completion of the stormwater management facility to determine if the completed work is constructed in accordance with the approved final stormwater management plan.</text>
  </level>
  <level label="d">
    <text>The Department shall maintain a permanent file of all inspection reports.</text>
  </level>
</section>
