<?xml version='1.0' encoding='utf-8'?>
<section number="32-203.05" name="Administration — Application Required" law="code" slug="sec-32-203.05" node_id="PTIITI17PULOLAPRGECOMA_SUBTITLE_32WAREPRGRCO_DIV4FLOR_S32-203.05ADAPRE">
  <level label="a">
    <text>The application for a county permit shall be made by the owner of the property or the owner's authorized agent (herein referred to as the applicant). The county permit shall be issued prior to start of any work.</text>
  </level>
  <level label="b">
    <text>New Technical Data:</text>
    <level label="1">
      <text>The applicant may seek a Letter of Map Change by submitting new technical data to FEMA, such as base maps, topography, and engineering analyses to support revision of floodplain and floodway boundaries and/or base flood elevations. Such submissions shall be prepared in a format acceptable to FEMA and any fees shall be the sole responsibility of the applicant.</text>
    </level>
    <level label="2">
      <text>If the applicant submits new technical data to support any change in floodplain and designated floodway boundaries and/or base flood elevations but has not sought a Letter of Map Change from FEMA, the applicant shall submit such data to FEMA as soon as practicable, but not later than six (6) months after the date such information becomes available. Such submissions shall be prepared in a format acceptable to FEMA and any fees shall be the sole responsibility of the applicant.</text>
    </level>
  </level>
</section>
