      <text>Notwithstanding § 2–303(f) of this article, the process for the review and approval of public school construction projects shall be in accordance with the provisions of this section.</text>
    </level>
    <level label="2">
      <text>This section applies only to construction projects and systemic renovation projects that cost more than $1,250,000 and:</text>
      <level label="i">
        <text>Have received State funding, or for which a local education agency will be requesting State funding; or</text>
      </level>
      <level label="ii">
        <text>That replace or make changes to a heating, ventilation, or air–conditioning system that are not like–for–like replacements of system components.</text>
      </level>
    </level>
    <level label="3">
      <text>At least once every 4 years, the Interagency Commission shall review the cost threshold amount under paragraph (2) of this subsection.</text>
    </level>
  </level>
  <level label="b">
    <level label="1">
      <text>Except as provided in subsection (e) of this section, educational specifications and schematic designs for applicable construction projects that will affect the plan configuration of student–occupied spaces in a school building or on its grounds are required to:</text>
      <level label="i">
        <text>Be reviewed by the Interagency Commission; and</text>
      </level>
      <level label="ii">
        <text>Prior to finalization by a local education agency, have any concerns or recommendations of the Interagency Commission satisfactorily resolved.</text>
      </level>
    </level>
    <level label="2">
      <text>To provide efficiency within the process, the Department and the Interagency Commission shall consider altering the review and approval process required under paragraph (1) of this subsection, including a rolling deadline for submission of documents, with schematic designs submitted following the completion of the educational specifications review.</text>
    </level>
  </level>
  <level label="c">
    <level label="1">
      <text>Change orders for applicable construction projects and systemic renovation projects may not be:</text>
      <level label="i">
        <text>Reviewed by the Department of General Services; and</text>
      </level>
      <level label="ii">
        <text>Approved by the Interagency Commission.</text>
      </level>
    </level>
    <level label="2">
      <text>A percentage of the State allocation related to change orders may not be withheld.</text>
    </level>
    <level label="3">
      <text>Local education agencies shall maintain contingency funds for each approved project to address unanticipated construction costs above the State allocation.</text>
    </level>
  </level>
  <level label="d">
    <level label="1">
      <text>Except as provided in subsection (e) of this section, design and construction documents for applicable construction projects and systemic renovation projects are required to be:</text>
      <level label="i">
        <text>Reviewed by the Department of General Services; and</text>
      </level>
      <level label="ii">
        <text>Approved by the Interagency Commission.</text>
      </level>
    </level>
    <level label="2">
      <text>The Department of General Services and the Interagency Commission, in consultation with local education agencies, shall develop a timeline for submission, review, and approval of design and construction documents.</text>
    </level>
  </level>
  <level label="e">
    <level label="1">
      <text>The provisions of subsections (b) and (d) of this section and § 5–310(h) of this subtitle do not apply to a local education agency that successfully completes a certification process that meets the requirements of this subsection.</text>
    </level>
    <level label="2">
      <text>Subject to the review and approval of the Interagency Commission, the Department of General Services shall develop a certification process through which a local education agency is able to demonstrate the expertise and capacity to complete the review of educational specifications, schematic designs, design and construction documents, or preventative maintenance schedule compliance within the county.</text>
    </level>
    <level label="3">
      <text>The certification process developed by the Department of General Services shall provide for a renewable, 5–year certification for a local education agency that successfully completes the certification process.</text>
    </level>
  </level>
  <level label="f">
    <text>School construction projects that are funded entirely with local funds are not required to be reviewed by the Department unless the project substantially alters or expands an existing school building that was built in part with State funds.</text>
  </level>
  <level label="g">
    <text>If there is any conflict between the provisions of this section and the regulations and procedures of the Interagency Commission, the Department, or the Department of General Services, the provisions of this section shall prevail.</text>