<?xml version='1.0' encoding='utf-8'?>
<subtitle article="gen" title_number="1" subtitle_number="6" title_name="Definitions; General Provisions; Enforcement" subtitle_name="Public Participation in the Permitting Process">
  <section article="gen" article_name="Environment" number="1-601" future_version_removed="true" title_number="1" title_name="Definitions; General Provisions; Enforcement" subtitle_number="6" subtitle_name="Public Participation in the Permitting Process">
    <level label="a">
      <text>Permits issued by the Department under the following sections shall be issued in accordance with this subtitle:</text>
      <level label="1">
        <text>Air quality control permits to construct subject to § 2–404 of this article;</text>
      </level>
      <level label="2">
        <text>Permits to install, materially alter, or materially extend landfill systems, incinerators for public use, or rubble landfills subject to § 9–209 of this article;</text>
      </level>
      <level label="3">
        <text>Permits to discharge pollutants to waters of the State issued pursuant to § 9–323 of this article;</text>
      </level>
      <level label="4">
        <text>Permits to install, materially alter, or materially extend a structure used for storage or distribution of any type of sewage sludge issued, renewed, or amended pursuant to § 9–234.1 or § 9–238 of this article;</text>
      </level>
      <level label="5">
        <text>Permits to own, operate, establish, or maintain a controlled hazardous substance facility issued pursuant to § 7–232 of this article;</text>
      </level>
      <level label="6">
        <text>Permits to own, operate, or maintain a hazardous material facility issued pursuant to § 7–103 of this article;</text>
      </level>
      <level label="7">
        <text>Permits to own, operate, establish, or maintain a low–level nuclear waste facility issued pursuant to § 7–233 of this article;</text>
      </level>
      <level label="8">
        <text>Potable reuse permits issued in accordance with § 9–303.2 of this article;</text>
      </level>
      <level label="9">
        <text>Permits for reservoir augmentation issued in accordance with § 9–303.4 of this article; and</text>
      </level>
      <level label="10">
        <text>Managed aquifer recharge pilot permits issued in accordance with § 9–303.4 of this article.</text>
      </level>
    </level>
    <level label="b">
      <text>For permits listed under subsection (a) of this section, a contested case hearing may not occur.</text>
    </level>
    <level label="c">
      <text>A final determination by the Department on the issuance, denial, renewal, or revision of any permit listed under subsection (a) of this section is subject to judicial review at the request of any person that:</text>
      <level label="1">
        <text>Meets the threshold standing requirements under federal law; and</text>
      </level>
      <level label="2">
        <level label="i">
          <text>Is the applicant; or</text>
        </level>
        <level label="ii">
          <text>Participated in a public participation process through the submission of written or oral comments, unless an opportunity for public participation was not provided.</text>
        </level>
      </level>
    </level>
    <level label="d">
      <level label="1">
        <text>Judicial review shall be on the administrative record before the Department and limited to objections raised during the public comment period, unless the petitioner demonstrates that:</text>
        <level label="i">
          <text>The objections were not reasonably ascertainable during the comment period; or</text>
        </level>
        <level label="ii">
          <text>Grounds for the objections arose after the comment period.</text>
        </level>
      </level>
      <level label="2">
        <text>The court shall remand the matter to the Department for consideration of objections under paragraph (1) of this subsection.</text>
      </level>
    </level>
    <level label="e">
      <level label="1">
        <text>Unless otherwise required by statute, a petition for judicial review by a person that meets the requirements of subsection (c) of this section shall be filed with the circuit court for the county where the application for the permit states that the proposed activity will occur.</text>
      </level>
      <level label="2">
        <text>The decision of the circuit court may be appealed to the Appellate Court of Maryland.</text>
      </level>
    </level>
    <level label="f">
      <level label="1">
        <text>When this article requires more than one public informational meeting or public hearing, the Department may consolidate some or all of the meetings or hearings for the proposed facility with similar meetings or hearings.</text>
      </level>
      <level label="2">
        <level label="i">
          <text>When this subtitle requires the Department to hold a public informational meeting or public hearing, the Department shall hold the meeting or hearing in accordance with the requirements of this paragraph.</text>
        </level>
        <level label="ii">
          <text>The Department may hold a public informational meeting or public hearing required under this subtitle using teleconference or Internet–based conferencing technology unless:</text>
          <level label="1">
            <text>An applicable provision of federal statute or regulation requires the meeting or hearing to be held in person; or</text>
          </level>
          <level label="2">
            <text>Subject to subparagraph (iv) of this paragraph, any person makes a timely request within the time periods specified in §§ 1–603(c)(1) and 1–604(a)(4)(i) of this subtitle that the meeting or hearing be held in person.</text>
          </level>
        </level>
        <level label="iii">
          <text>If the Department holds an in–person public informational meeting or public hearing, the Department shall hold the meeting or hearing at a location in the political subdivision and in close proximity to the location where the individual permit applies.</text>
        </level>
        <level label="iv">
          <text>To protect public health and safety, the Department is not required to hold an in–person public informational meeting or public hearing specified under subparagraph (ii)2 of this paragraph if an emergency declaration is issued by an executive authority of:</text>
          <level label="1">
            <text>The federal or State government; or</text>
          </level>
          <level label="2">
            <text>The local government with jurisdiction over a county or municipality where the in–person meeting or hearing would otherwise be held.</text>
          </level>
        </level>
      </level>
    </level>
  </section>
  <section article="gen" article_name="Environment" number="1-601.1" title_number="1" title_name="Definitions; General Provisions; Enforcement" subtitle_number="6" subtitle_name="Public Participation in the Permitting Process">
    <level label="a">
      <text>A person applying for a permit listed under § 1–601(a) of this subtitle shall include in the permit application the EJ Score from the Maryland EJ tool for the census tract where the applicant is seeking a permit, unless the permit requires the applicant to use a tool developed by the U.S. Environmental Protection Agency.</text>
    </level>
    <level label="b">
      <text>On receiving an application for a permit listed under § 1–601(a) of this subtitle, the Department shall, in accordance with regulations adopted under this section, review the EJ Score for the census tract where the applicant is seeking a permit using the Maryland EJ tool to verify the applicant’s information.</text>
    </level>
    <level label="c">
      <text>The Department shall adopt regulations to implement this section.</text>
    </level>
  </section>
  <section article="gen" article_name="Environment" number="1-602" title_number="1" title_name="Definitions; General Provisions; Enforcement" subtitle_number="6" subtitle_name="Public Participation in the Permitting Process">
    <level label="a">
      <text>Wherever this subtitle requires the Department to publish notice:</text>
      <level label="1">
        <text>Notice shall be published at least once a week for 2 consecutive weeks in a daily or weekly newspaper of general circulation in the geographical area in which the proposed facility is located;</text>
      </level>
      <level label="2">
        <text>The notice shall include:</text>
        <level label="i">
          <text>The EJ Score for the census tract where the applicant is seeking a permit, provided by the applicant under § 1–601.1 of this subtitle;</text>
        </level>
        <level label="ii">
          <text>The address of the Department website for accessing the EJ Score review conducted under § 1–601.1 of this subtitle; and</text>
        </level>
        <level label="iii">
          <text>A description of the environmental justice indicators contributing to the EJ Score of the census tract where the applicant is seeking a permit;</text>
        </level>
      </level>
      <level label="3">
        <text>The Department may require notice of an informational meeting or a public hearing by mail to each person requesting the meeting or hearing or to their authorized representatives;</text>
      </level>
      <level label="4">
        <text>The Department may provide additional notice by requiring the notice to be posted at the proposed facility or at public facilities in the geographical area of the proposed facility; and</text>
      </level>
      <level label="5">
        <text>The applicant shall bear all costs incurred by the Department in providing notice.</text>
      </level>
    </level>
    <level label="b">
      <level label="1">
        <text>In addition to the requirements set forth in subsection (a) of this section and notwithstanding any other requirements in this article, wherever this subtitle requires the Department to publish notice of an application for a permit, the Department shall:</text>
        <level label="i">
          <text>Electronically post the notice of an application for a permit on the Department’s website; and</text>
        </level>
        <level label="ii">
          <text>Provide a method for interested persons to electronically request any additional notices related to an application for a permit.</text>
        </level>
      </level>
      <level label="2">
        <text>The notice required under paragraph (1) of this subsection shall include:</text>
        <level label="i">
          <text>The name and address of the applicant;</text>
        </level>
        <level label="ii">
          <text>A description of the location and the nature of the activity for which the permit has been sought;</text>
        </level>
        <level label="iii">
          <text>A reference to the applicable statutes or regulations governing the application process;</text>
        </level>
        <level label="iv">
          <text>The time and place of any scheduled informational meeting or public hearing, or a description of where this information can be found;</text>
        </level>
        <level label="v">
          <text>A description of where further information about the permit application can be found;</text>
        </level>
        <level label="vi">
          <level label="1">
            <text>The EJ Score for the census tract where the applicant is seeking a permit, provided by the applicant under § 1–601.1 of this subtitle; and</text>
          </level>
          <level label="2">
            <text>The EJ Score review conducted under § 1–601.1 of this subtitle; and</text>
          </level>
        </level>
        <level label="vii">
          <text>Any other information that the Department determines is necessary.</text>
        </level>
      </level>
    </level>
    <level label="c">
      <text>The Department may require the applicant to publish and send the notices required in subsection (a) of this section.</text>
    </level>
  </section>
  <section article="gen" article_name="Environment" number="1-603" title_number="1" title_name="Definitions; General Provisions; Enforcement" subtitle_number="6" subtitle_name="Public Participation in the Permitting Process">
    <level label="a">
      <text>The Department shall cause to be published notice of applications for permits.</text>
    </level>
    <level label="b">
      <text>The Department shall assure that applications for permits shall be available to the public for inspection and copying.</text>
    </level>
    <level label="c">
      <level label="1">
        <text>Upon written request made within 10 working days after publication of a notice of application, or in its own discretion, the Department shall provide an opportunity for an informational meeting with respect to the application.</text>
      </level>
      <level label="2">
        <text>The informational meeting may be canceled if all persons who made timely written requests withdraw the requests prior to the meeting.</text>
      </level>
      <level label="3">
        <text>Unless the notice of application contained a notice of the informational meeting, the Department shall publish notice of the informational meeting.</text>
      </level>
    </level>
    <level label="d">
      <level label="1">
        <text>The Department may require the applicant to attend an informational meeting or public hearing and present information concerning the application.</text>
      </level>
      <level label="2">
        <text>If the applicant fails to appear and present information after a request from the Department, the application may be denied.</text>
      </level>
    </level>
  </section>
  <section article="gen" article_name="Environment" number="1-604" title_number="1" title_name="Definitions; General Provisions; Enforcement" subtitle_number="6" subtitle_name="Public Participation in the Permitting Process">
    <level label="a">
      <level label="1">
        <text>After the Department receives the permit application, the Department shall prepare a tentative determination, which shall include the following information:</text>
        <level label="i">
          <text>A proposal to issue or to not issue a permit;</text>
        </level>
        <level label="ii">
          <text>Any proposed permit limitations and conditions;</text>
        </level>
        <level label="iii">
          <text>A brief explanation of the Department’s tentative determination; and</text>
        </level>
        <level label="iv">
          <text>Any proposed schedule of compliance.</text>
        </level>
      </level>
      <level label="2">
        <text>If the tentative determination is to issue a permit, the tentative determination shall include a draft permit, which shall be available to the public for inspection and copying.</text>
      </level>
      <level label="3">
        <text>The Department shall publish a notice of the tentative determination. This publication shall allow 30 calendar days for public comment before the issuance of the final determination.</text>
      </level>
      <level label="4">
        <level label="i">
          <text>The Department shall schedule a public hearing on the tentative determination when a written request for a public hearing is made within 20 days of publication of a notice of the tentative determination.</text>
        </level>
        <level label="ii">
          <text>The public hearing may be canceled if all persons who made timely written requests withdraw the requests prior to the meeting. In addition, the Department may schedule a public hearing on a tentative determination at its discretion.</text>
        </level>
      </level>
    </level>
    <level label="b">
      <level label="1">
        <text>The Department shall prepare a final determination if:</text>
        <level label="i">
          <text>Written comments adverse to the tentative determination were received by the Department within 30 days after the publication of the notice of tentative determination pursuant to this section;</text>
        </level>
        <level label="ii">
          <text>Comments adverse to the tentative determination were received in writing at, or within 5 days after, the public hearing conducted pursuant to this section;</text>
        </level>
        <level label="iii">
          <text>Comments adverse to the tentative determination were received orally at the public hearing conducted pursuant to this section and the Department prepared a transcript of the comments made at the hearing; or</text>
        </level>
        <level label="iv">
          <text>The final determination is substantively different from the tentative determination and all persons aggrieved by the final determination have not waived, in writing, their right to request a contested case hearing.</text>
        </level>
      </level>
      <level label="2">
        <text>If the Department is required to prepare a final determination under this section, the Department shall publish a notice of the final determination.</text>
      </level>
      <level label="3">
        <text>If the Department is not required to prepare a final determination under this section, the tentative determination is a final decision by the Department when the permit is issued or denied.</text>
      </level>
    </level>
  </section>
  <section article="gen" article_name="Environment" number="1-605" title_number="1" title_name="Definitions; General Provisions; Enforcement" subtitle_number="6" subtitle_name="Public Participation in the Permitting Process">
    <level label="a">
      <text>A person petitioning for judicial review in accordance with § 1–601 of this subtitle or § 5–204 or § 16–204 of this article shall file the petition in accordance with the Maryland Rules.</text>
    </level>
    <level label="b">
      <text>A party submitting a petition for judicial review shall file the petition within 30 days after publication of a notice of final determination.</text>
    </level>
    <level label="c">
      <text>An action for judicial review brought in accordance with § 1–601 of this subtitle or § 5–204 or § 16–204 of this article shall be conducted in accordance with the Maryland Rules.</text>
    </level>
    <level label="d">
      <text>A party to the judicial review action may not challenge a facility’s compliance with zoning and land use requirements or conformity with a county plan issued under Title 9, Subtitle 5 of this article. However, nothing in this subtitle shall prevent a party from challenging whether the Department has complied with §§ 2–404(b)(1)(ii) and 9–210(a)(3) of this article, when applicable, nor does this subtitle prevent a party from contesting the compliance of the facility with zoning and land use or county plan requirements in any proceeding brought in accordance with and under any applicable local laws.</text>
    </level>
  </section>
  <section article="gen" article_name="Environment" number="1-606" title_number="1" title_name="Definitions; General Provisions; Enforcement" subtitle_number="6" subtitle_name="Public Participation in the Permitting Process">
    <level label="a">
      <level label="1">
        <text>In this section the following words have the meanings indicated.</text>
      </level>
      <level label="2">
        <text>“Board” means the Board of Public Works.</text>
      </level>
      <level label="3">
        <text>“License” means a license under § 16–202 of this article.</text>
      </level>
    </level>
    <level label="b">
      <text>This section applies to:</text>
      <level label="1">
        <text>A permit listed under § 1–601(a) of this subtitle;</text>
      </level>
      <level label="2">
        <text>A permit listed under § 5–204(f) of this article; or</text>
      </level>
      <level label="3">
        <text>A license issued under § 16–202 of this article.</text>
      </level>
    </level>
    <level label="c">
      <text>Any judicial review of a determination provided for in accordance with § 1–601 of this subtitle or § 5–204 or § 16–204 of this article shall be limited to a record compiled by the Department or Board, consisting of:</text>
      <level label="1">
        <text>Any permit or license application and any data submitted to the Department or Board in support of the application;</text>
      </level>
      <level label="2">
        <text>Any draft permit or license issued by the Department or Board;</text>
      </level>
      <level label="3">
        <text>Any notice of intent from the Department or Board to deny the application or to terminate the permit or license;</text>
      </level>
      <level label="4">
        <text>A statement or fact sheet explaining the basis for the determination by the Department or Board;</text>
      </level>
      <level label="5">
        <text>All documents referenced in the statement or fact sheet explaining the basis for the determination by the Department or Board;</text>
      </level>
      <level label="6">
        <text>All documents, except documents for which disclosure is precluded by law or that are subject to privilege, contained in the supporting file for any draft permit or license;</text>
      </level>
      <level label="7">
        <text>All comments submitted to the Department or Board during the public comment period, including comments made on the draft application;</text>
      </level>
      <level label="8">
        <text>Any tape or transcript of any public hearings held on the application; and</text>
      </level>
      <level label="9">
        <text>Any response to any comments submitted to the Department or Board.</text>
      </level>
    </level>
    <level label="d">
      <level label="1">
        <text>When a draft permit or license or tentative determination is issued, the Department or Board shall:</text>
        <level label="i">
          <text>Make available for inspection and copying no later than the date the permit, draft license, or tentative determination is issued:</text>
          <level label="1">
            <text>All permit or license applications;</text>
          </level>
          <level label="2">
            <text>Documents submitted with a permit or license application;</text>
          </level>
          <level label="3">
            <text>All documents relied on in making the tentative determination; and</text>
          </level>
          <level label="4">
            <text>A privilege log that identifies all documents not produced for inspection in accordance with subsection (c)(6) of this section and states the reasons for withholding each document; and</text>
          </level>
        </level>
        <level label="ii">
          <text>Extend the public comment period by 60 days on request by a person.</text>
        </level>
      </level>
      <level label="2">
        <text>A request submitted to the Department or Board under paragraph (1)(ii) of this subsection shall be:</text>
        <level label="i">
          <text>Submitted in writing; and</text>
        </level>
        <level label="ii">
          <text>Made before the expiration of the original comment period.</text>
        </level>
      </level>
      <level label="3">
        <text>A public comment period may not be extended more than once under paragraph (1)(ii) of this subsection.</text>
      </level>
    </level>
  </section>
  <section article="gen" article_name="Environment" number="1-607" title_number="1" title_name="Definitions; General Provisions; Enforcement" subtitle_number="6" subtitle_name="Public Participation in the Permitting Process">
    <level label="a">
      <level label="1">
        <text>This subsection applies to applications for all licenses and permits issued, or required to be reissued, by the Department.</text>
      </level>
      <level label="2">
        <text>On or before January 1, 1998, and each year thereafter, in consultation with interested parties, the Department shall publish expected review times for each licensing and permitting program.</text>
      </level>
      <level label="3">
        <text>On or before January 1, 1998, for each licensing and permitting program, the Department shall offer assistance and information to persons which may include:</text>
        <level label="i">
          <text>Written lists of information and materials required with applications;</text>
        </level>
        <level label="ii">
          <text>Written lists of common application questions and mistakes;</text>
        </level>
        <level label="iii">
          <text>Preapplication meetings with prospective applicants to address technical issues;</text>
        </level>
        <level label="iv">
          <text>Written receipts to the applicant upon submission of an application; and</text>
        </level>
        <level label="v">
          <text>The status of active applications.</text>
        </level>
      </level>
    </level>
    <level label="b">
      <level label="1">
        <text>This subsection applies to permits which are:</text>
        <level label="i">
          <text>Identified in § 1–601(a) of this subtitle; or</text>
        </level>
        <level label="ii">
          <text>Issued under Title 5, Subtitle 9 of this article.</text>
        </level>
      </level>
      <level label="2">
        <text>The Department shall provide to the applicant:</text>
        <level label="i">
          <text>A notice of completed application; or</text>
        </level>
        <level label="ii">
          <text>If the Department determines that the application is incomplete, the reasons, in writing, that the application was determined to be incomplete.</text>
        </level>
      </level>
      <level label="3">
        <level label="i">
          <text>For permits identified in § 1–601(a) of this subtitle, the notice of completed application shall include an estimated time for issuance of the tentative determination if requested by the applicant.</text>
        </level>
        <level label="ii">
          <text>For permits issued under Title 5, Subtitle 9 of this article, the notice of completed application shall include an estimate of the date by which the Department will grant, deny, or condition the permit.</text>
        </level>
      </level>
      <level label="4">
        <text>A permit applicant may apply to the Department for a refund of all or a portion of the application fee if:</text>
        <level label="i">
          <level label="1">
            <text>For permits identified in § 1–601(a) of this subtitle, the Department fails to issue a tentative determination regarding the application within the estimated time provided in the notice of completed application; or</text>
          </level>
          <level label="2">
            <text>For permits issued under Title 5, Subtitle 9 of this article, the Department fails to grant, deny, or condition a permit within the time periods provided under § 5–906 of this article;</text>
          </level>
        </level>
        <level label="ii">
          <text>The applicant demonstrates that the delay was caused solely by the Department and was not the result of procedures or requirements outside the control of the Department, including:</text>
          <level label="1">
            <text>Reviews by federal, local, or other State government</text>
            <text>agencies;</text>
          </level>
          <level label="2">
            <text>Procedures for public participation; or</text>
          </level>
          <level label="3">
            <text>The failure of the applicant to submit information to the Department in a timely manner; and</text>
          </level>
        </level>
        <level label="iii">
          <level label="1">
            <text>For permits identified in § 1–601(a) of this subtitle, the applicant applies to the Department within 60 days after the estimated time for issuance of a tentative determination; or</text>
          </level>
          <level label="2">
            <text>For permits issued under Title 5, Subtitle 9 of this article, the applicant applies to the Department within 60 days after the date by which the Department was to have granted, denied, or conditioned a permit under the time periods provided under § 5–906 of this article.</text>
          </level>
        </level>
      </level>
      <level label="5">
        <text>The Secretary, or the Secretary’s designee, shall review the refund request and determine if a refund of any amount is appropriate.</text>
      </level>
      <level label="6">
        <text>If the Secretary denies the refund request, the Department shall provide the applicant a written explanation of the denial and of the procedures and requirements outside the control of the Department on which the denial was based within 60 days.</text>
      </level>
    </level>
  </section>
</subtitle>