Title 15. Mines and Mining — Subtitle 6. Deep Mine Control
Statutes in effect as of October 1, 2026.
Md. Code Ann., Envir. § 15-601 (2026)
Title 15. Mines and Mining
Subtitle 6. Deep Mine Control
§ 15–601LinkCopy Citation
(a)
In this subtitle the following words have the meanings indicated.
(b)
“Abandoned” means an operation from which coal has not been removed for a six-month period.
(c)
“Affected area” means: (i) the land within the permit area from which coal is removed and which is occupied by pillars; (ii) all land adjacent to the mine openings utilized by the operator; and (iii) off-site disposal areas.
(d)
“Completed” means an operation where backfilling, sealing, revegetation, and other requirements of the permit have been accomplished.
(e)
“Deep mining” means the extraction of coal through underground mining methods, including gaining access to the coal deposits by means of vertical or inclined shafts, by drift mining from the coal outcrop, or by other means that do not involve the stripping away of overburden to expose the deposit.
(f)
“Mine opening sealing” means adequate sealing of a mine so that discharge from the mine is not or will not become injurious to animal or aquatic life or to use of water for domestic or industrial consumption or recreation or does not or will not violate water quality or effluent standards.
(g)
“Opening” means a passage into a coal bed that is used for haulage, traveling ways, ventilation, or removal or introduction of water.
(h)
“Operator” means any person, partnership, or corporation who removes or intends to remove more than 250 tons of coal from the earth by deep coal mining within 12 consecutive calendar months in any one location.
(i)
“Subsidence” means the sinking or settling of a land surface area from beneath which coal has been extracted.
Md. Code Ann., Envir. § 15-602 (2026)
Title 15. Mines and Mining
Subtitle 6. Deep Mine Control
§ 15–602LinkCopy Citation
In this subtitle the General Assembly intends to provide for the reclamation of the land affected by deep mining operations; provide for the protection of the waters of the State that otherwise might be affected adversely by pollution from deep mines; and provide for the improvement of the health, welfare, and living conditions in the communities and counties in which coal mining is an important industry.
Md. Code Ann., Envir. § 15-603 (2026)
Title 15. Mines and Mining
Subtitle 6. Deep Mine Control
§ 15–603LinkCopy Citation
(a)
The Secretary shall adopt rules and regulations for prevention of water pollution or damage to the land surface resulting from deep mining operations. The rules and regulations shall include standards and procedures for ensuring reclamation or sealing of mined areas after operations cease.
(b)
The Secretary may study and recommend and shall approve all procedures for reclamation, conservation, and revegetation of affected areas, including mine opening sealing, prevention or reclamation of subsidence damage, underground fires, disposition of spoil, restoration of plant cover, prevention of erosion, prevention of the creation of acid water, and any other actions that will ensure conservation and beneficial utilization of the natural resources of the State.
(c)
The Secretary shall review all mining and reclamation plans, progress reports, inspection reports, and completion reports.
(d)
The Secretary may enter to inspect any deep mine operation to determine reclamation progress, conservation, and water quality conditions and investigate for violations of this subtitle.
(e)
In order to protect the stability of land, the Secretary shall suspend deep mining under urbanized areas, cities, towns and communities and adjacent to industrial or commercial buildings, major impoundments or permanent streams if the Secretary finds imminent danger to inhabitants of the urbanized areas, cities, towns and communities.
(f)
The surface effects of deep mining shall be subject to the applicable provisions of Subtitle 5 of this title and any rules or regulations adopted pursuant thereto.
Md. Code Ann., Envir. § 15-604 (2026)
Title 15. Mines and Mining
Subtitle 6. Deep Mine Control
§ 15–604LinkCopy Citation
All funds received by the Secretary from permit fees and surcharges shall be deposited to the credit of the Deep Mining Fund to be used only for the administration and implementation of this subtitle, including mine opening sealing and reclamation of subsidence damage.
Md. Code Ann., Envir. § 15-605 (2026)
Title 15. Mines and Mining
Subtitle 6. Deep Mine Control
§ 15–605LinkCopy Citation
(a)
A person may not continue or commence operation of any deep mine as an operator within the State without first obtaining a license from the Department.
(b)
The application for a license shall be made in writing on a form the Department furnishes and accompanied by a $200 fee. The application shall contain the information concerning the applicant that the Department requires. If a corporation, partnership, or association submits the application, it shall contain the information concerning officers, directors, and principal owners that the Department requires. Subject to subsection (c) of this section, a license is renewable annually on application made on or before January 1 of the next succeeding year and payment of a $10 renewal fee.
(c)
(1)
The Secretary shall investigate each application for a license or renewal.
(2)
The Secretary may not issue a license to or renew the license of an applicant if the Secretary finds that the applicant:
(i)
Failed to correct a violation of any rule or regulation adopted under this subtitle;
(ii)
Failed to comply with any provision of this subtitle; or
(iii)
Forfeited any bond posted in connection with deep mining activities in any state.
(3)
With respect to an application of a corporation, partnership, or association, the Secretary may not issue a license to or renew the license of the applicant, if the Secretary finds that any of its officers, directors, or principal owners:
(i)
Failed and continues to fail to comply with any provision of this subtitle;
(ii)
Is or has been an officer, or principal owner of any other corporation, partnership, or association that previously failed and continues to fail to comply with any provision of this subtitle; or
(iii)
Forfeited any bond posted in connection with deep mining activity in any state.
(4)
The provisions of this subsection are not intended to expand the authority of the Secretary to adopt rules and regulations as otherwise provided by law.
Md. Code Ann., Envir. § 15-606 (2026)
Title 15. Mines and Mining
Subtitle 6. Deep Mine Control
§ 15–606LinkCopy Citation
(a)
A person may not continue or commence operation of any deep mine as an operator after January 1, 1977 without first obtaining a permit from the Secretary.
(b)
The application for a permit shall be on a form prescribed by the Secretary and shall be accompanied by a $200 fee. As part of the application, the operator shall include: (1) two copies of an accurate map or plan as required by subsection (i) of this section; (2) a detailed mine opening sealing plan and general reclamation plan for the affected area; (3) any other information required by the Secretary; and (4) an application for each other permit required for the operation by the Environment Article.
(c)
(1)
Notwithstanding any provision of the State Government Article, public notice on pending applications provided in accordance with the provisions of this subtitle shall be the only notice required by law.
(2)
Upon submission of the completed applications required by subsection (b) of this section, the Department shall require the applicant to publish an approved public notice of the opportunity to submit written comments and to request a hearing.
(3)
The public notice shall:
(i)
Be published in a newspaper of general circulation in the county of the proposed mining site at least once a week for 4 successive weeks;
(ii)
Identify the ownership of the land within the proposed permit area;
(iii)
Describe the location of the proposed operation sufficiently so that it can be easily located by local residents;
(iv)
Indicate the location where a copy of the application is available for public inspection; and
(v)
Include a statement that written comments and requests for a public hearing will be received by the Department for 30 days after the last newspaper publication.
(4)
The Department shall provide written notice of applications for permits to any person who requests written notice.
(5)
Prior to the hearing, the Secretary shall seek the recommendations of the Land Reclamation Committee concerning the general reclamation plan for the affected area.
(d)
(1)
If a hearing is requested within the comment period set forth in the public notice, the Department shall notify the applicant and any person who requests the hearing of the date, time, and location of the hearing. The Department shall publish the date, time, and location of the hearing in a newspaper of general circulation in the county of the proposed operation.
(2)
The Department shall hold the hearing at least 15 but not more than 60 days after the Department provides public notice of the hearing. Members of the public shall be provided an opportunity to comment on the application in writing until the date of the hearing and copies of the application shall be available for public inspection at the Department and at the soil conservation district office in the county of the proposed mine site 15 days before the hearing.
(3)
A record of the hearing shall be made and be available to the public.
(e)
(1)
The Secretary shall approve, reject, or modify the proposed deep mining plans. If a hearing is requested, after the hearing, the Secretary shall approve, reject, or modify the proposed deep mining plans.
(2)
If the Secretary modifies or rejects a deep mining plan, the operator shall be notified in writing of the reasons for rejection or the modifications required. The operator may resubmit the plan with the requested corrections or modifications to the Secretary.
(f)
A permit issued under this subtitle is valid for a period of up to five years from its issuance or until the operation is completed or abandoned, unless the Department suspends or revokes the permit or unless the permittee requests a change in operations.
(g)
A permit is renewable on application and payment of a $200 fee.
(h)
A permit may not be issued to any operator for the purpose of mining any abandoned mine or part of it that has been sealed in compliance with this subtitle, unless a detailed projected mining plan in the form of a cost-benefit analysis is submitted to and approved by the Secretary. The Secretary may not approve a plan unless the plan shows that a continuation of mining would not affect adversely the current environmental balance of the area and would be advantageous for the more complete recovery and utilization of the natural resources.
(i)
The operator of any coal mine in the State shall make, or cause to be made by a competent mining engineer or surveyor, an accurate map of the mine for each seam of coal worked, on a scale of not less than 200 feet to the inch, which shows:
(1)
The boundary lines of the property, the location of all buildings, railway tracks, wagon or other roads, rivers, streams, lakes and ponds, with the depth indicated, other important landmarks on the surface of the property; connecting lines of contiguous properties; and any lines with relation to contiguous mines or coal properties.
(2)
The openings, excavations, shafts, slopes, drifts, tunnels, planes, entries, rooms, crosscuts, and the name and location number of each coal mine, if so identified.
(3)
The elevation datum at top and bottom of each shaft, slope, and any drifts, tunnels, planes, at the faces of entries, as found at each semiannual survey; and in rooms and entries adjacent to boundary lines between the mine and any adjoining mine at points not more than 300 feet apart; the date of entry of each datum; and the location and elevation of any body of water dammed within or held back in any portion of the mine, giving as nearly as ascertainable, the true area of the body of water.
(4)
The direction of the air currents in the mine, indicated by arrows.
Md. Code Ann., Envir. § 15-607 (2026)
Title 15. Mines and Mining
Subtitle 6. Deep Mine Control
§ 15–607LinkCopy Citation
The Department shall adopt regulations to protect against, prevent, or correct material damage due to subsidence.
Md. Code Ann., Envir. § 15-608 (2026)
Title 15. Mines and Mining
Subtitle 6. Deep Mine Control
§ 15–608LinkCopy Citation
(a)
Nothing in this subtitle shall be construed as affecting the right of any person to enforce or protect that person’s interest in water resources affected by deep mining.
(b)
The operator of a deep mine shall replace the water supply of an owner of interest in real property who obtains all or part of the owner’s supply of water for domestic, agricultural, industrial, or other legitimate use from an underground or surface source where the supply has been affected by contamination, diminution, or interruption proximately resulting from deep mining operations.
(c)
(1)
If the Department determines that the water supply has been affected by deep mining operations, the Department shall notify the operator of its determination and shall establish a reasonable schedule for the operator to replace the water supply.
(2)
If the operator fails to comply with the schedule for replacing the affected water supply established in the Department’s notification under paragraph (1) of this subsection, the Department shall order the operator to replace the affected water supply.
(3)
On request from the operator, the Department shall use funds from the Deep Mining Fund to replace the affected water supply, if the operator agrees to reimburse the Fund for money expended by the Department as provided in subsection (f) of this section.
(d)
(1)
On request from the owner of the affected water supply, the Department may use funds from the Deep Mining Fund to replace the affected water supply if the operator fails to comply with either the schedule established in the Department’s notification or the Department’s order under subsection (c) of this section.
(2)
These funds may be used to replace a water supply only after the owner of the affected water supply agrees to reimburse the Fund for moneys expended by the Department as provided in subsection (f) of this section.
(e)
(1)
If the Department determines that the water supply has been affected by deep mining operations after bonds on the operations have been forfeited, the Department may use funds received from forfeiture on bonds, or funds from the Deep Mining Fund where funds received from forfeiture on bonds are not sufficient, to replace the water supply.
(2)
If the Department determines that the water supply has been affected by deep mining operations after all bonds on the operation have been fully released, instead of requiring the operator to replace the water supply under subsection (c) of this section, the Department shall use funds from the Deep Mining Fund to replace the water supply. The use of these funds may not be construed to extend any permit where bonds have been fully released.
(f)
(1)
The operator shall reimburse the Fund for all moneys expended by the Department to replace the water supply if:
(i)
After final administrative and judicial review of the Department’s determination or order issued under subsection (c) of this section, it is determined that the water supply contamination, diminution, or interruption did proximately result from the operator’s deep mining operation; and
(ii)
The Department has expended moneys from the Deep Mining Fund to replace the water supply.
(2)
The property owner shall reimburse the Fund for all moneys expended by the Department to replace the water supply if:
(i)
After final administrative and judicial review of the Department’s determination or order issued under subsection (c) of this section, it is determined that the water supply contamination, diminution, or interruption did not proximately result from the operator’s deep mining operation; and
(ii)
The Department has expended moneys from the Fund to replace the water supply.
(3)
(i)
The operator may request reimbursement from the Department for the actual direct costs incurred by the operator to replace the water supply if:
(1)
After final administrative and judicial review of the Department’s determination or order issued under subsection (c) of this section, it is determined that the water supply contamination, diminution, or interruption did not proximately result from the operator’s deep mining operation; and
(2)
The operator has replaced the water supply.
(ii)
The request shall be in writing, signed by the operator, and include a statement of the actual direct costs incurred by the operator to replace the water supply and a statement that the operator is not eligible for reimbursement for all or any part of the costs for which reimbursement is requested from any other source.
(iii)
The Department shall reimburse the operator for the operator’s eligible costs to replace the water supply from the Deep Mining Fund.
(g)
(1)
The operator shall be liable for any expenditures from the Deep Mining Fund in excess of funds received from forfeiture on bonds required to replace the water supply under subsection (e) of this section.
(2)
The Department may recover from the operator all costs of water supply replacement in excess of funds received from forfeiture on bonds.
Md. Code Ann., Envir. § 15-609 (2026)
Title 15. Mines and Mining
Subtitle 6. Deep Mine Control
§ 15–609LinkCopy Citation
(a)
When, by sale, lease, assignment, or otherwise, one operator succeeds to the interest of another in any uncompleted mining operation, the Department may release the first operator from all liabilities imposed on him by this subtitle with reference to the operation and transfer the permit to the successor operator, if both operators have complied with the requirements of this subtitle and the successor operator assumes the duties and responsibilities of the first operator with reference to reclamation of the land according to the authorized mining and reclamation plan and posts suitable bond or other security required by § 15-612 of this subtitle.
(b)
The successor operator shall pay a $20 fee on filing a transfer of permit.
Md. Code Ann., Envir. § 15-610 (2026)
Title 15. Mines and Mining
Subtitle 6. Deep Mine Control
§ 15–610LinkCopy Citation
(a)
If the Department determines that the activities under the mining and reclamation plan and other terms and conditions of the permit fail substantially to achieve the purposes and requirements of this subtitle, the Department shall give the operator written notice of:
(1)
The Department’s determination;
(2)
The Department’s intention to modify the mining and reclamation plan and other terms and conditions of the permit in a stated manner; and
(3)
The operator’s right to a hearing on the proposed modification at a stated time and place.
(b)
The hearing shall be held within 60 days after written notice is forwarded to the operator. After the hearing, the Department may modify the mining and reclamation plan and other terms and conditions of the permit in the manner stated in the notice or in another manner it considers reasonably appropriate in view of the evidence submitted at the hearing. Refusal of the operator to comply with the conditions set forth in the permit so modified by the Department shall result in the revocation of the permit.
(c)
A fee may not be charged to the operator for a departmental modification of the permit.
Md. Code Ann., Envir. § 15-611 (2026)
Title 15. Mines and Mining
Subtitle 6. Deep Mine Control
§ 15–611LinkCopy Citation
(a)
If the Department has reason to believe that a violation of this subtitle, any rules or regulations adopted under it, or the terms and conditions of a permit, including the approved mining and reclamation plan, has occurred, the Department shall serve written notice of a violation on the operator, specifying the facts constituting the apparent violation and inform the operator of his right to a hearing at a stated time and place. Subsequent to or concurrent with service of the written notice, the Department may suspend the permit or issue an order until the violation is corrected.
(b)
The hearing shall be held within 45 days after the notice is forwarded to the operator. The operator may appear at the hearing, either personally or through counsel, and present evidence on his behalf. The Department shall render a decision regarding the violation within ten days after the hearing.
(c)
The Department may revoke the permit if the violation is not corrected.
(d)
Any operator whose permit is suspended or revoked shall be denied a new permit or a renewal of the old permit to engage in mining until he has complied fully with the provisions of this subtitle, the rules and regulations adopted under it, and the terms and conditions of his permit, including any modifications and the approved mining and reclamation plan, and until he has satisfactorily corrected all previous violations.
Md. Code Ann., Envir. § 15-612 (2026)
Title 15. Mines and Mining
Subtitle 6. Deep Mine Control
§ 15–612LinkCopy Citation
(a)
(1)
After receiving notification that an application for a permit has been approved, but before commencing deep mining operations, the operator shall file a bond with the Department.
(2)
Before commencing operations on an additional opening not included in the original bond made in the application for a permit, the operator shall post an additional bond or deposit. The operator also shall submit additional information that would have been required to be included with the original application for a permit. On receipt of the additional bond or deposit and the additional material, the Secretary may issue an amended permit covering any additional opening covered by the additional bond.
(b)
The bond shall be on a form prescribed and furnished by the Department, payable to the State of Maryland, and conditioned on faithful performance of the requirements of this subtitle by the operator.
(c)
The amount of the bond shall be equal to the amount the Department determines to be the cost of reclamation of the affected area. Liability under the bond shall be for the duration of the mining operation, and for a period of five years after the mine has been completed, provided that a bond may not be fully released until all requirements of this subtitle, regulations adopted in accordance with this subtitle, and permit conditions have been met.
(d)
The bond shall be executed by the operator and by a corporate surety approved by the Department.
(e)
(1)
The operator may elect to deposit cash, a certificate of deposit from a bank that is physically located in the State or that otherwise subjects itself to the jurisdiction of the U.S. District Court for the District of Maryland, or negotiable bonds of the United States government with the Department in lieu of a corporate surety. The cash deposit or market value of the securities may not be less than the required sum of the bond.
(2)
On receipt of any deposit of cash or securities, the Secretary immediately shall forward it to the State Treasurer, who shall receive and hold it in the name of the State in trust for the purpose for which the deposit is made.
(3)
The operator making the deposit may demand and receive from the State Treasurer the whole or any portion of any securities so deposited, on depositing with the State Treasurer other negotiable securities of the classes specified in this section having a market value at least equal to the required sum of the bond.
(f)
On submission of the annual progress report required by § 15-615 of this subtitle, the Secretary may adjust the amount of the bond or security required from the operator to assure completion of reclamation work.
Md. Code Ann., Envir. § 15-613 (2026)
Title 15. Mines and Mining
Subtitle 6. Deep Mine Control
§ 15–613LinkCopy Citation
(a)
The performance bond or cash deposit in lieu of a bond shall be forfeited on failure of the operator to perform in the manner set forth in the authorized mining and reclamation plan and to reclaim the land as provided for in the permit or on revocation of the permit. The Department shall notify the operator by certified mail, return receipt requested, bearing a postmark from the United States Postal Service, of its intention to initiate forfeiture proceedings. The operator has 30 days to show cause why the bond or cash deposit should not be forfeited.
(b)
If the operator shows cause, the Department shall provide a reasonable time, but not less than six months, for the operator to restore the land to comply with the permit.
(c)
If the operator fails to show cause, the bond or cash deposit shall be forfeited nisi, and the Department shall give notice of the forfeiture to the operator, to the legal owner of the land if different from the operator, and to the surety. If a showing of intention to restore in compliance with the permit is not submitted to the Department within 30 days after the forfeiture nisi, the bond or cash deposit shall be forfeited absolute.
(d)
(1)
Funds received from forfeiture on bonds shall be deposited in the Deep Mining Fund and be used to reclaim the land affected by the operation on which the liability was charged on the bond and to perform the requirements of this subtitle, regulations issued under this subtitle, and permit conditions that the operator has failed to perform.
(2)
Funds received on a forfeiture in excess of the amount required to reclaim the land affected and to perform the requirements that the operator has failed to perform may be used to reclaim any other land affected by deep mining.
Md. Code Ann., Envir. § 15-614 (2026)
Title 15. Mines and Mining
Subtitle 6. Deep Mine Control
§ 15–614LinkCopy Citation
An operator may not conduct deep mining within the State if he previously has forfeited any bond posted pursuant to deep mining activities, unless, on application, the operator repays to the Department the cost of reclamation, if the Department has reclaimed the land with interest at the current rate for the time elapsed, less the amount of the forfeited bond. If the land is still unreclaimed, the operator shall reclaim the land covered by the forfeited bond at his own expense, including any additional erosional, sedimentation, or pollution damage resulting from the lack of proper reclamation during the interim.
Md. Code Ann., Envir. § 15-615 (2026)
Title 15. Mines and Mining
Subtitle 6. Deep Mine Control
§ 15–615LinkCopy Citation
(a)
By the twenty-fifth day of each month, a deep mine operator shall file a monthly progress report with the Secretary on a form furnished by the Secretary. In the report, the operator shall indicate the total area affected, number of mine openings, tonnage of coal removed, and changes in this information over previous months. An annual report shall be furnished to the Secretary not later than February 25 of each year for the preceding year covering facts the Secretary may require regarding the production and condition of the operation during the calendar year preceding. The operator also shall update the information on the maps previously supplied with the permit application.
(b)
On the basis of the approved annual and monthly progress or completion reports the Secretary shall assess a 15-cent surcharge for each ton of coal removed during the past year. Nine cents of the amounts collected from each ton of coal removed shall be retained by the Secretary and 6 cents shall be remitted directly to the county in which the coal was removed.
(c)
Every six months the operator of each mine shall cause to be accurately shown on the map and on the copies any extension of any portion of the mine, which was made during the intervening period, and any portion of the mine and mine workings, discontinued or abandoned.
(d)
If the district mine inspector reasonably believes that any map of any mine or copy furnished to him under the provisions of this section is inaccurate, he may order a survey of what he believes has been mapped incorrectly. The cost of the survey is recoverable from the operator as other debts are recoverable by law. However, if the map claimed to be inaccurate is found to be sufficiently accurate for its intended purpose, the reasonable cost of the survey is payable by the State.
Md. Code Ann., Envir. § 15-616 (2026)
Title 15. Mines and Mining
Subtitle 6. Deep Mine Control
§ 15–616LinkCopy Citation
(a)
Within 30 days after an operation is abandoned or completed, the operator shall file with the Department a completion report on a form prescribed and furnished by the Secretary.
(b)
The operator shall attach to the completion report:
(1)
A map of the operation certified by a surveyor or engineer that shows the boundary lines of the tract and the access to the operation from the nearest public highway;
(2)
The area of land affected by the deep mining operation; and
(3)
Details of the completed reclamation work.
Md. Code Ann., Envir. § 15-617 (2026)
Title 15. Mines and Mining
Subtitle 6. Deep Mine Control
§ 15–617LinkCopy Citation
On application of the Department, verified by oath, the circuit court of the county or city where the mining operation is located may enjoin compliance with or violation of any order, notice, rule, or regulation of the Department made in accordance with this subtitle.
Md. Code Ann., Envir. § 15-618 (2026)
Title 15. Mines and Mining
Subtitle 6. Deep Mine Control
§ 15–618LinkCopy Citation
Any operator who mines coal by the deep mining method without having a permit or amended permit or without providing bond as provided in this subtitle, who knowingly or intentionally includes false information in the application for a permit, or who does not fully comply with the permit or adopted rules and regulations is guilty of a misdemeanor and on conviction is subject to a fine not exceeding $5,000.