    <text>The Department may authorize a stream and floodplain restoration project in accordance with this section.</text>
  </level>
  <level label="b">
    <text>Prior to the authorization of any stream and floodplain restoration project in the State, the Department shall:</text>
    <level label="1">
      <text>Assess documentation submitted by the project applicant for degradation criteria related to:</text>
      <level label="i">
        <text>An existing biological function–based parameter; and</text>
      </level>
      <level label="ii">
        <text>A physical parameter, including an existing geomorphologic or hydraulic function–based parameter;</text>
      </level>
    </level>
    <level label="2">
      <text>Assess whether the project applicant incorporated the following cobenefits, as appropriate, into the application:</text>
      <level label="i">
        <text>The creation or restoration of wildlife habitat, riparian buffers, and wetland restoration;</text>
      </level>
      <level label="ii">
        <text>The restoration of aquatic resources, such as freshwater mussels, fish passage, or oyster reefs;</text>
      </level>
      <level label="iii">
        <text>Carbon sequestration;</text>
      </level>
      <level label="iv">
        <text>Climate change mitigation, adaptation, or resilience;</text>
      </level>
      <level label="v">
        <text>Improving and protecting public health; and</text>
      </level>
      <level label="vi">
        <text>Recreational opportunities and public access to waterways and natural habitats;</text>
      </level>
    </level>
    <level label="3">
      <text>Assess documentation of community notifications conducted by the project applicant prior to the submission of the application;</text>
    </level>
    <level label="4">
      <text>Assess whether the applicant incorporated, to the extent practicable, recognized best management practices to:</text>
      <level label="i">
        <text>Maximize ecological uplift;</text>
      </level>
      <level label="ii">
        <text>Minimize:</text>
        <level label="1">
          <text>Impacts to wildlife habitats;</text>
        </level>
        <level label="2">
          <text>Tree loss and removal;</text>
        </level>
        <level label="3">
          <text>Earth disturbance; and</text>
        </level>
        <level label="4">
          <text>Disturbance to native vegetation;</text>
        </level>
      </level>
      <level label="iii">
        <text>Avoid impacts to:</text>
        <level label="1">
          <text>Large noninvasive native plant communities; and</text>
        </level>
        <level label="2">
          <text>Specimen trees;</text>
        </level>
      </level>
      <level label="iv">
        <text>Use existing areas suitable for material staging areas to avoid forest removal;</text>
      </level>
      <level label="v">
        <text>Limit construction access road widths;</text>
      </level>
      <level label="vi">
        <text>Limit the impacts of ingress and egress points to minimize forest impacts; and</text>
      </level>
      <level label="vii">
        <text>Where appropriate, prioritize the removal of nonnative and invasive:</text>
        <level label="1">
          <text>Trees; and</text>
        </level>
        <level label="2">
          <text>Vegetation; and</text>
        </level>
      </level>
    </level>
    <level label="5">
      <text>Establish a plan to provide for at least 5 years of monitoring in accordance with subsection (d) of this section.</text>
    </level>
  </level>
  <level label="c">
    <text>The Department’s assessment review required under subsection (b)(3) of this section shall include:</text>
    <level label="1">
      <text>Whether the project applicant provided notice as required in § 18–101 of this title;</text>
    </level>
    <level label="2">
      <text>Whether the project applicant conducted a public meeting as required in § 18–101(d) of this title;</text>
    </level>
    <level label="3">
      <text>Whether the project applicant placed appropriate project signage;</text>
    </level>
    <level label="4">
      <text>Whether the project applicant considered the project’s compatibility with local land use, especially in urban, suburban, and other high–visibility areas;</text>
    </level>
    <level label="5">
      <text>Whether and how the project applicant considered and responded to relevant public input, including any resulting modifications to the project; and</text>
    </level>
    <level label="6">
      <text>How the project applicant considered public input in the final application design.</text>
    </level>
  </level>
  <level label="d">
    <level label="1">
      <text>On completion of a stream and floodplain restoration project, the Department shall provide for at least 5 years of monitoring per the design and permit associated with the design for each authorized project.</text>
    </level>
    <level label="2">
      <text>The monitoring required under this subsection shall include an assessment of stream stability, stream and floodplain function, and vegetation viability within the affected project area.</text>