<?xml version='1.0' encoding='utf-8'?>
<section article="gen" article_name="Environment" number="9-1307" title_number="9" title_name="Water, Ice, and Sanitary Facilities" subtitle_number="13" subtitle_name="Well Drilling">
  <level label="a">
    <text>In applying for a permit to drill a well, the well driller shall:</text>
    <level label="1">
      <text>Give the Department any information the Department requires; and</text>
    </level>
    <level label="2">
      <text>Notify a municipality if the well will be drilled inside the municipality’s corporate boundary line or if the well will be drilled 1 mile or less outside the municipality’s corporate boundary line.</text>
    </level>
  </level>
  <level label="b">
    <text>As a condition to issuing a permit to drill a well, the Department may require that samples of the materials encountered in drilling the well be preserved and submitted to the Department.</text>
  </level>
  <level label="c">
    <level label="1">
      <level label="i">
        <text>A county board of health may establish a permit fee to defray county expenses in inspecting wells, collecting water samples, and issuing certificates of potability.</text>
      </level>
      <level label="ii">
        <text>For an interim certificate of potability, a county board of health shall accept initial test results prepared by a private State certified laboratory.</text>
      </level>
    </level>
    <level label="2">
      <level label="i">
        <text>The fee may be charged before a permit required under § 9–1306 of this subtitle is issued.</text>
      </level>
      <level label="ii">
        <text>Except as provided in subparagraph (iii) of this paragraph, the fee may not exceed $160 per well or $160 per cluster of wells to be used exclusively to transfer heat to or from the ground or groundwater.</text>
      </level>
      <level label="iii">
        <text>In Anne Arundel County only:</text>
        <level label="1">
          <text>Subject to item 2 of this subparagraph, the fee charged shall be set so as to produce funds to reflect the actual cost of inspecting wells, collecting water samples, and issuing certificates of potability by the Anne Arundel County Board of Health; and</text>
        </level>
        <level label="2">
          <text>For a well drilled to replace an existing well the fee charged shall be no more than 50% of the fee as calculated under item 1 of this subparagraph.</text>
        </level>
      </level>
    </level>
    <level label="3">
      <text>A permit shall be issued within a reasonable period of time after receipt of the application and shall be valid for a period of 12 months from the date of issuance by the approved delegated permitting authority.</text>
    </level>
  </level>
  <level label="d">
    <text>A county board of health may waive a fee for a well that is drilled to replace a well not in conformity with the regulations adopted under § 9–1305 of this subtitle.</text>
  </level>
</section>
