<?xml version='1.0' encoding='utf-8'?>
<section article="glg" article_name="Local Government" number="12-608" title_number="12" title_name="Other Powers of Counties -- Generally" subtitle_number="6" subtitle_name="Bridges and Canals">
  <level label="a">
    <text>This section does not apply to Cecil County.</text>
  </level>
  <level label="b">
    <level label="1">
      <text>Except as provided in paragraph (3) of this subsection, if the cost of building or repairing a bridge under this part is more than $200, the governing body of a county shall:</text>
      <level label="i">
        <text>build or repair the bridge by contract; and</text>
      </level>
      <level label="ii">
        <text>advertise a contract to build or repair the bridge in at least one newspaper of general circulation in the county.</text>
      </level>
    </level>
    <level label="2">
      <text>The advertisement required under this subsection shall specify:</text>
      <level label="i">
        <text>the location where the bridge is to be built or repaired, including full specifications of the plan and materials; and</text>
      </level>
      <level label="ii">
        <text>that sealed proposals for building or repairing the bridge will be received until the date designated in the advertisement.</text>
      </level>
    </level>
    <level label="3">
      <text>Notwithstanding any other provision in this article, the governing body of Dorchester County shall either:</text>
      <level label="i">
        <text>authorize the appropriate unit of the county to build or repair a bridge; or</text>
      </level>
      <level label="ii">
        <text>award the necessary and appropriate contracts for all aspects of the building or repairing of the bridge in accordance with paragraphs (1) and (2) of this subsection, regardless of the cost of building or repairing the bridge.</text>
      </level>
    </level>
  </level>
  <level label="c">
    <text>If the cost of building or repairing a bridge is $200 or less, the governing body of a county may determine:</text>
    <level label="1">
      <text>the manner of building or repairing the bridge; and</text>
    </level>
    <level label="2">
      <text>if the building or repair is by contract, the manner in which a contract is awarded.</text>
    </level>
  </level>
</section>
