<?xml version='1.0' encoding='utf-8'?>
<section article="glg" article_name="Local Government" number="13-706" title_number="13" title_name="Other Powers of Counties -- Regulatory" subtitle_number="7" subtitle_name="Environmental Issues">
  <level label="a">
    <level label="1">
      <text>In this section the following words have the meanings indicated.</text>
    </level>
    <level label="2">
      <level label="i">
        <text>“Decommissioning” means the removal and legal disposal of an industrial wind energy conversion system and any other components related to the industrial wind energy conversion system.</text>
      </level>
      <level label="ii">
        <text>Unless the property owner specifies otherwise, “decommissioning” includes the removal and legal disposal of buildings, roads, concrete, fencing, gravel, stone, and foundations to a depth of 36 inches.</text>
      </level>
    </level>
    <level label="3">
      <text>“Industrial wind energy conversion system” means an aggregation of parts, including the base, wind turbine, generator, supports, guy wires, and accessory equipment in a configuration necessary to convert the power of wind into mechanical or electrical energy that is intended for sale to energy providers through the electric transmission grid.</text>
    </level>
    <level label="4">
      <text>“Restoration of pad site” means, at the location of the industrial wind energy conversion system:</text>
      <level label="i">
        <text>stabilizing, grading, and seeding disturbed areas to grow ground cover; and</text>
      </level>
      <level label="ii">
        <text>replacing the excavated foundation areas with topsoil that:</text>
        <level label="1">
          <text>is free of noxious weeds, rocks, root mat, or foreign objects larger than 2 inches in size; and</text>
        </level>
        <level label="2">
          <text>has proper soil nutrients to provide and sustain the growth of ground cover.</text>
        </level>
      </level>
    </level>
    <level label="5">
      <text>“Setback distance” means the distance measured from the base of the tower of a wind turbine in an industrial wind energy conversion system to any neighboring residential or school building in all directions.</text>
    </level>
    <level label="6">
      <text>“Structure height” means the measurement from ground level at the base of an industrial wind energy conversion system to the highest point of the structure or the highest point of the blade at its greatest extension.</text>
    </level>
    <level label="7">
      <text>“Wind turbine” means the tower, hub, blades, and nacelle.</text>
    </level>
  </level>
  <level label="b">
    <text>This section does not apply to any industrial wind energy conversion system that has submitted an interconnection application to the PJM Interconnection queue before March 1, 2013.</text>
  </level>
  <level label="c">
    <text>In Garrett County, each individual industrial wind energy conversion system shall comply with a minimum setback distance equal to no less than two and one–half times the structure height.</text>
  </level>
  <level label="d">
    <level label="1">
      <text>Before an occupancy permit is issued for an industrial wind energy conversion system in Garrett County, the Garrett County Department of Planning and Land Development shall:</text>
      <level label="i">
        <text>at the applicant’s expense, retain an independent and certified professional engineer to prepare a net cost estimate for decommissioning and restoration of the pad site, less the salvage value of the industrial wind energy conversion system; and</text>
      </level>
      <level label="ii">
        <text>require the applicant to post a bond equal to 100% of the cost estimate determined under item (i) of this paragraph and adjusted by an estimated construction pricing index to ensure that cost increases during the following 5–year interval will not decrease the value of the bond.</text>
      </level>
    </level>
    <level label="2">
      <text>A bond posted in accordance with paragraph (1)(ii) of this subsection shall be held by the Garrett County Finance Department to be used as surety in the event of noncompliance with a requirement under this section by an owner of an industrial wind energy conversion system.</text>
    </level>
    <level label="3">
      <level label="i">
        <text>On completion of the construction of an industrial wind energy conversion system in Garrett County, and every 10 years thereafter, the Garrett County Department of Planning and Land Development, at the applicant’s expense, shall retain an independent certified professional engineer to prepare a net cost estimate for decommissioning and restoration of the pad site, less the salvage value of the industrial wind energy conversion system.</text>
      </level>
      <level label="ii">
        <text>The Garrett County Department of Planning and Land Development may alter the amount of the bond determined under paragraph (1)(ii) of this subsection to provide adequate security for the costs of decommissioning and restoration of the pad site.</text>
      </level>
    </level>
    <level label="4">
      <text>If an industrial wind energy conversion system in Garrett County is sold, the bond posted in accordance with paragraph (1) of this subsection shall be released if the new owner posts a bond with the Garrett County Finance Department that:</text>
      <level label="i">
        <text>is equal to the amount of the bond posted by the seller; or</text>
      </level>
      <level label="ii">
        <text>is a greater amount if the Garrett County Department of Planning and Land Development determines that additional security is necessary to provide for the cost of decommissioning and restoration of the pad site.</text>
      </level>
    </level>
    <level label="5">
      <level label="i">
        <text>If an industrial wind energy conversion system in Garrett County has not generated electricity for a continuous period of 365 days or an owner has abandoned an industrial wind energy conversion system, the Garrett County Department of Planning and Land Development may require the owner to decommission and restore the pad site.</text>
      </level>
      <level label="ii">
        <text>If the owner fails to comply with the requirements under this paragraph, the bond shall be used by Garrett County to cover the costs of decommissioning and restoration of the pad site.</text>
      </level>
    </level>
  </level>
</section>