<?xml version='1.0' encoding='utf-8'?>
<subtitle article="glg" title_number="25" subtitle_number="10" title_name="Public Watershed Associations" subtitle_name="Miscellaneous">
  <section article="glg" article_name="Local Government" number="25-1001" title_number="25" title_name="Public Watershed Associations" subtitle_number="10" subtitle_name="Miscellaneous">
    <level label="a">
      <text>A person who is assessed for a ditch or drain that does not pass through or under the person’s land may open a ditch or install drain tile through the intervening land to connect to the main ditch and keep the ditch or drain tile open at the person’s expense and control.</text>
    </level>
    <level label="b">
      <text>A person may not open a ditch or install drain tile under this section through the land of another person without the consent of the owner of the land.</text>
    </level>
  </section>
  <section article="glg" article_name="Local Government" number="25-1002" title_number="25" title_name="Public Watershed Associations" subtitle_number="10" subtitle_name="Miscellaneous">
    <level label="a">
      <text>If a watershed project established under this title crosses a public highway at the intersection of the highway with a natural watercourse or depression through which water flows during periods of high water, the county in which the bridge is located or the governmental unit required by law to maintain the highway that is intersected shall:</text>
      <level label="1">
        <text>pay the cost of an existing bridge, repairing or enlarging an existing bridge and culvert, or constructing a new bridge or culvert; and</text>
      </level>
      <level label="2">
        <text>maintain the bridge or culvert described in item (1) of this subsection.</text>
      </level>
    </level>
    <level label="b">
      <text>If a watershed project established under this title crosses a public highway at a point where the highway does not intersect a natural watercourse or depression:</text>
      <level label="1">
        <text>the watershed association shall pay the cost of constructing a new bridge or culvert; and</text>
      </level>
      <level label="2">
        <text>after construction, the county or other governmental unit required by law to maintain the highway that is intersected shall maintain the bridge and any culvert constructed.</text>
      </level>
    </level>
  </section>
  <section article="glg" article_name="Local Government" number="25-1003" title_number="25" title_name="Public Watershed Associations" subtitle_number="10" subtitle_name="Miscellaneous">
    <level label="a">
      <text>If a channel established under this title crosses a railroad right–of–way at the intersection of the right–of–way with a natural watercourse or depression through which water flows at periods of high water, the railroad company shall:</text>
      <level label="1">
        <text>construct, build, and maintain any necessary new bridge or culvert; or</text>
      </level>
      <level label="2">
        <text>enlarge, strengthen, reconstruct, or replace any existing bridge or culvert.</text>
      </level>
    </level>
    <level label="b">
      <text>The expense to build a railroad under subsection (a) of this section shall be:</text>
      <level label="1">
        <text>considered an element of damage to the railroad company by the board of viewers; and</text>
      </level>
      <level label="2">
        <text>shown as a damage in the report of the board of viewers.</text>
      </level>
    </level>
  </section>
</subtitle>