<?xml version='1.0' encoding='utf-8'?>
<section article="gnr" article_name="Natural Resources" number="8-1808.4" title_number="8" title_name="Waters" subtitle_number="18" subtitle_name="Chesapeake and Atlantic Coastal Bays Critical Area Protection Program">
  <level label="a">
    <level label="1">
      <text>In this section the following words have the meanings indicated.</text>
    </level>
    <level label="2">
      <level label="i">
        <text>“Nonwater–dependent project” means a temporary or permanent structure that, by reason of its intrinsic nature, use, or operation, does not require location in, on, or over State or private wetlands.</text>
      </level>
      <level label="ii">
        <text>“Nonwater–dependent project” includes:</text>
        <level label="1">
          <text>A dwelling unit on a pier;</text>
        </level>
        <level label="2">
          <text>A restaurant, a shop, an office, or any other commercial building or use on a pier;</text>
        </level>
        <level label="3">
          <text>A temporary or permanent roof or covering on a pier;</text>
        </level>
        <level label="4">
          <text>A pier used to support a nonwater–dependent use; and</text>
        </level>
        <level label="5">
          <text>A small–scale renewable energy system on a pier, including:</text>
        </level>
        <level label="A">
          <text>A solar energy system and its photovoltaic cells, solar panels, or other necessary equipment;</text>
        </level>
        <level label="B">
          <text>A geothermal energy system and its geothermal heat exchanger or other necessary equipment; and</text>
        </level>
        <level label="C">
          <text>A wind energy system and its wind turbine, tower, base, or other necessary equipment.</text>
        </level>
      </level>
      <level label="iii">
        <text>“Nonwater–dependent project” does not include:</text>
        <level label="1">
          <text>A fuel pump or other fuel–dispensing equipment on a pier;</text>
        </level>
        <level label="2">
          <text>A sanitary sewage pump or other wastewater removal equipment on a pier; or</text>
        </level>
        <level label="3">
          <text>An office on a pier for managing marina operations, including monitoring vessel traffic, registering vessels, providing docking services, and housing electrical or emergency equipment related to marina operations.</text>
        </level>
      </level>
    </level>
    <level label="3">
      <level label="i">
        <text>“Pier” means any pier, wharf, dock, walkway, bulkhead, breakwater, piles, or other similar structure.</text>
      </level>
      <level label="ii">
        <text>“Pier” does not include any structure on pilings or stilts that was originally constructed beyond the landward boundaries of State or private wetlands.</text>
      </level>
    </level>
  </level>
  <level label="b">
    <text>This section does not apply to a nonwater–dependent project located on State or private wetlands within the Critical Area in Prince George’s County.</text>
  </level>
  <level label="c">
    <level label="1">
      <text>Except as provided in paragraphs (2) and (3) of this subsection and notwithstanding any other provision of law, a local jurisdiction may not issue a building permit or any other approval under this subtitle to authorize a nonwater–dependent project located on State or private wetlands within the Critical Area.</text>
    </level>
    <level label="2">
      <text>A local jurisdiction may issue a building permit or any other approval under this subtitle to authorize a nonwater–dependent project located on State or private wetlands within the Critical Area if the project:</text>
      <level label="i">
        <level label="1">
          <text>Involves a commercial activity that is permitted as a secondary or accessory use to a permitted primary commercial use;</text>
        </level>
        <level label="2">
          <text>Is not located on a pier that is attached to residentially, institutionally, or industrially used property;</text>
        </level>
        <level label="3">
          <text>Is located in:</text>
        </level>
        <level label="A">
          <text>An intensely developed area and the project is authorized under a program amendment to a local jurisdiction’s critical area program approved on or after July 1, 2013, if the approved program amendment includes necessary changes to the local jurisdiction’s zoning, subdivision, and other ordinances so as to be consistent with or more restrictive than the requirements provided under this paragraph; or</text>
        </level>
        <level label="B">
          <text>An area that has been excluded from a local critical area program if the exclusion has been adopted or approved by the Critical Area Commission;</text>
        </level>
        <level label="4">
          <text>Is approved by the local planning and zoning authorities after the local jurisdiction’s program amendment under item 3A of this item, if applicable, has been approved;</text>
        </level>
        <level label="5">
          <text>Allows or enhances public access to State wetlands, if applicable;</text>
        </level>
        <level label="6">
          <text>Does not expand beyond the length, width, or channelward encroachment of the pier on which the project is constructed;</text>
        </level>
        <level label="7">
          <text>Has a height of up to 18 feet unless the project is located at a marina; and</text>
        </level>
        <level label="8">
          <text>Is up to 1,000 square feet in total area; or</text>
        </level>
      </level>
      <level label="ii">
        <level label="1">
          <text>Is located on a pier that was in existence on or before December 31, 2012;</text>
        </level>
        <level label="2">
          <text>Satisfies all of the requirements under item (i)1 through 7 of this paragraph; and</text>
        </level>
        <level label="3">
          <text>If applicable, has a temporary or permanent roof or covering that is up to 1,000 square feet in total area.</text>
        </level>
      </level>
    </level>
    <level label="3">
      <level label="i">
        <text>A local jurisdiction may issue a building permit or other approval under this subtitle to authorize a nonwater–dependent project for a small–scale renewable energy system on a pier located on State or private wetlands within the Critical Area if the project:</text>
        <level label="1">
          <text>Involves the installation or placement of a small–scale renewable energy system that is permitted as a secondary or accessory use on a pier that is authorized under Title 16 of the Environment Article;</text>
        </level>
        <level label="2">
          <text>Is located in:</text>
        </level>
        <level label="A">
          <text>The Critical Area and the project is authorized under a program amendment to a local jurisdiction’s critical area program approved on or after July 1, 2013, if the approved program amendment includes necessary changes to the local jurisdiction’s zoning, subdivision, and other ordinances so as to be consistent with or more restrictive than the requirements provided under this paragraph; or</text>
        </level>
        <level label="B">
          <text>An area that has been excluded from a local critical area program if the exclusion has been adopted or approved by the Critical Area Commission; and</text>
        </level>
        <level label="3">
          <text>Is approved by the local planning and zoning authorities after the local jurisdiction’s program amendment under item 2A of this subparagraph, if applicable, has been approved.</text>
        </level>
      </level>
      <level label="ii">
        <text>A building permit or other approval issued under subparagraph (i) of this paragraph may include the installation or placement of:</text>
        <level label="1">
          <text>A solar energy system attached to a pier if the device or equipment associated with that system does not extend more than:</text>
        </level>
        <level label="A">
          <text>4 feet above or 18 inches below the deck of the pier; or</text>
        </level>
        <level label="B">
          <text>1 foot beyond the length or width of the pier;</text>
        </level>
        <level label="2">
          <text>A solar energy system attached to a piling if there is only one solar panel per boat slip;</text>
        </level>
        <level label="3">
          <text>A solar energy system attached to a boathouse roof if the device or equipment associated with that system does not extend beyond the length, width, or height of the boathouse roof;</text>
        </level>
        <level label="4">
          <text>A closed–loop geothermal heat exchanger under a pier if the geothermal heat exchanger or any associated devices or equipment do not:</text>
        </level>
        <level label="A">
          <text>Extend beyond the length, width, or channelward encroachment of the pier;</text>
        </level>
        <level label="B">
          <text>Deleteriously alter long shore drift; or</text>
        </level>
        <level label="C">
          <text>Cause significant individual or cumulative thermal impacts to aquatic resources; or</text>
        </level>
        <level label="5">
          <text>A wind energy system attached to a pier if there is only one wind energy system per pier for which:</text>
        </level>
        <level label="A">
          <text>The height from the deck of the pier to the blade extended at its highest point is up to 12 feet;</text>
        </level>
        <level label="B">
          <text>The rotor diameter of the wind turbine is up to 4 feet; and</text>
        </level>
        <level label="C">
          <text>The setbacks of the wind energy system from the nearest property line and from the channelward edge of the pier to which that system is attached are at least 1.5 times the total height of the system from its base to the blade extended at its highest point.</text>
        </level>
      </level>
    </level>
  </level>
</section>
