<?xml version='1.0' encoding='utf-8'?>
<section article="gpu" article_name="Public Utilities" number="11-205" title_number="11" title_name="Liquefied Gas Facilities and Hazardous Liquid Pipelines" subtitle_number="2" subtitle_name="Hazardous Liquid Pipelines">
  <level label="a">
    <text>Each year an intrastate pipeline operator shall submit an annual report on the state of its pipeline facility to the Commission and to each owner of real property:</text>
    <level label="1">
      <text>on which the pipeline facility is located; or</text>
    </level>
    <level label="2">
      <text>adjacent to or contiguous to real property on which the pipeline facility is located.</text>
    </level>
  </level>
  <level label="b">
    <text>The annual report shall include:</text>
    <level label="1">
      <text>a summary description of the system that includes the pipeline facility;</text>
    </level>
    <level label="2">
      <text>a description of the product transported in the pipeline facility and system;</text>
    </level>
    <level label="3">
      <text>State and local emergency response liaison information;</text>
    </level>
    <level label="4">
      <text>a description of the leak detection system in use for the pipeline facility;</text>
    </level>
    <level label="5">
      <text>a description of periodic testing methods used on the pipeline facility and a summary of results of the testing; and</text>
    </level>
    <level label="6">
      <text>any other information that the Commission requires.</text>
    </level>
  </level>
  <level label="c">
    <text>The Commission shall make annual reports available to the public, including publication using the Internet.</text>
  </level>
  <level label="d">
    <text>At least once every 5 years, an intrastate pipeline operator shall:</text>
    <level label="1">
      <text>identify each owner of real property on which the pipeline facility is located;</text>
    </level>
    <level label="2">
      <text>notify each property owner of the presence of the pipeline facility on the owner’s property;</text>
    </level>
    <level label="3">
      <text>verify that each property owner has received the notice; and</text>
    </level>
    <level label="4">
      <text>provide to the Commission a current list of all property owners.</text>
    </level>
  </level>
</section>
