<?xml version='1.0' encoding='utf-8'?>
<section article="gpu" article_name="Public Utilities" number="12-104" title_number="12" title_name="Underground Facilities" subtitle_number="1" subtitle_name="Excavation or Demolition Near Underground Facilities">
  <level label="a">
    <text>This section applies to:</text>
    <level label="1">
      <text>complete replacement of an existing underground facility;</text>
    </level>
    <level label="2">
      <text>underground storm drain systems and applicable devices; and</text>
    </level>
    <level label="3">
      <text>an existing previously detectable underground facility or locatable underground facility.</text>
    </level>
  </level>
  <level label="b">
    <text>Except as otherwise provided in § 12–129 of this subtitle, on or after October 1, 2021, all newly installed underground facilities shall be detectable or locatable.</text>
  </level>
  <level label="c">
    <text>Not later than October 1, 2021, any previously detectable underground facility or underground facility locatable during planned or emergency work must be restored to be detectable or locatable.</text>
  </level>
</section>
