<?xml version='1.0' encoding='utf-8'?>
<section article="gpu" article_name="Public Utilities" number="12-125" title_number="12" title_name="Underground Facilities" subtitle_number="1" subtitle_name="Excavation or Demolition Near Underground Facilities">
  <level label="a">
    <text>A person shall repeat the notification required under § 12–124 of this subtitle if the person:</text>
    <level label="1">
      <text>has not completed or will not complete the excavation or demolition within the time period authorized by the ticket;</text>
    </level>
    <level label="2">
      <text>expands the excavation or demolition beyond the location indicated in the notice under § 12–124(b) of this subtitle; or</text>
    </level>
    <level label="3">
      <text>adds a temporary excavator to the ticket.</text>
    </level>
  </level>
  <level label="b">
    <text>If a person discovers that a mark is obliterated, destroyed, or removed, or observes a visible indication that an underground facility or structure is not marked as required under § 12–126 of this subtitle, the person shall notify the one–call system to request that all or part of the current scope of work of a valid ticket be re–marked.</text>
  </level>
  <level label="c">
    <text>A person shall repeat the notification regardless of:</text>
    <level label="1">
      <text>any delays by an owner–member in marking its underground facilities; or</text>
    </level>
    <level label="2">
      <text>an agreement between the person and an owner–member regarding the time for marking underground facilities.</text>
    </level>
  </level>
  <level label="d">
    <text>Any re–marking made after a notification provided under this section shall comply with the requirements of § 12–126 of this subtitle.</text>
  </level>
</section>
