<?xml version='1.0' encoding='utf-8'?>
<section article="gpu" article_name="Public Utilities" number="20-101" title_number="20" title_name="Procurement" subtitle_number="1" subtitle_name="Water and Sewer Procurement Contracts">
  <level label="a">
    <text>In this subtitle the following words have the meanings indicated.</text>
  </level>
  <level label="b">
    <text>“Design/build contract” means a contract that provides for both architectural and engineering design services and construction services as a part of a single contract.</text>
  </level>
  <level label="c">
    <text>“Evaluated bid price” means the price of a bid after adjustment in accordance with objective measurable criteria.</text>
  </level>
  <level label="d">
    <text>“Facilities construction contract” means a contract that provides services for the construction of:</text>
    <level label="1">
      <text>a water or wastewater treatment plant;</text>
    </level>
    <level label="2">
      <text>a water or wastewater pumping station and related force mains in the pumping station site limits;</text>
    </level>
    <level label="3">
      <text>a water storage facility;</text>
    </level>
    <level label="4">
      <text>a wastewater storage facility;</text>
    </level>
    <level label="5">
      <text>a building for Commission purposes; or</text>
    </level>
    <level label="6">
      <text>a pipeline.</text>
    </level>
  </level>
  <level label="e">
    <text>“Objective measurable criteria” means standards that enable the Commission to compare the economy, effectiveness, or value of the subject of the bids.</text>
  </level>
</section>
