<?xml version='1.0' encoding='utf-8'?>
<subtitle article="gpu" title_number="23" subtitle_number="2" title_name="Water, Sewers, and Drainage" subtitle_name="Subdivision Lines and Service Connections">
  <section article="gpu" article_name="Public Utilities" number="23-201" title_number="23" title_name="Water, Sewers, and Drainage" subtitle_number="2" subtitle_name="Subdivision Lines and Service Connections">
    <level label="a">
      <level label="1">
        <text>In this section the following words have the meanings indicated.</text>
      </level>
      <level label="2">
        <text>“Authorization for service” means an application by a property owner or developer to the Commission for water or sewer service that requires the construction of subdivision lines.</text>
      </level>
      <level label="3">
        <text>“Development” means a project for the construction of:</text>
        <level label="i">
          <text>two or more residential dwelling units; or</text>
        </level>
        <level label="ii">
          <text>a commercial or industrial structure.</text>
        </level>
      </level>
      <level label="4">
        <text>“Health hazard” means an owner–occupied residential property with a failing well or septic system as certified by the State or a local health department.</text>
      </level>
      <level label="5">
        <text>“Payment security” means security to guarantee payment to the utility contractor, subcontractors, and suppliers that provide labor, materials, or construction equipment for the construction of subdivision lines.</text>
      </level>
      <level label="6">
        <text>“Performance security” means security to guarantee completion of the construction of subdivision lines.</text>
      </level>
      <level label="7">
        <level label="i">
          <text>“Subdivision lines” means the water and sewer pipelines or facilities necessary to provide service to a development, including service connections to individual lots or properties in a development.</text>
        </level>
        <level label="ii">
          <text>“Subdivision lines” does not include pipelines or facilities that constitute major projects as defined in § 23–301 of this title.</text>
        </level>
      </level>
    </level>
    <level label="b">
      <level label="1">
        <text>Subject to paragraph (2) of this subsection, this section does not apply to:</text>
        <level label="i">
          <text>authorizations for service for which:</text>
          <level label="1">
            <text>application was made with the Commission on or before June 30, 1999; and</text>
          </level>
          <level label="2">
            <text>the Commission entered into a contract for construction of subdivision lines with notice to proceed issued by the Commission to its contractor on or before June 30, 2001; or</text>
          </level>
        </level>
        <level label="ii">
          <text>authorizations for service for the relief of health hazards.</text>
        </level>
      </level>
      <level label="2">
        <text>Each part of a multipart authorization for service shall be considered a separate authorization under paragraph (1) of this subsection.</text>
      </level>
    </level>
    <level label="c">
      <text>Notwithstanding any other provision of law and except as provided in subsection (b) of this section, the owner or developer of a development in the sanitary district shall construct all subdivision lines for the development at the expense of the owner or developer.</text>
    </level>
    <level label="d">
      <text>Before constructing subdivision lines, the owner or developer of a development shall enter into an agreement with the Commission that:</text>
      <level label="1">
        <text>requires the subdivision lines to be constructed under plans and specifications submitted to and approved by the Commission;</text>
      </level>
      <level label="2">
        <text>requires the owner or developer to comply with all applicable laws and requirements for the construction of the subdivision lines;</text>
      </level>
      <level label="3">
        <text>provides for the inspection of the subdivision lines by the Commission before the line is placed in service;</text>
      </level>
      <level label="4">
        <text>requires the property owner or developer to provide:</text>
        <level label="i">
          <text>performance security payable to the Commission in an amount acceptable to the Commission, taking into account potential cost escalation; and</text>
        </level>
        <level label="ii">
          <text>payment security payable to the Commission in an amount equal to the amount of the performance security; and</text>
        </level>
      </level>
      <level label="5">
        <text>provides that before the subdivision lines are placed in service, the property owner or developer shall provide the Commission with a release of liens, on a form acceptable to the Commission, signed by the utility contractor and notarized, stating that the utility contractor, subcontractors, and suppliers have been paid.</text>
      </level>
    </level>
    <level label="e">
      <text>Acceptable forms of performance security and payment security under subsection (d) of this section are:</text>
      <level label="1">
        <text>a certified check;</text>
      </level>
      <level label="2">
        <text>a cash deposit;</text>
      </level>
      <level label="3">
        <text>a certificate of deposit;</text>
      </level>
      <level label="4">
        <text>an irrevocable letter of credit from a financial institution acceptable to the Commission and in a form acceptable to the Commission;</text>
      </level>
      <level label="5">
        <text>a bond executed by a surety company authorized to do business in the State; or</text>
      </level>
      <level label="6">
        <text>any other form of security acceptable to the Commission.</text>
      </level>
    </level>
    <level label="f">
      <level label="1">
        <level label="i">
          <text>A utility contractor, subcontractor, or supplier providing labor, materials, or equipment for the construction of the subdivision lines that has not been paid may file a claim against the payment security within 180 days after completion of construction of the subdivision lines under the procedure required in the payment security.</text>
        </level>
        <level label="ii">
          <text>If a procedure is not specified in the payment security, the procedure shall be as established by regulations adopted by the Commission.</text>
        </level>
      </level>
      <level label="2">
        <text>The Commission may not release or reduce the amount of the payment security until:</text>
        <level label="i">
          <text>all claimants have been paid; or</text>
        </level>
        <level label="ii">
          <text>180 days have passed since completion of construction and no claims have been made.</text>
        </level>
      </level>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="23-202" title_number="23" title_name="Water, Sewers, and Drainage" subtitle_number="2" subtitle_name="Subdivision Lines and Service Connections">
    <level label="a">
      <level label="1">
        <text>If property abuts on a street or right–of–way in which a water main or sanitary sewer is installed, the Commission shall provide a service connection from the water main or sanitary sewer to the property line of the abutting lot.</text>
      </level>
      <level label="2">
        <text>The service connection shall be constructed by and at the expense of the Commission and shall be paid for in accordance with this division.</text>
      </level>
    </level>
    <level label="b">
      <level label="1">
        <text>When the Commission declares a water main or sewer complete, after notice, every abutting property owner may hook up spigots, hydrants, toilets, and waste drains with the water main or sewer, as appropriate, within the time set by the Commission.</text>
      </level>
      <level label="2">
        <text>If the fixtures described in paragraph (1) of this subsection do not exist or if the Commission determines that they are improper or inadequate, the property owner shall install satisfactory equipment.</text>
      </level>
    </level>
    <level label="c">
      <level label="1">
        <text>Any cesspool, sink drain, outhouse, or well that is polluted or a menace to health shall be abandoned and left in a way that it cannot be used or pose a risk to the public health.</text>
      </level>
      <level label="2">
        <text>The Commission shall determine the disposition of these facilities.</text>
      </level>
    </level>
    <level label="d">
      <level label="1">
        <text>After the construction or acquisition of a water main or sewer, the Commission may order a property owner or occupant who refuses to connect to the water main or sewer to hook up to the water main or sewer if:</text>
        <level label="i">
          <text>a condition exists that appears to be a menace to the health of the occupants of the property or the occupants of a nearby or adjoining property;</text>
        </level>
        <level label="ii">
          <text>the property on which the condition exists abuts the water main or sewer;</text>
        </level>
        <level label="iii">
          <text>the Commission gives the owner or occupant 10 days’ notice and an opportunity to be heard; and</text>
        </level>
        <level label="iv">
          <text>the Commission determines the condition to be a menace to the health of the occupants of the property or the occupants of a nearby or adjoining property.</text>
        </level>
      </level>
      <level label="2">
        <level label="i">
          <text>If the Commission determines that a condition exists as provided in paragraph (1) of this subsection, the Commission shall pass an order that requires that the property hookup be made in not less than 30 days or more than 90 days of the issuance of the order.</text>
        </level>
        <level label="ii">
          <text>The property owner or occupant may not refuse to comply with the order or violate any of the other provisions of this section.</text>
        </level>
        <level label="iii">
          <text>As provided in the Administrative Procedure Act, the property owner or occupant may seek judicial review of the decision of the Commission.</text>
        </level>
      </level>
    </level>
    <level label="e">
      <level label="1">
        <text>In this subsection, “master meter” means a meter used to measure, for billing purposes, the total amount of water and sewer usage in a building, including the combined use from all individually leased or owned units and all common areas.</text>
      </level>
      <level label="2">
        <text>This subsection applies only in Prince George’s County.</text>
      </level>
      <level label="3">
        <text>The Commission may not authorize the use of a master meter for water and sewer service in a residential multiple occupancy building that is constructed or converted to condominium or cooperative ownership.</text>
      </level>
      <level label="4">
        <text>In the case of a residential multiple occupancy building in which the Commission has previously authorized the use of a master meter under this section, and that is intended to be converted to condominium or cooperative ownership, the conversion of ownership may not take effect until individual meters have been installed for each individual dwelling unit and for the common areas of the building.</text>
      </level>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="23-203" title_number="23" title_name="Water, Sewers, and Drainage" subtitle_number="2" subtitle_name="Subdivision Lines and Service Connections">
    <level label="a">
      <text>Except as provided in subsection (e) of this section, this section does not apply to streets, roads, alleys, sidewalks, or public property in the jurisdiction of Montgomery County.</text>
    </level>
    <level label="b">
      <level label="1">
        <text>The Commission shall make taps in installations of the Commission at a charge that the Commission considers reasonable.</text>
      </level>
      <level label="2">
        <text>The Commission may construct and make water service connections of 2 inches or larger and charge for the connections at the actual cost to the Commission.</text>
      </level>
    </level>
    <level label="c">
      <text>The Commission may authorize the construction of service connections by a master plumber, who is registered in the sanitary district, under the supervision of the Commission.</text>
    </level>
    <level label="d">
      <level label="1">
        <text>If the Commission, by resolution, authorizes service connections to be made by a master plumber, under regulations and after issuance of a written permit by the Commission, the master plumber may enter on and cut into a street under the jurisdiction of a public authority to the same extent that the Commission may enter on and cut into the street.</text>
      </level>
      <level label="2">
        <level label="i">
          <text>The master plumber shall first post with the Commission an indemnity bond in an amount set by and with sureties approved by the Commission.</text>
        </level>
        <level label="ii">
          <text>The bond shall indemnify the Commission and any State, county, or municipal authority having jurisdiction over the street against all loss, cost, or damage that may be caused by the master plumber’s entering on and cutting into the street.</text>
        </level>
        <level label="iii">
          <text>The master plumber shall deposit with the Commission in cash a sum set by the Commission to cover the cost of resurfacing the cut.</text>
        </level>
      </level>
      <level label="3">
        <level label="i">
          <text>The only permit required shall be a permit issued by the Commission in accordance with this section.</text>
        </level>
        <level label="ii">
          <text>The master plumber shall notify the authority having control of the street to be entered and cut of the time and nature of the work to be done.</text>
        </level>
      </level>
    </level>
    <level label="e">
      <text>Before cutting into a street, road, alley, sidewalk, or public property under the jurisdiction of Montgomery County, a master plumber shall secure a permit from the county and pay a fee and comply with regulations established by the county.</text>
    </level>
    <level label="f">
      <text>The Commission shall adopt regulations to implement this section.</text>
    </level>
  </section>
  <section article="gpu" article_name="Public Utilities" number="23-204" title_number="23" title_name="Water, Sewers, and Drainage" subtitle_number="2" subtitle_name="Subdivision Lines and Service Connections">
    <text>The Commission may grant water or sewer service connections, hookups, or authorizations for service or otherwise extend water and sewer service to a new development in the Prince George’s County portion of the sanitary district only if the development is in conformance with adopted and approved plans, programs, and policies of the county or other regulations that the county may include in an adopted and approved comprehensive water and sewer plan, amendment, or revision.</text>
  </section>
  <section article="gpu" article_name="Public Utilities" number="23-205" effective_note="EFFECTIVE UNTIL JUNE 30, 2034 PER CHAPTER 679 OF 2024" title_number="23" title_name="Water, Sewers, and Drainage" subtitle_number="2" subtitle_name="Subdivision Lines and Service Connections">
    <level label="a">
      <level label="1">
        <text>In this section the following words have the meanings indicated.</text>
      </level>
      <level label="2">
        <text>“Fund” means the Connection Pipe Emergency Replacement Fund.</text>
      </level>
      <level label="3">
        <level label="i">
          <text>“Pipe” means a water or sewer service pipe connection located on a Commission customer’s property that connects from the Commission’s service connection to a customer’s residence.</text>
        </level>
        <level label="ii">
          <text>“Pipe” includes polybutylene pipes.</text>
        </level>
      </level>
      <level label="4">
        <text>“Program” means the Connection Pipe Emergency Replacement Loan Program.</text>
      </level>
    </level>
    <level label="b">
      <text>The Commission shall establish a Connection Pipe Emergency Replacement Loan Program.</text>
    </level>
    <level label="c">
      <text>The purpose of the Program is to provide loans to residential customers to diagnose and finance the replacement of malfunctioning pipes.</text>
    </level>
    <level label="d">
      <text>The Program shall include:</text>
      <level label="1">
        <text>eligibility requirements for participation in the Program, including eligibility requirements for:</text>
        <level label="i">
          <text>customers applying to receive a loan through the Program;</text>
        </level>
        <level label="ii">
          <text>the type of connection pipe that is being installed to replace the existing connection pipe;</text>
        </level>
        <level label="iii">
          <text>the type of malfunction and pipe replacement emergency that qualifies for the Program; and</text>
        </level>
        <level label="iv">
          <text>the type of diagnostic action that qualifies for the Program;</text>
        </level>
      </level>
      <level label="2">
        <text>a requirement that a customer receive notification or have certification that there is an active leak in the pipe that will be replaced;</text>
      </level>
      <level label="3">
        <text>loan terms and conditions, including an interest rate repayment schedule and an administrative processing fee;</text>
      </level>
      <level label="4">
        <text>a requirement that the replacement of malfunctioning pipes or a diagnostic action taken under the Program be performed by a plumber licensed by the Commission; and</text>
      </level>
      <level label="5">
        <text>a prohibition on the Commission replacing malfunctioning pipes under the Program.</text>
      </level>
    </level>
    <level label="e">
      <level label="1">
        <text>The Program shall provide loans to customers on a first–come, first–served basis.</text>
      </level>
      <level label="2">
        <text>A loan made under the Program may not exceed $10,000.</text>
      </level>
      <level label="3">
        <text>A customer may not receive more than one loan at a time under the Program.</text>
      </level>
    </level>
    <level label="f">
      <level label="1">
        <text>Subject to paragraph (3) of this subsection, the Program shall require a customer to repay a loan provided under the Program:</text>
        <level label="i">
          <text>through a separate charge on the customer’s water and sewer bill; or</text>
        </level>
        <level label="ii">
          <text>by another method determined by the Commission.</text>
        </level>
      </level>
      <level label="2">
        <text>The Commission may not set a charge greater than an amount that allows the Commission to recover the costs associated with:</text>
        <level label="i">
          <text>financing the loan; and</text>
        </level>
        <level label="ii">
          <text>administering the Program.</text>
        </level>
      </level>
      <level label="3">
        <text>A person who acquires property subject to a charge under this section assumes the obligation to pay the charge.</text>
      </level>
    </level>
    <level label="g">
      <level label="1">
        <level label="i">
          <text>Subject to paragraph (4) of this subsection, a loan provided under the Program shall be a lien against the property on which a malfunctioning pipe has been replaced or a diagnostic action has been taken.</text>
        </level>
        <level label="ii">
          <text>A lien under subparagraph (i) of this paragraph shall continue until the loan is paid in full to the Commission.</text>
        </level>
      </level>
      <level label="2">
        <text>The Commission shall be the sole holder of the lien established under paragraph (1) of this subsection.</text>
      </level>
      <level label="3">
        <level label="i">
          <text>The Commission shall record a lien established under this subsection in the land records of the county where the property is located.</text>
        </level>
        <level label="ii">
          <text>A lien established under this subsection shall secure payment of a loan, including the principal, interest, late charges, cost of collection, and reasonable attorney’s fees.</text>
        </level>
        <level label="iii">
          <text>Enforcement of a lien established under this subsection shall be in accordance with the Maryland Contract Lien Act.</text>
        </level>
      </level>
      <level label="4">
        <text>A lien established under this subsection may not take priority over a lien, mortgage, deed of trust, or other security interest that is:</text>
        <level label="i">
          <text>already attached to the property at the time the lien established under this subsection is recorded; or</text>
        </level>
        <level label="ii">
          <text>given to secure a loan to:</text>
          <level label="1">
            <text>purchase the property subject to the lien established under this subsection; or</text>
          </level>
          <level label="2">
            <text>refinance a loan that is already attached to the property at the time the lien established under this subsection is recorded.</text>
          </level>
        </level>
      </level>
      <level label="5">
        <text>The Program may not provide, or at any time have outstanding, more than $2,000,000 total in loans.</text>
      </level>
    </level>
    <level label="h">
      <text>The Commission shall include $200,000 annually in the Commission’s budget for the Program for fiscal years 2020 through 2034.</text>
    </level>
    <level label="i">
      <level label="1">
        <text>There is a Connection Pipe Emergency Replacement Fund.</text>
      </level>
      <level label="2">
        <text>The purpose of the Fund is to provide funding for the Program.</text>
      </level>
      <level label="3">
        <text>Notwithstanding any other provision of law, the Fund shall be administered solely by the Commission or the Commission’s designee.</text>
      </level>
      <level label="4">
        <text>The Fund consists of:</text>
        <level label="i">
          <text>money appropriated by the Commission from ratepayer funds only;</text>
        </level>
        <level label="ii">
          <text>any investment earnings of the Fund; and</text>
        </level>
        <level label="iii">
          <text>any other money from any other source accepted for the benefit of the Fund.</text>
        </level>
      </level>
      <level label="5">
        <text>The Fund may be used only for:</text>
        <level label="i">
          <text>providing loans through the Program; and</text>
        </level>
        <level label="ii">
          <text>the administration of the Program.</text>
        </level>
      </level>
    </level>
  </section>
</subtitle>