<?xml version='1.0' encoding='utf-8'?>
<section article="gpu" article_name="Public Utilities" number="23-301" title_number="23" title_name="Water, Sewers, and Drainage" subtitle_number="3" subtitle_name="Capital Improvements Program">
  <level label="a">
    <text>In this subtitle the following words have the meanings indicated.</text>
  </level>
  <level label="b">
    <level label="1">
      <text>“Major project” means an extension, project, or program of water and sewer facilities.</text>
    </level>
    <level label="2">
      <text>“Major project” includes:</text>
      <level label="i">
        <text>a sewer main at least 15 inches in diameter;</text>
      </level>
      <level label="ii">
        <text>a water main at least 16 inches in diameter; and</text>
      </level>
      <level label="iii">
        <text>a sewage or water pumping station, force main, and storage or other major facility.</text>
      </level>
    </level>
    <level label="3">
      <text>“Major project” does not include a sewer main or water main that:</text>
      <level label="i">
        <text>provides only local service;</text>
      </level>
      <level label="ii">
        <text>is 2,000 feet or less; and</text>
      </level>
      <level label="iii">
        <text>is built to avoid unnecessary and uneconomical duplication when a major project is constructed.</text>
      </level>
    </level>
  </level>
  <level label="c">
    <text>“Program” means a 6–year projected program by the Commission of capital improvements for water and sewer facilities.</text>
  </level>
</section>
